| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | DENTON |
| Highway |
CR |
| From |
PLAINVIEW RD AT NORTH HICKORY CREEK |
| To |
. |
| CSJ |
0918-46-055 |
| Proj ID |
BR 94(75) |
| Work Type |
REPLACE EXISTING BRIDGE AND APPROAC |
| |
|
0.170 |
1349100.80 |
13888.48 |
646992.63 |
47.9 |
| Work Order |
07-02-08 |
| Work Began |
08-08-08 |
| Work Completed |
|
| Time Computed |
07-18-08 |
| Contract Working Days |
120 |
| Addl Days Granted |
0 |
| Working Days Charged |
51 |
| Percent Time Used |
42 |
| Contractor(s) |
| LINDER CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0918-46-055 DIRT TRUCKING CO. INC. (0.22%) GARY A. CRAIN, INC.(0.37%) HIGHWAY TECHNOLOGIES, L.P. (0.60%) ODUM SERVICES, L.P.(5.26%) PEACHTREE CONSTRUCTION, LTD. (4.39%) ROAD MASTER STRIPING LLC (0.39%) S & S BRIDGE PAINTING, INC.(0.16%) TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.01%) TEXAS SHAFTS, INC. (2.23%)
|
| Contract # |
05083009 |
|
Totals |
1349100.80 |
13888.48 |
646992.63 |
47.9 |
|
| County | DENTON |
| Highway |
CR |
| From |
ON FREEMAN RD @ NORTH HICKORY CREEK |
| To |
. |
| CSJ |
0918-46-064 |
| Proj ID |
BR 95(66) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.102 |
444200.80 |
2575.00 |
449731.16 |
99.9 |
| Work Order |
03-12-08 |
| Work Began |
05-30-08 |
| Work Completed |
|
| Time Computed |
03-28-08 |
| Contract Working Days |
84 |
| Addl Days Granted |
0 |
| Working Days Charged |
79 |
| Percent Time Used |
94 |
| Contractor(s) |
| JACKSON CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0918-46-064 CROSSROADS, L.P. (0.94%) ODUM SERVICES, L.P.(6.63%) REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 12.06%) STRIPING PLUS, INC.(0.63%) TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.96%) JM MATERIALS, INC. (1.49%)
|
| Contract # |
02083218 |
|
Totals |
444200.80 |
2575.00 |
449731.16 |
99.9 |
|
| County | DENTON |
| Highway |
VA |
| From |
ALONG US 377, FROM GRAYSON CO LINE |
| To |
TARRANT COUNTY LINE |
| CSJ |
0918-46-200 |
| Proj ID |
STP 2006(606) |
| Work Type |
THERMOPLASTIC STRIP & RAISE PAV MKS |
| |
|
225.100 |
3072761.10 |
0.00 |
2662243.27 |
86.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
07-21-06 |
| Work Began |
08-21-06 |
| Work Completed |
|
| Time Computed |
08-06-06 |
| Contract Working Days |
282 |
| Addl Days Granted |
0 |
| Working Days Charged |
207 |
| Percent Time Used |
73 |
| Contractor(s) |
| HIGHWAY TECHNOLOGIES, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 0918-46-200 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
06063017 |
|
Totals |
3072761.10 |
0.00 |
2662243.27 |
86.6 |
|
| County | DENTON |
| Highway |
CR |
| From |
BRUSH CREEK RD @ HICKORY CRK TRIB |
| To |
' |
| CSJ |
0918-46-211 |
| Proj ID |
BR 2006(837) |
| Work Type |
