Letting Schedule for September, 2011 (FY 2012)

 
 
Last Update: Monday, September 24, 2012
September, 2011 (FY 2012) (see Links)
SEP 2011 | OCT 2011 | NOV 2011 | DEC 2011 | JAN 2012 | FEB 2012 | MAR 2012 | APR 2012 | MAY 2012 | JUN 2012 | JUL 2012 | AUG 2012
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
1718-04-011 Andrews/
Odessa
FM 1788 Actual $1,263,725 11 UPGRADE TO STANDARDS NON - FREEWAY
0017-04-038 Atascosa/
San Antonio
IH 35 Actual $1,594,790 1 RELOCATE EXISTING RAMP & CONSTRUCT SOUTHBOUND FRONTAGE ROAD
0590-04-034 Bell/
Waco
FM 437 Actual $5,090,045 1 RECONSTRUCT ROADWAY, ADD SHOULDERS AND FLATTEN CURVES TO
0072-08-132 Bexar/
San Antonio
LP 345 Actual $2,292,781 1 MILL, BASE REPAIR, SEAL COAT, OVERLAY, & PAVEMENT MARKINGS
0915-12-485 Bexar/
San Antonio
VA Actual $267,000 7 ALAMO AREA COMMUTE SOLUTION PGM - FY 2011
2452-02-081 Bexar/
San Antonio
LP 1604 Actual $1,684,204 1 CONSTRUCT EB TO WB LP 1604 TURNAROUND
0912-31-227 Brazoria/
Houston
VA Actual $114,114 10 LANDSCAPE DEVELOPMENT_ON BS 288 AND FM 2004
0049-09-067 Brazos/
Bryan
US 190 Actual $5,324,879 1 SEAL COAT CONSISTING ON A ONE COURSE SURFACE TREATMENT
0696-03-014 Brooks/
Pharr
FM 1418 Actual $2,882,785 1 FY 2012 SEAL COAT PROGRAM
0181-02-025 Callahan/
Abilene
SH 36 Actual $32,193 1 INSTALL FLASHING BEACONS
1137-02-034 Cameron/
Pharr
LP 499 Actual $6,478,638 1 FY 2012 OVERLAY PROGRAM
7123-11-005 Coleman/
Brownwood
RL SO Actual $1,599,157 3 CONSTRUCT RAILROAD SIDING
0031-04-048 Collingsworth/
Childress
US 83 Actual $4,867,386 1 2012 DISTRICTWIDE SEALCOAT
0918-00-188 Dallas/
Dallas
VA Actual $3,700,000 7 PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY
0918-45-821 Dallas/
Dallas
CS Actual $3,062,543 ROW EXTEND EXISTING GRADE SEPARATION OF GALATYN PARKWAY AND
1567-02-020 Denton/
Dallas
FM 423 Actual $51,864,363 ROW SH 121 TO COUGAR ALLEY;WIDEN 4 TO 8 LN DIVIDED URBAN;COUGAR
0002-01-074 El Paso/
El Paso
SH 20 Actual $6,660,080 ROW INTERSECTION IMPROVEMENTS AND REHABILITATION (PHASE I)
0924-00-071 El Paso/
El Paso
VA Actual $2,581,488 1 IMPROVE GUARDRAIL TO DESIGN STANDARDS INSTALL PROTECTION
2552-01-033 El Paso/
El Paso
LP 375 Actual $61,272,749 3 WIDEN 2 LANE TO 4 LANE HIGHWAY WITH GRADE SEPARATIONS AT
0202-03-036 Fannin/
Paris
US 69 Actual $2,572,631 1 HOT MIX OVERLAY
0051-09-025 Galveston/
Houston
FM 3005 Actual $1,274,439 1 PLANE, ACP OVERLAY AND PAVEMENT MARKINGS
3049-01-028 Galveston/
Houston
FM 646 Actual $2,341,741 1 BASE REPAIR, OCST AND OVERLAY
0042-09-107 Hall/
Childress
US 287 Actual $3,587,255 1 OVERLAY
0508-01-331 Harris/
Houston
IH 10 Actual $1,550,849 1 INSTALLATION OF EAST / WEST U - TURNS, CONCRETE PAVING,
0912-00-380 Harris/
Houston
VA Actual $1,515,999 1 NEW TRAFFIC SIGNALS_ (NON - SITE SPECIFIC)
0912-00-445 Harris/
Houston
VA Actual $3,000,000 1 ITS - MAINTENANCE (NON - LETTING)
0912-70-084 Harris/
Houston
VA Actual $2,700,000 5 INSTALL 3 NEW INTERSECTIONS
0912-71-042 Harris/
Houston
CS Actual $7,669,961 5 UPTOWN MANAGEMENT PEDESTRIAN IMPROVEMENTS
0912-71-888 Harris/
Houston
PW Actual $3,457,061 10 CONST EMBANKMENT, FLEXIBLE BASE, ACP, STRUCTURES, CULVERTS,
0912-72-240 Harris/
Houston
VA Actual $209,638 1 CRACK SEAL AND SPALL REPAIR
0921-02-195 Hidalgo/
