Traffic impacts
Skip to main content
Ramp Closed

Traffic impacts

To provide the most accurate information about upcoming traffic impacts, the project team will provide as much notice as possible for lane closures and traffic switches. See below for a live map of traffic closures in San Antonio.

For a list of lane closures across Texas, visit TxDOT’s interative map website DriveTexas™.

I-35 NEX Central lane closures for April 21 – 27

This page is updated weekly. To find the most up to date and current lane closures, follow the I-35 NEX Central Twitter updates or contact us for email updates at i35nexcentral@txdot.gov.

This week's lane closures (weather permitting and subject to change):

I-35

FM 3009 to FM 1518

Northbound
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes, exit ramp closure, and entrance ramp closure of I-35 from Evans Road to Roy Richard Drive (FM 3009) for barrier work. Traffic should use next available ramps.
Southbound
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance ramp closure, and exit ramp closure from Roy Richard Drive (FM 3009) to Schertz Parkway for bridge structure work. Traffic should use next entrance and exit ramps.

FM 1518 to Loop 1604

Northbound
  • Through Saturday, August 2, 2025, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road  for construction work.
  • Through Friday, August 16, long-term closure (24/7). Right lane closure on northbound mainlanes of I-35 at Forum Parkway for construction work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for barrier, earthworks, and bridge work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramp closure of I-35 from Forum Parkway to Evans Road for drainage work. Traffic should use next exit ramp.
Southbound
  • Through Monday, May 20, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Forum Parkway to Ferrell Road for bridge structure work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure of eastbound and westbound lanes and full closure of northbound to southbound turnaround of Evans Road at I-35 for drainage work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Olympia Parkway for bridge substructure work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Corporate Drive to Evans Road and full closure of eastbound and westbound lanes of Evans Road for bridge substructure work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road, exit ramp closure of I-35 from Evans Road to Arcadia Drive, a full closure on northbound to southbound turnaround at Evans Road and a full closure on the westbound lanes on Evans Road for substructure work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound I-35 connector ramp to Loop 1604 and full closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for striping, barrier, temporary pavement, and demolition work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Forum Parkway to Gateway Boulevard for striping, barrier, temporary pavement, and demolition works. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Forum Parkway to Ferrell Road for bridge structure work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Schertz Parkway to Forum Parkway for bridge structure work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road and entrance ramp closure of I-35 from Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.

Loop 1604 Interchange

Northbound
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 to northbound I-35 connector ramp for construction work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on westbound I-35 collector ramp at the Loop 1604 interchange and full closure on northbound I-35 to westbound Loop 1604 connector ramp for construction work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on westbound I-35 collector ramp at the Loop 1604 interchange, full closure on northbound I-35 to westbound Loop 1604 connector ramp, full closure on southbound I-35 to westbound Loop 1604 connector ramp, and full closure of northbound and southbound lanes of IKEA-RBFCU Parkway at Loop 1604 for construction work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on northbound I-35 to eastbound Loop 1604 connector ramp for drilled shaft, columns, and caps. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
Southbound
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 to southbound I-35 connector ramp for column cap work. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 collector ramp at I-35 interchange and full closure on southbound I-35 to eastbound Loop 1604 connector ramp for barrier work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Alternating ramp closures on southbound I-35 connector ramp to Pat Booker Road for striping, barrier, and bridge substructure work. Traffic must exit Loop 1604 (exit 172) and follow the detour signs to Pat Booker Road.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound I-35 collector ramp at the Loop 1604 interchange for striping and barrier work. Traffic must use west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on connector ramp from westbound Loop 1604 to southbound I-35 for earthwork. Traffic must exit at Lookout Road and follow the detour signs to southbound I-35.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound I-35 to westbound Loop 1604 connector ramp and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for bridge substructure work. Southbound I-35 to Loop 1604 traffic should exit at Retama Parkway and follow the detour signs to Loop 1604.
  • Monday, April 22, 8 p.m. to 6 a.m. Full closure on southbound I-35 collector ramp closure at the Loop 1604 interchange for cap setting. Traffic must west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Monday, April 22, 8 p.m. to 6 a.m. Full closure on southbound I-35 collector ramp closure at the Loop 1604 interchange for cap setting. Traffic must west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Tuesday, April 23, 8 p.m. to 6 a.m. Full closure on southbound I-35 collector ramp closure at the Loop 1604 interchange for cap setting. Traffic must west use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Tuesday, April 23, 8 p.m. to 6 a.m. Full closure on southbound I-35 collector ramp closure at the Loop 1604 interchange for cap setting. Traffic must west use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Wednesday, April 24, 8 p.m. to 6 a.m. Full closure on southbound I-35 collector ramp closure at the Loop 1604 interchange for cap setting. Traffic must west use Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.
  • Wednesday, April 24, 8 p.m. to 6 a.m. Full closure on southbound I-35 collector ramp closure at the Loop 1604 interchange for cap setting. Traffic must west Loop 1604 (exit 172) to access southbound I-35 and follow detour signs.

