I-35 NEX lane closures for October 20 - 26

This page is updated weekly. To find the most up to date and current lane closures, follow the TxDOT San Antonio District on social media or contact us for email updates at i35NEX@txdot.gov.

This week's lane closures (weather permitting and subject to change):

Maintenance

  • No closures at this time.

I-35 from FM 3009 to FM 1518

Northbound
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes and alternating entrance ramps and exit ramp closure of I-35 from Evans Road to Roy Richard Drive (FM 3009) for paving, striping, wall demo, and barrier work.
Southbound
  • Through Saturday, November 8, long-term closure (24/7). Right lane closure on the southbound frontage road of I-35 from Pawlin Drive to Corporate Drive for roadway work.
  • Sunday, October 20, until Thursday, October 24, 8 p.m. to 6 a.m. Full closure on southbound mainlanes of I-35 from Roy Richards Drive to Schertz Parkway. for milling, base repair, and overlay operations.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes, entrance ramp closure, and exit ramp closure of I-35 from Roy Richard Drive (FM 3009) to Schertz Parkway for paving and barrier work. Traffic should use next entrance and exit ramps.
  • Wednesday, October 23, 9 p.m. to 5 a.m. Full closure on southbound I-35 from Mid Cities Parkway to Alamo Parkway for illumination repairs.
  • Wednesday, October 23, 9 p.m. to 5 a.m. Left lane closure on southbound I-35 from Tri County Parkway to Alamo Parkway for illumination repairs.

I-35 from FM 1518 to Loop 1604

Northbound
  • Through Saturday, August 2, 2025, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for construction work.
  • Through Saturday, November 8, long-term closure (24/7). Right lane closure on northbound mainlanes of I-35 at Forum Parkway for construction work.
  • Through Saturday, November 8, long-term closure (24/7). Right lane closure on northbound exit ramp and left lane closure on northbound frontage road from Forum Access Road to Olympia Parkway for construction work.
  • Through Monday, May 5, 2025, long-term closure (24/7). Exit ramp closure on northbound I-35 to Evans Road for construction work.
  • Sunday, October 20, until Friday, October 25, 9 p.m. to 5 a.m. Full closure on westbound frontage road of Loop 1604 at Agora Parkway to northbound frontage road I-35 at Olympia Parkway for bridge structure work. Traffic should follow detours.
  • Sunday, October 20, until Friday, October 25, 8 p.m. to 5 a.m. Full closure of northbound frontage road and exit ramp closure of I-35 from Forum Parkway to Olympia Parkway for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramps and entrance ramp closure of I-35 from Forum Parkway to Evans Road for bridge column work. Traffic should use next exit ramp.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 5 a.m. Full closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for bridge cap and column work. Traffic should follow detour signs.
  • Sunday, October 20, 9 p.m. to 5 a.m. Left lane closure on northbound mainlanes of I-35 from Retama Parkway to Olympia Parkway for illumination repairs.
Southbound
  • Through Sunday, May 25, 2025, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.
  • Sunday, October 20, until Sunday, October 27, 8 p.m. to 6 a.m. Full closure on southbound frontage road from Arcadia Drive to Olympia Parkway, entrance ramp closure at Old Austin, full closure on westbound I-35 collector ramp and northbound I-35 to westbound Loop 1604 connector ramp, full closure on southbound I-35 to westbound Loop 1604 connector ramp, full closure on eastbound frontage road from entrance ramp to IKEA-RBFCU Parkway, and full closure of northbound and southbound lanes of IKEA-RBFCU Parkway at Loop 1604 for deck, overhangs, column work.
  • Sunday, October 20, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure on southbound frontage road, exit ramp closure of I-35 from Evans Road to Olympia Parkway, full closure of northbound to southbound turnaround of Evans Road at I-35 and a full closure of the westbound lanes of Evans Road at I-35 for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Forum Parkway to Gateway Boulevard for substructure work. Traffic should follow detour signs.
  • Sunday, October 20, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Old Austin Road to Forum Parkway for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, until Thursday, October 24, 9 p.m. to 5 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Olympia Parkway to Forum Parkway for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Corporate Drive to Evans Road and full closure of eastbound and westbound lanes of Evans Road at I-35 for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, until Friday, October 25, 9 p.m. to 5 a.m. Full closure on Loop 1604 eastbound and westbound collector ramps and full closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 5 a.m. Full closure on southbound frontage road of I-35 from Retama Parkway to Forum Parkway for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, 9 p.m. to 5 a.m. Entrance ramp closure on southbound I-35 from Old Austin Road to Forum Parkway for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 8 p.m. to 5 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Schertz Parkway to Forum Parkway for bridge deck work and cap construction.
  • Monday, October 21, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound mainlanes of I-35 from Forum Parkway to McMorris Boulevard for bridge structure work.