REPLACE BRIDGE & APPROACHES |
| |
|
0.066 |
493379.40 |
161784.54 |
310621.11 |
62.9 |
| Work Order |
07-17-08 |
| Work Began |
08-19-08 |
| Work Completed |
|
| Time Computed |
08-02-08 |
| Contract Working Days |
116 |
| Addl Days Granted |
0 |
| Working Days Charged |
49 |
| Percent Time Used |
42 |
| Contractor(s) |
| ASHLAR CONTRACTING COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0918-46-211 ACTION SERVICES(0.50%) GARY A. CRAIN, INC.(0.40%) HIGHWAY TECHNOLOGIES, L.P. (0.93%) PEACHTREE CONSTRUCTION, LTD. (9.38%) RAYMOND PAINTING, INC. (0.19%) FORTSON CONTRACTING, INC.(2.64%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(3.25%) WYLIE DRILLING & DRAINAGE, INC.(3.96%) SYTCON, L.P. (2.87%)
|
| Contract # |
06083224 |
|
Totals |
493379.40 |
161784.54 |
310621.11 |
62.9 |
|
| County | DENTON |
| Highway |
VA |
| From |
VARIOUS LOCATIONS - ON SYSTEM |
| To |
IN THE DENTON MAINTENANCE SECTION |
| CSJ |
0918-46-222 |
| Proj ID |
STP 2008(667) |
| Work Type |
BASE REPAIR |
| |
|
86.024 |
2393117.20 |
207474.10 |
715801.88 |
29.9 |
| Work Order |
09-09-08 |
| Work Began |
10-08-08 |
| Work Completed |
|
| Time Computed |
09-25-08 |
| Contract Working Days |
102 |
| Addl Days Granted |
0 |
| Working Days Charged |
27 |
| Percent Time Used |
26 |
| Contractor(s) |
| JAGOE-PUBLIC COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0918-46-222 DUSTROL, INC. (ROANOKE)(8.41%) TOTAL HIGHWAY MAINTENANCE, LLC (3.01%)
|
| Contract # |
08083228 |
|
Totals |
2393117.20 |
207474.10 |
715801.88 |
29.9 |
|
| County | COLLIN |
| Highway |
FM 981 |
| From |
AT DESERT CREEK |
| To |
. |
| CSJ |
1012-03-013 |
| Proj ID |
BR 2008(437) |
| Work Type |
REPLACE BR AND APPRS |
| |
|
0.153 |
1084981.75 |
63979.70 |
1165052.06 |
99.9 |
| Work Order |
05-16-08 |
| Work Began |
06-17-08 |
| Work Completed |
|
| Time Computed |
06-01-08 |
| Contract Working Days |
104 |
| Addl Days Granted |
29 |
| Working Days Charged |
131 |
| Percent Time Used |
98 |
| Contractor(s) |
| L & N BRIDGE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1012-03-013 EAST TEXAS SIGN & SUPPLY, INC. (0.32%) GARY A. CRAIN, INC.(0.69%) PEACHTREE CONSTRUCTION, LTD. (6.81%) HIGHWAY TECHNOLOGIES, L.P. (0.35%) FORTSON CONTRACTING, INC.(1.21%) M & D FOUNDATION DRILLING INDUSTRIES, INC. (4.41%) TEXAS HIGHWAY MARKINGS, LLC(0.59%) TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (6.70%)
|
| Contract # |
03083019 |
|
Totals |
1084981.75 |
63979.70 |
1165052.06 |
99.9 |
|
| County | DALLAS |
| Highway |
FM 1382 |
| From |
HAMPTON ROAD |
| To |
IH 35E SB FRONTAGE ROAD |
| CSJ |
1047-02-045 |
| Proj ID |
NH 2008(295) |
| Work Type |
MILL AND INLAY |
| |
|
1.962 |
1091383.26 |
39641.27 |
226243.83 |
20.7 |
| Work Order |
03-07-08 |
| Work Began |
05-15-08 |