Loop 1604 to Toepperwein Road

Northbound
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road and exit ramp from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodation will be made for local traffic. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for bridge work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on I-35 Access Road from Pat Booker Road to westbound Loop 1604 for barrier and utility work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure of eastbound and westbound lanes of Pat Booker Road at I-35 for construction work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for striping, barrier, and temporary pavement work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Alternating lane closures on northbound frontage road of I-35 from Sandpiper Drive to Pat Booker Road for bridge structure work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure of I-35 Access Road bridge from I-35 northbound frontage road to I-35 southbound frontage road, near Shin Oak Drive for construction work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple mainlane closures (3) on northbound I-35, multiple lanes closures (2) northbound frontage road, entrance ramp closure, and alternating exit ramps closure from Toepperwein Road to Pat Booker Road for bridge work. Traffic should use next entrance and exit ramps.
  • Thursday, April 25, until Friday, April 26, 8 p.m. to 6 a.m. Multiple lane closures (2) on northbound mainlanes and multiple lane closures (2) on northbound frontage road of I-35 from Toepperwein Road to Shin Oak Drive for beam setting. Traffic should use next exit ramp.
Southbound
  • Through Sunday September 8, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for cap form erection work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure of southbound frontage road from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic should follow detour signs.

Toepperwein Road to O’Connor Road

Northbound
  • Through Monday, May 13, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Judson Road to Toepperwein Road for drainage, column, and cap work.
  • Through Friday, May 31, long-term closure (24/7). Right lane closure on northbound frontage road of I-35 from Bludau-Bishop Road to Judson Road for permanent widening and drainage work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound frontage road, and entrance ramp closure from O’Connor Road to Bludau-Bishop Road for bridge work. Traffic should use next entrance ramp.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes, multiple lane closures (2) on northbound frontage road, and alternating exit ramps closure from Judson Road to Toepperwein Road for bridge work. Traffic should use next entrance and exit ramps.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures on northbound frontage road, and exit ramp closure of I-35 from Bludau-Bishop Road to Gunn Road, right lane closure on the eastbound and westbound at the intersection of Judson Road and Randolph Boulevard and left lane closure on Randolph Boulevard at Judson Road for bridge work. Traffic should use next exit ramps
Southbound
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for cap form erection work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road, entrance ramp closure, and exit ramp closure of I-35 from Judson Road to O’Connor Road for cap form erection work. Accommodations will be made for local traffic. Traffic must follow detour.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure from Toepperwein Road to Judson Road for bridge work. Traffic should use next entrance and exit ramps.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure from Judson Road to O’Connor Road for bridge work. Traffic should use next entrance and exit ramps.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure from Pat Booker Road to Toepperwein Road for bridge work. Traffic should use next entrance and exit ramps.

