To provide the most accurate information about upcoming traffic impacts, the project team will provide as much notice as possible for lane closures and traffic switches. See below for a live map of traffic closures in San Antonio.
For a list of lane closures across Texas, visit TxDOT’s interative map website DriveTexas™.
I-35 NEX lane closures for April 27 - May 3
This page is updated weekly. To find the most up to date and current lane closures, follow the TxDOT San Antonio District on social media or contact us for email updates at i35NEX@txdot.gov.
This week's lane closures (weather permitting and subject to change):
Maintenance
- No closures at this time.
I-35 from FM 3009 to FM 1518
Northbound
- Through Friday, May 9, long-term closure (24/7). Right lane closure on I-35 northbound frontage road from Legacy Oaks to Schertz Parkway for construction work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of Corporate Drive at I-35 intersection for bridge work. Traffic should follow detour signs.
- Monday, April 28, until Wednesday, April 30, 9 p.m. to 5 a.m. Multiple mainlane closures (3), exit ramp, and entrance ramp of northbound I-35 from Evans Road to Roy Richard Drive (FM 3009) for roadway work. Traffic should use next available ramps.
Southbound
- Through Saturday, May 10, long-term closure (24/7). Left lane closure on I-35 southbound frontage road from FM 3009 to Mid Cities Parkway for drainage work.
- Sunday, April 27, until Monday, April 28, 6 p.m. to 6 a.m. Multiple mainlane closures (3) on southbound I-35 from Schertz Parkway to Forum Parkway and entrance ramp closure at retama parkway and left lane closure on the I-35 southbound frontage road for road work.
- Sunday, April 27, until Friday, May 2, 9 p.m. to 6 a.m. Full closure of southbound I-35 frontage road from Corporate Drive to Evans Road and Evans Road at I-35 intersection for bridge column and cap work. Traffic should follow detour signs.
- Sunday, April 27, until Tuesday, April 29, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road, entrance ramp and exit ramp from Schertz Parkway to Corporate Drive for bridge work. Traffic should follow detour signs.
- Monday, April 28, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple mainlane closures (3), and entrance ramp closure, and exit ramp closure of southbound I-35 from Roy Richard Drive (FM 3009) to Schertz Parkway for column and cap work. Traffic should use next available ramps.
- Tuesday, April 29, until Thursday, May 1, 8 p.m. to 6 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, entrance and exit ramps from Roy Richard Drive (FM 3009) to Alamo Parkway for mill and overlay operations.
- Tuesday, April 29, until Thursday, May 1, 8 p.m. to 6 a.m. Full closure on southbound I-35 mainlanes, entrance and exit ramps from Roy Richard Drive (FM 3009) to Alamo Parkway for mill and overlay operations. Traffic should follow detour signs.
- Wednesday, April 30, until Friday, May 2, 8 p.m. to 6 a.m. Full closure on southbound I-35 mainlanes, entrance and exit ramps from Alamo Parkway to Olympia Parkway for mill and overlay operations. Traffic should follow detour signs.
I-35 from FM 1518 to Loop 1604
Northbound
- Through Saturday, Aug. 2, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for construction work.
- Through Tuesday, May 13, long-term closure (24/7). Exit ramp closure on northbound I-35 to Evans Road for construction work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 6 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, exit ramp, and entrance ramp from Forum Parkway to Evans Road for bridge work. Traffic should use next exit and entrance ramps.
- Monday, April 28, until Wednesday, April 30, 8 p.m. to 6 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, entrance and exit ramps from Forum Parkway to Corporate Drive for mill and overlay operations.
- Monday, April 28, until Wednesday, April 30, 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 frontage road to northbound I-35 frontage road, and northbound I-35 connector ramp from Agora Parkway to Forum Parkway for column and cap work. Traffic should follow detour signs.
- Monday, April 28, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road from Forum Parkway to Forum Access Road for drainage and barrier work. Traffic should follow detour signs.
Southbound
- Through Tuesday, June 16, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.
- Through Tuesday, June 16, long-term closure (24/7). Right lane closure on I-35 southbound mainlanes from Olympia Parkway to Loop 1604 interchange for construction work.