| Work Completed |
|
| Time Computed |
05-15-08 |
| Contract Working Days |
168 |
| Addl Days Granted |
1 |
| Working Days Charged |
141 |
| Percent Time Used |
83 |
| Contractor(s) |
| LINDSEY CONTRACTORS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1047-02-045 JOY LATTIMER, LLC. (8.34%) HIGHWAY TECHNOLOGIES (1.20%) STRIPE-A-ZONE, INC.(3.90%)
|
| Contract # |
01083030 |
|
Totals |
1091383.26 |
39641.27 |
226243.83 |
20.7 |
|
| County | DALLAS |
| Highway |
FM 1382 |
| From |
AT UNION PACIFIC RAILROAD CROSSING |
| To |
(DOT NO. 794 952A) |
| CSJ |
1047-03-049 |
| Proj ID |
STP 2006(206)RGS |
| Work Type |
CONST RAILROAD GRADE SEPARATION STR |
| |
|
0.583 |
11083070.46 |
494228.82 |
10037459.83 |
94.6 |
| Work Order |
03-20-06 |
| Work Began |
06-12-06 |
| Work Completed |
|
| Time Computed |
04-05-06 |
| Contract Working Days |
468 |
| Addl Days Granted |
72 |
| Working Days Charged |
514 |
| Percent Time Used |
95 |
| Contractor(s) |
| W.W. WEBBER, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1047-03-049 INDUS CONSTRUCTION, L.P. (2.85%) SKAGGS ROAD BORING INC.(2.15%) A. H. BECK FOUNDATION CO., INC.(3.32%) COWTOWN TRAFFIC CONTROL, INC.(0.54%) REYNOLDS ASPHALT & CONSTRUCTION COMPANY(6.38%) CAPROCK SPECIALITY CONTRACTORS (0.09%) NORTH TEXAS BOMANITE, INC. (2.00%) CEN-TEX SEEDING, INC.(1.14%) TEXAS HIGHWAY MARKINGS, LLC(1.15%) MICA CORPORATION (5.42%) DURABLE SPECIALTIES, INC.(4.02%) FARR FOUNDATION, INC.(0.34%) S & S BRIDGE PAINTING, INC.(0.20%) EVANS ENVIRONMENTAL CONTRACTING, LLC.(0.24%)
|
| Contract # |
01063202 |
|
Totals |
11083070.46 |
494228.82 |
10037459.83 |
94.6 |
|
| County | DALLAS |
| Highway |
IH 30 |
| From |
TARRANT COUNTY LINE |
| To |
E OF NW 7TH STREET |
| CSJ |
1068-04-110 |
| Proj ID |
HP 266(100) |
| Work Type |
WDN GR STRS & SURF |
| |
|
2.920 |
35540701.06 |
150232.82 |
37359994.36 |
99.9 |
| Work Order |
10-08-02 |
| Work Began |
11-13-02 |
| Work Completed |
|
| Time Computed |
10-24-02 |
| Contract Working Days |
965 |
| Addl Days Granted |
110 |
| Working Days Charged |
1,209 |
| Percent Time Used |
112 |
| Contractor(s) |
| ED BELL CONSTRUCTION COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 1068-04-110 CRAIG OLDEN, INC.(3.28%) UNITED RENTALS (GRAND PRAIRIE) (0.96%) SCOTT DERR PAINTING CO.(0.19%) STOMPER DEMOLITION (0.21%) DUSTROL, INC. (ROANOKE)(1.32%) CONCRETE PAVER SYSTEMS, INC. (0.04%) REYNOLDS ASPHALT & CONSTRUCTION COM(9.55%) SAW TECH CUSTOM CONCRETE CUTTING AND CORING, INC.(0.41%) TEXAS SHAFTS, INC. (2.55%) MICA CORPORATION (3.41%) CHAMPAGNE-WEBBER INC., TEXAS (0.60%) ANCHOR POST PRODUCTS OF TEXAS, INC.(0.08%) L.A. UTILITIES, INC. (5.61%) BREDA COMPANY, INC.(1.39%) LAYFIELD CONSTRUCTION, INC (0.12%) DURABLE SPECIALTIES, INC.(0.67%) WIMS ENVIRONMENTAL, INC. (0.35%) BORING & TUNNELING COMPANY OF AMERI(2.14%) CAPROCK SPECIALITY CONTRACTORS (0.41%) EVANS UTILITY GROUP, INC.(0.02%)
