Monthly State Let Construction Report For Dallas District As Of May 15, 2013 Page 7 Of 8

Last Update: Wednesday, May 15, 2013
FTP Icon Text Version
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyROCKWALL
Highway FM 552
From SH 205
To SH 66
CSJ 1017-01-014
Proj ID STP 1102(262)HES
Work Type GR, BASE, PVMT, PVMT MKGS, SIGNS
 
5.364 3714076.80 130786.88 4028181.93 99.9
Work Order 09-14-11
Work Began 01-06-12
Work Completed  
Time Computed 11-13-11
Contract Working Days 188
Addl Days Granted 29
Working Days Charged 330
Percent Time Used 152
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1017-01-014
STRIPING TECHNOLOGY, L.P.(2.71%)
HIGHWAY TECHNOLOGIES, INC. (0.42%)
FORTSON CONTRACTING, INC.(1.47%)
SOUTHWEST ENVIRONMENT SERVICES LLC (1.73%)
USA EROSION, INC.(0.85%)
J & M CONTRACTING, COMPANY ( 11.14%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.41%)
CONCRETE CUTTING BY BOND (0.02%)
Contract # 08113050
Totals 3714076.80 130786.88 4028181.93 99.9

CountyTARRANT
Highway IH 30
From 0.5 MILES WEST OF N. FIELDER ROAD
To DALLAS/TARRANT COUNTY LINE
CSJ 1068-02-135
Proj ID C 1068-2-135
Work Type ITS, ETC, SIGNS
 
6.091 6960302.24 284447.95 291188.75 4.1
CountyDALLAS
Highway IH 30
From TARRANT/DALLAS COUNTY LINE
To SYLVAN AVE.
CSJ 1068-04-147
Proj ID IM 0305(082)
Work Type STR, GR, PVMT, PVMT MKGS, SIGNS, ITS
 
12.664 56121468.07 3682973.93 4236018.87 7.5
Work Order 02-28-13
Work Began 03-25-13
Work Completed  
Time Computed 03-16-13
Contract Working Days 728
Addl Days Granted 0
Working Days Charged 27
Percent Time Used 3
Contractor(s)
AUSTIN BRIDGE & ROAD, LP
SUBCONTRACTOR(S) FOR CCSJ: 1068-04-147
COWTOWN TRAFFIC CONTROL, INC.(0.04%)
THE ANCHOR GROUP, INC. (0.02%)
ANTIGO CONSTRUCTION, INC.(0.02%)
DUSTROL, INC.(0.33%)
DUSTIN ALLEN, INC. (0.41%)
HOUSTON SAWING & DRILLING(0.02%)
GUIDO CONSTRUCTION, INC. DBA GUIDO"S TRUCKS(0.09%)
PENHALL COMPANY(0.06%)
STORM WATER MANAGEMENT, INC. (0.13%)
VSTRUCTURAL LLC(0.42%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.12%)
W.O.E. CONSTRUCTION(0.64%)
STRIPING TECHNOLOGY, L.P.(2.08%)
MICA CORPORATION ( 19.67%)
W. W. FOUNDATION DRILLING, LTD.(2.65%)
K & S UTILITY CONTRACTORS, INC.(4.66%)
INDUS CONSTRUCTION, L.P. (0.56%)
PRESSURE CLEANING SERVICE, INC. DBA WATERBLASTING.COM(0.06%)
RAMBO CONTRACTING, INC.(1.19%)
NORTH TEXAS REBAR, LLC (0.13%)
HERDEZ TRUCKING, INC.(0.09%)
Contract # 12123201
Totals 63081770.31 3967421.88 4527207.62 7.1

CountyDALLAS
Highway IH 30
From BELT LINE RD. IN GRAND PRAIRIE
To N.E. 15TH ST.
CSJ 1068-04-142
Proj ID STP 2011(706)MM
Work Type GR, STR, PVMT, SIGNS, BUILDING
 
0.767 7282375.53 696599.13 6105645.04 83.8
CountyDALLAS
Highway IH 30
From BELT LINE RD.
To MACARTHUR BLVD.
CSJ 1068-04-145
Proj ID C 1068-4-145
Work Type GR, STR, PVMT, SIGNS
 