- Through Tuesday, June 16, long-term closure (24/7). Right lane closure on I-35 southbound collector distributor from Forum Parkway to Loop 1604 interchange for construction work.
- Sunday, April 27, until Wednesday, April 30, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Retama Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Olympia Parkway to Forum Parkway for bridge work. Traffic should follow detour signs.
- Sunday, April 27, until Friday, May 2, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road from Forum Parkway to Gateway Boulevard, southbound I-35 collector distributor at Loop 1604 interchange, and IKEA-RBFCU Parkway intersection at Loop 1604 for bridge work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 8 p.m. to 6 a.m. Multiple mainlane closures (3) on southbound I-35 from Schertz Parkway to Forum Parkway for asphalt paving, column, and cap work.
- Monday, April 28, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple mainlane closures (3) on southbound I-35 from Forum Parkway to McMorris Boulevard for bridge column and cap work.
- Monday, April 28, until Wednesday, April 30, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Evans Road to Arcadia Drive and northbound to southbound turnaround of Evans Road at I-35 intersection for roadway work. Traffic should follow detour signs.
- Tuesday, April 29, until Thursday, May 1, 9 p.m. to 5 a.m. Full closure on southbound I-35 mainlanes from Forum Parkway to Pat Booker Road for beam setting. Traffic should follow detour signs.
I-35 and Loop 1604 Interchange
Northbound
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of northbound I-35 collector distributor at the Loop 1604 interchange for drilled shaft work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of northbound I-35 collector distributor at Loop 1604 interchange, northbound I-35 bypass bridge at Pat Booker Road, and westbound Loop 1604 frontage road at Agora Parkway to northbound I-35 frontage road at Forum Parkway for column, cap, and bridge beam work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 collector distributor at I-35 interchange, southbound I-35 collector distributor at Loop 1604 interchange, northbound and southbound I-35 ramps to westbound Loop1604 mainlanes, eastbound Loop 1604 ramp to northbound and southbound I-35 mainlanes, northbound I-35 exit ramp to Olympia Parkway, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to McMorris Boulevard, and IKEA-RBFCU Parkway intersection at Loop 1604 for bridge work. Traffic should follow detour signs.
- Sunday, April 27, 8 p.m. to 6 a.m. Full closure on northbound I-35 collector distributor at the Loop 1604 interchange for traffic switch and paving work. Traffic should follow detour signs.
Southbound
- Through Tuesday, June 16, long-term closure (24/7). Right lane closure on I-35 southbound connector ramp to Loop 1604 westbound mainlanes for construction work.
- Sunday, April 27, until Tuesday, April 29, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 ramp to southbound I-35 mainlanes for deck work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from Arcadia Drive to Olympia Parkway, entrance ramp closure at Old Austin Road, full closure on westbound Loop 1604 collector distributor at I-35 interchange and northbound I-35 ramp to westbound Loop 1604 mainlanes, southbound I-35 collector distributor to westbound Loop 1604 mainlanes, eastbound Loop 1604 frontage road from entrance ramp to IKEA-RBFCU Parkway intersection, and IKEA-RBFCU Parkway intersection at Loop 1604 for column, cap, and bridge deck work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road from Arcadia Drive to Olympia Parkway, southbound I-35 entrance ramp at Old Austin Road, westbound I-35 collector distributor, northbound and southbound I-35 ramp to westbound Loop 1604 mainlanes, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to IKEA-RBFCU Parkway intersection, and IKEA-RBFCU Parkway intersection at Loop 1604 for bridge structure work and traffic switch. Traffic should follow detour signs.
- Monday, April 28, until Saturday, May 3, 8 p.m. to 5 a.m. Full closure of eastbound Loop 1604 collector distributor at the I-35 interchange, and southbound I-35 ramp to eastbound Loop 1604 mainlanes for steel beams work. Traffic should follow detour signs.
- Monday, April 28, until Wednesday, April 30, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 collector distributor at the I-35 interchange, and southbound I-35 ramp to eastbound Loop 1604 mainlanes for barrier work. Traffic should follow detour signs.
- Monday, April 28, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of eastbound I-410 ramp to southbound I-35 mainlanes for bridge deck work. Traffic should follow detour signs.