|
| Contract # |
08023268 |
|
Totals |
35540701.06 |
150232.82 |
37359994.36 |
99.9 |
|
| County | DALLAS |
| Highway |
IH 30 |
| From |
AT SH 161/NW 19TH |
| To |
. |
| CSJ |
1068-04-115 |
| Proj ID |
NH 2006(208) |
| Work Type |
STRS |
| |
|
1.837 |
27988228.42 |
155501.05 |
25867753.70 |
97.2 |
| County | DALLAS |
| Highway |
IH 30 |
| From |
AT SH 161/NW 19TH |
| To |
. |
| CSJ |
1068-04-121 |
| Proj ID |
NH 2000(459) |
| Work Type |
ACQ, RELOC & UTIL |
| |
|
0.001 |
72845.00 |
0.00 |
69199.90 |
99.9 |
| Work Order |
05-16-06 |
| Work Began |
07-13-06 |
| Work Completed |
|
| Time Computed |
06-01-06 |
| Contract Working Days |
592 |
| Addl Days Granted |
1 |
| Working Days Charged |
425 |
| Percent Time Used |
71 |
| Contractor(s) |
| TEXAS STERLING CONSTRUCTION CO. |
SUBCONTRACTOR(S) FOR CCSJ: 1068-04-115 FOUNDATION DRILLERS, INC.(4.04%) BUYER BARRICADES (0.60%) TONTO CONSTRUCTION,INC.(0.74%) CHAMPAGNE-WEBBER INC., TEXAS (0.75%) REYNOLDS ASPHALT & CONSTRUCTION COMPANY(3.98%) ANCHOR FENCE (0.32%) S & J CONTRACTING(2.78%) INLET STRUCTURE SPECIALTIES LTD. (2.21%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.76%) TEXAS HIGHWAY MARKINGS, LLC(0.66%) CRAIG OLDEN, INC.(0.97%) FORTSON CONTRACTING, INC.(0.27%) STOMPER DEMOLITION (0.31%) SCOTT DERR PAINTING CO (0.11%) SOUTHWEST CONSTRUCTION SERVICES(0.18%) BREDA COMPANY, INC.(0.40%) DURABLE SPECIALTIES, INC.(1.68%)
|
| Contract # |
03063201 |
|
Totals |
28061073.42 |
155501.05 |
25936953.60 |
97.2 |
|
| County | DALLAS |
| Highway |
IH 30 |
| From |
TARRANT COUNTY LINE |
| To |
EAST OF SYLVAN AVENUE |
| CSJ |
1068-04-126 |
| Proj ID |
CM 2007(163) |
| Work Type |
CONC PAV, CTB, PAV MKS, SIGNS, ITS |
| |
|
16.590 |
6248735.21 |
19146.14 |
5951293.81 |
95.2 |
| Work Order |
02-14-07 |
| Work Began |
04-09-07 |
| Work Completed |
|
| Time Computed |
03-26-07 |
| Contract Working Days |
281 |
| Addl Days Granted |
0 |
| Working Days Charged |
223 |
| Percent Time Used |
79 |
| Contractor(s) |
| W.W. WEBBER, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1068-04-126 UNITED RENTALS HIGHWAY TECHNOLOGIES (AUSTIN) (3.73%) REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 16.95%) TEXAS ENVIRONMENTAL MANAGEMENT, INC(0.02%) MICA CORPORATION ( 40.35%) LAYFIELD CONSTRUCTION, INC (0.13%)
|
| Contract # |
01073209 |
|
Totals |
6248735.21 |
19146.14 |
5951293.81 |
95.2 |
|
| County | DALLAS |
| Highway |
IH 30 |
| From |
WEST OF LOOP 12 |
| To |
EAST OF LOOP 12 |
| CSJ |
1068-04-133 |
| Proj ID |
STP 2005(162)MM |
| Work Type |
RECONSTRUCT STRUCTURES AND SURFACE |
| |
|
1.107 |
41735764.28 |
92037.55 |
40787032.01 |
99.9 |
| Work Order |
04-01-05 |