I-35 and Loop 1604 Interchange

Northbound
  • Sunday, October 20, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure of westbound Loop 1604 connector ramp to northbound I-35 for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, until Thursday, October 24, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 connector ramp to northbound I-35 for bridge substructure work. Traffic should follow detour signs.
  • Sunday, October 20, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure of northbound I-35 connector ramp to westbound Loop 1604 for drainage work. Traffic should follow the detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 5 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for striping, barrier, and construction entrance work. Traffic should follow detour signs.
  • Monday, October 21, until Thursday, October 24, 9 p.m. to 5 a.m. Full closure on westbound I-35 collector ramp at the Loop 1604 interchange, full closure on northbound I-35 to westbound Loop 1604 connector ramp, full closure on southbound I-35 to westbound Loop 1604 connector ramp, and full closure of northbound and southbound lanes of IKEA-RBFCU Parkway at Loop 1604 for bridge structure work. Traffic should follow detour signs.
  • Monday, October 21, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure on westbound I-35 collector ramp at the Loop 1604 interchange and full closure on northbound I-35 to westbound Loop 1604 connector ramp for bridge structure work. Traffic should follow detour signs.
  • Thursday, October 24, until Saturday, October 26, 8 p.m. to 6 a.m. Full closure on westbound 1604 collector ramp at the I-35 interchange and full closure on northbound I-35 to westbound Loop 1604 connector ramp for welding of steel girders. Traffic should follow detour signs.
  • Friday, October 25, until Monday, October 28, 9 p.m. to 5 a.m. Full closure on northbound I-35 collector ramp at the Loop 1604 interchange for drainage work.
Southbound
  • Sunday, October 20, until Sunday, October 27, 9 p.m. to 7 a.m. Full closure on eastbound Loop 1604 collector ramp at I-35 interchange and full closure on southbound I-35 to eastbound Loop 1604 connector ramp for barrier work. Traffic should follow detour signs.
  • Sunday, October 20, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure of westbound Loop 1604 connector ramp to southbound I-35 for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure of southbound I-35 connector ramp to westbound Loop 1604 and alternating lane closures on southbound mainlanes of I-35 at the exit to Loop 1604 for striping and barrier work. Traffic should follow detour signs.
  • Sunday, October 20, until Tuesday, October 22, 9 p.m. to 5 a.m. Full closure on southbound I-35 collector ramp at Loop 1604 interchange for drainage, bridge deck and column cap work. Traffic should follow detour signs.
  • Monday, October 21, until Thursday, October 24, 8 p.m. to 6 a.m. Full closure on eastbound collector ramp of Loop 1604 at I-35 interchange and full closure on southbound I-35 to eastbound Loop 1604 connector ramp for welding steel girders. Traffic should follow detour signs.
  • Monday, October 21, until Thursday, October 24, 9 p.m. to 5 a.m. Full closure of southbound frontage road of I-35 from IKEA-RBFCU Parkway to Pat Booker Road, eastbound Loop 1604 to southbound I-35 connector ramp closure, and southbound I-35 collector ramp closure at the Loop 1604 interchange for striping and barrier work. Traffic should follow detour signs.
  • Monday, October 21, until Thursday, October 24, 9 p.m. to 5 a.m. Full closure on southbound collector ramp of I-35 at the Loop 1604 interchange for column and cap work. Traffic should follow detour signs.