Loop 1604 from I-35 Interchange to Nacogdoches Road
Eastbound
- Through Tuesday, May 6, long-term closure (24/7). Left lane closure on eastbound frontage road of Loop 1604 from Lookout Road to IKEA-RBFCU Boulevard for construction.
- Through Monday, May 5, long-term closure (24/7). Full closure on Loop 1604 eastbound to westbound turnaround at Union Pacific Railroad for construction work.
- Sunday, April 27, until Friday, May 2, 8 p.m. to 6 a.m. Full closure on eastbound Loop 1604 collector distributor at I-35 interchange and entrance ramp at Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for steel beam works. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 collector distributor at I-35 interchange and eastbound Loop 1604 entrance ramp from Lookout Road to IKEA-RBFCU Parkway for bridge column and cap work. Traffic should follow detour signs.
- Monday, April 28, until Friday, May 2, 8 p.m. to 6 a.m. Full closure of eastbound Loop 1604 mainlanes from Gateway Boulevard to Pat Booker Road, eastbound Loop 1604 collector distributor at I-35 interchange and southbound I-35 collector distributor at Loop 1604 interchange for steel beam work. Traffic should follow detour signs.
- Tuesday, April 29, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple mainlane closures (2) and entrance ramp of eastbound I-410 from Quail Creek Drive to Perrin Beitel for barrier work.
- Wednesday, April 30, until Saturday, May 3, 8 p.m. to 5 a.m. Multiple mainlane closures (2) on eastbound I-35 from Perrin Beitel to Perrin Beitel entrance ramp for bridge beam setting.
- Wednesday, April 30, until Saturday, May 3, 9 p.m. to 5 a.m. Alternating lane closures on eastbound I-410 frontage road and entrance ramp closure from Perrin Beitel to Austin Highway (Loop 368) for cap work. Traffic should follow detour signs.
Westbound
- Through Thursday, June 26, long-term closure (24/7). Full closure on Loop 1604 westbound to eastbound turnaround at Lookout Road for construction work.
- Monday, April 28, until Friday, May 2, 9 a.m. to 3 p.m. Left lane closure on westbound frontage road of Loop 1604 from Gateway Place to Lookout Road exit ramp for illumination work.
- Monday, April 28, until Wednesday, April 30, 9 p.m. to 5 a.m. Full closure of westbound Loop 1604 mainlanes from Pat Booker Road to Lookout Road for steel beam work. Traffic should follow detour signs.
- Monday, April 28, until Wednesday, April 30, 8 p.m. to 6 a.m. Full closure on westbound Loop 1604 mainlanes from Pat Booker Road to Gateway Boulevard, westbound Loop 1604 collector distributor at I-35 interchange, northbound I-35 ramp to westbound Loop 1604 mainlanes, and southbound I-35 collector distributor at Loop 1604 interchange for steel beam work. Traffic should follow detour signs.
I-35 from Loop 1604 to Toepperwein Road
Northbound
- Through Friday, May 9, long-term closure (24/7). Full closure on I-35 northbound collector exit ramp and left lane closure on I-35 northbound frontage road from Pat Booker Road to Loop 1604 for bridge work.
- Through Friday, May 9, long-term closure (24/7). Entrance ramp closure from Shin Oak Drive to Pat Booker Road for bridge work.
- Through Wednesday, May 7, long-term closure (24/7). Entrance ramp closure from I-35 northbound collector distributor to I-35 northbound mainlanes for construction work.
- Through Saturday, March 14, 2026, long-term (24/7). Full closure on northbound I-35 access road from Shin Oak to Pat Booker Road for construction work.
- Sunday, April 27, until Saturday, May 3, 8 p.m. to 5 a.m. Multiple mainlane closures (3) on northbound I-35, multiple lane closures (2) on northbound I-35 frontage road, entrance ramp and exit ramp closure from Toepperwein Road to Pat Booker Road for drilled shaft, column, and cap work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple mainlane closures (3) of northbound I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for bridge structure work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of northbound I-35 access road from Shin Oak Drive to Pat Booker Road for drilled shaft, column, and cap work. Traffic should follow detour signs.
