Monthly State Let Construction Report For Austin District As Of Feb 10, 2017 Page 4 Of 7

Last Update: Friday, February 10, 2017
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7

Contract Identification and InformationLengthContract AmountAmount This EstimateTotal Estimate To Date% Comp

CountyGILLESPIE ETC
HighwaySH 16 ETC
From5.24 S OF GILLESPIE COUNTY LINE
ToRIDGEWOOD DRIVE
CSJ0290-03-029
Proj IDSTP 2017(473)
Work TypeLEVEL-UP AND SEAL COAT
 
30.5642194472.980.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days59
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
LONE STAR PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0290-03-029
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #01173211
Totals2194472.980.000.000.0

CountyGILLESPIE
HighwaySH 16
FromBOOS LANE
To0.5 MI SOUTH MORRIS RANCH ROAD
CSJ0291-01-048
Proj IDSTP 2015(276)
Work TypeUPGRADE TO SUPER 2 AND ADD LTLS
 
6.6706732998.405641421.6083.7
CountyGILLESPIE
HighwaySH 16
From0.5 MI SOUTH OF MORRIS RANCH ROAD
ToKERR/GILLESPIE COUNTY LINE
CSJ0291-01-049
Proj IDSTP 2015(493)
Work TypeUPGRADE TO SUPER 2 AND ADD LTLS
 
6.7145676561.766012377.4099.9
CountyKERR
HighwaySH 16
FromGILLESPIE/KERR COUNTY LINE
ToWOLF CREEK
CSJ0291-02-035
Proj IDSTP 2015(493)
Work TypeUPGRADE TO SUPER 2 AND ADD LTLS
 
0.466584945.99577662.2098.7
Work Order03-13-15
Work Began04-06-15
Work Completed
Time Computed03-29-15
Contract Working Days333
Addl Days Granted58
Working Days Charged355
Percent Time Used90
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0291-01-048
EGGEMEYER LAND CLEARING, LLC (0.35)
BMP SPECIALIST, LLC (2.18)
INTERSTATE BARRICADES & MARKINGS, INC. (2.19)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.57)
MPB, INC. (11.12)
DUSTROL, INC. (0.47)
CLARK CONSTRUCTION OF TEXAS, INC. (4.83)
ROADWAY SPECIALTIES, INC. (0.62)
RPV CONSTRUCTION (2.74)
WEST TEXAS RUMBLE STRIP (0.08)
Contract #01153201
Totals12994506.15149497.6012231461.2094.1

CountyWILLIAMSON
HighwaySH 95
FromAT WILLIS CREEK
To(STR 0320-03-032)
CSJ0320-03-083
Proj IDBR 1502(592)
Work TypeREPLACE BRIDGE AND APPROACHES
 
0.1052497365.802635751.3699.9
Work Order12-10-15
Work Began04-11-16
Work Completed
Time Computed02-05-16
Contract Working Days180
Addl Days Granted0
Working Days Charged167
Percent Time Used92
Contractor(s)
CHASCO CONSTRUCTORS
SUBCONTRACTOR(S) FOR CCSJ: 0320-03-083
FLASHER EQUIPMENT COMPANY (0.70)
MCKINNEY DRILLING__(BUDA) (3.43)
APAC-TEXAS, INC. (3.99)
DUSTROL, INC. (0.30)
FLASHER EQUIPMENT COMPANY (0.77)
ROADWAY SPECIALTIES, INC. (6.66)
WOOLERY CUSTOM FENCE CO. (0.20)
N-LINE TRAFFIC MAINTENANCE, L.P. (2.58)
Contract #08153253
Totals2497365.80328746.342635751.3699.9

CountyWILLIAMSON
HighwaySH 95
FromFM 971
To0.1 MI S OF CHANDLER RD
CSJ0320-03-095
Proj IDSTP 2016(303)
Work TypeLEVEL UP & SEAL COAT
 
7.393861567.42363036.2442.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order01-29-16
Work Began08-08-16
Work Completed
Time Computed08-01-15
Contract Working Days39
Addl Days Granted0
Working Days Charged31
Percent Time Used79
Contractor(s)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 0320-03-095
ROADWAY SPECIALTIES, INC. (37.63)
TRP CONSTRUCTION GROUP, LLC (8.41)
RUCOBA & MAYA CONSTRUCTION (15.75)
Contract #12153231
Totals861567.420.00363036.2442.1

CountyWILLIAMSON
HighwaySH 95
FromTH JOHNSON DR
To2ND ST
CSJ0320-03-097
Proj IDSTP 2017(571)
Work TypeMILL, SEAL AND TYPE D INLAY
 