Loop 1604 from I-35 Interchange to Nacogdoches Road

Eastbound
  • Through Monday, March 31, 2025, long-term closure (24/7). Left lane closure on eastbound frontage road of Loop 1604 from Lookout Road to IKEA-RBFCU Boulevard for construction. 
  • Monday, October 21, until Saturday, October 26, 9 p.m. to 7 a.m. Alternating lane closures on eastbound mainlanes of Loop 1604 from Nacogdoches Road to Pat Booker Road for bridge column work. 
  • Monday, October 21, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 connector ramps to I-35 and entrance ramp closure of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway for bridge structure work. Traffic should follow detour signs. 
  • Monday, October 21, until Friday, October 25, 9 p.m. to 5 a.m. Full closure on eastbound mainlanes of Loop 1604 from Union Pacific Railroad to Pat Booker Road for bridge deck work. Traffic must follow detour signs. 
  • Monday, October 21, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure of eastbound frontage road and exit ramp closure of Loop 1604 from Lookout Road to IKEA-RBFCU Parkway and full closure of westbound to eastbound turnaround on westbound frontage road of Loop 1604 at Lookout for barrier resetting and traffic shift. Traffic should follow detour signs. 
  • Sunday, October 20, until Monday, October 21, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 from Lookout Road to IKEA-RBFCU Parkway and full closure of Lookout Road intersection and turnarounds at Loop 1604 for bridge deck work. Traffic should follow detour signs.
Westbound
  • Sunday, October 20, until Sunday, October 27, 9 p.m. to 7 a.m. Full closure on westbound frontage road of Loop 1604 from Gateway Boulevard to Gateway Place for bridge deck work. Traffic should follow detour signs.
  • Sunday, October 20, until Sunday, October 27, 9 p.m. to 7 a.m. Alternating lane closures on westbound mainlanes of Loop 1604 from Pat Booker Road to Nacogdoches Road for bridge deck and barrier work.
  • Tuesday, October 22, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure on westbound mainlanes of Loop 1604 from Pat Booker Road to Lookout Road and full closure of Lookout Road intersection and turnarounds at Loop 1604 for bridge deck work. Traffic must follow detour signs.       

I-35 from Loop 1604 to Toepperwein Road

Northbound
  • Through Monday, February 3, 2025, long-term closure (24/7). Full closure on I-35 northbound collector exit ramp and left lane closure on I-35 northbound frontage road from Pat Booker Road to Loop 1604 for bridge work.
  • Through Monday, February 3, 2025, long-term closure (24/7). Entrance ramp closure from Shin Oak Drive to Pat Booker Road for bridge work.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure of eastbound and westbound lanes of Toepperwein Road at I-35 for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple mainlane closures (3) on northbound I-35, multiple lane closures (2) northbound I-35 frontage road and exit ramp closure of I-35 from Toepperwein Road to Pat Booker Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes and exit ramps and entrance ramp closure of I-35 from Forum Parkway to Evans Road for bridge column work. Traffic should use next exit ramp.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound mainlanes, exit ramp closure of I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for bridge structure, striping, barrier, and temporary pavement work. Traffic should use next exit and entrance ramps.
  • Sunday, October 20, until Tuesday, October 22, 9 p.m. to 5 a.m. Full closure of eastbound and westbound lanes of Pat Booker Road and Pat Booker Road exit at I-35 for bridge structure work. Traffic should follow detour signs.
  • Sunday, October 20, until Friday, October 25, 9 p.m. to 5 a.m. Full closure on northbound frontage road of I-35 from Shin Oak Drive to Pat Booker Road for drill shaft work. Traffic should follow detour signs.
  • Sunday, October 20, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure of northbound frontage road, exit ramp closure, and entrance ramp closure of I-35 from Pat Booker Road to Loop 1604 for bridge structure work. Traffic should follow detour signs.
  • Monday, October 21, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound mainlanes of I-35 from I-35 Access Road near Shin Oak Drive to Forum Parkway for bridge structure work.
Southbound
  • Through Monday, June 30, 2025, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure on southbound frontage road and entrance ramp of I-35 from Shin Oak Drive to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure of I-35 from Pat Booker Road to Toepperwein Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Thursday, October 24, 9 p.m. to 5 a.m. Left lane closure on southbound I-35 from Shin Oak Drive to Toepperwein Road for illumination repairs.

