Letting Schedule for May, 2012 (FY 2012)
Letting Schedule for May, 2012 (FY 2012) | ||||
Last Update: Monday, September 24, 2012 |
May, 2012 (FY 2012) | (see Links) |
SEP 2011 | OCT 2011 | NOV 2011 | DEC 2011 | JAN 2012 | FEB 2012 | MAR 2012 | APR 2012 | MAY 2012 | JUN 2012 | JUL 2012 | AUG 2012 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0042-03-040 | Armstrong/ Amarillo |
US 287 | Actual | $9,779,917 | 1 | REHAB EXISTING ROADWAY |
0913-20-072 | Austin/ Yoakum |
CR | Actual | $199,145 | 6 | REPLACE BRIDGE AND APPROACHES |
1258-01-022 | Austin/ Yoakum |
FM 1093 | Actual | $28,000 | 10 | 2012 RAILROAD REPLANKING PROGRAM |
0115-04-042 | Bastrop/ Austin |
FM 20 | Actual | $1,527,587 | 1 | ADD TURN LANE, RE - ALIGN INTERSECTION AND CORRECT VERTICAL |
0265-04-059 | Bastrop/ Austin |
SH 21 | Actual | $1,659,922 | 1 | MILL, SEAL, & PFC OVERLAY |
0231-03-128 | Bell/ Waco |
US 190 | Actual | $1,838,565 | 3 | CONSTRUCT EASTBOUND TO WESTBOUND TURNAROUND BRIDGE |
2389-01-012 | Bell/ Waco |
FM 2184 | Actual | $39,200 | 10 | RAILROAD REPLANKING |
0915-12-494 | Bexar/ San Antonio |
VA | Actual | $2,893,180 | 10 | CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE |
0954-02-017 | Blanco/ Austin |
RM 165 | Actual | $5,608,622 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
1004-01-052 | Brazoria/ Houston |
FM 524 | Actual | $249,163 | 1 | UPGRADE DRAINAGE STRUCTURES |
0049-12-083 | Brazos/ Bryan |
SH 6 | Actual | $283,320 | 3 | SAFETY WORK CONSISTING OF TRAFFIC SIGNALS |
0050-01-076 | Brazos/ Bryan |
BS 6-R | Actual | $1,592,254 | 1 | OVERLAY CONSISTING OF MILLING, ONE COURSE SURFACE TREATMENT, |
0506-01-082 | Brazos/ Bryan |
FM 60 | Actual | $7,633,962 | 11 | WIDENING OF A NON - FREEWAY FACILITY CONSISTING OF GRADING, |
1316-01-034 | Brazos/ Bryan |
FM 1179 | Actual | $4,711,558 | ROW | MISC CONSTRUCTION TO ADD RIGHT - TURN LANES CONSISTING OF |
0923-00-057 | Brown/ Brownwood |
VA | Actual | $967,700 | 10 | ADA CURB RAMPS |
0186-11-008 | Burleson/ Bryan |
FM 1363 | Actual | $22,400 | 10 | RAILROAD CROSSING REPLANKING, 2012 RAILROAD GRADE CROSSING |
1438-01-024 | Calhoun/ Yoakum |
FM 1289 | Actual | $942,515 | 6 | REPLACE BRIDGE AND APPROACHES |
0684-03-017 | Cameron/ Pharr |
FM 1732 | Actual | $48,128 | 10 | UPDGRADE RAILROAD CROSSING PLANKING |
1136-01-018 | Cameron/ Pharr |
FM 800 | Actual | $51,200 | 10 | UPGRADE RAIL ROAD CROSSING PLANKING |
1140-01-019 | Cameron/ Pharr |
FM 802 | Actual | $102,272 | 10 | UPGRADE RAIL ROAD CROSSING PLANKING |
0919-00-067 | Cass/ Atlanta |
VA | Actual | $671,770 | 1 | PAVEMENT MARKINGS |
0945-04-041 | Cass/ Atlanta |
FM 249 | Actual | $52,800 | 10 | REPLANK RAILROAD CROSSING |
0670-01-016 | Childress/ Childress |
FM 164 | Actual | $33,600 | 10 | RR REPLANKING |
0047-06-146 | Collin/ Dallas |
US 75 | Actual | $670,566 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR |
1746-01-021 | Collin/ Dallas |
FM 1827 | Actual | $756,412 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0253-03-043 | Comal/ San Antonio |
US 281 | Actual | $22,368,285 | 3 | EXPAND 2 TO 4 LANES DIVIDED RURAL |
0095-13-025 | Dallas/ Dallas |
IH 20 | Actual | $4,972,861 | 12 | CONSTRUCT TWO NEW RAMPS CONNECTING IH 20 WITH KLEBERG RD. |
0261-03-062 | Dallas/ Dallas |
US 67 | Actual | $524,774 | 1 | FULL DEPTH REPAIR CONCRETE PAVEMENT |
1059-01-043 | Denton/ Dallas |
FM 1173 | Actual | $28,000 | 10 | RAILROAD GRADE CROSSING REPLANKING PROGRAM |
1310-01-040 | Denton/ Dallas |
FM 407 | Actual | $36,096 | 10 | RAILROAD GRADE CROSSING REPLANKING PROGRAM |
1311-01-051 | Denton/ Dallas |
FM 1171 | Actual | $628,000 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND |
0913-00-086 | Dewitt/ Yoakum |
VA | Actual | $495,921 | 10 | CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE |
0913-00-088 | Dewitt/ Yoakum |
VA | Actual | $475,081 | 10 | CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE |
0925-15-012 | Dickens/ Childress |
CR | Actual | $208,611 | 6 | REPLACE BRIDGE AND APPROACHES |
0258-01-027 | Erath/ Fort Worth |
SH 6 | Actual | $51,200 | 10 | 2012 RAILROAD CROSSING REPLANKING PROGRAM |
0902-49-066 | Erath/ Fort Worth |
VA | Actual | $379,628 | 10 | LANDSCAPE ENHANCEMENT AT US 377 / BU377J SOUTH, US 377 / US 67, |
1597-02-018 | Erath/ Fort Worth |
FM 847 | Actual | $25,600 | 10 | 2012 RAILROAD REPLANKING PROGRAM |
0925-21-004 | Foard/ Childress |
CR | Actual | $293,942 | 6 | REPLACEMENT OF EXISTING BRIDGE FACILITY |
0188-02-043 | Fort Bend/ Houston |
SH 36 | Actual | $6,309,409 | 6 | WIDEN TO ADD A NORTHBOUND EVACUATION LANE WITH OVERLAY AND |
0917-20-029 | Freestone/ Bryan |
CR | Actual | $318,878 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF |
1325-03-021 | Freestone/ Bryan |
FM 489 | Actual | $22,400 | 10 | RAILROAD CROSSING REPLANKING, 2012 RAILROAD GRADE CROSSING |
0017-15-023 | Frio/ San Antonio |
SP 581 | Actual | $24,064 | 10 | REPLACE CROSSING SURFACE AT SP 581 & UPRR (DOT 448488J) |
0748-04-041 | Frio/ San Antonio |
FM 140 | Actual | $96,256 | 10 | REPLACE CROSSING SURFACE AT FM 140 & UPRR (DOT 448480E) |
0192-04-102 | Galveston/ Houston |
SH 6 | Actual | $3,221,796 | 1 | BASE REPAIR, SEAL COAT & ACP OVERLAY |
0389-06-101 | Galveston/ Houston |
SH 146 | Actual | $98,935 | 8 | ADD LEFT TURN LANE |
0113-01-041 | Gillespie/ Austin |
US 290 | Actual | $2,818,665 | 8 | INSTALL CENTER TURN LANE AND WIDEN PAVED SHOULDERS |
0113-02-059 | Gillespie/ Austin |
US 290 | Actual | $3,481,347 | 1 | ADD TWO WAY LEFT TURN LANE |
0913-22-034 | Gonzales/ Yoakum |
CR | Actual | $244,980 | 6 | REPLACE BRIDGE AND APPROACHES |
0047-12-021 | Grayson/ Paris |
SH 91 | Actual | $38,400 | 10 | UPGRADE RXR CROSSING PLANKING TO CONCRETE |
0091-01-046 | Grayson/ Paris |
SH 289 | Actual | $4,252,949 | 8 | ADD SHOULDERS |