1.912893754.230.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days35
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0320-03-097
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02173224
Totals893754.230.000.000.0

CountyWILLIAMSON
HighwaySH 95
FromOLD COUPLAND ROAD
ToTRAVIS C/L
CSJ0321-01-054
Proj IDSTP 1502(593)
Work TypeCONVERT SUPER 2
 
14.82613427785.2114257005.8499.9
Work Order11-10-15
Work Began01-04-16
Work Completed
Time Computed12-10-15
Contract Working Days263
Addl Days Granted0
Working Days Charged238
Percent Time Used90
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0321-01-054
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (1.02)
CHEROKEE SERVICES (0.19)
ROADWAY SPECIALTIES, INC. (3.28)
JORDAN FOSTER CONSTRUCTION, LLC (22.59)
S & S BRIDGE PAINTING, INC. (2.41)
TEXAS TRUCKING COMPANY, INC. (0.00)
TEX OP CONSTRUCTION, LP (3.30)
TRP CONSTRUCTION GROUP, LLC (2.80)
AUSTIN WOOD RECYCLING (0.49)
PHILLIPS TRAFFIC CONTROL (0.05)
AREA WIDE PROTECTIVE, INC. (0.06)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.05)
KRL CONSTRUCTION INC. (0.13)
TEXOP CONSTRUCTION (0.82)
G. CARTER CONSTRUCTION COMPANY, INC. (0.02)
CHANDLER CONCRETE, INC. (0.06)
Contract #08153009
Totals13427785.21202017.7914257005.8499.9

CountyLEE
HighwayFM 448
FromUS 77
ToFM 2239
CSJ0334-06-026
Proj IDSTP 1502(595)
Work TypeLEVEL-UP, OVERLAY, WIDEN & SEAL
 
4.8503138496.552624783.2783.6
Work Order04-06-16
Work Began06-20-16
Work Completed
Time Computed06-05-16
Contract Working Days95
Addl Days Granted0
Working Days Charged87
Percent Time Used91
Contractor(s)
KNIFE RIVER CORPORATION - SOUTH
SUBCONTRACTOR(S) FOR CCSJ: 0334-06-026
EGGEMEYER LAND CLEARING, LLC (1.94)
FARR FOUNDATION, INC. (0.93)
MURRAY CONSTRUCTION (0.53)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.21)
ROADWAY SPECIALTIES, INC. (2.76)
ROADSAFE TRAFFIC SYSTEMS, INC. (1.28)
BATTEN DRILLING, INC. (0.07)
Contract #08153040
Totals3138496.559308.172624783.2783.6

CountyWILLIAMSON
HighwaySH 29
FromCEDAR HOLLOW ROAD
ToRIVER CHASE BOULEVARD
CSJ0337-01-038
Proj IDSTP 2016(575)
Work TypeUNDERSEAL & THIN OVERLAY
 
3.5062014970.432132402.6999.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order05-02-16
Work Began08-04-16
Work Completed
Time Computed06-01-16
Contract Working Days60
Addl Days Granted0
Working Days Charged73
Percent Time Used121
Contractor(s)
RAMMING PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0337-01-038
ENVIRONMENTAL SAFETY SERVICES, INC. (6.31)
D.I.J. CONSTRUCTION, INC (2.34)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.53)
PERFORMANCE EQUIPMENT SERVICE (5.69)
TEXOP CONSTRUCTION (5.08)
Contract #01163021
Totals2014970.430.002132402.6999.9

CountyWILLIAMSON
HighwaySH 29
FromSOUTH AUSTIN AVE.
ToGEORGETOWN INNER LOOP
CSJ0337-02-040
Proj IDSTP 2016(635)
Work TypeOVERLAY
 
2.9051319538.690.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days37
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
LONE STAR PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0337-02-040
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02173008
Totals1319538.690.000.000.0

CountyWILLIAMSON
HighwaySH 29
FromINNER LOOP
ToMILEHAM CREEK BRIDGE
CSJ0337-02-041
Proj IDSTP 2016(576)
Work TypeUNDERSEAL & THIN OVERLAY
 
