| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | TRAVIS |
| Highway |
SH 71 |
| From |
IH 35 |
| To |
1500' EAST OF MONTOPOLIS DR. |
| CSJ |
0113-13-148 |
| Proj ID |
STP 2011(108) |
| Work Type |
LANDSCAPING AND IRRIGATION |
| |
|
6.360 |
519513.90 |
2800.00 |
544626.46 |
99.9 |
| Work Order |
09-14-10 |
| Work Began |
01-03-11 |
| Work Completed |
|
| Time Computed |
11-13-10 |
| Contract Working Days |
88 |
| Addl Days Granted |
10 |
| Working Days Charged |
77 |
| Percent Time Used |
78 |
| Contractor(s) |
| LEGENDS LANDSCAPES LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0113-13-148 LONE STAR TRAFFIC SERVICE, INC.(0.69%) DOWN UNDER CONSTRUCTION(3.00%) CARTER PLUMBING, INC.(4.23%)
|
| Contract # |
08103019 |
|
Totals |
519513.90 |
2800.00 |
544626.46 |
99.9 |
|
| County | TRAVIS |
| Highway |
SH 71 |
| From |
EAST OF MONTOPOLIS DR |
| To |
US 183 |
| CSJ |
0113-13-149 |
| Proj ID |
NH 1102(240) |
| Work Type |
CONST UNDERPASS, FRT RDS & MAIN LANES |
| |
|
1.419 |
33460488.85 |
998393.65 |
14099609.17 |
42.1 |
| County | TRAVIS |
| Highway |
SH 71 |
| From |
EAST OF MONTOPOLIS DR |
| To |
US 183 |
| CSJ |
0113-13-151 |
| Proj ID |
RW 113-13-151 |
| Work Type |
ROW ACQ. AND UTL. ADJ. |
| |
|
1.300 |
1522117.70 |
0.00 |
1123929.41 |
73.8 |
| Work Order |
09-27-11 |
| Work Began |
01-26-12 |
| Work Completed |
|
| Time Computed |
12-25-11 |
| Contract Working Days |
581 |
| Addl Days Granted |
0 |
| Working Days Charged |
246 |
| Percent Time Used |
42 |
| Contractor(s) |
| SEMA CONSTRUCTION, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0113-13-149 RICE ENVIRONMENTAL SERVICES(0.33%) SCOTT DERR PAINTING CO, LLC(0.14%) HIGHWAY TECHNOLOGIES, INC. (0.22%) AUSTIN WOOD RECYCLING(0.09%) INDUS CONSTRUCTION, L.P. (0.39%) PRIMATE CONSTRUCTION, INC. (0.21%) BMP SPECIALIST, LLC(0.08%) TEX OP CONSTRUCTION, LP(0.01%) PERFORMANCE EQUIPMENT(0.13%) AUSTIN FILTER SYSTEMS, INC.(3.34%) J.D. RAMMING PAVING CO., LTD.( 11.54%) CRAIG OLDEN, INC.( 12.42%) MCKINNEY DRILLING__(BUDA)(0.66%) ROYAL VISTA INC. (9.79%) AARON CONCRETE CONTRACTORS, L.P. (4.70%) ROADWAY SPECIALTIES, INC.(0.54%) BOOTHE BROTHERS PAVING COMPANY, INC. (1.34%) FLASHER EQUIPMENT COMPANY(5.73%) RANGER EXCAVATING, L.P.(0.00%) AUSTIN TRAFFIC SIGNAL CONSTRUCTION (OLD PRIME) (2.11%) BRYANT & FREY CONSTRUCTION (0.00%) CHAMPION SITE PREP, L.P. (0.00%) CENTRAL TEXAS REINFORCEMENT(0.01%) CHANDLER CONCRETE, INC.(0.57%) MG DRILLING(0.00%) REINFORCING STEEL SUPPLY (0.00%) LONE STAR SITEWORK, LLC(0.57%) KRL CONSTRUCTION INC.(0.11%)
|
| Contract # |
08113002 |
|
Totals |
34982606.55 |
998393.65 |
15223538.58 |
43.5 |
|
| County | TRAVIS |
| Highway |
LP 360 |
| From |
BEE CAVES RD |
| To |
LP 1 |
| CSJ |
0113-13-152 |
| Proj ID |
NH 1102(427) |
| Work Type |
MILL, SEAL & THIN OVERLAY |
| |
|
3.912 |
1640002.97 |
0.00 |
1838316.76 |