0901-19-172 | Grayson/ Paris |
PW | Actual | $1,172,197 | 10 | REPAIR PAVEMENT AND OVERLAY; CONSTRUCT SECONDARY ENTRANCE |
2454-01-009 | Grayson/ Paris |
FM 131 | Actual | $1,658,502 | 1 | REHABILITATE EXISTING ROADWAY |
0495-07-068 | Gregg/ Tyler |
IH 20 | Actual | $1,634,802 | 1 | RESURFACE ROADWAY |
1763-03-045 | Gregg/ Tyler |
LP 281 | Actual | $78,208 | 10 | REPLANK RR CROSSING |
1931-01-016 | Gregg/ Tyler |
FM 2087 | Actual | $30,080 | 10 | REPLANK RR CROSSING |
0315-03-054 | Grimes/ Bryan |
SH 90 | Actual | $1,534,029 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF SUBGRADE WIDENING, |
0917-17-057 | Grimes/ Bryan |
CR | Actual | $523,137 | 3 | REHABILITATE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES, |
0917-17-059 | Grimes/ Bryan |
CR | Actual | $874,137 | 3 | OVERLAY CONSISTING OF PLACING AN HMA OVERLAY |
0067-09-032 | Hale/ Lubbock |
BI 27-U | Actual | $50,400 | 10 | REPLANK EXISTING CROSSING |
1650-01-009 | Hall/ Childress |
FM 1619 | Actual | $22,400 | 10 | RR REPLANKING |
0912-00-448 | Harris/ Houston |
VA | Actual | $3,000,000 | 7 | REGIONAL VANPOOL PROGRAM (FY 2012) |
0912-00-461 | Harris/ Houston |
VA | Actual | $2,000,000 | 5 | REGIONAL VANPOOL PROGRAM (FY 2012) |
0912-00-469 | Harris/ Houston |
VA | Actual | $778,293 | 10 | LANDSCAPE DEVELOPMENT |
0912-72-278 | Harris/ Houston |
VA | Actual | $789,714 | 1 | REPLACE ARMOR JOINTS, REPAIR SPALLED CONSTRUCTION JOINTS AND |
0912-72-287 | Harris/ Houston |
VA | Actual | $2,475,888 | 10 | ADA CURB RAMP PROGRAM FY 12 (VARIOUS LOCATIONS IN HARRIS |
1005-01-041 | Harris/ Houston |
FM 525 | Actual | $213,761 | 8 | IMPROVE TRAFFIC SIGNAL |
0843-06-017 | Harrison/ Atlanta |
FM 450 | Actual | $30,080 | 10 | REPLANK RAILROAD CROSSING |
0016-02-127 | Hays/ Austin |
IH 35 | Actual | $6,298,069 | 3 | CONST SB FRONTAGE RD |
0471-02-068 | Hays/ Austin |
SH 21 | Actual | $72,192 | 10 | REPLACE CONCRETE GRADE CROSSING |
0805-01-017 | Hays/ Austin |
RM 150 | Actual | $3,483,074 | 3 | ROADWAY REALIGNMENT |
0914-33-063 | Hays/ Austin |
VA | Actual | $467,145 | 10 | LANDSCAPE AND IRRIGATION |
0904-03-012 | Hemphill/ Amarillo |
CR | Actual | $1,247,677 | 6 | REPLACE BRIDGE AND APPROACHES |
0863-01-063 | Hidalgo/ Pharr |
FM 493 | Actual | $83,200 | 10 | UPGRADE RAIL ROAD CROSSING PLANKING |
0921-02-256 | Hidalgo/ Pharr |
CS | Actual | $2,398,889 | ROW | ADD LEFT TURN CENTER LANE |
0014-05-031 | Hill/ Waco |
SH 81 | Actual | $1,440,525 | 6 | REPLACE BRIDGE AND APPROACHES |
0909-37-049 | Hill/ Waco |
CS | Actual | $603,456 | 6 | REPLACE BRIDGE AND APPROACHES |
0909-37-051 | Hill/ Waco |
CS | Actual | $396,045 | 3 | CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF |
0009-07-042 | Hunt/ Paris |
SP 302 | Actual | $44,800 | 10 | UPGRADE RXR CROSSING PLANKING TO CONCRETE |
0726-01-028 | Hunt/ Paris |