2.060 7497722.23 41876.37 5469042.47 72.9
Work Order 02-15-11
Work Began 04-22-11
Work Completed  
Time Computed 04-16-11
Contract Working Days 491
Addl Days Granted 194
Working Days Charged 499
Percent Time Used 72
Contractor(s)
HAYDON BUILDING CORP.
SUBCONTRACTOR(S) FOR CCSJ: 1068-04-142
DUSTROL, INC. (ROANOKE)(0.09%)
FORTSON CONTRACTING, INC.(0.81%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(5.65%)
BUYERS BARRICADES, INC.(0.04%)
THE ANCHOR GROUP, INC. (0.38%)
CONCRETE CUTTING BY BOND (0.06%)
COWTOWN TRAFFIC CONTROL, INC.(0.19%)
FARR FOUNDATION, INC.(6.20%)
GK CONSTRUCTION, LLC (0.66%)
C.T. AND S. METALWORKS, INC. (1.72%)
CENTRAL NORTH CONSTRUCTION, LLC(2.17%)
STAR OPERATIONS, INC.(3.43%)
MCMAHON CONTRACTING, L.P.( 20.81%)
STRIPE-A-ZONE, INC.(0.61%)
ALLIANCE GEOTECHNICAL GROUP(0.15%)
PIBURN & CARSON, LLC (0.50%)
FOUNDATION DRILLERS, INC.(0.15%)
COWBOY TRUCKING(0.13%)
RMI WORLDWIDE, LLC (0.05%)
LONE STAR HIGHWAY PRODUCTS, INC. (2.50%)
USA SWPPP INSPECTIONS, INC.(0.45%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.02%)
SUPREME SAWING AND SEALING (0.24%)
J.L. STEEL REINFORCING, LLC(0.09%)
W.O.E. CONSTRUCTION(0.05%)
L & E HART ENTERPRISES, INC. (2.20%)
STORM WATER MANAGEMENT, INC. (0.03%)
Contract # 12103201
Totals 14780097.76 738475.50 11574687.51 78.3

CountyDALLAS
Highway IH 30
From 0.5 MILES WEST OF WESTMORELAND RD
To EAST OF WESTMORELAND RD
CSJ 1068-04-153
Proj ID C 1068-4-153
Work Type GRADING, PAVEMENT, SIGNS, PVMT MKGS
 
0.574 2655000.00 380822.21 753556.80 28.3
Work Order 01-04-13
Work Began 01-22-13
Work Completed  
Time Computed 01-20-13
Contract Working Days 128
Addl Days Granted 0
Working Days Charged 69
Percent Time Used 53
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 1068-04-153
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(8.60%)
COWTOWN TRAFFIC CONTROL, INC.(0.57%)
W.O.E. CONSTRUCTION(0.25%)
HIGHWAY TECHNOLOGIES, INC. (0.72%)
BREDA COMPANY, INC.(0.77%)
INLET STRUCTURE SPECIALTIES LTD. (3.56%)
MELS ELECTRIC, L.P.(6.28%)
TEX OP CONSTRUCTION, LP(0.64%)
FORTSON CONTRACTING, INC.(0.27%)
BRENDA PRICE TRUCKING(0.18%)
USA SWPPP INSPECTIONS, INC.(3.16%)
Contract # 10123213
Totals 2655000.00 380822.21 753556.80 28.3

CountyKAUFMAN
Highway FM 740
From BUFFALO CREEK
To '
CSJ 1091-01-016
Proj ID STP 2009(601)ES
Work Type REPL BR & APPRS
 
