Monthly State Let Construction Report For Dallas District As Of Feb 11, 2016 Page 7 Of 12

Last Update: Thursday, February 11, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9 | page 10 | page 11 | page 12

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyDALLAS
Highway SL 12
From ILLINOIS AVENUE
To NORTH OF SINGLETON BLVD
CSJ 0581-02-141
Proj ID STP 1502(042)
Work Type FDR - CP AND OVERLAY ON FRONTAGE RDS
 
8.760 2761594.56 151911.57 1006330.52 36.4
Work Order 04-20-15
Work Began 06-15-15
Work Completed  
Time Computed 05-06-15
Contract Working Days 225
Addl Days Granted 0
Working Days Charged 115
Percent Time Used 51
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0581-02-141
AUSTIN BRIDGE & ROAD SERVICES, LP( 33.94%)
EROSION CONTROL MANAGEMENT SERVICES(0.27%)
DURABLE SPECIALTIES, INC.(0.96%)
ALTUS TRAFFIC MANAGEMENT LLC (0.51%)
STRIPING TECHNOLOGY, L.P.(3.68%)
BRENDA PRICE TRUCKING(2.14%)
UNDER CONSTRUCTION INC.(2.54%)
Contract # 03153219
Totals 2761594.56 151911.57 1006330.52 36.4

CountyELLIS
Highway FM 66
From AT WEST FORK WEAKLY BRANCH
To .
CSJ 0596-02-037
Proj ID BR 1502(319)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.345 2694785.55 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 378
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
IEA INC.
SUBCONTRACTOR(S) FOR CCSJ: 0596-02-037
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11153017
Totals 2694785.55 0.00 0.00 0.0

CountyELLIS
Highway FM 66
From AT OAK BRANCH
To .
CSJ 0596-02-038
Proj ID BR 2015(066)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.206 1798061.60 119293.67 1191395.78 66.2
Work Order 12-01-14
Work Began 07-27-15
Work Completed  
Time Computed 01-30-15
Contract Working Days 343
Addl Days Granted 0
Working Days Charged 131
Percent Time Used 38
Contractor(s)
MASSANA CONSTRUCTION INC.
SUBCONTRACTOR(S) FOR CCSJ: 0596-02-038
FRAIRE"S REBAR, INC(6.74%)
ALTUS TRAFFIC MANAGEMENT LLC (0.71%)
DUSTROL, INC.(1.39%)
METRO CUTTING AND SEALING, INC.(0.28%)
IOWA BRIDGE & CULVERT, LC(3.21%)
HAYWARD BAKER, INC.(2.40%)
TEXAS SHAFTS, INC. (5.42%)
FORTSON CONTRACTING, INC.(1.73%)
USA SWPPP INSPECTIONS, INC.(1.84%)
TEXAS HIGHWAY MAINTENANCE, LLC (1.78%)
DENALI SERVICES & TRANSPORT LLC(0.79%)
JANEK & WHITTEN CONSTRUCTION INC.(1.34%)
PEACHTREE CONSTRUCTION, LTD. (2.82%)
F & K BUILDERS (0.98%)
JUST GROOVING, LTD.(0.24%)
CLEMONS TRUCKING (1.44%)
Contract # 09143226
Totals 1798061.60 119293.67 1191395.78 66.2

CountyELLIS
Highway FM 66
From AT WEST FORK GREATHOUSE BRANCH
To .
CSJ 0596-02-039
Proj ID BR 1502(321)
Work Type REPLACE BRIDGES AND APPROACHES
 
0.374 3421432.25 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 08-13-15
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 396
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
MASSANA CONSTRUCTION INC.
SUBCONTRACTOR(S) FOR CCSJ: 0596-02-039
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 06153022
Totals 3421432.25 0.00 0.00 0.0

CountyELLIS
Highway FM 66
From 0.475 MI W OF GREATHOUSE RD
To 0.375 MI E OF GREATHOUSE RD
CSJ 0596-02-042
Proj ID STP 2015(846)HES
Work Type ADD LEFT TURN LANE
 