FM 118 | Actual | $52,800 | 10 | UPGRADE RXR CROSSING PLANKING TO CONCRETE |
0420-01-039 | Jackson/ Yoakum |
SH 172 | Actual | $61,600 | 10 | 2012 RAILROAD REPLANKING PROGRAM |
0028-13-131 | Jefferson/ Beaumont |
IH 10 | Actual | $2,393,201 | 11 | REPAIR EXISTING PAVEMENT AND OVERLAY ROADWAY |
0065-08-164 | Jefferson/ Beaumont |
SP 380 | Actual | $84,224 | 10 | RAILROAD GRADE CROSSING REPLANKING |
0508-04-160 | Jefferson/ Beaumont |
SH 73 | Actual | $48,128 | 10 | RAILROAD GRADE CROSSING REPLANKING |
0667-01-114 | Jefferson/ Beaumont |
SH 347 | Actual | $2,015,986 | 1 | REHABLILITATE EXISTING ROADWAY |
0920-00-110 | Jefferson/ Beaumont |
VA | Actual | $177,098 | 10 | INSTALL LANDSCAPING |
0920-38-218 | Jefferson/ Beaumont |
CS | Actual | $113,854 | 5 | CONSTRUCTION OF SIDEWALKS |
1447-01-021 | Jim Wells/ Corpus Christi |
FM 1352 | Actual | $617,097 | 1 | MILL, SEAL & OVERLAY |
1693-01-021 | Jim Wells/ Corpus Christi |
FM 1931 | Actual | $79,200 | 10 | REPLANK RAILROAD CROSSING |
0260-01-052 | Johnson/ Fort Worth |
US 67 | Actual | $108,000 | 1 | INSTALLATION OF TRAFFIC - ACTUATED TRAFFIC SIGNAL |
0747-05-039 | Johnson/ Fort Worth |
FM 157 | Actual | $84,000 | 10 | 2012 RAILROAD REPLANKING PROGRAM |
2762-01-014 | Johnson/ Fort Worth |
FM 2738 | Actual | $1,319,000 | 1 | REPLACE BRIDGE AND APPROACHES |
0992-01-020 | Kleberg/ Corpus Christi |
RM 628 | Actual | $1,354,854 | 6 | WIDEN ROADWAY |
0052-08-015 | Lamb/ Lubbock |
FM 37 | Actual | $56,000 | 10 | REPLANK EXISTING CROSSING |
0231-17-009 | Lampasas/ Brownwood |
SL 257 | Actual | $3,245,193 | ROW | GRADING, PAVEMENT, CURB & GUTTER, STORM DRAIN, SURFACING AND |
1032-01-033 | Lampasas/ Brownwood |
FM 580 | Actual | $89,600 | 10 | RAILROAD REPLANKING |
0913-29-032 | Lavaca/ Yoakum |
CR | Actual | $674,856 | 6 | REPLACE BRIDGE AND APPROACHES |
2887-02-012 | Liberty/ Beaumont |
FM 2830 | Actual | $36,096 | 10 | RAILROAD GRADE CROSSING REPLANKING |
0605-01-058 | Matagorda/ Yoakum |
FM 457 | Actual | $185,829 | 6 | BRIDGE REHABILITATION |
0846-03-037 | Matagorda/ Yoakum |
FM 521 | Actual | $2,680,480 | 6 | REPLACE BRIDGE AND APPROACHES |
0846-03-043 | Matagorda/ Yoakum |
FM 521 | Actual | $3,358,617 | 11 | REPLACE BRIDGE AND APPROACHES |
3224-01-009 | Matagorda/ Yoakum |
FM 3156 | Actual | $28,000 | 10 | 2012 RAILROAD REPLANKING PROGRAM |
0299-13-029 | Maverick/ Laredo |
BU 277N | Actual | $84,224 | 10 | RAILROAD GRADE CROSSING REPLANKING |
1229-01-042 | Maverick/ Laredo |
FM 1021 | Actual | $8,966,870 | ROW | CONSTRUCT RAILROAD GRADE SEPARATION STR AND APPROACHES |
0070-06-046 | McCulloch/ Brownwood |
US 87 | Actual | $83,200 | 10 | RAILROAD REPLANKING |
0015-01-232 | McLennan/ Waco |
IH 35 | Actual | $84,224 | 10 | RAILROAD REPLANKING |
0338-04-079 | Montgomery/ Houston |
SH 105 | Actual | $1,230,592 | 1 | INSTALL LEFT TURN LANES |
0523-08-012 | Montgomery/ Houston |