0.323 2856520.65 0.00 3422048.41 99.9
Work Order 09-28-09
Work Began 02-16-10
Work Completed  
Time Computed 10-14-09
Contract Working Days 389
Addl Days Granted 18
Working Days Charged 463
Percent Time Used 124
Contractor(s)
DOUGHTIE CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 1091-01-016
BTA SERVICES, LTD. (0.58%)
PREMIER PAVING, LTD. ( 10.17%)
COWTOWN TRAFFIC CONTROL, INC.(0.30%)
CENTRAL TEXAS ENVIRONMENTAL SERVICES, LLC(0.42%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (3.98%)
D & E CONTRACTORS(8.87%)
HOLES INCORPORATED (0.98%)
TEX OP CONSTRUCTION, LP(0.35%)
JUST GROOVING, LTD.(0.19%)
LONE STAR HIGHWAY PRODUCTS, INC. (3.67%)
CLEMONS TRUCKING (0.36%)
SOUTHWEST CRUSHING, LLC(0.36%)
BREDA COMPANY, INC.(0.24%)
INTERSTATE SAFETY SYSTEMS, INC.(3.92%)
WEBBER BARRIER SERVICES, INC.(3.07%)
ODUM SERVICES, L.P.(0.74%)
Contract # 07093216
Totals 2856520.65 0.00 3422048.41 99.9

CountyKAUFMAN
Highway FM 740
From RANCH ROAD IN FORNEY
To ROCKWALL COUNTY LINE
CSJ 1091-01-019
Proj ID STP 2013(318)
Work Type GR, BASE, PVMT, HMAC, PVMT MKGS, SI
 
6.023 5599999.92 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 210
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
BILLY CUMMINGS CONSTRUCTION INC.
SUBCONTRACTOR(S) FOR CCSJ: 1091-01-019
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04133223
Totals 5599999.92 0.00 0.00 0.0

CountyKAUFMAN
Highway FM 741
From FM 740
To MONITOR BLVD. IN FORNEY
CSJ 1092-01-018
Proj ID STP 2013(453)
Work Type LANDSCAPE DEVELOPMENT
 
1.976 298102.56 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 92
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
LANDSCAPE CONTRACTING AND IRRIGATION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1092-01-018
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03133221
Totals 298102.56 0.00 0.00 0.0

CountyELLIS
Highway FM 813
From EAST OF HACIENDA DR IN WAXAHACHIE
To FM 983
CSJ 1139-01-041
Proj ID STP 2011(468)SB
Work Type PAV SHLDRS
 
6.326 4983944.03 80709.86 5322564.27 99.9
Work Order 01-03-11
Work Began 01-21-11
Work Completed  
Time Computed 01-19-11
Contract Working Days 337
Addl Days Granted 0
Working Days Charged 523
Percent Time Used 155
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1139-01-041
FORTSON CONTRACTING, INC.(2.06%)
HIGHWAY TECHNOLOGIES, INC. (1.92%)
COLD CREEK CONSTRUCTION, LTD (0.02%)
J & M CONTRACTING, COMPANY ( 15.90%)
DANRIDGE CONSTRUCTION, LLC.(0.41%)
RICE ENVIRONMENTAL SERVICES(0.45%)
TEXAS ENVIRONMENTAL MANAGEMENT, INC(2.10%)
TEXAS ALTERNATIVE GRASSER, INC.(0.25%)
W.O.E. CONSTRUCTION(0.02%)
SAN-ANN-CO., INC.(1.02%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.23%)
SOUTHEAST GRINDING & GROOVING, LLC (0.45%)
Contract # 10103006
Totals 4983944.03 80709.86 5322564.27 99.9

CountyELLIS
Highway FM 813
From FM 983
To FM 878 IN PALMER
CSJ 1139-01-042
Proj ID STP 2011(469)SB
Work Type PAV SHLDRS
 
5.871 4664634.84 16346.50 4803578.97 100.0
Work Order 01-06-11
Work Began 01-24-11
Work Completed 05-08-13
Time Computed 01-22-11
Contract Working Days 297
Addl Days Granted 2
Working Days Charged 425
Percent Time Used 142
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1139-01-042
J & M CONTRACTING, COMPANY ( 16.20%)
COLD CREEK CONSTRUCTION, LTD (0.28%)
FORTSON CONTRACTING, INC.(2.42%)
HIGHWAY TECHNOLOGIES, INC. (1.83%)
DANIEL CONSTRUCTION SERVICES, INC. (AR DANIEL...)(0.63%)
RICE ENVIRONMENTAL SERVICES(0.52%)
ANALYTICAL TECHNOLOGY CONSULTANTS, INC.(0.31%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(5.15%)
SOUTHWEST ENVIRONMENT SERVICES LLC (0.27%)
PENHALL COMPANY(0.32%)
Contract # 10103207
Totals 4664634.84 16346.50 4803578.97 100.0