0.427 2085055.65 0.00 58896.00 2.8
Work Order 09-09-15
Work Began 00-00-00
Work Completed  
Time Computed 01-07-16
Contract Working Days 159
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0596-02-042
W.O.E. CONSTRUCTION(0.60%)
STRIPING TECHNOLOGY, L.P.(2.43%)
BRENDA PRICE TRUCKING(4.28%)
TEX OP CONSTRUCTION, LP(1.22%)
PREMIER PAVING, LTD. ( 14.43%)
ALTUS TRAFFIC MANAGEMENT LLC (0.86%)
DURABLE SPECIALTIES, INC.( 19.76%)
GJ SEEDING, LLC(1.78%)
SYNERGY SIGNS & SERVICES, LLC(0.24%)
Contract # 07153223
Totals 2085055.65 0.00 58896.00 2.8

CountyELLIS
Highway FM 66
From FM 308
To 0.4 MI S OF BRINDLEY RD
CSJ 0596-02-043
Proj ID STP 1502(491)HES
Work Type WIDEN PAVEMENT
 
1.859 2446061.87 26170.60 26170.60 1.0
CountyELLIS
Highway FM 66
From 0.4 MI S OF BRINDLEY RD
To FM 916
CSJ 0596-02-045
Proj ID STP 1502(490)
Work Type WIDEN PAVEMENT
 
1.593 1809353.61 23208.00 23208.00 1.2
Work Order 09-09-15
Work Began 01-06-16
Work Completed  
Time Computed 11-08-15
Contract Working Days 136
Addl Days Granted 0
Working Days Charged 15
Percent Time Used 11
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0596-02-043
O. TREVINO CONSTRUCTION, LLC (2.26%)
TRP CONSTRUCTION GROUP, LLC(1.22%)
TEX OP CONSTRUCTION, LP(3.40%)
LONE STAR BARRIER SERVICES, LLC(3.72%)
J & M CONTRACTING, COMPANY ( 17.36%)
ALTUS TRAFFIC MANAGEMENT LLC (0.20%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (2.18%)
W.O.E. CONSTRUCTION(0.07%)
BRENDA PRICE TRUCKING(0.08%)
Contract # 07153031
Totals 4255415.48 49378.60 49378.60 1.1

CountyCOLLIN
Highway FM 6
From AT SABINE CREEK
To .
CSJ 0619-01-023
Proj ID BR 1502(323)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.760 3493547.40 305082.00 805107.90 23.0
Work Order 08-24-15
Work Began 11-23-15
Work Completed  
Time Computed 11-22-15
Contract Working Days 292
Addl Days Granted 0
Working Days Charged 36
Percent Time Used 12
Contractor(s)
HAYDON BUILDING CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0619-01-023
REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 12.51%)
BREDA COMPANY, INC.(0.45%)
FORTSON CONTRACTING, INC.(4.62%)
ACU CONSTRUCTION LLC (0.62%)
TOTAL HIGHWAY MAINTENANCE, LLC (1.26%)
USA SWPPP INSPECTIONS, INC.(2.18%)
PENHALL COMPANY(0.19%)
A.E.A. TRANSPORTATION(2.89%)
LONE STAR BARRIER SERVICES, LLC(0.04%)
W. W. FOUNDATION DRILLING, LTD.(4.71%)
PROJECT 2015, LLC(3.75%)
W.O.E. CONSTRUCTION(0.11%)
Contract # 06153015
Totals 3493547.40 305082.00 805107.90 23.0

CountyDENTON
Highway FM 544
From FM 2281
To 0.17 MILE WEST OF JOSEY LANE
CSJ 0619-05-034
Proj ID STP 1402(111)MM
Work Type GR, STR, BASE, PVMT, SIGNS, MKGS
 
2.311 21406881.99 34909.38 600579.15 2.8
CountyDENTON
Highway FM 544
From AT KCS RR, E OF FM 2281
To .
CSJ 0619-05-036
Proj ID BR 2014(763)
Work Type REPL BR & APPR
 
0.060 5316292.06 25000.00 1619356.00 30.4
CountyDENTON
Highway FM 544
From 0.17 MILES WEST OF JOSEY LN
To PARKER/DOZIER RD.
CSJ 0619-05-037
Proj ID HP 2008(733)
Work Type RECONSTRUCT EXISTING ROADWAY
 