99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
09-14-11 |
| Work Began |
09-05-12 |
| Work Completed |
|
| Time Computed |
09-30-11 |
| Contract Working Days |
39 |
| Addl Days Granted |
0 |
| Working Days Charged |
39 |
| Percent Time Used |
100 |
| Contractor(s) |
| RAMMING PAVING COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0113-13-152 HIGHWAY TECHNOLOGIES, INC. (6.04%)
|
| Contract # |
08113273 |
|
Totals |
1640002.97 |
0.00 |
1838316.76 |
99.9 |
|
| County | TRAVIS |
| Highway |
US 290 |
| From |
490 FT. EAST OF SHADOWGLEN BLVD CTL |
| To |
1020 FT. EAST OF FM 973 |
| CSJ |
0114-02-098 |
| Proj ID |
CC 114-2-98 |
| Work Type |
ADD EB RIGHT TURN AND EB & WB LTLS |
| |
|
0.599 |
372486.10 |
0.00 |
0.00 |
0.0 |
| County | TRAVIS |
| Highway |
LP 212 |
| From |
1775 FT. SOUTH OF US 290 |
| To |
US 290 |
| CSJ |
0114-20-010 |
| Proj ID |
CC 114-20-10 |
| Work Type |
ADD SB RIGHT & NB LEFT TURN LANES |
| |
|
0.336 |
397395.50 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
50 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| AARON CONCRETE CONTRACTORS, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 0114-02-098 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133227 |
|
Totals |
769881.60 |
0.00 |
0.00 |
0.0 |
|
| County | BASTROP |
| Highway |
US 290 |
| From |
0.28 MI EAST OF COUNTY LINE ROAD |
| To |
0.44 MI EAST OF COUNTY LINE ROAD |
| CSJ |
0114-04-064 |
| Proj ID |
CC 114-4-64 |
| Work Type |
EXTEND LEFT TURN LANE AT MEDIAN |
| |
|
0.159 |
107797.28 |
39100.52 |
39100.52 |
36.2 |
| Work Order |
02-19-13 |
| Work Began |
03-27-13 |
| Work Completed |
|
| Time Computed |
03-07-13 |
| Contract Working Days |
41 |
| Addl Days Granted |
0 |
| Working Days Charged |
15 |
| Percent Time Used |
36 |
| Contractor(s) |
| DIAMOND X CONTRACTING, INC |
SUBCONTRACTOR(S) FOR CCSJ: 0114-04-064 N-LINE TRAFFIC MAINTENANCE, L.P. (6.18%) D. I. J. CONSTRUCTION, INC.(6.48%) ENVIRONMENTAL SAFETY SERVICES, INC.(2.28%) LONE STAR PAVING CO. ( 22.82%) AARON CONCRETE CONTRACTORS, L.P. (4.67%)
|
| Contract # |
12123205 |
|
Totals |
107797.28 |
39100.52 |
39100.52 |
36.2 |
|
| County | CALDWELL |
| Highway |
FM 20 |
| From |
SH 80 |
| To |
1.881 MI W OF US 183 |
| CSJ |
0115-02-017 |
| Proj ID |
STP 2013(473) |
| Work Type |
FULL DEPTH REPAIR, LEVEL - UP & SEAL |
| |
|
11.115 |
1097372.07 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
26 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| RAMMING PAVING COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0115-02-017 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03133004 |
|
Totals |
1097372.07 |
0.00 |
0.00 |
0.0 |
|
| County | BASTROP |
| Highway |
FM 20 |
| From |
0.261 MI S OF FM 535 |
| To |
0.175 MI N OF FM 535 |
| CSJ |
0115-04-042 |
| Proj ID |
STP 2012(548) |
| Work Type |
WDN, RE - ALIGN VERT, TWLTL, CULV, OV |
| |