- Sunday, April 27, until Tuesday, April 29, 8 p.m. to 6 a.m. Multiple mainlane closures (3), exit ramp of northbound I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for asphalt paving and traffic switch. Traffic should use next available ramps.
- Sunday, April 27, until Saturday, May 3, 8 p.m. to 6 a.m. Full closure on northbound I-35 collector distributor at Loop 1604 interchange, northbound I-35 frontage road from Pat Booker Road to Loop 1604 interchange and westbound Loop 1604 frontage road at Agora Parkway to I-35 frontage road at Forum Parkway for traffic switch, barrier, cap work. Traffic should follow detour signs.
- Monday, April 28, until Thursday, May 1, 8 p.m. to 5 a.m. Full closure on northbound I-35 mainlanes from Toepperwein Road to Pat Booker Road for bridge beam setting.
- Monday, April 28, until Friday, May 2, 8 p.m. to 6 a.m. Multiple mainlane closures (3) on northbound I-35, multiple lane closures (2) on northbound I-35 frontage road, and exit ramp closure from Toepperwein Road to Pat Booker Road for bridge beam setting.
- Monday, April 28, until Saturday, May 3, 8 p.m. to 5 a.m. Multiple mainlane closures (2) on northbound I-35 from Toepperwein Road to Sandpiper Drive for bridge beam setting.
- Monday, April 28, 9 p.m. to 5 a.m. Full closure of Pat Booker Road at I-35 intersection and northbound I-35 exit ramp to Pat Booker Road for bridge structure work. Traffic should follow detour signs.
- Tuesday, April 29, 8 p.m. to 6 a.m. Full closure on northbound I-35 collector distributor at Loop 1604 interchange, northbound I-35 frontage road from Pat Booker Road to Loop 1604 interchange and westbound Loop 1604 frontage road at Agora Parkway to I-35 frontage road at Forum Parkway for traffic switch, barrier, and cap work. Traffic should follow detour signs.
- Tuesday, April 29, 8 p.m. to 6 a.m. Multiple mainlane closures (3), exit ramp of northbound I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for roadworks and traffic switch. Traffic should use next exit and entrance ramps.
- Wednesday, April 30, until Friday, May 2, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road from Shin Oak Drive to Pat Booker Road for roadway work. Traffic should follow detour signs.
- Wednesday, April 30, until Saturday, May 3, 8 p.m. to 5 a.m. Full closure of Toepperwein Road at I-35 intersection for bridge beam setting. Traffic should follow detour signs.
Southbound
- Through Tuesday, July 7, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Shin Oak Drive to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closures from Pat Booker Road to Toepperwein Road for column, cap, and bridge deck work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 6 a.m. Multiple mainlane closures (3) of southbound I-35 from Forum Parkway to Ferrell Road for bridge deck work.
- Monday, April 28, until Saturday, May 3, 9 p.m. to 6 a.m. Exit ramp closure on I-35 southbound mainlanes to Pat Booker Road for bridge deck work. Traffic should follow detour signs.
I-35 from Toepperwein Road to O’Connor Road
Northbound
- Through Sunday, May 10, long-term closure (24/7). Exit ramp closure on northbound I-35 to Toepperwein Road for construction work.
- Through Saturday, May 10, long-term closure (24/7). Full closure on Sandpiper Drive for utility work.
- Through Saturday, May 10, long-term closure (24/7). Right lane closure on northbound I-35 frontage road from O’Connor Road to Bludau-Bishop Road for construction work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, and exit ramp and entrance ramp closures from O’Connor Road to Judson Road for drilled shaft, column, and cap work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, and exit ramp closure from Judson Road to Toepperwein Road for drilled shaft, column, and cap work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road and exit ramp from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, entrance ramp and exit ramp from O’Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
Southbound
- Through Monday, May 5, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 at Crownpoint Drive for construction work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Crownpoint Drive to O’Connor Road for cap form work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, exit ramp closures from Toepperwein Road to Judson Road for bridge deck work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp, and exit ramp closures from Judson Road to O’Connor Road for drilled shaft, column, and cap work.
I-35 from O'Connor Road to Thousand Oaks Drive
Northbound
- Through Saturday, May 10, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Weidner Road to O’Connor Road for bridge work.