O’Connor Road to Thousand Oaks Drive

Northbound
  • Through Thursday, July 4, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Starlight Terrace to Weidner Road for construction work.
  • Through Saturday, August 3, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Weidner Road to O'Connor Road for construction work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closure (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound frontage road, entrance ramp closure, and exit ramp closure from Weidner Road to O’Connor Road for drainage and bridge work. Traffic should use the next exit and entrance ramps.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes, multiple lane closures (2) on northbound frontage road, entrance ramp closure, and exit ramp closure of I-35 form Thousand Oaks Drive to Weidner Road for drainage and bridge work. Traffic should use the next exit and entrance ramps.
  • Sunday, April 21, 8 p.m. to 5 a.m. Southbound to northbound turnaround closure, left lane closure on northbound frontage road, and entrance ramp closure of I-35 from Starlight Terrace to Weidner Road for drilled shaft work. Traffic should use next entrance ramp.
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Full closure on northbound frontage road, southbound to northbound turnaround closure, northbound to southbound turnaround closure, entrance ramp closure, and exit ramp closure of I-35 from Starlight Terrace to Weidner Road for drilled shaft work. Traffic must follow detour signs.
  • Saturday, April 27, 9 p.m. to 7 a.m. Full closure on northbound frontage road, southbound to northbound turnaround closure, northbound to southbound turnaround closure, entrance ramp closure, and exit ramp closure of I-35 from Starlight Terrace to Weidner Road for drilled shaft work. Traffic must follow detour signs.
Southbound
  • Through Thursday, July 18, long term closure (24/7). Exit ramp closure of Weidner Road on I-35 for construction work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on southbound frontage road and exit ramp closure of I-35 from O’Connor Road to Weidner Road for cap form erection work. Accommodations will be made for local traffic. Traffic must follow detour.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closure (3) on southbound mainlanes, multiple lane closures (2) on southbound frontage road, entrance ramp closure, and exit ramp closure of I-35 from Weidner Road to Thousand Oaks Drive for drainage and bridge work. Traffic should use the next exit and entrance ramps.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane closures on southbound frontage road, and entrance ramp closure of I-35 from O’Connor Road to Weidner Road for drainage and barrier work. Traffic should use next entrance and exit ramps.
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Full closure on northbound frontage road, southbound to northbound turnaround closure, northbound to southbound turnaround closure, entrance ramp closure, and exit ramp closure of I-35 from Starlight Terrace to Weidner Road for drilled shaft work. Traffic must follow detour signs.

Thousand Oaks Drive to I-410 North Interchange

Northbound
  • Thursday, April 25, 12 p.m. to 5 a.m. Left lane closure on northbound frontage road of I-35 from Crestway Drive to Starlight Terrace for beam staging.
  • Friday, April 26, 12 p.m. to 5 a.m. Left lane closure on northbound frontage road of I-35 from Crestway Drive to Starlight Terrace for beam staging. 
Southbound
  • Through Monday, May 20, long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Full closure on southbound frontage road, exit ramp closure, and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Randolph Boulevard for bridge cap work. Traffic should follow detour signs.
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Multiple lane closures (2) on southbound frontage road of I-35 from Whirlwind Drive to Randolph Boulevard for construction work.
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow detour signs. Accommodations will be made for local traffic.
  • Saturday, April 27, 9 p.m. to 7 a.m. Full closure on southbound frontage road, exit ramp closure, and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Randolph Boulevard for bridge cap work. Traffic should follow detour signs.
  • Saturday, April 27, 9 p.m. to 7 a.m. Multiple lane closures (2) on southbound frontage road of I-35 from Whirlwind Drive to Randolph Boulevard for construction work.
  • Saturday, April 27, 9 p.m. to 7 a.m. Full closure on southbound frontage road and northbound to southbound turnaround closure of I-35 from Thousand Oaks Drive to Whirlwind Drive for drilling work. Traffic should follow detour signs. Accommodations will be made for local traffic.

I-410 North Interchange

Northbound
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Full closure of northbound I-35 to westbound I-410 connector ramp and entrance ramp closure from Randolph Boulevard for column work. Traffic should follow detour signs.
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Full closure of northbound I-35 to westbound I-410 connector ramp for drilling work. Traffic should follow detour signs.
  • Saturday, April 27, 9 p.m. to 7 a.m. Full closure of northbound I-35 to westbound I-410 connector ramp and entrance ramp closure from Randolph Boulevard for column work. Traffic should follow detour signs.
  • Saturday, April 27, 9 p.m. to 7 a.m. Full closure of northbound I-35 to westbound I-410 connector ramp for drilling work. Traffic should follow detour signs.       
Southbound
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Full closure of eastbound I-410 connector ramp to southbound I-35 for bridge work. Traffic should follow detour signs.
  • Saturday, April 27, 9 p.m. to 7 a.m. Full closure of eastbound I-410 connector ramp to southbound I-35 for bridge work. Traffic should follow detour signs.