CountyKAUFMAN
Highway FM 1641
From FM 148
To FM 548
CSJ 1217-01-014
Proj ID STP 2011(470)ES
Work Type OVERLAY, REWORK BASE, BLADING, PVT MRK
 
5.239 3172491.78 0.00 3573123.29 99.9
Work Order 12-01-10
Work Began 02-14-11
Work Completed  
Time Computed 01-30-11
Contract Working Days 252
Addl Days Granted 73
Working Days Charged 308
Percent Time Used 94
Contractor(s)
KNIFE RIVER CORPORATION - SOUTH
SUBCONTRACTOR(S) FOR CCSJ: 1217-01-014
LONE STAR EQUIPMENT CO. INC. (INACTIVE--SEE 12687) (5.11%)
COWBELL TRAFFIC SERVICES, INC. (0.83%)
SOUTHWEST ENVIRONMENT SERVICES LLC (2.66%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 20.72%)
CATOCON, INC.(0.54%)
HJC FARMS, INC.(7.65%)
J & M CONTRACTING, COMPANY ( 15.04%)
HIGHWAY TECHNOLOGIES, INC. (2.12%)
A BROTHERS (0.19%)
TRADE RESOURCES, INC.(2.21%)
Contract # 10103215
Totals 3172491.78 0.00 3573123.29 99.9

CountyDENTON
Highway FM 1171
From WEST OF US 377
To WEST OF SHILOH RD
CSJ 1311-01-034
Proj ID C 1311-1-34
Work Type GR, STRS, BASE, CRCP, PVMT MKGS, SIGNS
 
7.011 45721253.16 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 693
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 1311-01-034
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03133002
Totals 45721253.16 0.00 0.00 0.0

CountyDENTON
Highway FM 1171
From SHILOH RD
To GARDEN RIDGE RD IN FLOWER MOUND
CSJ 1311-01-051
Proj ID STP 2012(579)
Work Type LANDSCAPE DEVELOPMENT
 
12.177 628000.00 2083.75 614406.45 100.0
Work Order 06-21-12
Work Began 07-24-12
Work Completed 04-30-13
Time Computed 07-07-12
Contract Working Days 129
Addl Days Granted 0
Working Days Charged 120
Percent Time Used 93
Contractor(s)
LEGENDS LANDSCAPES LLC
SUBCONTRACTOR(S) FOR CCSJ: 1311-01-051
LONE STAR TRAFFIC SERVICE, INC.(1.14%)
AQUA BORE(2.29%)
TEJAS COMMERCIAL CONSTRUCTION, LLC (2.38%)
MELS ELECTRIC, L.P.(3.16%)
Contract # 05123014
Totals 628000.00 2083.75 614406.45 100.0

CountyELLIS
Highway FM 1387
From WEST OF KENSINGTON DR
To EAST OF WALNUT GROVE RD
CSJ 1394-02-023
Proj ID CC 1394-2-23
Work Type GRADING, PAVING, STRUCTURES, SIGNS
 
0.925 4091255.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 309
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TISEO PAVING CO.
SUBCONTRACTOR(S) FOR CCSJ: 1394-02-023
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04133010
Totals 4091255.00 0.00 0.00 0.0

CountyNAVARRO
Highway FM 55
From ELLIS COUNTY LINE
To SH 22
CSJ 1451-03-013
Proj ID STP 2012(753)HES
Work Type GR, BASE, PVMT, PVMT MARKINGS
 
9.694 2796268.18 201208.96 1493177.48 53.3
Work Order 09-24-12
Work Began 11-28-12
Work Completed  
Time Computed 11-23-12
Contract Working Days 193
Addl Days Granted 7
Working Days Charged 101
Percent Time Used 50
Contractor(s)
KNIFE RIVER CORPORATION - SOUTH
SUBCONTRACTOR(S) FOR CCSJ: 1451-03-013
FORTSON CONTRACTING, INC.(1.50%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. ( 11.30%)
D. I. J. CONSTRUCTION, INC.(2.66%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.73%)
3LW MANAGEMENT, LLC(2.49%)
Contract # 08123032
Totals 2796268.18 201208.96 1493177.48 53.3