I-35 from Toepperwein Road to O’Connor Road

Northbound
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure on northbound frontage road and exit ramp of I-35 from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodation will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure on northbound frontage road, and entrance ramp closure on I-35 from O’Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodation will be made for local traffic. Traffic should follow detour signs.
  •  Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, exit ramp closure and entrance ramp closure of I-35 from O’Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound mainlanes, multiple lane closures (2) on northbound I-35 frontage road and exit ramp closure of I-35 from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
Southbound
  • Through Friday, January 3, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 at Crownpoint Drive for construction work.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure on southbound frontage road and entrance ramp closure from Judson Road to Crownpoint Drive for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure on southbound frontage road and exit ramp closure from Crownpoint Drive to O’Connor Road for cap form erection work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure of I-35 from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure of I-35 from Judson Road to O’Connor Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.

I-35 from O'Connor Road to Thousand Oaks Drive

Northbound
  • Through Saturday, November 2, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Starlight Terrace to Weidner Road for construction work.
  • Through Saturday, November 8, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Weidner Road to O'Connor Road for construction work.
  • Sunday, October 20, until Friday, October 25, 8 p.m. to 6 a.m. Full closure northbound frontage road of I-35 from Crestway Drive to Weidner Road and full closure of Starlight Terrace intersection at I-35 for drainage and drilled shaft work, traffic should follow the detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure on northbound frontage road, southbound to northbound turnaround closure, northbound to southbound turnaround closure, entrance ramp closure, and exit ramp closure of I-35 from Starlight Terrace to Weidner Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, alternating lane closures (2) on northbound I-35 frontage road and exit ramp closure of I-35 from Thousand Oaks Drive to Weidner Road for drainage and drilled shaft work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, right lane closure on eastbound O’Connor Road, entrance ramp closure, and exit ramp closure of I-35 from Weidner Road to O’Connor Road for drainage and drilled shaft work. Accommodations will be made for local traffic. Traffic should follow detour signs.
Southbound
  • Through Saturday, November 8, long-term closure (24/7). Right lane closure on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for bridge work.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure on southbound frontage road of I-35 from O’Connor Road to Tech Com Drive for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure on southbound frontage road and exit ramp of I-35 from Tech Com Drive to Weidner Road for cap form erection work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure of I-35 from O’Connor Road to Weidner Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs. 
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure, and exit ramp closure of I-35 from Weidner Road to Thousand Oaks Drive for drainage and drilled shaft work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Monday, October 21, until Thursday, October 24, 9 p.m. to 5 a.m. Full closure on southbound frontage road, entrance ramp closure, and exit ramp closure of I-35 from Weidner Road to Thousand Oaks Drive for column work. Traffic should follow detour signs. 
  • Tuesday, October 22, 9 p.m. to 5 a.m. Left lane closure on southbound I-35 from Weidner Road to Thousand Oaks Drive for illumination repairs.