- Through Saturday, May 10, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Starlight Terrace to Weidner Road for construction work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, entrance ramp, and exit ramp from Starlight Terrace to Weidner Road, southbound to northbound turnaround at I-35 and Starlight Terrace intersection, northbound to southbound turnaround at I-35 and Weidner Road intersection for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to O’Connor Road for barrier and striping work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, alternating lane closures (2) on northbound I-35 frontage road, and exit ramp closure from Thousand Oaks Drive/Starlight Terrace to Weidner Road for drainage and drilled shaft work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, multiple lane closures (2) of northbound I-35 frontage road, entrance ramp and exit ramp closures from Weidner Road to O’Connor Road for drainage and drilled shaft work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road from Crestway Drive to Weidner Road and Starlight Terrace at I-35 intersection for column and cap work. Traffic should follow detour signs.
- Sunday, April 27, until Tuesday, April 29, 8 p.m. to 6 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, entrance and exit ramps from Weidner Road to O’Connor Road for mill and overlay operations.
Southbound
- Through Saturday, May 10, long-term closure (24/7). Right lane closure on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for bridge work.
- Through Wednesday, May 28, long-term closure (24/7). Entrance ramp closure on southbound I-35 from O’Connor Road for bridge work.
- Through Saturday, May 10, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Tech Com to Weidner Road for construction work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, from O’Connor Road to Tech Com Drive for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Tech Com Drive to Weidner Road for cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive for sidewalk and curb installation work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane closures (2) on southbound I-35 frontage road, exit ramp closures from O’Connor Road to Weidner Road for drilled shaft, column, and cap work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, and entrance ramp and exit ramp closures from Weidner Road to Thousand Oaks Drive for drainage and drilled shaft work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, exit ramp from O’Connor Road to Weidner Road for cap work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 a.m. to 3 p.m. Right turn lane closure on southbound frontage road of I-35 at Weidner Road and right lane closure on westbound Weidner Road from southbound frontage road of I-35 to Weidner Road for utilities work.
- Monday, April 28, until Saturday, May 3, 8 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive and northbound to southbound turnaround of Weidner Road at I-35 intersection for column cap setting. Traffic should follow detour signs.
- Monday, April 28, until Saturday, May 3, 8 p.m. to 5 a.m. Multiple mainlane closures (3) on southbound I-35 from Weidner Road to Thousand Oaks Drive for column cap setting.
- Monday, April 28, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive for column work. Traffic should follow detour signs.
I-35 from Thousand Oaks Drive to I-410 North Interchange
Northbound
- Through Saturday, May 10, long-term (24/7). Left lane closure on northbound frontage road of I-35 from Randolph Boulevard to Starlight Terrace for bridge work.
- Monday, April 28, until Thursday, May 1, 8 p.m. to 6 a.m. Full closure on northbound I-35 frontage road and exit ramp from Weidner Road to O’Connor Road for column cap setting. Traffic should follow detour signs.
- Tuesday, April 29, until Friday, May 2, 8 p.m. to 6 a.m. Full closure northbound I-35 frontage road from Crestway Drive to Weidner Road and Starlight Terrace intersection at I-35 for column cap setting. Traffic should follow detour signs.
- Tuesday, April 29, until Friday, May 2, 8 p.m. to 6 a.m. Multiple mainlane closures (2) on northbound I-35 from Crestway Road to Starlight Terrace for column cap setting.
Southbound
- Through Tuesday, May 6, long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
- Through Saturday, May 10, long-term closure (24/7). Southbound to northbound turnaround closure at Thousand Oaks for construction work.
- Through Friday, May 2, long-term closure (24/7). Exit ramp closure on I-35 southbound mainlanes to Thousand Oaks for construction work.
- Through Saturday, May 10, long-term closure (24/7). Left lane closure on I-35 southbound frontage road from Weidner Road to Thousand Oaks for construction work.
- Through Wednesday May 7, long-term closure (24/7). Northbound to southbound turnaround closure at Thousand Oaks for construction work.
- Monday, April 28, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple mainlane closures (3) on southbound I-35 from Thousand Oaks Drive to Randolph Boulevard for panel and deck work. Traffic should follow detour signs.