I-410 Interchange to Walzem Road

Northbound
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
  • Saturday, April 27, 9 p.m. to 7 a.m. Southbound to northbound turnaround closure at Walzem Road, alternating lane closures on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for striping and barrier work. Traffic should follow detour signs for available ramps.
Southbound
  • Through Friday, July 12, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Randolph Boulevard to Fratt Road for construction work.
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour signs.
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Full closure on Fratt Road from Austin Highway (Loop 368) to Interchange Parkway, alternating lane closures on southbound Interchange parkway from Austin Highway (Loop 368) to Fratt Road, and full closure on Interchange Parkway from Fratt Road and Walzem Road for utility, columns, and striping work. Traffic should follow detour signs.
  • Saturday, April 27, 9 p.m. to 7 a.m. Full closure on Fratt Road from Austin Highway (Loop 368) to Interchange Parkway, alternating lane closures on southbound Interchange parkway from Austin Highway (Loop 368) to Fratt Road, and full closure on Interchange Parkway from Fratt Road and Walzem Road for utility, columns, and striping work. Traffic should follow detour signs.
  • Saturday, April 27, 9 p.m. to 7 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Fratt Road for drilled shaft work. Traffic should follow detour signs.

Loop 1604

Loop 1604 Interchange to Nacogdoches Road

Eastbound
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on eastbound frontage road of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for column cap work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 connector ramps to I-35 and entrance ramp closure of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for bridge work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on eastbound mainlanes of Loop 1604 from Union Pacific Railroad to Pat Booker Road for drilled shaft work. Traffic must follow detour signs.
Westbound
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway Place, full closure on southbound I-35 to westbound Loop 1604 connector ramp, and exit ramp closure to frontage road for column cap work. Traffic should follow detour signs.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Full closure on westbound mainlanes of Loop 1604 from Pat Booker Road to Lookout Road for equipment movement. Traffic must follow detour signs.

I-410

Austin Highway (Loop 368)
Northbound
  • No closures at this time.
Southbound
  • No closures at this time.

I-410 Interchange to Starcrest Drive

Eastbound
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for striping and barrier work. Traffic should follow detour signs.
  • Saturday, April 27, 9 p.m. to 7 a.m. Alternating lane closures on eastbound frontage road of I-410, entrance ramp closure, and right mainlane closure from Perrin Beitel to Austin Highway (Loop 368) for striping and barrier work. Traffic should follow detour signs.
Westbound
  • Through Saturday, August 31, long-term closure (24/7). Left lane closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.
  • Sunday, April 21, until Thursday, April 25, 9 p.m. to 5 a.m. Alternating lane closures on northbound Austin Highway (Loop 368) connector ramp to westbound I-410 for barrier work.
  • Sunday, April 21, until Saturday, April 27, 9 p.m. to 5 a.m. Multiple lane closures (2) on westbound mainlanes of I-410 from I-35 to Starcrest Drive for pavement work.
  • Sunday, April 21, until Friday, April 26, 9 p.m. to 5 a.m. Full closure of entrance ramp on westbound frontage road and exit ramp of I-410 to Austin Highway (Loop 368) for barrier work. Traffic should follow detour signs.
  • Saturday, April 27, 9 p.m. to 7 a.m. Full closure of entrance ramp on westbound frontage road and exit ramp of I-410 to Austin Highway (Loop 368) for barrier work. Traffic should follow detour signs.

Starcrest Drive to Nacogdoches Road

Eastbound
  • No closures at this time.

Other lane closures

  • For your information, there are other lane closures underway within the I-35 NEX project this week, but they are not expected to affect traffic or create notable delays.