|
0.850 |
1527586.43 |
1448.12 |
1453004.54 |
95.1 |
| Work Order |
07-09-12 |
| Work Began |
10-22-12 |
| Work Completed |
|
| Time Computed |
09-07-12 |
| Contract Working Days |
63 |
| Addl Days Granted |
0 |
| Working Days Charged |
60 |
| Percent Time Used |
95 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0115-04-042 HIGHWAY TECHNOLOGIES, INC. (0.41%) AUSTIN WOOD RECYCLING(0.66%) MPB, INC.(3.36%) ROADWAY SPECIALTIES, INC.(0.92%) MURRAY CONSTRUCTION(1.13%) FLASHER EQUIPMENT COMPANY(0.85%)
|
| Contract # |
05123210 |
|
Totals |
1527586.43 |
1448.12 |
1453004.54 |
95.1 |
|
| County | LEE |
| Highway |
SH 21 |
| From |
0.383 MI. W OF FM 3403 |
| To |
0.009 MI. W OF FM 141 |
| CSJ |
0116-01-028 |
| Proj ID |
NH 2013(191) |
| Work Type |
ADD SHLDRS., PAV REPAIR, SEAL COAT |
| |
|
10.251 |
7525070.79 |
847484.40 |
1282412.22 |
17.0 |
| Work Order |
01-23-13 |
| Work Began |
03-11-13 |
| Work Completed |
|
| Time Computed |
03-11-13 |
| Contract Working Days |
204 |
| Addl Days Granted |
0 |
| Working Days Charged |
32 |
| Percent Time Used |
15 |
| Contractor(s) |
| HUNTER INDUSTRIES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0116-01-028 AUSTIN WOOD RECYCLING(1.25%) COWBELL TRAFFIC SERVICES, INC. (0.13%) D. I. J. CONSTRUCTION, INC.(3.55%) ENVIRONMENTAL SAFETY SERVICES, INC.(1.91%) HIGHWAY TECHNOLOGIES, INC. (0.37%) ROADWAY SPECIALTIES, INC.(1.92%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(2.24%)
|
| Contract # |
11123217 |
|
Totals |
7525070.79 |
847484.40 |
1282412.22 |
17.0 |
|
| County | LLANO |
| Highway |
SH 29 |
| From |
RM 2241 |
| To |
RM 1431 |
| CSJ |
0150-04-043 |
| Proj ID |
STP 2013(246) |
| Work Type |
LEVEL - UP & SEAL COAT |
| |
|
12.867 |
1485594.91 |
860687.67 |
860687.67 |
57.9 |
| Work Order |
03-08-13 |
| Work Began |
04-08-13 |
| Work Completed |
|
| Time Computed |
03-24-13 |
| Contract Working Days |
32 |
| Addl Days Granted |
0 |
| Working Days Charged |
13 |
| Percent Time Used |
40 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0150-04-043 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12123024 |
|
Totals |
1485594.91 |
860687.67 |
860687.67 |
57.9 |
|
| County | BURNET |
| Highway |
SH 29 |
| From |
FANIN STREET IN BURNET |
| To |
HILL STREET |
| CSJ |
0151-01-040 |
| Proj ID |
STP 2011(355) |
| Work Type |
REHAB RDWY |
| |
|
1.000 |
1416556.10 |
0.00 |
1685895.62 |
99.9 |
| County | BURNET |
| Highway |
US 281 |
| From |
HOUSTON CLINTON DR |
| To |
GREEN MILE RD |
| CSJ |
0252-01-069 |
| Proj ID |
STP 2011(355) |
| Work Type |
REHAB RDWY |
| |
|
2.300 |
3255002.03 |
15188.91 |
3486903.59 |
99.9 |
| Work Order |
09-15-10 |
| Work Began |
10-12-10 |
| Work Completed |
|
| Time Computed |
10-12-10 |
| Contract Working Days |
387 |
| Addl Days Granted |
66 |
| Working Days Charged |
404 |
| Percent Time Used |
89 |
| Contractor(s) |
