Monthly State Let Construction Report For Austin District As Of Apr 11, 2014 Page 3 Of 7

Last Update: Friday, April 11, 2014
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyWILLIAMSON
Highway US 183
From 0.030 MI SOUTH OF LAKE CREEK PKWY
To 0.152 MI SOUTH OF ANDERSON MILL RD
CSJ 0151-05-098
Proj ID STP 2014(518)
Work Type MILL, SEAL & OVERLAY NB & SB FRT RD
 
1.000 588778.08 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 35
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
RAMMING PAVING COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0151-05-098
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03143209
Totals 588778.08 0.00 0.00 0.0

CountyWILLIAMSON
Highway US 183
From 350 FEET NORTH OF WALTON WAY
To 350 FEET SOUTH OF WALTON WAY
CSJ 0151-05-103
Proj ID C 151-5-103
Work Type ADD RIGHT TURN & DUAL LEFT TURN LANES
 
0.100 344399.00 27150.00 27150.00 7.8
Work Order 10-04-13
Work Began 03-10-14
Work Completed  
Time Computed 10-20-13
Contract Working Days 55
Addl Days Granted 0
Working Days Charged 12
Percent Time Used 21
Contractor(s)
ANALYTICAL TECHNOLOGY CONSULTANTS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0151-05-103
BUYERS BARRICADES, INC.(1.91%)
ROADMASTER, INC. (1.32%)
WHEELER COATINGS ASPHALT, INC. ( 44.64%)
Contract # 08133256
Totals 344399.00 27150.00 27150.00 7.8

CountyTRAVIS
Highway US 183
From BURLESON RD
To FM 812
CSJ 0152-01-077
Proj ID NH 2014(303)
Work Type OVERLAY
 
1.290 698386.33 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-17-14
Work Began 00-00-00
Work Completed  
Time Computed 02-02-14
Contract Working Days 35
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0152-01-077
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 12133011
Totals 698386.33 0.00 0.00 0.0

CountyCALDWELL
Highway US 183
From PECAN STREET
To FM 20
CSJ 0152-02-070
Proj ID C 152-2-70
Work Type RECONSTRUCT TO 5 - LN URBAN SECTION
 
1.125 7221836.67 0.00 0.00 0.0
CountyCALDWELL
Highway US 183
From FM 20
To 0.274 MI S. OF MLK/INDUSTRIAL BLVD
CSJ 0152-03-057
Proj ID C 152-3-57
Work Type RECONST TO 5 - LANE URBAN SECTION
 
0.909 4477082.25 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 267
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0152-02-070
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11133003
Totals 11698918.92 0.00 0.00 0.0

CountyCALDWELL
Highway US 183
From 5.0 MI SOUTH OF FM 20
To 0.5 MI SOUTH OF FM 86
CSJ 0152-03-053
Proj ID NH 2013(553)
Work Type PAVEMENT REPAIR, MILL, SEAL & OVERLAY
 
8.000 7526709.80 1646278.97 5963689.53 79.2
Work Order 06-20-13
Work Began 06-26-13
Work Completed  
Time Computed 06-26-13
Contract Working Days 174
Addl Days Granted 0
Working Days Charged 132
Percent Time Used 75
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0152-03-053
FLASHER EQUIPMENT COMPANY(0.27%)
RELMCO, INC. (2.20%)
D. I. J. CONSTRUCTION, INC.(2.29%)
ROADWAY SPECIALTIES, INC.(1.99%)
R.P.V. CONSTRUCTION(0.05%)
Contract # 04133206
Totals 7526709.80 1646278.97 5963689.53 79.2

CountyWILLIAMSON
Highway US 79
From COTTONWOOD CREEK BRDG EAST ABUTMENT
To EXCHANGE BOULEVARD
CSJ 0204-02-030
Proj ID NH 2014(359)
Work Type MILL, UNDERSEAL & THIN OVERLAY
 
1.008 554433.42 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-04-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 36
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0204-02-030
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01143225
Totals 554433.42 0.00 0.00 0.0

CountyLEE
Highway US 77
From AT SPRING BRANCH
To (STR 211-2-33)
CSJ 0211-02-024
Proj ID BR 2014(616)
Work Type REPLACE BRIDGE AND APPROACHES
 
1.193 1883084.21 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 205
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
BIG CREEK CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0211-02-024
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04143036
Totals 1883084.21 0.00 0.00 0.0

CountyBURNET
Highway US 281
From ON US 281 AT COLORADO RIVER
To (STR 0252-02-017)
CSJ 0252-02-046
Proj ID BR 2010(786)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.568 28272713.57 1147447.99 24712737.71 87.4
CountyBURNET
Highway US 281
From ON US 281 AT COLORADO RIVER
To .
CSJ 0252-02-049
Proj ID BR 2009(641)
Work Type ROW ACQ. AND RELOC. ASSIST.
 