1.136 8667784.26 124192.55 2201712.24 25.4
Work Order 03-23-15
Work Began 07-06-15
Work Completed  
Time Computed 07-06-15
Contract Working Days 755
Addl Days Granted 0
Working Days Charged 136
Percent Time Used 18
Contractor(s)
MCM
SUBCONTRACTOR(S) FOR CCSJ: 0619-05-036
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(9.65%)
OSCAR ORDUNO, INC. (0.17%)
LIRA ELECTRIC(1.75%)
FORTSON CONTRACTING, INC.(0.16%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(2.00%)
BOWMAN ENGINEERING & CONSTRUCTION, INC.(6.33%)
BROCK ENVIRONMENTAL SERVICES, LLC(0.31%)
EXTREME ENVIRONMENTAL SERVICES (0.09%)
ALTUS TRAFFIC MANAGEMENT LLC (2.54%)
CARRASCO TRUCKING(0.03%)
GUIDO CONSTRUCTION, INC. DBA GUIDO"S TRUCKS(0.36%)
DALLAS LITE AND BARRICADE INC. (0.41%)
STRIPING TECHNOLOGY, L.P.(0.71%)
Contract # 09143001
Totals 35390958.31 184101.93 4421647.39 12.4

CountyKAUFMAN
Highway FM 986
From TOWN NORTH DR IN TERRELL
To CR 2326 (NEAR HUNT C/L)
CSJ 0642-05-023
Proj ID STP 2013(768)HES
Work Type GR, BASE, PVMT, PVMT MKGS, SIGNS
 
6.560 3869442.70 0.00 4297696.13 99.9
Work Order 08-19-13
Work Began 10-07-13
Work Completed  
Time Computed 10-07-13
Contract Working Days 207
Addl Days Granted 88
Working Days Charged 207
Percent Time Used 70
Contractor(s)
D. L. LENNON INCORPORATED - CONTRACTOR
SUBCONTRACTOR(S) FOR CCSJ: 0642-05-023
BAHENA CONSTRUCTION CO.,INC. ( 17.30%)
CATOCON, INC.(0.94%)
DUSTROL, INC.(1.97%)
EROSION CONTROL MANAGEMENT SERVICES(2.13%)
FARR FOUNDATION, INC.(1.26%)
PEACHTREE CONSTRUCTION, LTD. ( 23.73%)
STRIPING TECHNOLOGY, L.P.(1.34%)
ALTUS TRAFFIC MANAGEMENT LLC (0.72%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.10%)
Contract # 06133017
Totals 3869442.70 0.00 4297696.13 99.9

CountyKAUFMAN
Highway FM 429
From SH 243
To US 80
CSJ 0697-03-027
Proj ID STP 2015(393)HES
Work Type TEXTURE SHOULDERS AND CENTERLINE
 
21.758 207202.70 0.00 189122.23 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-07-15
Work Began 02-09-15
Work Completed 07-01-15
Time Computed 01-23-15
Contract Working Days 104
Addl Days Granted 0
Working Days Charged 26
Percent Time Used 25
Contractor(s)
STRIPING TECHNOLOGY, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0697-03-027
FLEX SUPPLY, LLC (5.30%)
COWBELL TRAFFIC SERVICES, INC. ( 29.14%)
STRIPING SYSTEMS, INC. (0.92%)
Contract # 12143221
Totals 207202.70 0.00 189122.23 100.0

CountyDENTON
Highway FM 156 ETC
From SOUTH HICKORY CREEK
To 0.1 MI NORTH OF FM 2450
CSJ 0718-01-051
Proj ID STP 2007(014)
Work Type ADD 10' SHOULDERS AND REHAB
 
10.779 7732000.00 0.00 7453800.26 97.2
Work Order 09-26-13
Work Began 11-11-13
Work Completed  
Time Computed 10-12-13
Contract Working Days 288
Addl Days Granted 10
Working Days Charged 355
Percent Time Used 119
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0718-01-051
W.O.E. CONSTRUCTION(4.24%)
J & M CONTRACTING, COMPANY (4.78%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.95%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.52%)
TEXAS SHAFTS, INC. (1.79%)
MASTERPIECE GRINDING & GROOVING, LLC (0.05%)
HJC FARMS, INC.(0.49%)
FORTSON CONTRACTING, INC.(2.68%)
BREDA COMPANY, INC.(0.42%)
ALTUS TRAFFIC MANAGEMENT LLC (0.50%)
MCL CONTRACTING, LLC (0.09%)
N.L. SCHUTTE FOUNDATION DRILLING, INC. (0.11%)
Contract # 07133229
Totals 7732000.00 0.00 7453800.26 97.2