| Work Began |
05-31-05 |
| Work Completed |
|
| Time Computed |
05-31-05 |
| Contract Working Days |
650 |
| Addl Days Granted |
187 |
| Working Days Charged |
1,037 |
| Percent Time Used |
123 |
| Contractor(s) |
| AUSTIN BRIDGE & ROAD, LP |
SUBCONTRACTOR(S) FOR CCSJ: 1068-04-133 UNITED RENTALS HIGHWAY TECHNOLOGIES (NEWELL RD-FTWORTH)(0.63%) W.W. WEBBER INC. (0.93%) FORTSON CONTRACTING, INC.(0.96%) STOMPER DEMOLITION (0.12%) STRIPE-A-ZONE, INC.(0.24%) MICA CORPORATION (2.76%) CRAIG OLDEN, INC.(0.30%) TEXAS ENVIRONMENTAL MANAGEMENT, SA, INC. (0.81%) FOUNDATION DRILLERS, INC.(6.37%) DUSTROL, INC. (ROANOKE)(1.48%) RAYMOND PAINTING, INC. (0.32%) BRATTON STEEL, INC.(0.28%) BREDA COMPANY, INC.(3.83%) HERDEZ TRUCKING, INC.(0.85%) LAYFIELD CONSTRUCTION, INC (0.07%) DESTRUCTORS, INC.(0.23%) CAPROCK SPECIALITY CONTRACTORS (0.12%) CONCRETE CORING COMPANY(0.01%) H. L. MERRILL & SONS CONSTRUCTION CO., INC.(0.22%) GREAT WESTERN ERECTORS (0.52%)
|
| Contract # |
01053002 |
|
Totals |
41735764.28 |
92037.55 |
40787032.01 |
99.9 |
|
| County | DALLAS |
| Highway |
IH 30 |
| From |
CARRIER PKWY |
| To |
WEST OF LOOP 12 |
| CSJ |
1068-04-144 |
| Proj ID |
IM 0301(053) |
| Work Type |
RETAINING WALL REPLACEMENT |
| |
|
4.891 |
2588040.46 |
128909.50 |
148573.76 |
5.7 |
| Work Order |
09-16-08 |
| Work Began |
10-13-08 |
| Work Completed |
|
| Time Computed |
10-02-08 |
| Contract Working Days |
300 |
| Addl Days Granted |
0 |
| Working Days Charged |
36 |
| Percent Time Used |
12 |
| Contractor(s) |
| J.L. STEEL, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 1068-04-144 TREVCON, INC.( 16.24%) BREDA COMPANY, INC.(0.81%) SCOTT DERR PAINTING CO (0.26%) TEXAS SHAFTS, INC. ( 18.22%) BRENDA PRICE TRUCKING(2.13%) TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.35%)
|
| Contract # |
08083218 |
|
Totals |
2588040.46 |
128909.50 |
148573.76 |
5.7 |
|
| County | KAUFMAN |
| Highway |
FM 740 |
| From |
AT JUGHANDLE OF US 80 EB FRTG ROAD |
| To |
IN CITY OF FORNEY |
| CSJ |
1091-01-017 |
| Proj ID |
STP 2008(362) |
| Work Type |
GR, BASE, PAVING |
| |
|
0.389 |
342184.90 |
7185.82 |
364440.20 |
99.9 |
| Work Order |
03-18-08 |
| Work Began |
04-21-08 |
| Work Completed |
|
| Time Computed |
04-03-08 |
| Contract Working Days |
57 |
| Addl Days Granted |
30 |
| Working Days Charged |
76 |
| Percent Time Used |
87 |
| Contractor(s) |
| AUSTIN BRIDGE & ROAD, LP |
SUBCONTRACTOR(S) FOR CCSJ: 1091-01-017 CTF STRIPING (1.68%) EAST TEXAS SIGN & SUPPLY, INC. (1.78%) FORTSON CONTRACTING, INC.(1.22%) HIGHWAY TECHNOLOGIES, L.P. (2.33%) MULTIPLE CONSTRUCTION SERVICES, LLC(2.64%) AXIS CONTRACTING, INC. (1.34%) SMITH CONTRACTING, INC., S.A.(2.88%)
|
| Contract # |
02083219 |
|
Totals |
342184.90 |
7185.82 |
364440.20 |
99.9 |
|
| County | KAUFMAN |