| DAN WILLIAMS COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0252-01-069 J.D. RAMMING PAVING CO., LTD.( 27.80%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.61%) F & W ELECTRICAL CONTRACTORS, INC. (2.47%) D. I. J. CONSTRUCTION, INC.(0.71%)
|
| Contract # |
08103110 |
|
Totals |
4671558.13 |
15188.91 |
5172799.21 |
99.9 |
|
| County | WILLIAMSON |
| Highway |
SH 29 |
| From |
1145 FT. WEST OF CR 200 |
| To |
FM 1869 |
| CSJ |
0151-03-039 |
| Proj ID |
STP 2013(338) |
| Work Type |
MILL, SEAL & OVERLAY |
| |
|
1.542 |
509202.94 |
0.00 |
0.00 |
0.0 |
| County | WILLIAMSON |
| Highway |
SH 29 |
| From |
FM 1869 |
| To |
1775 FT. EAST OF EAST END OF LP 332 |
| CSJ |
0151-04-068 |
| Proj ID |
STP 2013(338) |
| Work Type |
MILL, SEAL & OVERLAY |
| |
|
0.704 |
217918.73 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
04-15-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
05-01-13 |
| Contract Working Days |
25 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| RAMMING PAVING COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0151-03-039 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01133029 |
|
Totals |
727121.67 |
0.00 |
0.00 |
0.0 |
|
| County | WILLIAMSON |
| Highway |
US 183 |
| From |
APPROX. 920' S OF 183A |
| To |
RM 2243 |
| CSJ |
0151-04-067 |
| Proj ID |
NH 2013(474) |
| Work Type |
PAVEMENT REPAIR, UNDERSEAL & OVERLAY |
| |
|
1.824 |
867875.03 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
33 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| RAMMING PAVING COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0151-04-067 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03133034 |
|
Totals |
867875.03 |
0.00 |
0.00 |
0.0 |
|
| County | WILLIAMSON |
| Highway |
US 183 |
| From |
DISCOVERY BLVD |
| To |
AVERY RANCH BLVD |
| CSJ |
0151-05-095 |
| Proj ID |
NH 2012(306) |
| Work Type |
MILL, SEAL & OVERLAY |
| |
|
2.626 |
1366638.30 |
417473.14 |
418256.04 |
30.6 |
| Work Order |
03-12-12 |
| Work Began |
12-10-12 |
| Work Completed |
|
| Time Computed |
05-11-12 |
| Contract Working Days |
49 |
| Addl Days Granted |
0 |
| Working Days Charged |
12 |
| Percent Time Used |
24 |
| Contractor(s) |
| RAMMING PAVING COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0151-05-095 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. (1.33%) MPB, INC.(0.37%) HIGHWAY TECHNOLOGIES, INC. (5.73%) TEX OP CONSTRUCTION, LP(4.76%)
|
| Contract # |
02123031 |
|
Totals |
1366638.30 |
417473.14 |
418256.04 |
30.6 |
|
| County | TRAVIS |
| Highway |
LP 111 |
| From |
BOLM RD |
| To |
US 183 |
| CSJ |
0151-06-130 |
| Proj ID |
STP 2012(049)MM |
| Work Type |
CONSTRUCT SIDEWALK ON AIRPORT BLVD |
| |
|
0.486 |
117198.00 |
0.00 |
115928.43 |
100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-08-11 |
| Work Began |
02-13-12 |
| Work Completed |
05-01-13 |