Pharr
VA Actual $762,101 3 CONSTRUCT CROSSWALKS AND SIDEWALKS ALONG ROUTES TO SCHOOLS
2966-01-011 Hidalgo/
Pharr
SH 364 Actual $5,446,345 11 CONSTRUCT 4 LANE DIVIDED URBAN
0611-01-055 Johnson/
Fort Worth
PR 21 Actual $575,349 6 REPLACE BRIDGE
0902-50-105 Johnson/
Fort Worth
CS Actual $365,609 3 INSTALLATION OF FULL TRAFFIC ACTUATED TRAFFIC SIGNALS
0100-05-071 Karnes/
Corpus Christi
US 181 Actual $9,565,611 1 SEAL COAT ROADWAY (2012 LOW CONTROL SEAL COAT PROJECT)
0100-05-072 Karnes/
Corpus Christi
US 181 Actual $643,627 1 MISCELLANEOUS ROADWAY WORK
1042-01-029 Kendall/
San Antonio
RM 474 Actual $2,053,021 1 REHABILITATE & WIDEN TO PROVIDE TURN LANES, CURB, SIDEWALK &
0496-01-022 Knox/
Childress
SH 222 Actual $2,439,058 1 REHABILITATION OF EXISTING ROADWAY
0700-04-044 Llano/
Austin
SH 71 Actual $1,667,910 1 UPGRADE TO SUPER 2
0005-04-068 Martin/
Odessa
IH 20 Actual $1,790,694 1 PAVEMENT OVERLAY
0015-01-186 McLennan/
Waco
IH 35 Actual 212,440,195 ROW RECONSTRUCT AND WIDEN FROM FOUR TO SIX MAIN LANES TO REDUCE
0848-01-039 Medina/
San Antonio
FM 462 Actual $2,072,109 1 REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS
3497-01-008 Montague/
Wichita Falls
FM 3301 Actual $1,297,486 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0919-20-029 Morris/
Atlanta
CR Actual $224,366 6 REPLACE BRIDGE AND APPROACHES
0028-09-113 Orange/
Beaumont
IH 10 Actual $816,102 1 UPGRADE BRIDGE RAIL
0689-02-027 Orange/
Beaumont
FM 105 Actual $1,805,821 1 RECONSTRUCT AND ADD SHOULDERS
0063-12-018 Panola/
Atlanta
BU 59-D Actual $268,724 1 UPGRADE EXISTING TRAFFIC SIGNALS
0008-03-100 Parker/
Fort Worth
IH 20 Actual $5,420,506 1 MILL AND OVERLAY WESTBOUND MAIN LANES AND SHOULDERS
0809-01-030 Shelby/
Lufkin
FM 699 Actual $4,891,507 1 REHAB & WIDEN EXISTING PAVEMENT
0910-00-091 Smith/
Tyler
VA Actual $246,012 1 DISTRICT - WIDE THERMO PLASTIC PAVEMENT MARKINGS PROGRAM
0014-02-047 Tarrant/
Fort Worth
IH 35W Actual $2,503,821 1 REPAIR FAILURES, DIAMOND GRINDING, PAVEMENT MARKERS
0094-02-117 Tarrant/
Fort Worth
SH 183 Actual $57,963 10 LANDSCAPING_DEVELOPMENT
0902-48-824 Tarrant/
Fort Worth
VA Actual $575,000 1 ITS EQUIPMENT UPGRADES FOR TECHNOLOGY ADVANCES / PURCHASE
1068-01-198 Tarrant/
Fort Worth
IH 30 Actual $297,500 1 SLOPE REPAIR, CONCRETE RIPRAP FILL ERODED AREAS
1068-01-200 Tarrant/
Fort Worth
IH 30 Actual $2,216,823 1 MILL, CONCRETE PAVEMENT REPAIRS AND 2" OVERLAY
2374-05-076 Tarrant/
Fort Worth
IH 20 Actual $4,544,379 1 REPAIR FAILURES AND UTBHMWC MAIN LANES
0034-01-123 Taylor/
Abilene
US 83 Actual $365,702 1 IMPROVE INTERSECTION MOVEMENTS
2270-01-022 Taylor/
Abilene
FM 3438 Actual $131,956 1 UPGRADE TRAFFIC SIGNAL
0151-06-130 Travis/
Austin
LP 111 Actual $117,198 7 CONSTRUCT SIDEWALK ON AIRPORT BLVD
0914-00-301 Travis/
Austin
VA Actual $4,204,760 1 FY 2012 NON - SITE SPECIFIC ITS MAINTENANCE CONTRACT
0143-10-047 Victoria/
Yoakum
US 87 Actual $5,134,001 1 PAVEMENT UPGRADE ON 4 - LANE DIVIDED FACILITY
0212-02-037 Walker/
Bryan
SH 30 Actual $13,817,770 11 SAFETY IMPROVEMENT WORK CONSISTING OF GRADING, STRUCTURES,
0675-06-081 Walker/
Bryan
IH 45 Actual $8,711,014 1 UPGRADING OF FREEWAY FACILITY CONSISTING OF GRADING


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract