Traffic impacts
Skip to main content

Traffic impacts

To provide the most accurate information about upcoming traffic impacts, the project team will provide as much notice as possible for lane closures and traffic switches. See below for a live map of traffic closures in San Antonio.

For a list of lane closures across Texas, visit TxDOT’s interative map website DriveTexas™.

I-35 NEX lane closures for Nov. 9 - 15

This page is updated weekly. To find the most up to date and current lane closures, follow the TxDOT San Antonio District on social media or contact us for email updates at i35NEX@txdot.gov.

This week's lane closures (weather permitting and subject to change):

Maintenance

  • No closures at this time.

I-35 from FM 3009 to FM 1518

Northbound

  • Sunday, Nov. 9, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Multiple mainlane closures (3), exit ramp, and entrance ramp of northbound I-35 from Evans Road to Roy Richard Drive (FM 3009) for pavement, roadway, and drainage work. Traffic should use next available ramps.
  • Monday, Nov. 10, until Friday, Nov. 14, 9 a.m. to 3 p.m. Rolling closure project wide for sweeping operation.
  • Monday, Nov. 10, 9 p.m. to 5 a.m. Full closure of northbound I-35 mainlanes from Schertz Parkway exit ramp (exit 174B) to Schertz Parkway entrance ramp for deck panels setting. Traffic should follow detour signs. Traffic should take previous exit ramp and take the following on-ramp.
  • Tuesday, Nov. 11, until Wednesday, Nov. 12, 8 p.m. to 6 a.m. Full closure of northbound I-35 mainlanes from Schertz Parkway exit ramp (exit 174B) to Schertz Parkway entrance ramp for deck panel setting. Traffic should follow detour signs. Traffic should take previous exit ramp and take the following on-ramp.

Southbound

  • Sunday, Nov. 9, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Multiple mainlane closures (3), and entrance ramp, and exit ramp of southbound I-35 from Roy Richard Drive (FM 3009) to Schertz Parkway for barrier work. Traffic should use next available ramps.
  • Monday, Nov. 10, until Saturday, Nov. 15, 12 p.m. to 5 a.m. Right lane closure on southbound I-35 frontage road from FM 2252 to Cibolo Valley Drive and rolling closures on southbound mainlanes of I-35 from Cibolo Valley Drive to Pat Booker Road for beam staging.
  • Monday, Nov. 10, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure of Corporate Drive at I-35 intersection for bridge deck work. Traffic should follow detour signs.
  • Thursday, Nov. 13, until Sunday, Nov. 16, 8 p.m. to 6 a.m. Full closure on southbound I-35 mainlanes from Roy Richard Drive (FM 3009) to Schertz Parkway for bridge panels setting. Traffic should follow detour signs.
Eastbound
  • No closures at this time.

I-35 from FM 1518 to Loop 1604

Northbound

  • Through Monday, Nov. 24, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Forum Parkway to Forum Access Road for construction work.
  • Through Monday, Nov. 24, long-term closure (24/7). Exit ramp closure on northbound I-35 to Evans Road for construction work.
  • Sunday, Nov. 9, 9 p.m. to 5 a.m. Full closure of Evans Road and northbound to southbound turnaround at I-35 intersection for bridge deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Wednesday, Nov. 12, 9 p.m. to 5 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, exit ramp, and entrance ramp from Forum Parkway to Evans Road for bridge deck work. Traffic should use next exit and entrance ramps.
  • Sunday, Nov. 9, until Wednesday, Nov. 12, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road from Forum Parkway to Forum Access Road for bridge structure work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road and exit ramp from Forum Parkway to Evans Road for utility work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Saturday, Nov. 15, 8 p.m. to 6 a.m. Full closure of northbound I-35 frontage road and exit ramp from Forum Parkway to Olympia Parkway for cap work. Traffic should follow detour signs.
  • Monday, Nov. 10, 12 a.m. to 6 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, exit ramp, and entrance ramp from Forum Parkway to Evans Road for traffic switch. Traffic should use next exit and entrance ramps.
  • Monday, Nov. 10, until Wednesday, Nov. 12, 9 p.m. to 5 a.m. Full closure on northbound frontage road of I-35 at Pasatiempo Intersection for footing and column work.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 6 a.m. Multiple mainlane closures (3) on northbound I-35 from Forum Access Road to Pasatiempo for column cap setting.
  • Monday, Nov. 10, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road from Olympia Parkway to Pasatiempo for asphalt paving. Traffic should follow detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 6 a.m. Full closure of northbound I-35 frontage road and exit ramp from Forum Parkway to Olympia Boulevard for column cap setting. Traffic should follow detour signs.
  • Wednesday, Nov. 12, until Saturday, Nov. 15, 8 p.m. to 6 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, exit ramp, and entrance ramp from Forum Parkway to Evans Road for bridge deck work. Traffic should use next exit and entrance ramps.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple mainlane closures (3) on northbound I-35 from Forum Access Road to Pasatiempo for column cap setting.
  • Friday, Nov. 14, 8 p.m. to 12 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, exit ramp, and entrance ramp from Forum Parkway to Evans Road for traffic switch. Traffic should use next exit and entrance ramps.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of northbound I-35 frontage road and exit ramp from Forum Parkway to Olympia Boulevard for column cap setting. Traffic should follow detour signs.
  • Saturday, Nov. 15, until Monday, Nov. 17, 12 a.m. to 12 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, exit ramp, and entrance ramp from Forum Parkway to Evans Road for traffic switch. Traffic should use next exit and entrance ramps.

Southbound

  • Through Monday, Nov. 30, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Forum Parkway to Old Austin Road for bridge and roadway work.
  • Through Monday, Nov. 24, long-term closure (24/7). Right lane closure on I-35 southbound mainlanes from Olympia Parkway to Loop 1604 interchange for construction work.
  • Through Monday, Nov. 24, long-term closure (24/7). Right lane closure on I-35 southbound collector distributor from Forum Parkway to Loop 1604 interchange for construction work.
  • Through Monday, Nov. 30, long-term closure (24/7). Entrance ramp closure on I-35 southbound frontage road from Old Austin Road to I-35 southbound mainlanes for construction work.
  • Through Monday, Nov. 24, long-term closure (24/7). Full closure on I-35 southbound to northbound turnaround at Corporate Drive for construction work.
  • Sunday, Nov. 9, until Wednesday, Nov. 12, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road from Old Austin Road to Forum Parkway and northbound I-35 exit ramp to Olympia Parkway for bridge deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Wednesday, Nov. 12, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Olympia Parkway to Forum Parkway for construction work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Multiple mainlane closures (3) on southbound I-35 mainlanes, exit ramp, and entrance ramp from Schertz Parkway to Forum Parkway for bridge deck pour, traffic shift, and lane striping.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Corporate Drive to Evans Road and Evans Road at I-35 intersection for bridge structure work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Friday, Nov. 14, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Retama Parkway to Forum Parkway for moving barrier, paving, and traffic shift. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Evans Road to Arcadia Drive and northbound to southbound turnaround of Evans Road at I-35 intersection for traffic shift. Traffic should follow detour signs.
  • Wednesday, Nov. 12, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from Old Austin Road to Forum Parkway and northbound I-35 exit ramp to Olympia Parkway for bridge deck work. Traffic should follow detour signs.
  • Wednesday, Nov. 12, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Olympia Parkway to Forum Parkway for construction work. Traffic should follow detour signs.
  • Thursday, Nov. 13, until Saturday, Nov. 15, 8 p.m. to 6 a.m. Multiple mainlane closures (3) on southbound I-35 mainlanes, exit ramp, and entrance ramp from Schertz Parkway to Forum Parkway for bridge deck pour, traffic shift, and lane striping.
  • Thursday, Nov. 13, until Saturday, Nov. 15, 8 p.m. to 6 a.m. Full closure of southbound I-35 frontage road from Corporate Drive to Evans Road and Evans Road at I-35 intersection for bridge structure work. Traffic should follow detour signs.

I-35 and Loop 1604 Interchange

Northbound

  • Through Friday, Dec. 19, long-term closure (24/7). Entrance ramp closure on I-35 northbound collector ramp to I-35 northbound mainlanes for construction work.
  • Sunday, Nov. 9, until Friday, Nov. 14, 9 p.m. to 5 a.m. Multiple mainlane closures (3) northbound I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for bridge structure work.
  • Sunday, Nov. 9, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Multiple mainlane closures (3), exit ramp of northbound I-35 and exit ramp closure from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for bridge structure work. Traffic should use next available ramps.
  • Sunday, Nov. 9, until Tuesday, Nov. 11, 9 p.m. to 5 a.m. Full closure on northbound I-35 connector ramp at Loop 1604 interchange, northbound I-35 frontage road from Pat Booker Road to Loop 1604 interchange and westbound Loop 1604 frontage road at Agora Parkway to I-35 frontage road at Forum Parkway for traffic switch, barrier, cap work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Friday, Nov. 14, 9 p.m. to 5 a.m. Full closure of northbound I-35 collector ramp at Loop 1604 interchange, northbound I-35 bypass bridge at Pat Booker Road, and westbound Loop 1604 frontage road at Agora Parkway to northbound I-35 frontage road at Forum Parkway for column, cap, and bridge beam work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Friday, Nov. 14, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 to northbound I-35 mainlanes connector ramp and full closure of westbound Loop 1604 to northbound I-35 mainlanes connector ramp for bridge cap work. Traffic follows the detour signs.
  • Sunday, Nov. 9, until Friday, Nov. 14, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 collector ramp at I-35 interchange and eastbound Loop 1604 entrance ramp from Lookout Road to IKEA-RBFCU Parkway for bridge deck work. Traffic to follow detour sign.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 5 a.m. Multiple main lane closures (2) on northbound I-35 from Pat Booker Road to forum pkwy Multiple main lane closures (2) on northbound I-35 from Pat Booker Road to Forum Parkway
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 5 a.m. Full closure on northbound I-35 exit ramp and entrance ramp at Toepperwein Road, I-35 northbound collector distributor, northbound I-35 frontage road from Pat Booker Road to Loop 1604 and westbound Loop 1604 frontage road from Agora Parkway to Forum Parkway for bridge beam setting. Traffic should follow detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 6 a.m. Full closure of northbound I-35 Access Road from Shin Oak Drive to Pat Booker Road for cap work. Traffic should follow detour signs.
  • Monday, Nov. 10, until Thursday, Nov. 13, 8 p.m. to 5 a.m. Full closure on eastbound Loop 1604 connector ramp to northbound I-35 mainlanes for bridge beam setting. Traffic should follow detour signs.
  • Monday, Nov. 10, until Saturday, Nov. 15, 12 p.m. to 5 a.m. Left shoulder closure on westbound mainlanes of Loop 1604 from West Byrd Boulevard to Kitty Hawk Road for beam staging.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 6 a.m. Full closure of northbound collector, full closure of northbound frontage road and access road on I-35 from Shin Oak to Pat Booker Road for bridge structure work. Traffic should follow detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 6 a.m. Full closure of northbound I-35 frontage road from Shin Oak Drive to Pat Booker Road for bridge structure work. Traffic should follow detour signs.
  • Tuesday, Nov. 11, 8 p.m. to 6 a.m. Multiple mainlane closures (3) northbound I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for bridge structure work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple mainlane closures (3) northbound I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for bridge structure work.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Multiple main lane closures (2) on northbound I-35 from Pat Booker Road to forum pkwy Multiple main lane closures (2) on northbound I-35 from Pat Booker Road to Forum Parkway
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of northbound I-35 collector ramp at Loop 1604 interchange, northbound I-35 bypass bridge at Pat Booker Road, and westbound Loop 1604 frontage road at Agora Parkway to northbound I-35 frontage road at Forum Parkway for column, cap, and bridge beam work. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure on northbound I-35 exit ramp and entrance ramp at Toepperwein Road, I-35 northbound collector distributor, northbound I-35 frontage road from Pat Booker Road to Loop 1604 and westbound Loop 1604 frontage road from Agora Parkway to Forum Parkway for bridge beam setting. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure on eastbound Loop 1604 connector ramp to northbound I-35 mainlanes for bridge beam setting. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of eastbound Loop 1604 to northbound I-35 mainlanes connector ramp and full closure of westbound Loop 1604 to northbound I-35 mainlanes connector ramp for bridge cap work. Traffic follows the detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of eastbound Loop 1604 collector ramp at I-35 interchange and eastbound Loop 1604 entrance ramp from Lookout Road to IKEA-RBFCU Parkway for bridge deck work. Traffic to follow detour sign.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Multiple mainlane closures (3) northbound I-35 from I-35 Access Road bridge near Shin Oak Drive to Forum Parkway for bridge structure work.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure of northbound I-35 collector ramp at Loop 1604 interchange, northbound I-35 bypass bridge at Pat Booker Road, and westbound Loop 1604 frontage road at Agora Parkway to northbound I-35 frontage road at Forum Parkway for column, cap, and bridge beam work. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure of eastbound Loop 1604 to northbound I-35 mainlanes connector ramp and full closure of westbound Loop 1604 to northbound I-35 mainlanes connector ramp for bridge cap work. Traffic follows the detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure of eastbound Loop 1604 collector ramp at I-35 interchange and eastbound Loop 1604 entrance ramp from Lookout Road to IKEA-RBFCU Parkway for bridge deck work. Traffic to follow detour sign.

Southbound

  • Through Monday, Nov. 24, long-term closure (24/7). Right lane closure on I-35 southbound connector ramp to Loop 1604 westbound mainlanes for construction work.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to McMorris Boulevard for bridge column and cap work.
  • Sunday, Nov. 9, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Multiple mainlane closures (3) of southbound I-35 from Forum Parkway to Ferrell Road for bridge deck work.
  • Sunday, Nov. 9, until Tuesday, Nov. 11, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Forum Parkway to Gateway Boulevard for column and cap work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road at Forum Parkway to westbound Loop 1604 frontage road at Gateway Boulevard and entrance ramp closure from Old Austin Road for utilities work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 mainlanes from Pat Booker Road to Gateway Boulevard, westbound Loop 1604 distributor ramp at I-35 interchange, northbound I-35 ramp to westbound Loop 1604 mainlanes, and southbound I-35 distributor ramp at Loop 1604 interchange for bridge deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure eastbound Loop 1604 to northbound I-35 direct connector, full closure of westbound Loop 1604 to northbound I-35 direct connector, full closure of westbound Loop 1604 frontage road to northbound I-35 frontage from Agora parkway to Forum and full closure of northbound collector distributor after northbound I-35 to westbound Loop 1604 loop for bridge cap work, traffic follows detour signs.
  • Sunday, Nov. 9, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure eastbound Loop 1604 to northbound I-35 direct connector, full closure of westbound Loop 1604 to northbound I-35 connector ramp full closure of westbound Loop 1604 frontage road to northbound I-35 frontage from Agora parkway to Forum and full closure of northbound collector distributor after northbound I-35 to westbound Loop 1604 loop for deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from Arcadia Drive to Olympia Parkway, entrance ramp closure at Old Austin Road, full closure on westbound Loop 1604 distributor ramp at I-35 interchange and northbound I-35 ramp to westbound Loop 1604 mainlanes, southbound I-35 distributor ramp to westbound Loop 1604 mainlanes, eastbound Loop 1604 frontage road from entrance ramp to IKEA-RBFCU Parkway intersection, and IKEA-RBFCU Parkway intersection at Loop 1604 for column, cap, and bridge deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 distributor ramp at I-35 interchange, southbound I-35 distributor ramp at Loop 1604 interchange, northbound I-35 ramp to westbound Loop1604 mainlanes, eastbound Loop 1604 distributor ramp at I-35 interchange, northbound I-35 exit ramp to Olympia Parkway, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to McMorris Boulevard, and IKEA-RBFCU Parkway intersection at Loop 1604 for barrier movement and striping. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from Arcadia Drive to Olympia Parkway, southbound I-35 entrance ramp at Old Austin Road, westbound I-35 distributor ramp, northbound and southbound I-35 ramp to westbound Loop 1604 mainlanes, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to IKEA-RBFCU Parkway intersection, and IKEA-RBFCU Parkway intersection at Loop 1604 for column cap work and traffic switch. Traffic should follow detour signs.
  • Monday, Nov. 10, until Thursday, Nov. 13, 8 p.m. to 5 a.m. Multiple mainlane closures (3) on southbound I-35 from Forum Parkway to McMorris Boulevard. for bridge beam setting.
  • Monday, Nov. 10, until Thursday, Nov. 13, 8 p.m. to 5 a.m. Full closure on southbound I-35 collector ramp at Loop 1604 interchange for bridge beam setting. Traffic should follow detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 5 a.m. Full closure on southbound I-35 frontage road at Forum Parkway to westbound Loop 1604 frontage road at Gateway Boulevard and entrance ramp closure from Old Austin Road for bridge beam setting. Traffic should follow detour signs.
  • Monday, Nov. 10, until Wednesday, Nov. 12, 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 mainlanes from Pat Booker Road to Gateway Boulevard, westbound Loop 1604 connector ramp at I-35 interchange, northbound I-35 ramp to westbound Loop 1604 mainlanes, and southbound I-35 connector ramp at Loop 1604 interchange for steel girders welding work. Traffic should follow detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 9 p.m. to 5 a.m. Full closure on eastbound and westbound Loop 1604 mainlanes at I-35 interchange, eastbound and westbound Loop 1604 collector ramps, southbound I-35 collector ramp at Loop 1604 interchange, northbound I-35 connector ramp to westbound Loop 1604 mainlanes northbound I-35 collector distributor, northbound I-35 frontage road over Pat Booker to Loop 1604 eastbound frontage road, exit ramp and entrance ramp closure at Toepperwein Road for bridge deck work. Traffic should follow detour signs.
  • Tuesday, Nov. 11, 8 p.m. to 6 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to McMorris Boulevard for bridge column and cap work.
  • Tuesday, Nov. 11, until Thursday, Nov. 13, 8 p.m. to 5 a.m. Full closure of southbound frontage road of I-35 from Forum Parkway to Gateway boulevard, full closure of the northbound and southbound IKEA-RBFCU intersection, full closure of the southbound collector of I-35, full closure of westbound Loop 1604 to southbound I-35 connector ramp and full closure of southbound I-35 to westbound Loop 1604 connector ramp for bridge beam setting. Traffic should follow detour signs.
  • Tuesday, Nov. 11, until Friday, Nov. 14, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road from Arcadia Drive to Olympia Parkway, southbound I-35 entrance ramp at Old Austin Road, westbound I-35 distributor ramp, northbound and southbound I-35 ramp to westbound Loop 1604 mainlanes, eastbound Loop 1604 frontage road from IKEA-RBFCU Parkway entrance ramp to IKEA-RBFCU Parkway intersection, and IKEA-RBFCU Parkway intersection at Loop 1604 for column cap work and traffic switch. Traffic should follow detour signs.
  • Wednesday, Nov. 12, until Friday, Nov. 14, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 mainlanes from Gateway Boulevard to Pat Booker Road, eastbound Loop 1604 connector ramp at I-35 interchange and southbound I-35 connector ramp at Loop 1604 interchange for steel girder work. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to McMorris Boulevard for bridge column and cap work.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Multiple mainlane closures (3) on southbound I-35 from Forum Parkway to McMorris Boulevard. for bridge beam setting.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure on southbound I-35 collector ramp at Loop 1604 interchange for bridge beam setting. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure on southbound I-35 frontage road at Forum Parkway to westbound Loop 1604 frontage road at Gateway Boulevard and entrance ramp closure from Old Austin Road for bridge beam setting. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on eastbound and westbound Loop 1604 mainlanes at I-35 interchange, eastbound and westbound Loop 1604 collector ramps, southbound I-35 collector ramp at Loop 1604 interchange, northbound I-35 connector ramp to westbound Loop 1604 mainlanes northbound I-35 collector distributor, northbound I-35 frontage road over Pat Booker to Loop 1604 eastbound frontage road, exit ramp and entrance ramp closure at Toepperwein Road for bridge deck work. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on westbound Loop 1604 mainlanes from Pat Booker Road to Gateway Boulevard, westbound Loop 1604 distributor ramp at I-35 interchange, northbound I-35 ramp to westbound Loop 1604 mainlanes, and southbound I-35 distributor ramp at Loop 1604 interchange for bridge deck work. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure eastbound Loop 1604 to northbound I-35 direct connector, full closure of westbound Loop 1604 to northbound I-35 direct connector, full closure of westbound Loop 1604 frontage road to northbound I-35 frontage from Agora parkway to Forum and full closure of northbound collector distributor after northbound I-35 to westbound Loop 1604 loop for bridge cap work, traffic follows detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road from Arcadia Drive to Olympia Parkway, entrance ramp closure at Old Austin Road, full closure on westbound Loop 1604 distributor ramp at I-35 interchange and northbound I-35 ramp to westbound Loop 1604 mainlanes, southbound I-35 distributor ramp to westbound Loop 1604 mainlanes, eastbound Loop 1604 frontage road from entrance ramp to IKEA-RBFCU Parkway intersection, and IKEA-RBFCU Parkway intersection at Loop 1604 for column, cap, and bridge deck work. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Multiple lane closures (3) on southbound I-35 mainlanes from Forum Parkway to McMorris Boulevard for bridge column and cap work.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure on westbound Loop 1604 mainlanes from Pat Booker Road to Gateway Boulevard, westbound Loop 1604 distributor ramp at I-35 interchange, northbound I-35 ramp to westbound Loop 1604 mainlanes, and southbound I-35 distributor ramp at Loop 1604 interchange for bridge deck work. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure eastbound Loop 1604 to northbound I-35 direct connector, full closure of westbound Loop 1604 to northbound I-35 direct connector, full closure of westbound Loop 1604 frontage road to northbound I-35 frontage from Agora parkway to Forum and full closure of northbound collector distributor after northbound I-35 to westbound Loop 1604 loop for bridge cap work, traffic follows detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure on southbound I-35 frontage road from Arcadia Drive to Olympia Parkway, entrance ramp closure at Old Austin Road, full closure on westbound Loop 1604 distributor ramp at I-35 interchange and northbound I-35 ramp to westbound Loop 1604 mainlanes, southbound I-35 distributor ramp to westbound Loop 1604 mainlanes, eastbound Loop 1604 frontage road from entrance ramp to IKEA-RBFCU Parkway intersection, and IKEA-RBFCU Parkway intersection at Loop 1604 for column, cap, and bridge deck work. Traffic should follow detour signs.

Loop 1604 from I-35 Interchange to Nacogdoches Road

Eastbound

  • Through Friday, Nov. 30, long-term closure (24/7). Left lane closure on eastbound frontage road of Loop 1604 from Lookout Road to IKEA-RBFCU Boulevard for construction.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure of eastbound Loop 1604 mainlanes from Nacogdoches Road to Pat Booker Road for bridge deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure of Lookout Road and turnarounds at Loop 1604 intersection for bridge deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on eastbound Loop 1604 frontage road, and exit ramp closure from Lookout Road to IKEA-RBFCU Parkway intersection and westbound to eastbound turnaround of Lookout Road at Loop 1604 intersection for bridge deck work. Traffic follows the detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on eastbound frontage road, close the westbound to eastbound turnaround and westbound to eastbound turnaround, entrance ramp and exit ramp closure and intersection closure of Loop 1604 at Lookout Road for construction work. Traffic follows the detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of eastbound Loop 1604 mainlanes from Nacogdoches Road to Pat Booker Road for bridge deck work. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of Lookout Road and turnarounds at Loop 1604 intersection for bridge deck work. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on eastbound Loop 1604 frontage road, and exit ramp closure from Lookout Road to IKEA-RBFCU Parkway intersection and westbound to eastbound turnaround of Lookout Road at Loop 1604 intersection for bridge deck work. Traffic follows the detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on eastbound frontage road, close the westbound to eastbound turnaround and westbound to eastbound turnaround, entrance ramp and exit ramp closure and intersection closure of Loop 1604 at Lookout Road for construction work. Traffic follows the detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure of eastbound Loop 1604 mainlanes from Nacogdoches Road to Pat Booker Road for bridge deck work. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure of Lookout Road and turnarounds at Loop 1604 intersection for bridge deck work. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure on eastbound Loop 1604 frontage road, and exit ramp closure from Lookout Road to IKEA-RBFCU Parkway intersection and westbound to eastbound turnaround of Lookout Road at Loop 1604 intersection for bridge deck work. Traffic follows the detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure on eastbound frontage road, close the westbound to eastbound turnaround and westbound to eastbound turnaround, entrance ramp and exit ramp closure and intersection closure of Loop 1604 at Lookout Road for construction work. Traffic follows the detour signs.

Westbound

  • Through Sunday, Nov. 30, long-term closure (24/7). Entrance ramp closure on Loop 1604 westbound from Lookout Road to Nacogdoches Road for construction work.
  • Through Friday, Dec. 19, long-term closure (24/7). Entrance ramp closure on I-35 northbound collector ramp to I-35 northbound mainlanes for construction work.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure of westbound Loop 1604 frontage road from Gateway Boulevard to Gateway Place for bridge deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on westbound Loop 1604 frontage road, and exit ramp from Lookout Road to Nacogdoches Road and eastbound to westbound turnarounds at Union Pacific Railroad and Lookout Road intersection at Loop 1604 for bridge deck work. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of westbound Loop 1604 frontage road from Gateway Boulevard to Gateway Place for bridge deck work. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on westbound Loop 1604 frontage road, and exit ramp from Lookout Road to Nacogdoches Road and eastbound to westbound turnarounds at Union Pacific Railroad and Lookout Road intersection at Loop 1604 for bridge deck work. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure of westbound Loop 1604 frontage road from Gateway Boulevard to Gateway Place for bridge deck work. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure on westbound Loop 1604 frontage road, and exit ramp from Lookout Road to Nacogdoches Road and eastbound to westbound turnarounds at Union Pacific Railroad and Lookout Road intersection at Loop 1604 for bridge deck work. Traffic should follow detour signs.

I-35 from Loop 1604 to Toepperwein Road

Northbound

  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of northbound frontage road, close the exit ramp, entrance ramp and close sandpiper drive on I-35 from Toepperwein Road to Shin Oak Drive for construction work. Traffic follows detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, entrance ramp and exit ramp closures from Toepperwein Road to Pat Booker Road for drilled shaft, column, and cap work.
  • Sunday, Nov. 9, until Wednesday, Nov. 12, 9 p.m. to 5 a.m. Full closure of Pat Booker Road at I-35 intersection and northbound I-35 exit ramp to Pat Booker Road for bridge structure work. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of northbound frontage road, close the exit ramp, entrance ramp and close sandpiper drive on I-35 from Toepperwein Road to Shin Oak Drive for construction work. Traffic follows detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, entrance ramp and exit ramp closures from Toepperwein Road to Pat Booker Road for drilled shaft, column, and cap work.

Southbound

  • Through Monday, Nov. 24, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from McMorris Boulevard to Pat Booker Road for construction.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Shin Oak Drive to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure from Pat Booker Road to Toepperwein Road for column, cap and bridge deck work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Shin Oak Drive to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure from Pat Booker Road to Toepperwein Road for column, cap and bridge deck work.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp closure from Pat Booker Road to Toepperwein Road for column, cap and bridge deck work.
  • Saturday, Nov. 15, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Shin Oak Drive to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.

Eastbound

  • No closures at this time.

I-35 from Toepperwein Road to O’Connor Road

Northbound

  • Through Tuesday, Nov. 25, long-term closure (24/7). Right lane closure on northbound I-35 frontage road from O’Connor Road to Bludau-Bishop Road for construction work.
  • Through Thursday, Dec. 18, long-term closure (24/7). Exit ramp closure on I-35 northbound mainlanes to O’Connor Road for construction work.
  • Through Saturday, Feb. 28, 2026, long-term closure (24/7). Full closure of Gunn Road at northbound frontage road on I-35 for construction work. Traffic follows detour signs.
  • Sunday, Nov. 9, until Wednesday, Nov. 12, 9 p.m. to 5 a.m. Full closure of eastbound and westbound lanes of Toepperwein Road at I-35 intersection for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, and exit ramp closure from Judson Road to Toepperwein Road for drilled shaft, column, and cap work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, and exit ramp and entrance ramp closures from O'Connor Road to Judson Road for drilled shaft, column, and cap work.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, entrance ramp and exit ramp from O'Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road and exit ramp from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, and exit ramp closure from Judson Road to Toepperwein Road for drilled shaft, column, and cap work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, multiple lane closures (2) on northbound I-35 frontage road, and exit ramp and entrance ramp closures from O'Connor Road to Judson Road for drilled shaft, column, and cap work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp, and exit ramp closure from Judson Road to O'Connor Road for drilled shaft, column, and cap work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of northbound I-35 frontage road, entrance ramp and exit ramp from O'Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of northbound I-35 frontage road and exit ramp from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, entrance ramp and exit ramp from O'Connor Road to Judson Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road and exit ramp from Judson Road to Toepperwein Road for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.

Southbound

  • Through Sunday Nov. 23, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 at Crownpoint Drive for construction work.
  • Through Sunday, Nov. 23, long-term closure (24/7). Full closure on Crownpoint Drive for utility work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, and exit ramp from Toepperwein Road to Judson Road for bridge deck work.
  • Sunday, Nov. 9, 8 p.m. to 6 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp, and exit ramp closure from Judson Road to O'Connor Road for drilled shaft, column, and cap work.
  • Sunday, Nov. 9, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road and exit ramp from Crownpoint Drive to O'Connor Road for cap form work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Monday, Nov. 10, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, entrance ramp, and exit ramp closure from Judson Road to O'Connor Road for drilled shaft, column, and cap work.
  • Monday, Nov. 10, until Thursday, Nov. 13, 8 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for bridge beam setting. Traffic should follow detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 5 a.m. Multiple main lane closures (3) on southbound I-35 from Judson Road to Crownpoint Drive for bridge beam setting. Traffic should follow detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 6 a.m. Multiple mainlane (3) closures on southbound I-35 from Judson Road to Crownpoint Drive for column cap setting.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for column cap setting. Traffic should follow detour signs.
  • Monday, Nov. 10, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Crownpoint Drive to O'Connor Road for cap form work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Wednesday, Nov. 12, until Friday, Nov. 14, 9 p.m. to 5 a.m. Right lane and right turn lane closure on eastbound Judson Road at I-35 intersection and right lane and right turn lane closure on southbound frontage road of I-35 from Toepperwein Road to Crownpoint Drive for traffic signal installation work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, and exit ramp from Toepperwein Road to Judson Road for bridge deck work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road and exit ramp from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road and exit ramp from Crownpoint Drive to O'Connor Road for cap form work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for bridge beam setting. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Multiple main lane closures (3) on southbound I-35 from Judson Road to Crownpoint Drive for bridge beam setting. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Multiple mainlane (3) closures on southbound I-35 from Judson Road to Crownpoint Drive for column cap setting.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for column cap setting. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Toepperwein Road to Judson Road for bridge deck work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and entrance ramp from Judson Road to Crownpoint Drive for column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.

I-35 from O'Connor Road to Thousand Oaks Drive

Northbound

  • Through Friday, Dec. 11, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Weidner Road to O’Connor Road for bridge work.
  • Through Friday, Jan. 31, 2026, long-term closure (24/7). Left lane closure on northbound frontage road of I-35 from Starlight Terrace to Weidner Road for construction work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road of I-35 after Weidner entrance ramp to O'Connor Road for barrier and striping work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road from Crestway Drive to Weidner Road and Starlight Terrace at I-35 intersection for cap work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, alternating lane closures (2) on northbound I-35 frontage road, and exit ramp closure from Thousand Oaks Drive/Starlight Terrace to Weidner Road for drainage and drilled shaft work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, multiple lane closures (2) of northbound I-35 frontage road, entrance ramp from Weidner Road to O'Connor Road for drainage and drilled shaft work.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, entrance ramp, and exit ramp from Starlight Terrace to Weidner Road, southbound to northbound turnaround at I-35 and Starlight Terrace intersection, northbound to southbound turnaround at I-35 and Weidner Road intersection for barrier slipping, temporary barriers moving. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road, entrance ramp, from Weidner Road to O'Connor Road, southbound to northbound turnaround at I-35 and Weidner Road intersection for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, entrance ramp, and exit ramp from Starlight Terrace to Weidner Road, southbound to northbound turnaround at I-35 and Thousand Oaks/Starlight Terrace intersection, northbound to southbound turnaround at I-35 and Weidner Road intersection for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on northbound I-35 frontage road of I-35 after Weidner entrance ramp to O'Connor Road for barrier and striping work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) on northbound I-35 mainlanes, alternating lane closures (2) on northbound I-35 frontage road, and exit ramp closure from Thousand Oaks Drive/Starlight Terrace to Weidner Road for drainage and drilled shaft work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) of northbound I-35 mainlanes, multiple lane closures (2) of northbound I-35 frontage road, entrance ramp from Weidner Road to O'Connor Road for drainage and drilled shaft work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on northbound I-35 frontage road, entrance ramp, from Weidner Road to O'Connor Road, southbound to northbound turnaround at I-35 and Weidner Road intersection for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of northbound I-35 frontage road, entrance ramp, and exit ramp from Starlight Terrace to Weidner Road, southbound to northbound turnaround at I-35 and Thousand Oaks/Starlight Terrace intersection, northbound to southbound turnaround at I-35 and Weidner Road intersection for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure of northbound I-35 frontage road, entrance ramp, and exit ramp from Starlight Terrace to Weidner Road, southbound to northbound turnaround at I-35 and Starlight Terrace intersection, northbound to southbound turnaround at I-35 and Weidner Road intersection for barrier slipping, temporary barriers moving. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on northbound I-35 frontage road, entrance ramp, from Weidner Road to O'Connor Road, southbound to northbound turnaround at I-35 and Weidner Road intersection for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.

Southbound

  • Through Tuesday, Nov. 25, long-term closure (24/7). Right lane closure on southbound frontage road of I-35 from Weidner Road to Thousand Oaks Drive for bridge work.
  • Through Tuesday, Nov. 25, long-term closure (24/7). Entrance ramp closure on southbound I-35 from O’Connor Road for bridge work.
  • Through Friday, Nov. 21, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from O’Connor Road to Tech Com for construction work.
  • Through Tuesday, Nov. 25, long-term closure (24/7). Left lane closure on southbound frontage road of I-35 from Tech Com to Weidner Road for construction work.
  • Through Tuesday, Nov. 25, long-term closure (24/7). Full closure on I-35 southbound to northbound turnaround at Weidner Road for construction work.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Tech Com Drive to Weidner Road for cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, exit ramp from O'Connor Road to Weidner Road for cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, and entrance ramp and exit ramp closures from Weidner Road to Thousand Oaks Drive for drainage and drilled shaft work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane closures (2) on southbound I-35 frontage road, and exit ramp closure from O'Connor Road to Weidner Road for drilled shaft, column, and cap work.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from O'Connor Road to Tech Com Drive for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive for cap work and drainage work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, entrance ramp, exit ramp and southbound to northbound turnaround closure, northbound to southbound turnaround closure from Weidner Road to Thousand Oaks Drive for sidewalk and curb installation work. Traffic should follow detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 5 a.m. Multiple mainlane closures (3) on southbound I-35 from Weidner Road to Thousand Oaks Drive for bridge beam setting.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 6 a.m. Multiple mainlane closures (3) on southbound I-35 from Weidner Road to Thousand Oaks Drive for column cap setting.
  • Monday, Nov. 10, until Thursday, Nov. 13, 8 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive, southbound to northbound turnaround of Thousand Oaks Drive at I-35 intersection, and northbound to southbound turnaround closure of Weidner Road at I-35 intersection for bridge beam setting. Traffic should follow detour signs.
  • Monday, Nov. 10, until Thursday, Nov. 13, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive, southbound to northbound turnaround of Thousand Oaks Drive at I-35 intersection, and northbound to southbound turnaround closure of Weidner Road at I-35 intersection for column cap setting. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road and exit ramp from Tech Com Drive to Weidner Road for cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road, exit ramp from O'Connor Road to Weidner Road for cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, multiple lane closures (2) on southbound I-35 frontage road, and entrance ramp and exit ramp closures from Weidner Road to Thousand Oaks Drive for drainage and drilled shaft work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple lane closures (3) on southbound I-35 mainlanes, alternating lane closures (2) on southbound I-35 frontage road, and exit ramp closure from O'Connor Road to Weidner Road for drilled shaft, column, and cap work.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road from O'Connor Road to Tech Com Drive for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure on southbound I-35 frontage road, entrance ramp, exit ramp and southbound to northbound turnaround closure, northbound to southbound turnaround closure from Weidner Road to Thousand Oaks Drive for sidewalk and curb installation work. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Multiple mainlane closures (3) on southbound I-35 from Weidner Road to Thousand Oaks Drive for bridge beam setting.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Multiple mainlane closures (3) on southbound I-35 from Weidner Road to Thousand Oaks Drive for column cap setting.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure on southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive, southbound to northbound turnaround of Thousand Oaks Drive at I-35 intersection, and northbound to southbound turnaround closure of Weidner Road at I-35 intersection for bridge beam setting. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure on southbound I-35 frontage road, entrance ramp, and exit ramp from Weidner Road to Thousand Oaks Drive, southbound to northbound turnaround of Thousand Oaks Drive at I-35 intersection, and northbound to southbound turnaround closure of Weidner Road at I-35 intersection for column cap setting. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road and exit ramp from Tech Com Drive to Weidner Road for cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, exit ramp from O'Connor Road to Weidner Road for cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from O'Connor Road to Tech Com Drive for drilled shaft, column, and cap work. Accommodations will be made for local traffic. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, entrance ramp, exit ramp and southbound to northbound turnaround closure, northbound to southbound turnaround closure from Weidner Road to Thousand Oaks Drive for sidewalk and curb installation work. Traffic should follow detour signs.

I-35 from Thousand Oaks Drive to I-410 North Interchange

Northbound

  • Through Friday, Nov. 30, long-term (24/7). Left lane closure on northbound frontage road of I-35 from Randolph Boulevard to Starlight Terrace for bridge work.
  • Monday, Nov. 10, until Saturday, Nov. 15, 12 p.m. to 5 a.m. Left lane closure on northbound frontage road of I-35 from Crestway Drive to Starlight Terrace for beam staging.

Southbound

  • Through Friday, Nov. 30, long-term closure (24/7). Alternating lane closures on southbound I-35 frontage road between Thousand Oaks Drive and Whirlwind Drive for roadway reconstruction and structural work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road, and exit ramp from Thousand Oaks Drive to Randolph Boulevard, and northbound to southbound turnaround at Thousand Oaks Drive and I-35 intersection for panel and deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple mainlane closures (3) on southbound I-35 from Thousand Oaks Drive to Randolph Boulevard for panel and deck work. Traffic should follow detour signs.
  • Thursday, Nov. 13, 8 a.m. to 6 p.m. Full closure of southbound I-35 frontage road, and exit ramp from Thousand Oaks Drive to Randolph Boulevard, and northbound to southbound turnaround at Thousand Oaks Drive and I-35 intersection for panel and deck work. Traffic should follow detour signs.

I-35 and I-410 North Interchange

Northbound

  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of eastbound I-410 ramp to northbound I-35 mainlanes for cap work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of northbound I-35 connector ramp to westbound I-410 mainlanes, entrance ramp closure from Randolph Boulevard to westbound I-410 mainlanes, and full closure of the I-35 southbound to I-410 westbound mainlanes for steel girder work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of entrance ramp on westbound I-410 frontage road to Austin Highway and exit ramp to Austin Highway (Loop 368) from westbound I-410 mainlanes for deck work. Traffic should follow detour signs.

Southbound

  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of eastbound I-410 ramp to southbound I-35 mainlanes for bridge deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of southbound I-35 ramp to westbound I-410 mainlanes for cap work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of southbound I-35 to Loop 368 exit, full closure of entrance ramp to Loop 368 on westbound frontage road of I-410 and full closure of exit ramp to Loop 368 on westbound mainlanes of I-410 for cap work. Traffic follows detour signs.

I-410 North from Starcrest Drive to Harry Wurzbach Road

Eastbound

  • No closures at this time.

Westbound

  • No closures at this time.

I-410 North from I-35 Interchange to Starcrest Drive

Eastbound

  • Through Monday, Nov. 24, long-term (24/7). Left lane closure on I-410 eastbound frontage road from Starcrest Drive to Perrin Beitel for construction work.
  • Through Monday, Nov. 24, long-term (24/7). Left lane closure on I-410 eastbound frontage road from Quail Creek to Perrin Beitel for construction work.
  • Through Thursday, Nov. 20, long-term (24/7). Left lane closure on I-410 eastbound frontage road from Perrin Beitel to Vicar Road for construction work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (2) on eastbound I-410 mainlanes from Perrin Beitel to Austin Highway exit ramp for deck work, barrier and shore tower setting.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of eastbound frontage road on I-410 from Perrin Beitel to Walzem Road for deck work. Traffic should use detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of eastbound mainlanes, entrance ramp closure to I-410 eastbound mainlane from Vicar drive to Austin Highway, and entrance ramp closure from Starcrest Drive to I-410 eastbound mainlane for steel girder work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Entrance ramp closure from Perrin Beitel to Austin Highway (Loop 368) for cap work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Right lane closure on eastbound mainlanes of I-410 from Goldstar Drive to Perrin Beitel and left lane closure on the frontage road from Goldstar Drive to Perrin Beitel for column and cap work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Shoulder closure on I-410 eastbound mainlanes and shoulder closure on the bypass ramp at Starcrest for steel girders staging area
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on eastbound frontage road, westbound to eastbound turnaround closure, entrance ramp and exit ramp closure of I-410 from Starcrest Drive to Perrin Beitel for deck work. Traffic follows the detour signs.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of eastbound frontage road, close the eastbound to westbound turnaround, close the westbound to eastbound turnaround and close the entrance ramp on I-410 from Perrin Beitel to Vicar drive and full closure of Perrin Beitel intersection on I-410 for deck work. Traffic follows the detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 6 a.m. Alternating lane closures on eastbound I-410 frontage road and entrance ramp closure from Perrin Beitel to Austin Highway (Loop 368) for column cap setting. Traffic should follow detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 5 a.m. Full closure of eastbound I-410 exit ramp to Austin Highway (Loop 368) for column cap setting. Traffic should take the next ramp.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 5 a.m. Multiple main lane closures (3) on eastbound I-410 from Starcrest Drive Road to Perrin Beitel for bridge beam setting.
  • Monday, Nov. 10, until Saturday, Nov. 15, 12 p.m. to 5 a.m. Right shoulder on eastbound I-410 mainlane from Starcrest bypass exit ramp to Starcrest Dr bridge. Right shoulder on eastbound I-410 bypass under Starcrest bridge. for girder staging.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 5 a.m. Full closure on eastbound frontage road, westbound to eastbound turnaround closure, entrance ramp and exit ramp closure of I-410 from Starcrest Drive to Perrin Beitel for bridge beam setting. Traffic should follow detour signs.
  • Thursday, Nov. 13, 8 a.m. to 6 p.m. Multiple lane closures (2) on eastbound I-410 mainlanes from Perrin Beitel to Austin Highway exit ramp for deck work, barrier and shore tower setting.
  • Thursday, Nov. 13, 8 a.m. to 6 p.m. Full closure on eastbound frontage road, westbound to eastbound turnaround closure, entrance ramp and exit ramp closure of I-410 from Starcrest Drive to Perrin Beitel for deck work. Traffic follows the detour signs.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Alternating lane closures on eastbound I-410 frontage road and entrance ramp closure from Perrin Beitel to Austin Highway (Loop 368) for column cap setting. Traffic should follow detour signs.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure of eastbound I-410 exit ramp to Austin Highway (Loop 368) for column cap setting. Traffic should take the next ramp.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Multiple main lane closures (3) on eastbound I-410 from Starcrest Drive Road to Perrin Beitel for bridge beam setting.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure on eastbound frontage road, westbound to eastbound turnaround closure, entrance ramp and exit ramp closure of I-410 from Starcrest Drive to Perrin Beitel for bridge beam setting. Traffic should follow detour signs.
  • Saturday, Nov. 13, 9 p.m. to 5 a.m. Full closure on eastbound frontage road, westbound to eastbound turnaround closure, entrance ramp and exit ramp closure of I-410 from Starcrest Drive to Perrin Beitel for deck work. Traffic follows the detour signs.