FM 1488 | Actual | $36,096 | 10 | FY 2012 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0912-37-205 | Montgomery/ Houston |
CR | Actual | $856,575 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12170AA0852001) |
3158-01-036 | Montgomery/ Houston |
FM 3083 | Actual | $67,200 | 10 | FY 2012 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
1407-01-026 | Nacogdoches/ Lufkin |
FM 1275 | Actual | $44,800 | 10 | REPLANK EXISTING RAILROAD CROSSING SURFACE |
0627-03-024 | Newton/ Beaumont |
FM 363 | Actual | $3,877,299 | 1 | RAISE ROADWAY AND REPLACE BRIDGE |
1742-01-025 | Nueces/ Corpus Christi |
FM 1694 | Actual | $44,000 | 10 | REPLANK RAILROAD CROSSING |
3364-01-010 | Nueces/ Corpus Christi |
FM 3386 | Actual | $2,782,732 | 1 | CONSTRUCT NEW FM ROAD |
0008-02-069 | Parker/ Fort Worth |
US 180 | Actual | $1,319,101 | 3 | CONSTRUCT INTERSECTION CONSISTING OF EARTHWORK, CONCRETE PVMT |
0008-09-033 | Parker/ Fort Worth |
FM 1187 | Actual | $11,725,766 | 1 | WIDEN FROM 2 LANES TO 4 LANES WITH RAISED MEDIAN |
0171-03-064 | Parker/ Fort Worth |
SH 199 | Actual | $5,792,172 | 1 | FABRIC UNDERSEAL, 2" HMA OVERLAY AND PAVEMENT MARKINGS |
0902-38-071 | Parker/ Fort Worth |
CR | Actual | $669,466 | 6 | REPLACE BRIDGE AND APPROACHES |
0213-03-095 | Polk/ Lufkin |
US 190 | Actual | $485,302 | 8 | IMPROVE TRAFFIC SIGNAL, LENGTHEN LEFT TURN LANE & LENGTHEN |
0911-04-047 | Polk/ Lufkin |
CR | Actual | $546,402 | 6 | REPLACE BRIDGE AND APPROACHES |
0911-04-048 | Polk/ Lufkin |
CR | Actual | $486,955 | 6 | REPLACE BRIDGE AND APPROACHES |
0168-08-062 | Randall/ Amarillo |
US 60 | Actual | $1,009,920 | 6 | REPLACE BRIDGE & APPROACHES |
0904-11-050 | Randall/ Amarillo |
CR | Actual | $594,289 | 3 | REHAB EXISTING RDWY |
1210-02-011 | Robertson/ Bryan |
FM 979 | Actual | $24,064 | 10 | RAILROAD CROSSING REPLANKING, 2012 RAILROAD GRADE CROSSING |
1014-03-057 | Rockwall/ Dallas |
FM 740 | Actual | $507,683 | 10 | LANDSCAPE DEVELOPMENT |
1015-01-076 | Rockwall/ Dallas |
FM 3549 | Actual | $24,064 | 10 | RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0378-01-030 | Rusk/ Tyler |
SH 135 | Actual | $57,600 | 10 | REPLANK RR CROSSING |
1933-02-015 | Rusk/ Tyler |
FM 2012 | Actual | $30,080 | 10 | REPLANK RR CROSSING |
0923-25-011 | San Saba/ Brownwood |
CR | Actual | $849,397 | 6 | REHAB STRUCTURE |
1526-03-014 | Scurry/ Abilene |
FM 1606 | Actual | $22,400 | 10 | REPLANK RAILROAD GRADE CROSSING |
0492-01-033 | Smith/ Tyler |
FM 14 | Actual | $2,193,887 | 1 | ADD SHOULDERS & RESURFACE ROADWAY |
0011-07-046 | Stephens/ Brownwood |
US 180 | Actual | $3,274,969 | 6 | REPLACE BRIDGE AND APPROACHES |
0172-02-071 | Tarrant/ Fort Worth |
BU 287P | Actual | $628,000 | 10 | LANDSCAPE ENHANCEMENT ALONG THE CORRIDOR |
1978-01-055 | Tarrant/ Fort Worth |
FM 1938 | Actual | $856,000 | 10 | LANDSCAPING ENHANCEMENT ALONG CORRIDOR |
0699-03-016 | Taylor/ Abilene |