CountyDENTON
Highway FM 156
From SH 114
To 12TH ST IN JUSTIN
CSJ 0718-01-064
Proj ID C 718-1-64
Work Type WIDEN
 
4.203 32541855.76 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 521
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
MARIO SINACOLA & SONS EXCAVATING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0718-01-064
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11153002
Totals 32541855.76 0.00 0.00 0.0

CountyKAUFMAN
Highway FM 148
From FM 1390 SOUTH
To US 175 SOUTH
CSJ 0751-02-023
Proj ID STP 2014(660)
Work Type MILL, REPAIR, OL, STR, MRKS, SIGN
 
7.475 10805279.10 900826.60 10741848.64 99.4
Work Order 07-08-14
Work Began 10-01-14
Work Completed  
Time Computed 09-06-14
Contract Working Days 246
Addl Days Granted 141
Working Days Charged 249
Percent Time Used 64
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0751-02-023
TRP CONSTRUCTION GROUP, LLC(0.94%)
ALTUS TRAFFIC MANAGEMENT LLC (0.21%)
SAMMY G. SMALLWOOD (0.54%)
FORTSON CONTRACTING, INC.(2.15%)
K & S UTILITY CONTRACTORS, INC.(6.70%)
USA SWPPP INSPECTIONS, INC.(1.95%)
W.O.E. CONSTRUCTION(2.93%)
PEACHTREE CONSTRUCTION, LTD. (4.30%)
HORIZON SIGNAL TECHNOLOGIES, INC.(0.04%)
G & G SAW & SEAL (0.02%)
RAMBO CONTRACTING, INC.(0.60%)
Contract # 05143221
Totals 10805279.10 900826.60 10741848.64 99.4

CountyELLIS
Highway FM 663
From SOUTH OF US 287
To NORTH OF US 287
CSJ 0815-08-027
Proj ID PTF 2013(451)
Work Type STR, PVMT, PVMT MKGS
 
0.568 4728943.55 1497.76 4576548.99 98.8
Work Order 05-16-13
Work Began 06-30-14
Work Completed  
Time Computed 09-11-15
Contract Working Days 161
Addl Days Granted 0
Working Days Charged 263
Percent Time Used 163
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0815-08-027
TOTAL HIGHWAY MAINTENANCE, LLC (0.26%)
WYLIE DRILLING & DRAINAGE, INC.(0.75%)
USA SWPPP INSPECTIONS, INC.(1.93%)
STRIPING TECHNOLOGY, L.P.(1.20%)
SOUTHEAST GRINDING & GROOVING, LLC (0.05%)
SCOTT DERR PAINTING CO, LLC(0.20%)
MCL CONTRACTING, LLC (0.48%)
LONE STAR BARRIER SERVICES, LLC(0.83%)
INLET STRUCTURE SPECIALTIES LTD. (1.27%)
DUSTROL, INC.(0.51%)
DURABLE SPECIALTIES, INC.(5.94%)
PREMIER PAVING, LTD. ( 10.88%)
CHRISTINE"S CONCERTE SAWING & SEALING LLC(0.17%)
T-BAR FENCE, INC.(0.67%)
W.O.E. CONSTRUCTION(0.17%)
Contract # 03133216
Totals 4728943.55 1497.76 4576548.99 98.8

CountyDENTON
Highway FM 455
From AT BOOM CREEK
To .
CSJ 0816-02-053
Proj ID BR 2014(764)
Work Type REPLACE EXISTING BRIDGE AND APPROAC
 
1.646 3335495.22 390165.16 2652927.58 80.0
Work Order 09-09-14
Work Began 04-08-15
Work Completed  
Time Computed 09-25-14
Contract Working Days 193
Addl Days Granted 0
Working Days Charged 209
Percent Time Used 108
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0816-02-053
ALTUS TRAFFIC MANAGEMENT LLC (0.39%)
FOUNDATION DRILLERS, INC.(1.63%)
HJC FARMS, INC.(0.21%)
LAYFIELD CONSTRUCTION, INC (1.66%)
LINDAMOOD DEMOLITION, INC. (0.41%)
MCL CONTRACTING, LLC (1.58%)
PENHALL COMPANY(0.08%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (3.40%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.98%)
THELIN RECYCLING COMPANY, L.P. (0.29%)
VILHAUER ENTERPRISES, LLC(2.42%)
W.O.E. CONSTRUCTION(7.75%)
RG PAINTING(0.06%)
Contract # 06143238
Totals 3335495.22 390165.16 2652927.58 80.0