CountyDENTON
Highway FM 720
From AT HARTS BRANCH
To .
CSJ 1567-01-021
Proj ID BR 2010(983)
Work Type REPL BR & APPRS
 
0.080 1726268.66 2883.01 530423.70 30.7
CountyDENTON
Highway FM 720
From AT LITTLE ELM CREEK BRANCH OF LAKE
To LEWISVILLE
CSJ 1567-01-022
Proj ID BR 2010(983)
Work Type REPL BR & APPRS
 
0.484 15758790.61 74897.08 8709048.93 55.2
CountyDENTON
Highway FM 720
From 0.2 MI W OF GARZA LANE (W OF LAKE L
To 0.1 MI WEST OF FM 423
CSJ 1567-01-029
Proj ID STP 2010(982)MM
Work Type GRADING, STR, PVMT, SIGNS
 
4.493 33538923.64 793844.19 12904404.47 38.4
CountyDENTON
Highway FM 720
From 0.2 MILE WEST OF GARZA LANE
To 0.1 MILE WEST OF FM 423
CSJ 1567-01-032
Proj ID RW 1567-1-32
Work Type ROW ACQ. AND UTIL. ADJUST.
 
0.001 3297279.80 0.00 42859.00 1.2
Work Order 09-13-10
Work Began 07-14-11
Work Completed  
Time Computed 03-12-11
Contract Working Days 577
Addl Days Granted 0
Working Days Charged 241
Percent Time Used 41
Contractor(s)
J.D. ABRAMS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 1567-01-029
ATS DRILLING, L.P. (5.77%)
BRENDA PRICE TRUCKING(0.22%)
CRAIG OLDEN, INC.(0.61%)
DALLAS LITE AND BARRICADE INC. (0.11%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.21%)
HIGHWAY TECHNOLOGIES, INC. (0.31%)
L & E HART ENTERPRISES, INC. (2.09%)
MICA CORPORATION (4.78%)
NORTH TEXAS REBAR, LLC (5.54%)
PENHALL COMPANY(0.05%)
RAMBO CONTRACTING, INC.(2.62%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(6.26%)
S & V CONSTRUCTION LLC (0.05%)
SOUTH TEXAS PAINTING COMPANY (0.15%)
STORM WATER MANAGEMENT, INC. (0.10%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.28%)
TEX OP CONSTRUCTION, LP(0.99%)
WEIR BROS.,INC.(5.19%)
GREAT WESTERN ERECTORS (0.12%)
DURABLE SPECIALTIES, INC.(1.39%)
LAYFIELD CONSTRUCTION, INC (0.01%)
Contract # 07103001
Totals 54321262.71 871624.28 22186736.10 40.8

CountyDENTON
Highway FM 720
From FINSBURY TRAIL
To FM 423
CSJ 1567-01-035
Proj ID STP 2013(666)
Work Type LANDSCAPE DEVELOPMENT
 
1.160 524000.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 83
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
LEGENDS LANDSCAPES LLC
SUBCONTRACTOR(S) FOR CCSJ: 1567-01-035
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 05133010
Totals 524000.00 0.00 0.00 0.0

CountyDENTON
Highway FM 423
From STEWARTS CREEK ROAD
To SH 121
CSJ 1567-02-020
Proj ID C 1567-2-20
Work Type WIDEN TO 6 LANE DIVIDED URBAN
 
3.761 43849314.67 6833.18 877567.78 2.0
CountyDENTON
Highway FM 423
From STEWARTS CREEK ROAD
To SH 121
CSJ 1567-02-030
Proj ID RW 1567-2-30
Work Type ROW ACQ, RELOC & UTILITIES
 
3.794 8015048.33 0.00 0.00 0.0
Work Order 12-05-11
Work Began 00-00-00
Work Completed  
Time Computed 06-02-12
Contract Working Days 642
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
BALFOUR BEATTY INFRASTRUCTURE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1567-02-020
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09113202
Totals 51864363.00 6833.18 877567.78 1.6