- Monday, April 28, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road, and exit ramp from Thousand Oaks Drive to Randolph Boulevard, and northbound to southbound turnaround at Thousand Oaks Drive and I-35 intersection for column, and cap work. Traffic should follow detour signs.
I-35 and I-410 North Interchange
Northbound
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of eastbound I-410 ramp to northbound I-35 mainlanes for cap work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of northbound I-35 ramp to westbound I-410 mainlanes and entrance ramp from Randolph Boulevard to westbound I-410 mainlanes for column and cap work. Traffic should follow detour signs.
Southbound
- No closures at this time.
I-410 North from Starcrest Drive to Harry Wurzbach Road
Eastbound
- No closures at this time.
Westbound
- No closures at this time.
I-410 North from I-35 Interchange to Starcrest Drive
Eastbound
- Through Saturday, May 10, long-term (24/7). Left lane closure on I-410 eastbound frontage road from Starcrest Drive to Perrin Beitel for construction work.
Westbound
- Through Tuesday, May 6, long-term closure (24/7). Left lane closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of entrance ramp on westbound I-410 frontage road from Perrin Creek to Perrin Beitel and exit ramp to Austin Highway (Loop 368) from southbound I-35 ramp to westbound I-410 mainlanes for cap work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple (2) lane closures on westbound I-410 mainlanes from Perrin Beitel exit ramp to Perrin Beitel intersection for bridge deck work.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of westbound I-410 frontage road and exit ramp from Perrin Creek to Perrin Beitel, and ramp from northbound Austin Highway (Loop 368) to westbound I-410 frontage road for bridge deck work. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of exit ramp from westbound I-410 mainlanes to southbound Austin Highway (Loop 368) for cap work. Traffic should use next exit ramp.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on westbound I-410 frontage road from Randolph Boulevard to Perrin Creek and northbound Austin Highway (Loop 368) frontage road from Interchange Parkway to westbound I-410 frontage road for cap work. Traffic should follow detour signs.
- Monday, April 28, until Saturday, May 3, 12 p.m. to 5 a.m. Left lane closure on westbound frontage road of I-410 from Randolph Boulevard to Perrin Beitel for bridge beams staging.
- Monday, April 28, until Friday, May 2, 9 a.m. to 3 p.m. Left lane closure of westbound I-410 frontage road from Perrin Beitel Road to Starcrest Drive for traffic signal equipment installation work.
- Wednesday, April 30, until Saturday, May 3, 8 p.m. to 5 a.m. Full closure of Austin Highway (Loop 368) connector ramp to westbound I-410 frontage road, westbound I-410 frontage road from Perrin Beitel exit ramp to Perrin Beitel and full closure of Austin Highway (Loop 368) from Walzem Road to I-410 interchange for column cap setting. Traffic should follow detour signs.
- Wednesday, April 30, 9 p.m. to 5 a.m. Full closure of northbound I-35 ramp to westbound I-410 mainlanes and entrance ramp closure from Randolph Boulevard to westbound I-410 mainlanes for column and cap work. Traffic should follow detour signs.
I-410 North from Starcrest Drive to Nacogdoches Road
Eastbound
- Through Tuesday, September 30, long-term closure (24/7). Left lane closure on eastbound frontage road of I-410 from Harry Wurzbach to Starcrest Drive for construction.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple mainlane closures (3), entrance ramp of eastbound I-410 from Harry Wurzbach Road to Quail Creek Drive, and the exit ramp to Starcrest and Perrin Beitel Road for barrier and drilled shaft work. Traffic should use previous exit ramp.
Westbound
- No closures at this time.
I-410 North and Austin Highway (Loop 368)
Northbound
- No closures at this time.
Southbound
- No closures at this time.
I-35 from I-410 North Interchange to Walzem Road
Northbound
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Multiple (3) lane closures of northbound I-35 mainlanes from Walzem Road to I-410 interchange for barrier setting. Traffic should follow detour signs.
- Sunday, April 27, until Saturday, May 3, 9 p.m. to 5 a.m. Southbound to northbound turnaround closure at Walzem Road and I-35, alternating lane closures (2) on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for column and drilled shaft work. Traffic should follow detour signs.