| Highway |
FM 740 |
| From |
DALLAS C/L (1.4 MI S OF FM 2757) |
| To |
FM 688 |
| CSJ |
1091-02-017 |
| Proj ID |
SFT 1091-2-17 |
| Work Type |
PAV SHLDRS |
| |
|
5.882 |
2849114.69 |
67284.41 |
3280936.12 |
99.9 |
| Work Order |
09-13-06 |
| Work Began |
10-23-06 |
| Work Completed |
|
| Time Computed |
09-29-06 |
| Contract Working Days |
237 |
| Addl Days Granted |
118 |
| Working Days Charged |
375 |
| Percent Time Used |
105 |
| Contractor(s) |
| AUSTIN BRIDGE & ROAD, LP |
SUBCONTRACTOR(S) FOR CCSJ: 1091-02-017 CEN-TEX SEEDING, INC.(5.22%) DALLAS LITE AND BARRICADE INC. (0.99%) EAST TEXAS SIGN & SUPPLY, INC. (1.80%) FIREMAN EXCAVATING, INC. (0.05%) UNITED RENTALS HIGHWAY TECHNOLOGIES (DALLAS) (1.22%) R. K. HALL CONSTRUCTION, LTD.(1.92%) MARONEY EXCAVATION, LLC(3.39%) PEACHTREE CONSTRUCTION, LTD. ( 45.92%) DUSTROL, INC.(4.73%) W.S. CONSTRUCTION COMPANY(9.41%)
|
| Contract # |
08063041 |
|
Totals |
2849114.69 |
67284.41 |
3280936.12 |
99.9 |
|
| County | ELLIS |
| Highway |
FM 1446 |
| From |
ARROWHEAD ROAD |
| To |
IH 35E |
| CSJ |
1160-02-015 |
| Proj ID |
STP 2008(492)HES |
| Work Type |
PAV SURF |
| |
|
5.030 |
3986485.02 |
224778.98 |
470227.85 |
11.7 |
| Work Order |
06-26-08 |
| Work Began |
08-11-08 |
| Work Completed |
|
| Time Computed |
07-12-08 |
| Contract Working Days |
313 |
| Addl Days Granted |
0 |
| Working Days Charged |
94 |
| Percent Time Used |
30 |
| Contractor(s) |
| LINDSEY CONTRACTORS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1160-02-015 FORTSON CONTRACTING, INC.(0.60%) FARR FOUNDATION, INC.(2.22%) HIGHWAY TECHNOLOGIES (1.65%) N-LINE TRAFFIC MAINTENANCE, L.P. (0.51%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(5.75%) J & M CONTRACTING, COMPANY (9.84%)
|
| Contract # |
05083225 |
|
Totals |
3986485.02 |
224778.98 |
470227.85 |
11.7 |
|
| County | DENTON |
| Highway |
FM 1171 |
| From |
WEST OF SHILOH RD |
| To |
FM 2499 |
| CSJ |
1311-01-031 |
| Proj ID |
STP 2008(166) |
| Work Type |
GR, STRS, BASE, CRCP, PVMT MKGS, SIGNS |
| |
|
3.972 |
24323917.61 |
117127.65 |
2314877.66 |
9.5 |
| County | DENTON |
| Highway |
FM 1171 |
| From |
WEST OF SHILOH RD |
| To |
FM 2499 |
| CSJ |
1311-01-041 |
| Proj ID |
RW 1311-1-41 |
| Work Type |
ACQUISITION, UTILITIES AND RELOCATI |
| |
|
3.853 |
1069789.10 |
17750.20 |
979381.30 |
91.5 |
| Work Order |
01-10-08 |
| Work Began |
02-21-08 |
| Work Completed |
|
| Time Computed |
02-21-08 |
| Contract Working Days |
522 |
| Addl Days Granted |
0 |
| Working Days Charged |
62 |
| Percent Time Used |
11 |
| Contractor(s) |