CountyDENTON
Highway FM 423
From 0.8 MI. S. OF FM 2934
To STEWARTS CREEK ROAD
CSJ 1567-02-027
Proj ID C 1567-2-27
Work Type WIDEN TO 6 LANE DIVIDED URBAN
 
3.470 29931000.00 7807.69 27575761.50 92.1
Work Order 09-14-09
Work Began 12-10-09
Work Completed  
Time Computed 03-13-10
Contract Working Days 536
Addl Days Granted 28
Working Days Charged 557
Percent Time Used 98
Contractor(s)
AUSTIN BRIDGE & ROAD, LP
SUBCONTRACTOR(S) FOR CCSJ: 1567-02-027
J.T. DERSNER INC.( 14.78%)
BREDA COMPANY, INC.(1.00%)
BROCK ENVIRONMENTAL, LLC (0.19%)
CONCRETE PAVER SYSTEMS, INC. (0.01%)
CRAIG OLDEN, INC.(0.05%)
CROSSROADS, L.P. (0.54%)
DUSTROL, INC. (ROANOKE)(2.22%)
FORTSON CONTRACTING, INC.(0.26%)
HIGHWAY TECHNOLOGIES, INC. (0.93%)
IOWA BRIDGE & CULVERT, LC(0.43%)
NORTH TEXAS BOMANITE, INC. (0.12%)
ROADWAY SOLUTIONS, INC.(5.76%)
RIVER CITIES SAWING LLC(0.31%)
RUNNING HORSE CONSTRUCTION, INC. (0.15%)
SCOTT DERR PAINTING CO (0.02%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.35%)
TEXAS SHAFTS, INC. (0.22%)
W.O.E. CONSTRUCTION(0.65%)
WEBBER BARRIER SERVICES, INC.(0.26%)
WEIR BROS.,INC.(7.55%)
KDAT (0.14%)
Contract # 08093002
Totals 29931000.00 7807.69 27575761.50 92.1

CountyDENTON
Highway FM 407
From AT TRAIL CREEK
To .
CSJ 1568-02-007
Proj ID BR 2012(682)
Work Type REPLACE BR AND APPRS
 
0.136 1303237.77 224315.86 853000.13 65.4
Work Order 09-13-12
Work Began 12-03-12
Work Completed  
Time Computed 11-12-12
Contract Working Days 189
Addl Days Granted 0
Working Days Charged 109
Percent Time Used 57
Contractor(s)
MCMAHON CONTRACTING, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 1568-02-007
TEXAS SHAFTS, INC. (3.33%)
TEX OP CONSTRUCTION, LP(0.99%)
SCOTT DERR PAINTING CO, LLC(0.24%)
JAGOE-PUBLIC COMPANY ( 10.46%)
HIGHWAY TECHNOLOGIES, INC. (0.88%)
EROSION CONTROL MANAGEMENT SYSTEMS (0.64%)
DUSTIN ALLEN, INC. (6.10%)
TEXAS ALTERNATIVE GRASSER, INC.(2.16%)
MCL CONTRACTING, LLC (0.12%)
SOUTHEAST GRINDING & GROOVING, LLC (0.11%)
Contract # 08123239
Totals 1303237.77 224315.86 853000.13 65.4

CountyCOLLIN
Highway FM 1827
From NORTH OF CR 995
To NORTH OF MEADOWS
CSJ 1746-01-021
Proj ID STP 2012(567)HES
Work Type GR, BASE, PVMT, PVMT MKGS, SIGNS
 
3.995 756412.47 0.00 755383.10 99.9
Work Order 06-15-12
Work Began 10-22-12
Work Completed  
Time Computed 12-22-12
Contract Working Days 84
Addl Days Granted 0
Working Days Charged 95
Percent Time Used 113
Contractor(s)
RK HALL, LLC
SUBCONTRACTOR(S) FOR CCSJ: 1746-01-021
CF SOUTHWEST ENVIRONMENT SERVICES LLC(6.84%)
HIGHWAY TECHNOLOGIES, INC. (0.80%)
J & M CONTRACTING, COMPANY (6.80%)
STRIPING TECHNOLOGY, L.P.(2.27%)
TEX OP CONSTRUCTION, LP(0.84%)
Contract # 05123234
Totals 756412.47 0.00 755383.10 99.9