0.001 375131.40 0.00 122149.84 32.5
Work Order 07-15-10
Work Began 12-07-10
Work Completed  
Time Computed 12-07-10
Contract Working Days 1,177
Addl Days Granted 0
Working Days Charged 943
Percent Time Used 80
Contractor(s)
ARCHER-WESTERN CONTRACTORS, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0252-02-046
AARON CONCRETE CONTRACTORS, L.P. (0.65%)
AFS ENVIRONMENTAL, INC.(0.22%)
APAC-TEXAS, INC. (2.51%)
BPI ENVIRONMENTAL SERVICES INC.(0.61%)
BREDA COMPANY, INC.(0.37%)
CONCRETE CUTTING BY BOND (0.11%)
DUSTROL, INC. (ROANOKE)(0.01%)
PENHALL COMPANY(0.07%)
ROADWAY SPECIALTIES, INC.(1.73%)
SCOTT DERR PAINTING CO, LLC(0.37%)
THE LEVY COMPANY, L.P. (2.27%)
TREVCON, INC.(1.90%)
W. W. FOUNDATION DRILLING, LTD.(3.29%)
PANTHER CREEK TRANSPORTATION, INC. (0.35%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.02%)
HIGHWAY TECHNOLOGIES, INC. (0.23%)
SWEEP ACROSS TEXAS (0.00%)
MUSTANG COLT SERVICES, INC.(0.00%)
OMEGA DEMOLITION CORPORATION (3.33%)
D. I. J. CONSTRUCTION, INC.(0.13%)
Contract # 05103201
Totals 28647844.97 1147447.99 24834887.55 86.7

CountyBURNET
Highway US 281
From SH 71
To BLANCO COUNTY LINE
CSJ 0252-02-053
Proj ID STP 2013(247)
Work Type MILL, SEAL & OVERLAY
 
3.093 1090537.74 0.00 1111060.96 99.9
CountyBLANCO
Highway US 281
From BURNET COUNTY LINE
To US 290 WEST IN JOHNSON CITY
CSJ 0252-03-047
Proj ID STP 2013(247)
Work Type MILL, SEAL & OVERLAY
 
15.051 3601894.57 0.00 3840793.16 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-23-13
Work Began 05-16-13
Work Completed  
Time Computed 02-08-13
Contract Working Days 55
Addl Days Granted 0
Working Days Charged 36
Percent Time Used 65
Contractor(s)
CLARK CONSTRUCTION OF TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0252-03-047
INTERSTATE BARRICADES & MARKINGS, INC. (0.00%)
Contract # 12123010
Totals 4692432.31 0.00 4951854.12 99.9

CountyBLANCO
Highway US 281
From AT N CYPRESS CREEK
To (STR 0252-03-010)
CSJ 0252-03-045
Proj ID BR 2011(955)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.071 742748.14 0.00 828571.51 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 06-14-11
Work Began 01-10-12
Work Completed  
Time Computed 06-30-11
Contract Working Days 99
Addl Days Granted 28
Working Days Charged 170
Percent Time Used 133
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0252-03-045
D. I. J. CONSTRUCTION, INC.(1.33%)
DEPENDABLE FENCE & WELDING CO. (DEPENDABLE ENTERPRISES,INC.) (2.81%)
TURNKEY OPERATIONS (0.67%)
BMP SPECIALIST, LLC(1.38%)
ROADWAY SPECIALTIES, INC.(0.50%)
Contract # 05113004
Totals 742748.14 0.00 828571.51 99.9

CountyBLANCO
Highway US 281 ETC
From BURNET C/L
To US 290 IN JOHNSON CITY
CSJ 0252-03-049
Proj ID STP 2011(045)HES
Work Type GUARDRAIL & SAFETY TREAT FIXED OBJCTS
 
66.151 1471795.60 0.00 1631966.84 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-01-10
Work Began 10-25-10
Work Completed  
Time Computed 10-25-10
Contract Working Days 360
Addl Days Granted 55
Working Days Charged 413
Percent Time Used 99
Contractor(s)
WAGNER MATERIALS & CONSTRUCTION
SUBCONTRACTOR(S) FOR CCSJ: 0252-03-049
HILL COUNTRY BRIDGE, INC.( 45.55%)
F.D. CONCRETE, LLC (9.89%)
RICE ENVIRONMENTAL SERVICES( 16.33%)
M.V. HENKE ENTERPRISES, INC. (0.95%)
Contract # 07103068
Totals 1471795.60 0.00 1631966.84 99.9

CountyBLANCO
Highway US 281
From SOUTH OF RM 32
To 0.422 MI. SOUTH OF KOCH ROAD
CSJ 0253-01-055
Proj ID C 253-1-55
Work Type UPGRADE TO SUPER 2
 