CountyCOLLIN
Highway FM 455
From US 75 NB FRONTAGE ROAD
To SH 5
CSJ 0816-04-044
Proj ID C 816-4-44
Work Type GR, STRS, BASE, SURF, PAV, MARK
 
1.960 12399737.47 360111.92 4072247.91 32.8
Work Order 09-03-13
Work Began 08-10-15
Work Completed  
Time Computed 03-02-14
Contract Working Days 251
Addl Days Granted 37
Working Days Charged 117
Percent Time Used 40
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0816-04-044
TOTAL HIGHWAY MAINTENANCE, LLC (0.95%)
PARKER TREE SERVICES (0.24%)
W.O.E. CONSTRUCTION(0.30%)
FARR FOUNDATION, INC.(0.31%)
CTBX, INC. (0.10%)
DURABLE SPECIALTIES, INC.(1.42%)
PREMIER PAVING, LTD. (9.45%)
TEXAS SHAFTS, INC. (0.40%)
Contract # 03133204
Totals 12399737.47 360111.92 4072247.91 32.8

CountyCOLLIN
Highway FM 455
From CR 98
To FM 3356
CSJ 0816-04-047
Proj ID STP 2014(700)HES
Work Type GR, BASE, PVMT, PVMT MKGS, SIGNS
 
8.080 5536032.38 0.00 5689636.86 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-20-14
Work Began 07-09-14
Work Completed 07-30-15
Time Computed 07-06-14
Contract Working Days 191
Addl Days Granted 16
Working Days Charged 207
Percent Time Used 100
Contractor(s)
AUSTIN BRIDGE & ROAD SERVICES, LP
SUBCONTRACTOR(S) FOR CCSJ: 0816-04-047
TRP CONSTRUCTION GROUP, LLC(1.04%)
ALTUS TRAFFIC MANAGEMENT LLC (0.26%)
RICE ENVIRONMENTAL SERVICES(2.95%)
W.S. CONSTRUCTION COMPANY( 10.92%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(3.34%)
FORTSON CONTRACTING, INC.(0.18%)
Contract # 04143009
Totals 5536032.38 0.00 5689636.86 100.0

CountyCOLLIN
Highway FM 455
From 0.21 MILE WEST OF FM 3356
To US 75
CSJ 0816-04-054
Proj ID STP 2016(144)
Work Type SHLD WDN, BS REP, OV, GUARD RAIL
 
5.032 3866001.58 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-29-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 188
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
A. K. GILLIS & SONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0816-04-054
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10153008
Totals 3866001.58 0.00 0.00 0.0

CountyELLIS
Highway FM 308
From HILL COUNTY LINE
To US 77
CSJ 0834-01-013
Proj ID STP 2013(953)
Work Type GR, BASE, PVMT, CULVERTS, PVMT MKGS
 
4.806 3096481.32 0.00 3059398.28 100.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-19-13
Work Began 02-03-14
Work Completed 09-11-15
Time Computed 01-18-14
Contract Working Days 252
Addl Days Granted 30
Working Days Charged 282
Percent Time Used 100
Contractor(s)
KNIFE RIVER CORPORATION - SOUTH
SUBCONTRACTOR(S) FOR CCSJ: 0834-01-013
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(5.13%)
STRIPING TECHNOLOGY, L.P.(1.45%)
FORTSON CONTRACTING, INC.(0.28%)
N-LINE TRAFFIC MAINTENANCE, L.P. (3.26%)
BEAR CREEK CONSTRUCTION, LLC ( 18.14%)
L&S CONTRACTORS, LLC (0.01%)
Contract # 08133026
Totals 3096481.32 0.00 3059398.28 100.0

CountyDALLAS
Highway VA
From DISTRICTWIDE
To (ON-SYSTEM)
CSJ 0918-00-156
Proj ID STP 2010(038)
Work Type ASBESTOS ABATEMENT ON BRIDGES
 
0.001 690174.50 0.00 736729.22 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-06-09
Work Began 01-04-10
Work Completed  
Time Computed 10-22-09
Contract Working Days 252
Addl Days Granted 210
Working Days Charged 387
Percent Time Used 83
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0918-00-156
1 PRIORITY ENVIRONMENTAL SERVICES, INC.( 60.27%)
Contract # 09093038
Totals 690174.50 0.00 736729.22 99.9