6.2861499000.001496297.4699.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order03-28-16
Work Began07-11-16
Work Completed
Time Computed04-27-16
Contract Working Days40
Addl Days Granted0
Working Days Charged31
Percent Time Used77
Contractor(s)
RAMMING PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0337-02-041
N-LINE TRAFFIC MAINTENANCE, L.P. (0.65)
CHEROKEE SERVICES (3.01)
PERFORMANCE EQUIPMENT SERVICE (3.16)
ENVIRONMENTAL SAFETY SERVICES, INC. (12.29)
D.I.J. CONSTRUCTION, INC (4.37)
TEXOP CONSTRUCTION (3.16)
MOORE CLEAN, LLC (0.56)
TRP CONSTRUCTION GROUP, LLC (0.87)
Contract #01163208
Totals1499000.000.001496297.4699.8

CountyHAYS
HighwaySH 123
From3500 FT NORTH OF RM 12
To3500 FT SOUTH OF RM 12
CSJ0366-01-066
Proj IDC 366-1-66
Work TypeCONST GRADE SEPARATION
 
1.32611596550.4810409656.4889.7
Work Order08-27-14
Work Began03-31-15
Work Completed
Time Computed02-23-15
Contract Working Days465
Addl Days Granted116
Working Days Charged457
Percent Time Used78
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0366-01-066
BMP SPECIALIST, LLC (1.56)
FLASHER EQUIPMENT COMPANY (1.80)
HOUSTON SAWING & DRILLING (0.04)
THE LEVY COMPANY, L.P. (3.95)
MCL CONTRACTING, LLC (0.24)
MURRAY CONSTRUCTION (0.22)
R K STEPHENS CONSTRUCTION, LLC (1.77)
VEGETATION MANAGEMENT SPECIALIST, INC. (0.06)
VOGES DRILLING CO. (0.73)
Contract #06143202
Totals11596550.48294202.8810409656.4889.7

CountyCALDWELL
HighwaySH 142
FromSH 80
ToBORCHERT LOOP
CSJ0384-01-021
Proj IDSTP 2017(021)
Work TypeSEAL & THIN OVERLAY
 
17.5412587289.350.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-26-16
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days45
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
ANGEL BROTHERS HOLDINGS CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0384-01-021
MV HENKE COMPANY, LLC (0.91)
FLASHER EQUIPMENT COMPANY (0.15)
ROADWAY SPECIALTIES, INC. (4.16)
D.I.J. CONSTRUCTION, INC (4.51)
Contract #09163207
Totals2587289.350.000.000.0

CountyTRAVIS
HighwaySH 130
FromSH 130 @ FM 812
To.
CSJ0440-06-014
Proj IDNH 1502(385)
Work TypeLANDSCAPING AND IRRIGATION
 
0.100642322.00589783.5091.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order08-31-15
Work Began10-26-15
Work Completed
Time Computed10-26-15
Contract Working Days60
Addl Days Granted0
Working Days Charged60
Percent Time Used100
Contractor(s)
ENCINO LANDSCAPE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0440-06-014
N-LINE TRAFFIC MAINTENANCE, L.P. (0.70)
CLASSIC TEJAS CONSTRUCTION, INC. (12.85)
M & M UNDERGROUND CONSTRUCTION (1.08)
Contract #07153257
Totals642322.000.00589783.5091.8

CountyCALDWELL
HighwaySH 21
FromHAYS COUNTY LINE
ToBASTROP COUNTY LINE
CSJ0471-04-029
Proj IDSTP 2016(852)
Work TypeREPAIR, LEVEL-UP, WIDEN AND OVERLAY
 
5.1902356387.981316879.0556.7
Work Order04-19-16
Work Began06-27-16
Work Completed
Time Computed05-19-16
Contract Working Days36
Addl Days Granted0
Working Days Charged62
Percent Time Used172
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0471-04-029
EGGEMEYER LAND CLEARING, LLC (2.08)
FLASHER EQUIPMENT COMPANY (3.30)
ROADWAY SPECIALTIES, INC. (0.25)
A BROTHERS MILLING, LLC (3.00)
DELGADOS CONSTRUCTION, DBA ERNESTO A. DELGADO (3.86)
Contract #03163214
Totals2356387.9812584.191316879.0556.7

CountyBASTROP
HighwaySH 21
From@ SL 150 (EAST)
To.
CSJ0472-01-042
Proj IDSTP 2017(572)HES
Work TypeREALIGN INTERSECTION
 
0.195286003.250.000.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order00-00-00
Work Began00-00-00
Work Completed
Time Computed00-00-00
Contract Working Days30
Addl Days Granted0
Working Days Charged0
Percent Time Used0
Contractor(s)
JIMMY EVANS COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0472-01-042
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #02173009
Totals286003.250.000.000.0