FM 613 | Actual | $22,400 | 10 | REPLANK RAILROAD GRADE CROSSING |
0974-04-020 | Taylor/ Abilene |
FM 604 | Actual | $56,000 | 10 | REPLANK RAILROAD GRADE CROSSING |
0919-30-047 | Titus/ Atlanta |
CR | Actual | $458,642 | 6 | REPLACE BRIDGE AND APPROACHES_ON CR 3250 AT MILL CREEK |
0070-02-086 | Tom Green/ San Angelo |
US 87 | Actual | $192,000 | 10 | REPLANK RAILROAD CROSSING |
2574-01-045 | Tom Green/ San Angelo |
RM 584 | Actual | $243,200 | 10 | REPLANK RAILROAD CROSSING |
0015-13-338 | Travis/ Austin |
IH 35 | Actual | $1,886,742 | 11 | CONST SIDEWALKS ON BOTH SIDES OF IH 35 FRONTAGE |
0015-13-368 | Travis/ Austin |
IH 35 | Actual | $96,000 | 10 | REPLACE CONCRETE GRADE CROSSING |
0757-02-015 | Travis/ Austin |
FM 685 | Actual | $1,224,218 | 1 | MILL, SEAL & OVERLAY |
0914-04-265 | Travis/ Austin |
VA | Actual | $1,039,973 | 9 | INSTALL BICYCLE LANES ON OFF - SYSTEM ROADS |
0914-04-269 | Travis/ Austin |
VA | Actual | $775,000 | 10 | LANDSCAPE AND IRRIGATION BETWEEN MAINLANES AND FRONTAGE RDS |
0911-40-027 | Trinity/ Lufkin |
CR | Actual | $222,916 | 6 | REPLACE BRIDGE AND APPROACHES |
0964-02-028 | Upshur/ Atlanta |
FM 2088 | Actual | $24,064 | 10 | REPLANK RAILROAD CROSSING |
1171-01-019 | Van Zandt/ Tyler |
FM 859 | Actual | $48,128 | 10 | REPLANK RR CROSSING |
2443-01-019 | Walker/ Bryan |
FM 980 | Actual | $2,265,916 | 8 | SAFETY WORK CONSISTING OF STRUCTURES, CEMENT TREATED SUB - |
0543-01-063 | Waller/ Houston |
FM 359 | Actual | $84,224 | 10 | FY 2012 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0292-07-015 | Ward/ Odessa |
LP 464 | Actual | $84,224 | 10 | RAILROAD CRADE CROSSING REPLANKING @ DOT#796 272L |
1370-01-019 | Ward/ Odessa |
FM 1219 | Actual | $30,080 | 10 | RAILROAD GRADE CROSSING REPLANKING @DOT# 796 270X |
0114-10-092 | Washington/ Bryan |
US 290 | Actual | $1,189,629 | 8 | SAFETY WORK CONSISTING OF THE INSTALLATION OF MEDIAN BARRIER |
0922-00-059 | Webb/ Laredo |
VA | Actual | $2,192,500 | 10 | CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE |
0922-33-085 | Webb/ Laredo |
CR | Actual | $222,637 | 6 | FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING |
0922-33-139 | Webb/ Laredo |
CS | Actual | $356,330 | 3 | FOR THE CONSTRUCTION OF A HIKE & BIKE TRAIL AT MANADAS CREEK |
0433-02-051 | Willacy/ Pharr |
SH 186 | Actual | $72,192 | 10 | UPGRADE RAIL ROAD CROSSING PLANKING |
0334-01-044 | Williamson/ Austin |
FM 112 | Actual | $108,288 | 10 | REPLACE CONCRETE GRADE CROSSING |
0914-05-172 | Williamson/ Austin |
CR | Actual | $596,333 | 6 | REPLACE BRIDGE & APPROACHES |
1755-03-007 | Williamson/ Austin |
FM 3405 | Actual | $1,198,349 | 1 | BASE REPAIR & OVERLAY |
0100-03-071 | Wilson/ San Antonio |
US 181 | Actual | $89,572 | 10 | LANDSCAPE DEVELOPMENT |
0354-01-042 | Winkler/ Odessa |
SH 115 | Actual | $51,200 | 10 | RAILROAD GRADE CROSSING REPLANKING @ DOT# 864 611B |
|
|