| Time Computed |
01-07-12 |
| Contract Working Days |
51 |
| Addl Days Granted |
0 |
| Working Days Charged |
25 |
| Percent Time Used |
49 |
| Contractor(s) |
| GARCIA J CONTRACTORS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0151-06-130 TEXAS CONCRETE COMPANY ( 18.21%)
|
| Contract # |
09113027 |
|
Totals |
117198.00 |
0.00 |
115928.43 |
100.0 |
|
| County | TRAVIS |
| Highway |
US 183 |
| From |
BURNET RD |
| To |
IH 35 |
| CSJ |
0151-06-135 |
| Proj ID |
STP 1102(322) |
| Work Type |
MILL, SEAL & OVERLAY FRONTAGE RDS |
| |
|
3.476 |
1912437.45 |
0.00 |
1957389.26 |
100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
07-19-11 |
| Work Began |
09-12-11 |
| Work Completed |
04-17-13 |
| Time Computed |
09-12-11 |
| Contract Working Days |
58 |
| Addl Days Granted |
6 |
| Working Days Charged |
74 |
| Percent Time Used |
115 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0151-06-135 AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (4.24%) HIGHWAY TECHNOLOGIES, INC. (7.03%)
|
| Contract # |
06113246 |
|
Totals |
1912437.45 |
0.00 |
1957389.26 |
100.0 |
|
| County | TRAVIS |
| Highway |
US 183 |
| From |
0.46 MI W. OF SPRINGDALE |
| To |
0.68 MI S. OF BOLM RD |
| CSJ |
0151-09-139 |
| Proj ID |
NH 2011(722) |
| Work Type |
PVMT SURF REHAB - 2IN ML IP RCYC |
| |
|
6.939 |
1359831.37 |
0.00 |
1672906.21 |
100.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
01-06-11 |
| Work Began |
04-18-11 |
| Work Completed |
04-17-13 |
| Time Computed |
04-06-11 |
| Contract Working Days |
53 |
| Addl Days Granted |
12 |
| Working Days Charged |
65 |
| Percent Time Used |
100 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0151-09-139 HIGHWAY TECHNOLOGIES, INC. (7.14%) AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (2.32%) AGGREGATE TECHNOLOGIES, INC. (2.10%) BMP SPECIALIST, LLC(0.32%) ROADWAY SPECIALTIES, INC.(4.13%)
|
| Contract # |
12103224 |
|
Totals |
1359831.37 |
0.00 |
1672906.21 |
100.0 |
|
| County | CALDWELL |
| Highway |
US 183 |
| From |
5.0 MI SOUTH OF FM 20 |
| To |
0.5 MI SOUTH OF FM 86 |
| CSJ |
0152-03-053 |
| Proj ID |
NH 2013(553) |
| Work Type |
PAVEMENT REPAIR, MILL, SEAL & OVERLAY |
| |
|
8.000 |
7526709.80 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
174 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0152-03-053 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133206 |
|
Totals |
7526709.80 |
0.00 |
0.00 |
0.0 |
|
| County | BURNET |
| Highway |
US 281 |
| From |
ON US 281 AT COLORADO RIVER |
| To |
(STR 0252-02-017) |
| CSJ |
0252-02-046 |
| Proj ID |
BR 2010(786) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.568 |
28272713.57 |
521409.40 |
17390540.03 |
61.5 |
| County | BURNET |
| Highway |
US 281 |
| From |
ON US 281 AT COLORADO RIVER |
| To |
. |
| CSJ |
0252-02-049 |
| Proj ID |
BR 2009(641) |
| Work Type |