Westbound

  • Through Saturday, Jan. 31, 2026, long-term closure (24/7). Left lane closure on westbound frontage road of I-410 from Perrin Creek to Austin Highway (Loop 368) for construction.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closures (2) on westbound I-410 mainlanes from Austin Highway exit ramp to Perrin Beitel intersection for barrier setting and shore tower setting.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of westbound I-410 frontage road and exit ramp from Perrin Creek to Perrin Beitel, and ramp from northbound Austin Highway (Loop 368) to westbound I-410 frontage road for bridge deck work. Traffic should follow detour signs.
  • Monday, Nov. 10, until Thursday, Nov. 13, 8 p.m. to 6 a.m. Full closure of westbound lanes of Fratt Road from Interchange Parkway to Austin Highway (Loop 368) for column cap setting. Traffic should follow detour signals.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Full closure of westbound lanes of Fratt Road from Interchange Parkway to Austin Highway (Loop 368) for column cap setting. Traffic should follow detour signals.

I-410 North from Starcrest Drive to Nacogdoches Road

Eastbound

  • Through Tuesday, Nov. 25, long-term closure (24/7). Left lane closure on eastbound frontage road of I-410 from Harry Wurzbach to Starcrest Drive for construction work.
  • Through Tuesday, Nov. 25, long-term closure (24/7). Exit ramp closure on I-410 eastbound mainlanes to Starcrest Drive for construction work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple lane closure (2) of eastbound I-410 frontage road, exit and entrance ramp from Nacogdoches Road to Harry Wurzbach Road. For temporary barrier setting.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure of eastbound I-410 frontage road, and entrance ramp from Harry Wurzbach Road to Ira Lee Road, and westbound to eastbound turnaround at Harry Wurzbach Road and I-35 intersection, and eastbound frontage road bypass closure of I-410 from Harry Wurzbach Road to Ira Lee Road for drilled shaft work. Traffic should follow detour signs.

Westbound

  • No closures at this time.

I-410 North and Austin Highway (Loop 368)

Northbound

  • No closures at this time.

Southbound

  • No closures at this time.

I-35 from I-410 North Interchange to Walzem Road

Northbound

  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Southbound to northbound turnaround closure at Walzem Road and I-35 intersection, alternating lane closures (2) on northbound I-35 frontage road, and alternating entrance and exit ramp closures from Walzem Road to Crestway Drive for cap and column work.
  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Multiple mainlane closures (3) of northbound I-35 from Walzem Road to Windcrest Drive for column work.
  • Sunday, Nov. 9, until Friday, Nov. 14, 9 p.m. to 5 a.m. Full closure of eastbound, westbound, northbound and southbound of Fratt Road from Austin highway to I-35 southbound frontage road for column work. Traffic follows the detour signs.
  • Monday, Nov. 10, until Friday, Nov. 14, 8 p.m. to 6 a.m. Southbound to northbound turnaround closure at Walzem Road and I-35 intersection, alternating lane closures (2) on northbound I-35 frontage road, and alternating entrance and exit ramp closures from Walzem Road to Windcrest Drive for column cap setting. Traffic should rake the next exit ramp.
  • Friday, Nov. 14, 8 p.m. to 6 a.m. Southbound to northbound turnaround closure at Walzem Road and I-35 intersection, alternating lane closures (2) on northbound I-35 frontage road, and alternating entrance and exit ramp closures from Walzem Road to Crestway Drive for cap and column work.
  • Friday, Nov. 14, 9 p.m. to 9 a.m. Southbound to northbound turnaround closure at Walzem Road and I-35 intersection, alternating lane closures (2) on northbound I-35 frontage road, and alternating entrance and exit ramp closures from Walzem Road to Windcrest Drive for column cap setting. Traffic should rake the next exit ramp.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Full closure of eastbound, westbound, northbound and southbound of Fratt Road from Austin highway to I-35 southbound frontage road for column work. Traffic follows the detour signs.

Southbound

  • Sunday, Nov. 9, until Sunday, Nov. 16, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road, exit ramp, and entrance ramp from Randolph Boulevard to Walzem Road for bridge deck work. Traffic should follow detour signs.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Randolph Boulevard to Fratt Road and full closure of Randolph Boulevard at I-35 intersection for construction work. Traffic should follow detour signs.
  • Friday, Nov. 14, 8 p.m. to 6 a.m. Full closure on southbound I-35 frontage road, exit ramp, and entrance ramp from Randolph Boulevard to Walzem Road for bridge deck work. Traffic should follow detour signs.
  • Saturday, Nov. 13, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road from Randolph Boulevard to Fratt Road and full closure of Randolph Boulevard at I-35 intersection for construction work. Traffic should follow detour signs.

I-35 from Walzem Road to Eisenhauer Road

Northbound

  • Monday, Nov. 10, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Multiple right lane closures (3) on northbound I-35 mainlanes from Eisenhauer Road to Walzem Road for deck work.
  • Wednesday, Nov. 12, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Multiple left lane closures (2) on northbound I-35 frontage road from Eisenhauer Road to Walzem Road for deck work.
  • Thursday, Nov. 13, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-35 main lanes between Eisenhauer Road and Walzem Road for deck work. Traffic should use next entrance.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Multiple left lane closures (2) on northbound I-35 frontage road from Eisenhauer Road to Walzem Road for deck work.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Multiple right lane closures (3) on northbound I-35 mainlanes from Eisenhauer Road to Walzem Road for deck work.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Entrance ramp closure on northbound I-35 main lanes between Eisenhauer Road and Walzem Road for deck work. Traffic should use next entrance.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Multiple left lane closures (2) on northbound I-35 frontage road from Eisenhauer Road to Walzem Road for deck work.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Entrance ramp closure on northbound I-35 main lanes between Eisenhauer Road and Walzem Road for deck work. Traffic should use next entrance.