| GLENN THURMAN, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1311-01-031 CONCRETE CUTTING BY BOND (0.40%) DUSTROL, INC. (ROANOKE)(0.99%) EVANS ENVIRONMENTAL CONTRACTING, LLC.(2.59%) HIGHWAY TECHNOLOGIES, L.P. (0.34%) INDUS CONSTRUCTION, L.P. (9.36%) LARRETT, INC.( 13.17%) INLET STRUCTURE SPECIALTIES LTD. (3.53%) NORTH TEXAS BOMANITE, INC. (1.08%) REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 18.39%) STRIPING TECHNOLOGY, L.P.(1.17%) DURABLE SPECIALTIES, INC.(3.54%)
|
| Contract # |
11073001 |
|
Totals |
25393706.71 |
134877.85 |
3294258.96 |
12.9 |
|
| County | DENTON |
| Highway |
FM 1171 |
| From |
FM 2499 |
| To |
KIRKPATRICK LANE |
| CSJ |
1311-01-047 |
| Proj ID |
STP 2007(746) |
| Work Type |
LANDSCAPE DEVELOPMENT |
| |
|
4.299 |
223548.50 |
0.00 |
212855.32 |
98.2 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
09-11-07 |
| Work Began |
10-17-07 |
| Work Completed |
|
| Time Computed |
09-27-07 |
| Contract Working Days |
68 |
| Addl Days Granted |
16 |
| Working Days Charged |
99 |
| Percent Time Used |
117 |
| Contractor(s) |
| LEGENDS LANDSCAPES LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1311-01-047 LONE STAR TRAFFIC SERVICE, INC.(1.78%) AXIS CONTRACTING, INC. ( 16.10%) ELITE LANDSCAPE( 20.57%) AQUA BORE(6.05%)
|
| Contract # |
08073215 |
|
Totals |
223548.50 |
0.00 |
212855.32 |
98.2 |
|
| County | KAUFMAN |
| Highway |
FM 1836 |
| From |
AT WILLIAMS CREEK |
| To |
. |
| CSJ |
1397-01-023 |
| Proj ID |
BR 2007(436) |
| Work Type |
REPL BR & APPRS |
| |
|
0.523 |
2137532.28 |
237854.00 |
748010.03 |
34.9 |
| Work Order |
04-28-08 |
| Work Began |
05-30-08 |
| Work Completed |
|
| Time Computed |
05-14-08 |
| Contract Working Days |
250 |
| Addl Days Granted |
0 |
| Working Days Charged |
89 |
| Percent Time Used |
35 |
| Contractor(s) |
| R. K. HALL CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 1397-01-023 COWBELL TRAFFIC SERVICES, INC. (0.42%) STRIPING TECHNOLOGY, L.P.(3.02%) TEX OP CONSTRUCTION, LP(1.13%) DUSTIN ALLEN, INC. (6.44%) M & D FOUNDATION DRILLING INDUSTRIES, INC. (5.52%) RUNNING HORSE CONSTRUCTION, INC. (3.27%) SOUTHWEST ENVIRONMENT SERVICES, INC. (1.81%)
|
| Contract # |
03083210 |
|
Totals |
2137532.28 |
237854.00 |
748010.03 |
34.9 |
|
| County | NAVARRO |
| Highway |
FM 1126 |
| From |
SH 31 |
| To |
SH 22 |
| CSJ |
1724-01-015 |
| Proj ID |
STP 2008(439) |
| Work Type |
FLEXIBLE PAVEMENT REPAIR & OVERLAY |
| |
|
13.548 |
6256369.60 |
249703.53 |
5800332.22 |
92.7 |
| Work Order |
04-28-08 |
| Work Began |
06-02-08 |
| Work Completed |
|
| Time Computed |
06-02-08 |
| Contract Working Days |
242 |
| Addl Days Granted |
0 |
| Working Days Charged |
126 |
| Percent Time Used |
52 |
| Contractor(s) |
| BIG CREEK CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 1724-01-015 AMERICAN REMEDIATION OPTIONS, INC. (8.40%) FORTSON CONTRACTING, INC.(4.39%) HIGHWAY TECHNOLOGIES (1.57%)
|
| Contract # |
03083002 |
|
Totals |
6256369.60 |
249703.53 |
5800332.22 |
92.7 |
|