I-35 from Thousand Oaks Drive to I-410 North Interchange

Northbound
  • No closures at this time.
Southbound
  • Through Saturday, November 30, long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Monday, October 21, until Saturday, October 26, 8 p.m. to 6 a.m. Full closure on southbound frontage road, exit ramp closure of I-35 from Thousand Oaks Drive to Randolph Boulevard and northbound to southbound turnaround closure at I-35 and Thousand Oaks Drive for column, and cap work. Traffic should follow detour signs. 

I-35 and I-410 North Interchange

Northbound
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure of northbound I-35 connector ramp to westbound I-410 and entrance ramp closure from Randolph Boulevard for cap work. Traffic should follow detour signs.
Southbound
  • No closures at this time.

I-410 North from I-35 Interchange to Starcrest Drive

Eastbound
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure of eastbound I-410 connector ramp to northbound mainlanes of I-35 for cap work. Traffic should follow detour signs.
Westbound
  • Through Sunday, December 1, long-term closure (24/7). Left lane closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure of westbound I-410 mainlines from Perrin Beitel to Quail Creek Drive for bridge deck work. Traffic should use the frontage road.
  • Sunday, October 20, until Wednesday, October 23, 9 p.m. to 5 a.m. Full closure on westbound frontage road of I-410 from Perrin Creek to Perrin Beitel, exit ramp closure, and connector ramp from Loop 368 northbound to I-410 westbound frontage road for column work. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure of entrance ramp on westbound frontage road of I-410 from Perrin Creek to Perrin Beitel and exit ramp to Austin Highway (Loop 368) from southbound I-35 connector ramp to westbound I-410 for bridge cap work. Traffic should follow detour signs.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Full closure on westbound frontage road of I-410 from Randolph Boulevard to Perrin Beitel and Austin Highway at I-410 westbound frontage road intersection for column work. Traffic should use detour signs.
  • Monday, October 21, until Friday, October 25, 9 a.m. to 3 p.m. Left lane closure on westbound frontage road of I-410 from Perrin Beitel to Starcrest Drive trenching for traffic signal equipment.
  • Wednesday, October 23, until Saturday, October 26, 9 p.m. to 5 a.m. Full closure on westbound frontage road of I-410 from Perrin Creek to Perrin Beitel, exit ramp closure, and connector ramp from Loop 368 northbound to I-410 westbound frontage road for column work. Traffic should follow detour signs.

I-410 North from Starcrest Drive to Nacogdoches Road

Eastbound
  • Monday, October 21, until Sunday, October 27, 9 p.m. to 7 a.m. Multiple lane closures (3) on eastbound mainlanes of I-410 from Harry Wurzbach Road to Quail Creek Drive and entrance ramp closure from Harry Wurzbach Road to I-410 eastbound mainlanes. for striping work.
  • Monday, October 21, until Sunday, October 27, 9 p.m. to 7 a.m. Multiple lane closures (2) on eastbound mainlanes of I-410 from Quail Creek Dr to Perrin Beitel and entrance ramp closure from Quail Creek Dr to I-410 eastbound mainlanes for striping work.
Westbound
  • Monday, October 21, 9 p.m. to 5 a.m. Left lane closure on westbound I-410 from Interchange Parkway to Vicar Drive for illumination repairs.

I-410 North and Austin Highway (Loop 368)

Northbound
  • No closures at this time.
Southbound
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Exit ramp closure from westbound I-410 mainlanes to southbound Austin Highway (Loop 368) for cap work. Traffic should use next exit ramp.