ROW ACQ. AND RELOC. ASSIST. |
| |
|
0.001 |
375131.40 |
-294.82 |
366309.84 |
97.6 |
| Work Order |
07-15-10 |
| Work Began |
12-07-10 |
| Work Completed |
|
| Time Computed |
12-07-10 |
| Contract Working Days |
1,177 |
| Addl Days Granted |
0 |
| Working Days Charged |
676 |
| Percent Time Used |
57 |
| Contractor(s) |
| ARCHER-WESTERN CONTRACTORS, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0252-02-046 AARON CONCRETE CONTRACTORS, L.P. (0.65%) AFS ENVIRONMENTAL, INC.(0.22%) APAC-TEXAS, INC. (2.51%) BPI ENVIRONMENTAL SERVICES INC.(0.61%) BREDA COMPANY, INC.(0.37%) CONCRETE CUTTING BY BOND (0.11%) DUSTROL, INC. (ROANOKE)(0.01%) PENHALL COMPANY(0.07%) ROADWAY SPECIALTIES, INC.(1.73%) SCOTT DERR PAINTING CO, LLC(0.37%) THE LEVY COMPANY, L.P. (2.27%) TREVCON, INC.(1.90%) W. W. FOUNDATION DRILLING, LTD.(3.29%) PANTHER CREEK TRANSPORTATION, INC. (0.35%) N-LINE TRAFFIC MAINTENANCE, L.P. (0.02%) HIGHWAY TECHNOLOGIES, INC. (0.23%) SWEEP ACROSS TEXAS (0.00%) MUSTANG COLT SERVICES, INC.(0.00%) OMEGA DEMOLITION CORPORATION (3.33%)
|
| Contract # |
05103201 |
|
Totals |
28647844.97 |
521114.58 |
17756849.87 |
62.0 |
|
| County | BURNET |
| Highway |
US 281 |
| From |
SH 71 |
| To |
BLANCO COUNTY LINE |
| CSJ |
0252-02-053 |
| Proj ID |
STP 2013(247) |
| Work Type |
MILL, SEAL & OVERLAY |
| |
|
3.093 |
1090537.74 |
0.00 |
0.00 |
0.0 |
| County | BLANCO |
| Highway |
US 281 |
| From |
BURNET COUNTY LINE |
| To |
US 290 WEST IN JOHNSON CITY |
| CSJ |
0252-03-047 |
| Proj ID |
STP 2013(247) |
| Work Type |
MILL, SEAL & OVERLAY |
| |
|
15.051 |
3601894.57 |
15819.50 |
26729.50 |
0.7 |
| Work Order |
01-23-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
02-08-13 |
| Contract Working Days |
55 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| CLARK CONSTRUCTION OF TEXAS, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0252-03-047 INTERSTATE BARRICADES & MARKINGS, INC. (0.00%)
|
| Contract # |
12123010 |
|
Totals |
4692432.31 |
15819.50 |
26729.50 |
0.5 |
|
| County | BLANCO |
| Highway |
US 281 |
| From |
AT N CYPRESS CREEK |
| To |
(STR 0252-03-010) |
| CSJ |
0252-03-045 |
| Proj ID |
BR 2011(955) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.071 |
742748.14 |
0.00 |
811696.19 |
99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
06-14-11 |
| Work Began |
01-10-12 |
| Work Completed |
|
| Time Computed |
06-30-11 |
| Contract Working Days |
99 |
| Addl Days Granted |
10 |
| Working Days Charged |
170 |
| Percent Time Used |
155 |
| Contractor(s) |
| DEAN WORD COMPANY, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0252-03-045 D. I. J. CONSTRUCTION, INC.(1.33%) DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (2.81%) TURNKEY OPERATIONS (0.67%) BMP SPECIALIST, LLC(1.38%) ROADWAY SPECIALTIES, INC.(0.50%)
|
| Contract # |
05113004 |
|
Totals |
742748.14 |
0.00 |
811696.19 |
99.9 |
|