CountyMASON
HighwaySH 71
From0.119 MILES SOUTH OF SH 71
To0.303 MILES EAST OF RM 386
CSJ0577-01-026
Proj IDSTP 2016(898)
Work TypeADD LT TURN LN & ADD RT ACCEL LN
 
0.536944570.87720243.0876.2
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order06-17-16
Work Began07-18-16
Work Completed
Time Computed07-17-16
Contract Working Days108
Addl Days Granted0
Working Days Charged53
Percent Time Used49
Contractor(s)
FRITCHER CONSTRUCTION SERVICES
SUBCONTRACTOR(S) FOR CCSJ: 0577-01-026
JM YANEZ CONSTRUCTION (15.61)
FLASHER EQUIPMENT COMPANY (5.58)
BMP CONSTRUCTION, INC. (4.02)
AUSTIN MATERIALS, LLC (31.23)
Contract #04163024
Totals944570.870.00720243.0876.2

CountyMASON
HighwayRM 386
FromSH 71
ToUS 87/ SH 29
CSJ0577-01-028
Proj IDSTP 1502(146)HES
Work TypeSAFETY TREAT FIXED OBJECTS
 
15.8871151527.251311107.5099.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order07-07-15
Work Began01-07-16
Work Completed
Time Computed09-06-15
Contract Working Days247
Addl Days Granted6
Working Days Charged203
Percent Time Used80
Contractor(s)
ALLEN KELLER COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0577-01-028
TRP CONSTRUCTION GROUP, LLC (2.97)
ROADWAY SPECIALTIES, INC. (7.67)
INCE ENTERPRISES, INC. (9.89)
Contract #05153231
Totals1151527.250.001311107.5099.9

CountyTRAVIS
HighwayRM 620
From500 FT N OF LOHMANS CROSSING RD
ToLADERA BLVD.
CSJ0683-02-063
Proj IDSTP 1502(596)
Work TypeOPERATIONAL IMPROVEMENTS
 
0.9381419535.801316166.0692.7
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order02-08-16
Work Began09-15-16
Work Completed
Time Computed03-09-16
Contract Working Days58
Addl Days Granted0
Working Days Charged52
Percent Time Used89
Contractor(s)
AARON CONCRETE CONTRACTORS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0683-02-063
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (1.39)
ENVIRONMENTAL SAFETY SERVICES, INC. (0.95)
LONE STAR PAVING CO. (48.99)
N-LINE TRAFFIC MAINTENANCE, L.P. (4.43)
TRP CONSTRUCTION GROUP, LLC (2.69)
Contract #09153229
Totals1419535.800.001316166.0692.7

CountyHAYS
HighwayRM 12
FromAT OLD FITZHUGH RD.
To.
CSJ0683-05-011
Proj IDSTP 1502(388)
Work TypeINSTALL FLASH BEACON/REALIGN INTER.
 
0.001232728.36271229.0599.9
CountyHAYS
HighwayRM 12
From0.25 MI N OF OLD FITZHUGH RD.
To0.25 MI S OF OLD FITZHUGH RD.
CSJ0683-05-012
Proj IDSTP 1502(387)HES
Work TypeADD CENTER TURN LANE AND SHOULDERS
 
0.560826750.43977034.3999.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order10-05-15
Work Began04-25-16
Work Completed
Time Computed11-04-15
Contract Working Days98
Addl Days Granted0
Working Days Charged76
Percent Time Used77
Contractor(s)
CAPITAL EXCAVATION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0683-05-011
AUSTIN WOOD RECYCLING (1.05)
ENVIRONMENTAL SAFETY SERVICES, INC. (3.83)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (6.22)
FLASHER EQUIPMENT COMPANY (4.33)
LONE STAR PAVING, INC. (23.03)
Contract #07153036
Totals1059478.790.001248263.4499.9

CountyBURNET
HighwaySH 71
FromAT CR 401
To.
CSJ0700-01-040
Proj IDSTP 1602(151)HESG
Work TypeINSTALL INTERSECTION FLASHING BEAC
 
0.409113531.00109791.0096.7
Work Order08-08-16
Work Began11-28-16
Work Completed
Time Computed09-07-16
Contract Working Days64
Addl Days Granted0
Working Days Charged58
Percent Time Used90
Contractor(s)
SIGNAL SERVICES GROUP INC.
SUBCONTRACTOR(S) FOR CCSJ: 0700-01-040
NO SUBCONTRACTORS FOR THIS CCSJ
Contract #06163007
Totals113531.0011721.00109791.0096.7