I-35 from I-410 North Interchange to Walzem Road

Northbound
  • Through Tuesday, October 29, long- term closure (24/7). Left lane closure on northbound frontage road of I-35 from Randolph Boulevard to Starlight Terrace for bridge work.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Southbound to northbound turnaround closure at Walzem Road and I-35, alternating lane closures (2) on northbound frontage road, and alternating entrance and exit ramp closures of I-35 from Walzem Road to Crestway Drive for cap work. Traffic should follow detour signs.
Southbound
  • Through Saturday, November 8, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Randolph Boulevard to Fratt Road for construction work.
  • Sunday, October 20, until Friday, October 25, 9 p.m. to 5 a.m. Full closure of southbound frontage road of I-35 from Randolph Boulevard to Fratt Road and full closure of Randolph Boulevard at I-35 for drill shaft work. Traffic should follow detour signs.
  • Monday, October 21, until Sunday, October 27, 9 p.m. to 7 a.m. Full closure on southbound frontage road, exit ramp, and entrance ramp of I-35 from Randolph Boulevard to Walzem Road for drilled shaft and column work. Traffic should follow detour signs.
  • Wednesday, October 23, until Friday, October 25, 9 p.m. to 5 a.m. Full closure on Fratt Road from Austin Highway (Loop 368) to southbound I-35 frontage road, full closures on southbound Interchange Parkway from Austin Highway (Loop 368) to Fratt Road, and full closure on Interchange Parkway from Fratt Road and Walzem Road. for drilled shaft work. Traffic should follow detour signs.
  • Wednesday, October 23, until Saturday, October 26, 9 p.m. to 5 a.m. Full closure of southbound I-35 connector ramp to westbound I-410 mainlanes, Randolph Boulevard at I-35, and southbound I-35 frontage road from Randolph Boulevard to Fratt Road for column cap work. Traffic must follow detour signs.

I-35 from Walzem Road to Eisenhauer Road

Northbound
  • Sunday, October 20, until Tuesday, October 22, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-35 frontage road from Galahad Drive to Innovation Way for barrier work. Traffic should use next entrance ramp.
  • Sunday, October 20, until Friday, October 25, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-35 frontage road between Eisenhauer Road and Walzem Road for drilled shaft work. Traffic should take previous entrance ramp.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Left lane closure on northbound I-35 frontage from Galahad Drive to Walzem Road for drilled shaft work.
  • Sunday, October 20, until Saturday, October 26, 9 p.m. to 7 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Galahad Drive to Walzem Road for drilled shaft work.
  • Monday, October 21, 9 p.m. to 5 a.m. Multiple left lane closures (2) on northbound I-35 frontage road from Galahad Drive to Innovation Way for barrier work.
  • Monday, October 21, 9 p.m. to 5 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Galahad Drive to Innovation Way for barrier work.
  • Wednesday, October 23, until Friday, October 25, 9 p.m. to 5 a.m. Left lane closure on northbound I-35 frontage road from Eisenhauer Road to Galahad Drive for drainage work.
  • Wednesday, October 23, until Friday, October 25, 9 p.m. to 5 a.m. Left lane closure on northbound I-35 frontage road from Eisenhauer Road to Galahad Drive for drainage work.
  • Thursday, October 24, until Friday, October 25, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-35 frontage road between Eisenhauer Road and Walzem Road for drainage work. Traffic should take previous entrance ramp.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Entrance ramp closure on northbound I-35 frontage road between Eisenhauer Road and Walzem Road for drilled shaft work. Traffic should take previous entrance ramp.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Left lane closure on northbound I-35 frontage from Galahad Drive to Walzem Road for drilled shaft work.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Multiple right lane closures (2) on northbound I-35 mainlanes from Galahad Drive to Walzem Road for drilled shaft work.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Left lane closure on northbound I-35 frontage road from Eisenhauer Road to Galahad Drive for drainage work.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Entrance ramp closure on northbound I-35 frontage road between Eisenhauer Road and Walzem Road for drainage work. Traffic should take previous entrance ramp.
Southbound
  • Monday, October 21, until Friday, October 25, 9 p.m. to 5 a.m. Left lane closure on southbound I-35 frontage road from Walzem Road to Lanark Drive for drainage work.
  • Wednesday, October 23, until Friday, October 25, 9 p.m. to 5 a.m. Right lane closure on southbound I-35 mainlanes from Walzem Road to Lanark Drive for drainage work.
  • Wednesday, October 23, until Friday, October 25, 9 p.m. to 5 a.m. Turnaround closure on southbound I-35 frontage road at Eisenhauer Road for drainage work.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Multiple lane closures (2) closure on southbound and northbound I-35 mainlanes from Walzem Road to Rittiman Road for roadway work.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Left lane closure on southbound I-35 frontage road from Walzem Road to Lanark Drive for drainage work.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Turnaround closure on southbound I-35 frontage road at Eisenhauer Road for drainage work.