Southbound
- Monday, April 28, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, exit ramp, and entrance ramp from Randolph Boulevard to Walzem Road for bridge deck work. Traffic should follow detour signs.
- Monday, April 28, until Saturday, May 3, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Randolph Boulevard to Fratt Road and full closure of Randolph Boulevard at I-35 intersection for column work. Traffic should follow detour signs.
I-35 from Walzem Road to Eisenhauer Road
Northbound
- Sunday, April 27, until Thursday, May 1, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-35 frontage road between Galahad Drive and Walzem Road for beam setting. Traffic should use next entrance ramp.
- Sunday, April 27, until Thursday, May 1, 9 p.m. to 5 a.m. Exit ramp closure on northbound I-35 mainlanes between Eisenhauer Road and Walzem Road for beam and cap setting. Traffic should use previous exit ramp.
- Sunday, April 27, until Thursday, May 1, 9 p.m. to 5 a.m. Multiple left lane closures (2) on northbound I-35 frontage road from Eisenhauer Road to Walzem Road for beam and cap setting.
- Sunday, April 27, until Thursday, May 1, 9 p.m. to 5 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Eisenhauer Road to Walzem Road for beam and cap setting.
Southbound
- Wednesday, April 30, until Friday, May 2, 9 p.m. to 5 a.m. Entrance closure on southbound I-35 frontage road between Walzem Road and Eisenhauer Road for pavement work.
- Wednesday, April 30, until Friday, May 2, 9 p.m. to 5 a.m. Right lane closure on southbound I-35 mainlanes from Walzem Road to Fairdale Drive for pavement work.
I-35 from Eisenhauer Road to Rittiman Road
Northbound
- No closures at this time.
Southbound
- Wednesday, April 30, until Friday, May 2, 9 p.m. to 5 a.m. Exit ramp closure on southbound I-35 mainlanes between Eisenhauer Road and Rittiman Road for pavement work. Traffic should use previous exit ramp.
Eastbound
- No closures at this time.
Westbound
- No closures at this time.
I-35 from Rittiman Road to I-410 South Interchange
Northbound
- Monday, May 5, long-term closure (24/7). Left lane closure on northbound I-35 frontage road from Greatfare to Rittiman Road for drainage and bridge work.
- Wednesday, April 30, 9 a.m. to 3 p.m. Entrance ramp closure on northbound I-35 frontage road between Winnco Drive and Rittiman Road for roadway work. Traffic should use next entrance ramp.
- Wednesday, April 30, 9 a.m. to 3 p.m. Right lane closure on northbound I-35 mainlanes from Winnco Drive to Rittiman Road for roadway work.
- Wednesday, April 30, until Friday, May 2, 9 p.m. to 5 a.m. Left lane closure on northbound I-410 frontage road from Macro to Rittiman road for drilled shaft work.
- Wednesday, April 30, until Friday, May 2, 9 p.m. to 5 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Winnco Drive to Rittiman Road for drilled shaft work.
- Friday, May 2, 11 p.m. to 7 a.m. Left lane closure on northbound I-410 frontage road from Macro to Rittiman road for drilled shaft work.
- Friday, May 2, 11 p.m. to 7 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Winnco Drive to Rittiman Road for drilled shaft work.
- Saturday, May 3, 9 p.m. to 8 a.m. Left lane closure on northbound I-410 frontage road from Macro to Rittiman road for drilled shaft work.
Southbound
- No closures at this time.
Eastbound
- No closures at this time.
I-35 and I-410 South Interchange
Northbound
- Monday, April 28, until Friday, May 2, 9 p.m. to 5 a.m. Full closure on northbound frontage road of I-35 to northbound frontage road of I-410 for drilled shaft work. Traffic should follow detour signs.
- Friday, May 2, 11 p.m. to 7 a.m. Full closure on northbound frontage road of I-35 to northbound frontage road of I-410 for drilled shaft work. Traffic should follow detour signs.
Southbound
- Wednesday, April 30, until Friday, May 2, 9 a.m. to 5 a.m. Right lane southbound I-35 connector ramp to I-410 South for roadway work.
I-35 from I-410 South to Petroleum Drive
Northbound
- No closures at this time.