Southbound

  • Through Friday, Dec. 12, long-term closure (24/7). Left lane closure on southbound I-35 frontage road from Walzem Road to Lanark Drive for drilled shaft work.
  • Sunday, Nov. 9, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 frontage road from Walzem Road to Lanark Drive for drilled shaft work. Traffic should follow detour.
  • Monday, Nov. 10, until Friday, Nov. 14, 9 p.m. to 5 a.m. Multiple left lane closures (2) on southbound and northbound I-35 mainlanes form Walzem Road to Judivan for drilled shaft and utility work.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Multiple left lane closures (2) on southbound and northbound I-35 mainlanes form Walzem Road to Judivan for drilled shaft and utility work.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Full closure on southbound I-35 frontage road from Walzem Road to Lanark Drive for drill shaft work. Traffic should follow detour.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure on southbound I-35 frontage road from Walzem Road to Lanark Drive for drill shaft work. Traffic should follow detour.

I-35 from Eisenhauer Road to Rittiman Road

Northbound

  • Through Tuesday, June 9, 2026, long-term closure (24/7). Left lane closure on northbound I-35 frontage road from Barrel Creek to Dinn Drive for drainage work.

Southbound

  • No closures at this time.

Eastbound

  • No closures at this time.

Westbound

  • No closures at this time.

I-35 from Rittiman Road to I-410 South Interchange

Northbound

  • Through Friday, Dec. 19, long-term closure (24/7). Left lane closure on northbound I-35 frontage road from Greatfare to Rittiman Road for drainage and drilled shaft work.
  • Through Thursday, Nov. 20, long-term closure (24/7). Turnaround closure on northbound to southbound I-35 frontage road at Rittiman for drilled shaft work.
  • Through Sunday, Nov. 30, long-term closure (24/7). Partial closure of left lane closure on southbound to northbound turnaround at Rittiman Road for drainage work.
  • Monday, Nov. 10, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Entrance ramp closure on northbound I-35 frontage road between Winnco Drive and Rittiman Road for cap work. Traffic should use next entrance.
  • Monday, Nov. 10, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Multiple left lane closures (2) on northbound I-35 frontage road from Space Center Drive to Rittiman Road for drill shaft work.
  • Monday, Nov. 10, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Multiple left lane closures (2) on northbound I-410 frontage road from Macro to Rittiman Road for deck panel work.
  • Thursday, Nov. 13, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on northbound I-35 mainlanes from Petroleum Drive to Rittiman Road for beam setting.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Entrance ramp closure on northbound I-35 frontage road between Winnco Drive and Rittiman Road for cap work. Traffic should use next entrance.
  • Friday, Nov. 14, 9 p.m. to 7 a.m. Multiple right lane closure (3) on I-35 northbound main lanes from Space Center Drive to Rittiman Road for drilled shaft work.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Multiple left lane closures (2) on northbound I-35 frontage road from Space Center Drive to Rittiman Road for drill shaft work.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Multiple left lane closures (2) on northbound I-410 frontage road from Macro to Rittiman Road for deck panel work.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure on northbound I-35 mainlanes from Petroleum Drive to Rittiman Road for beam setting.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Entrance ramp closure on northbound I-35 frontage road between Winnco Drive and Rittiman Road for cap work. Traffic should use next entrance.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Multiple left lane closures (2) on northbound I-35 frontage road from Space Center Drive to Rittiman Road for drill shaft work.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Multiple right lane closure (3) on I-35 northbound main lanes from Space Center Drive to Rittiman Road for drilled shaft work.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Multiple left lane closures (2) on northbound I-410 frontage road from Macro to Rittiman Road for deck panel work.

Southbound

  • Through Sunday, Jan. 25, 2026, long-term closure (24/7).Left lane closure on southbound I-35 frontage road from Rittiman Road to Petroleum Drive for drilled shaft work.
  • Thursday, Nov. 13, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Full closure on southbound I-35 mainlanes from Rittiman Road to Petroleum Drive for beam setting.

Eastbound

  • No closures at this time.

I-35 and I-410 South Interchange

Northbound

  • Monday, Nov. 10, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on northbound frontage road of I-35 to northbound frontage road of I-410 for cap work. Traffic should follow detour signs.
  • Monday, Nov. 10, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for sweeping and debris work.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Full closure on northbound frontage road of I-35 to northbound frontage road of I-410 for cap work. Traffic should follow detour signs.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Rolling closure on northbound and southbound mainlanes of I-35 from George Beach Avenue to Walzem Road and I-410 from Binz Engleman Road to Space Center Drive for sweeping and debris work.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure on northbound frontage road of I-35 to northbound frontage road of I-410 for cap work. Traffic should follow detour signs.

Southbound

  • Monday, Nov. 10, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on southbound I-35 connector ramp and entrance ramp to I-410 South for deck work. Traffic should follow detour signs.
  • Monday, Nov. 10, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure of southbound I-35 frontage road entrance ramp to southbound I-410 South for column work. Traffic should follow detour signs.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Full closure of southbound I-35 frontage road entrance ramp to southbound I-410 South for column work. Traffic should follow detour signs.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Full closure on southbound I-35 connector ramp and entrance ramp to I-410 South for deck work. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure of southbound I-35 frontage road entrance ramp to southbound I-410 South for column work. Traffic should follow detour signs.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure on southbound I-35 connector ramp and entrance ramp to I-410 South for deck work. Traffic should follow detour signs.

I-35 from I-410 South to Petroleum Drive

Northbound

  • No closures at this time.

Southbound

  • No closures at this time.

I-410 South from I-35 to Binz Engleman Road

Northbound

  • Monday, Nov. 10, until Thursday, Nov. 13, 9 p.m. to 5 a.m. Full closure on northbound I-410 mainlanes from Binz Engleman Road to Space Center Drive for beam setting.
  • Friday, Nov. 14, 11 p.m. to 7 a.m. Full closure on northbound I-410 mainlanes from Binz Engleman Road to Space Center Drive for beam setting.
  • Saturday, Nov. 15, 9 p.m. to 8 a.m. Full closure on northbound I-410 mainlanes from Binz Engleman Road to Space Center Drive for beam setting.

Southbound

  • Through Thursday, Nov. 13, long-term closure (24/7). Left lane closure on southbound I-410 frontage road from Winnco Drive to Binz Engleman Road for drainage work.
  • Sunday, Nov. 9, 9 p.m. to 5 a.m. Entrance ramp closure on southbound I-410 frontage road between Winnco Drive and Binz Engleman Road for drainage work. Traffic should follow detour signs.

I-35/I-410 S Interchange to FM 78

Northbound

  • No closures at this time.

Southbound

  • Thursday, Nov. 13, until Saturday, Nov. 15, 9 p.m. to 5 a.m. Closure of I-410 southbound frontage from just north of Binz Engleman to Binz Engleman for drilled shaft work.

Eastbound

  • No closures at this time.

Westbound

  • No closures at this time.

Other lane closures

  • For your information, there are other lane closures underway within the I-35 NEX project this week, but they are not expected to affect traffic or create notable delays.