I-35 from Eisenhauer Road to Rittiman Road

Northbound
  • Wednesday, October 23, until Friday, October 25, 9 p.m. to 5 a.m. Left lane closure on northbound I-35 frontage road from Remount Drive to Eisenhauer Road for drainage work.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Left lane closure on northbound I-35 frontage road from Remount Drive to Eisenhauer Road for drainage work.
Southbound

  • Monday, October 21, through November 19, long-term closure (24/7). Southbound to northbound I-35 turnaround closure at Rittiman Road for drainage work.
  • Monday, October 21, 8 a.m. to 8 a.m. Southbound to northbound I-35 turnaround closure at Rittiman Road for drainage work.
  • Tuesday, October 22, 9 p.m. to 5 a.m. Exit ramp closure on southbound I-35 mainlanes between Eisenhauer Road and Rittiman Road for drainage work. Traffic should use prior exit ramp.
  • Tuesday, October 22, until Thursday, October 24, 9 p.m. to 5 a.m. Right lane closure on southbound I-35 frontage road from Eisenhauer Road to Judivan for drainage work.
  • Wednesday, October 23, until Friday, October 25, 9 p.m. to 5 a.m. Exit ramp closure on southbound I-35 mainlanes between Eisenhauer Road and Rittiman Road for drainage work. Traffic should use prior exit ramp.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Exit ramp closure on southbound I-35 mainlanes between Eisenhauer Road and Rittiman Road for drainage work. Traffic should use prior exit ramp.
Eastbound
  • Thursday, October 24, until Friday, October 25, 9 p.m. to 5 a.m. Right turn lane closure on eastbound Eisenhauer Road to southbound I-35 frontage road for drainage work.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Right turn lane closure on eastbound Eisenhauer Road to southbound I-35 frontage road for drainage work.
Westbound
  • Thursday, October 24, until Friday, October 25, 9 p.m. to 5 a.m. Right turn lane closure on westbound Eisenhauer Road to northbound I-35 frontage road for drainage work.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Right turn lane closure on westbound Eisenhauer Road to northbound I-35 frontage road for drainage work.

I-35 from Rittiman Road to I-410 South Interchange

Northbound
  • No closures at this time.
Southbound
  • Tuesday, October 22, until Thursday, October 24, 9 p.m. to 5 a.m. Left lane closure on southbound I-35 frontage road from Rittiman Road to Tejasco for drainage work.
I-35 and I-410 South Interchange
Northbound
  • No closures at this time.
Southbound
  • Sunday, October 20, until Friday, October 25, 9 p.m. to 5 a.m. Alternating lane closures on southbound I-35 connector ramp to southbound I-410 South for drilled shaft and column work.
  • Friday, October 25, until Saturday, October 26, 11 p.m. to 7 a.m. Alternating lane closures on southbound I-35 connector ramp to southbound I-410 South for drilled shaft and column work.

I-35 from I-410 South to Petroleum Drive

Northbound
  • Sunday, October 20, until Tuesday, October 22, 9 p.m. to 5 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for sweeping work.
Southbound
  • No closures at this time.

I-410 South from I-35 to Binz Engleman Road

Northbound
  • No closures at this time.
Southbound
  • No closures at this time.

Other lane closures

  • For your information, there are other lane closures underway within the I-35 NEX project this week, but they are not expected to affect traffic or create notable delays.