Southbound
- Through Thursday, June 14, long-term closure (24/7). Right lane closure on southbound I-35 frontage road from Tejasco to Petroleum Drive for bridge work.
- Monday, April 28, until Friday, May 2, 9 p.m. to 5 a.m. Exit ramp closure on southbound I-35 mainlanes between Rittiman Road and George Beach Avenue for drainage work. Traffic should use previous exit ramp.
- Monday, April 28, until Friday, May 2, 9 p.m. to 5 a.m. Left lane closure on southbound I-35 frontage road from Rittiman Road to Petroleum Drive for drilled shaft work.
- Friday, May 2, 11 p.m. to 7 a.m. Left lane closure on southbound I-35 frontage road from Rittiman Road to Petroleum Drive for drilled shaft work.
- Friday, May 2, 11 p.m. to 7 a.m. Entrance ramp closure on southbound I-35 frontage road between Rittiman Road to Petroleum Drive for drainage work. Traffic should follow detour signs.
- Friday, May 2, 11 p.m. to 7 a.m. Exit ramp closure on southbound I-35 mainlanes between Rittiman Road and George Beach Avenue for drainage work. Traffic should use previous exit ramp.
- Friday, May 2, 11 p.m. to 7 a.m. Left lane closure on southbound I-35 frontage road from Rittiman to Petroleum Drive for drainage work.
- Saturday, May 3, 9 p.m. to 8 a.m. Entrance ramp closure on southbound I-35 frontage road between Rittiman Road to Petroleum Drive for drainage work. Traffic should follow detour signs.
- Saturday, May 3, 9 p.m. to 8 a.m. Exit ramp closure on southbound I-35 mainlanes between Rittiman Road and George Beach Avenue for drainage work. Traffic should use previous exit ramp.
- Saturday, May 3, 9 p.m. to 8 a.m. Left lane closure on southbound I-35 frontage road from Rittiman to Petroleum Drive for drainage work.
- Sunday, May 4, 9 p.m. to 5 a.m. Entrance ramp closure on southbound I-35 frontage road between Rittiman Road to Petroleum Drive for drainage work. Traffic should follow detour signs.
- Sunday, May 4, 9 p.m. to 5 a.m. Exit ramp closure on southbound I-35 mainlanes between Rittiman Road and George Beach Avenue for drainage work. Traffic should use previous exit ramp.
I-410 South from I-35 to Binz Engleman Road
Northbound
- Through Wednesday, May 7, long-term closure (24/7). Entrance ramp closure on northbound I-410 frontage road between Binz Engleman and Rittiman Road for bridge work. Traffic should follow detour signs.
- Monday, April 28, until Friday, May 2, 9 p.m. to 5 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for sweeping and debris work.
- Thursday, May 1, until Friday, May 2, 9 p.m. to 5 a.m. Left lane closure on northbound mainlanes of I-410 from Old Seguin Road to Space Center Drive for drilled shaft work.
- Friday, May 2, 11 p.m. to 7 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for sweeping and debris work.
Southbound
- No closures at this time.
I-35/I-410 S Interchange to FM 78
Northbound
- Sunday, April 27, until Friday, May 2, 9 p.m. to 5 a.m. Alternating closure on the northbound I-410 frontage road from Wehman Drive to FM 78 and Binz Engleman to Butter Krust for base repair work.
Southbound
- Monday, April 28, until Friday, May 2, 9 p.m. to 5 a.m. Left lane closure on the southbound I-410 mainlanes of I-410 from Interstate Drive to Milling Road for shoulder repair work.
- Monday, April 28, until Saturday, May 3, 9 p.m. to 5 a.m. Left lane closure on the southbound I-410 frontage road from Winnco Drive to Binz Engleman Road and from FM 78 to Interstate Drive for asphalt work.
Westbound
- Tuesday, April 29, until Friday, May 2, 9 p.m. to 5 a.m. Alternating Lane Closure on westbound FM 78 from the northbound I-410 frontage road to southbound I-410 frontage road for base repair work.
Other lane closures
- For your information, there are other lane closures underway within the I-35 NEX project this week, but they are not expected to affect traffic or create notable delays.