2.550 2620770.59 183597.97 859616.88 32.8
CountyBLANCO
Highway US 281
From 0.422 MI. SOUTH OF KOCH ROAD
To STALLION ESTATE ROAD
CSJ 0253-02-030
Proj ID C 253-2-30
Work Type UPGRADE TO SUPER 2
 
4.800 3680726.21 273458.36 792774.48 21.5
Work Order 11-14-13
Work Began 12-03-13
Work Completed  
Time Computed 12-03-13
Contract Working Days 146
Addl Days Granted 15
Working Days Charged 75
Percent Time Used 46
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0253-02-030
VEGETATION MANAGEMENT SERVICES (0.60%)
INTERSTATE BARRICADES & MARKINGS, INC. (0.20%)
DU MOR ENTERPRISES (1.05%)
MPB, INC.( 10.78%)
ROADWAY SPECIALTIES, INC.(3.17%)
D&S TEXAS ICON CONSTRUCTION, LLC (2.31%)
D. I. J. CONSTRUCTION, INC.(1.37%)
EGGEMEYER LAND CLEARING, LLC (1.39%)
Contract # 08133021
Totals 6301496.80 457056.33 1652391.36 26.2

CountyTRAVIS
Highway SH 71
From 1250' WEST OF FM 973
To 1275' EAST OF FM 973
CSJ 0265-01-107
Proj ID NH 2012(153)
Work Type CONSTR TURNLANES & INSTALL TRF SGNLS
 
1.583 2744957.75 0.00 2926253.62 99.9
CountyTRAVIS
Highway SH 71
From US 183 @ SH 71
To SPIRIT OF TEXAS DRIVE
CSJ 0265-01-111
Proj ID CC 265-1-111
Work Type ROW UTL. ADJ.
 
0.996 66579.00 0.00 69032.27 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 02-22-12
Work Began 04-18-12
Work Completed  
Time Computed 03-09-12
Contract Working Days 110
Addl Days Granted 26
Working Days Charged 148
Percent Time Used 108
Contractor(s)
SEMA CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0265-01-107
FLASHER EQUIPMENT COMPANY(3.98%)
ROADWAY SPECIALTIES, INC.(6.95%)
ROYAL VISTA INC. (5.42%)
J.D. RAMMING PAVING CO., LTD.( 29.43%)
PERFORMANCE EQUIPMENT(2.05%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (9.46%)
AARON CONCRETE CONTRACTORS, L.P. (0.51%)
Contract # 12113229
Totals 2811536.75 0.00 2995285.89 99.9

CountyTRAVIS
Highway SH 71
From ONION CREEK
To BASTROP COUNTY LINE
CSJ 0265-02-033
Proj ID NH 2012(154)
Work Type MILL, SEAL & THIN OVERLAY
 
5.773 1818505.76 0.00 1866340.81 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-18-12
Work Began 08-21-12
Work Completed  
Time Computed 02-03-12
Contract Working Days 85
Addl Days Granted 0
Working Days Charged 76
Percent Time Used 89
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0265-02-033
ROADWAY SPECIALTIES, INC.(0.52%)
HIGHWAY TECHNOLOGIES, INC. (0.78%)
JAVELINA CONSTRUCTION SOUTH, INC.(1.41%)
MPB, INC.(1.74%)
HIGHWAY TECHNOLOGIES, INC. (8.99%)
D. I. J. CONSTRUCTION, INC.(8.99%)
TEX OP CONSTRUCTION, LP(1.41%)
N-LINE TRAFFIC MAINTENANCE, L.P. (2.02%)
AARON CONCRETE CONTRACTORS, L.P. (0.14%)
Contract # 12113215
Totals 1818505.76 0.00 1866340.81 99.9

CountyBASTROP
Highway SH 71
From WEST OF FM 20
To EAST OF FM 969
CSJ 0265-04-057
Proj ID SFT 265-4-57
Work Type CONSTRUCT OVERPASS
 
1.354 12032551.48 0.00 12057180.39 99.9
CountyBASTROP
Highway SH 71
From EAST OF FM 969
To WEST OF SH 304
CSJ 0265-04-058
Proj ID HP 2012(096)
Work Type CONSTRUCT FRONTAGE ROADS & RAMPS
 
0.511 2176829.01 0.00 1494193.37 68.6
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-03-12
Work Began 04-11-12
Work Completed  
Time Computed 03-03-12
Contract Working Days 308
Addl Days Granted 126
Working Days Charged 434
Percent Time Used 100
Contractor(s)
HUNTER INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0265-04-057
FLASHER EQUIPMENT COMPANY(0.64%)
SOUTHERN STAR TRUCKING (0.25%)
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., L.P. (4.07%)
DANRIDGE CONSTRUCTION, LLC.(1.41%)
DUSTROL, INC.(0.06%)
GK CONSTRUCTION, LLC (0.06%)
HOUSTON SAWING & DRILLING(0.02%)
ROADWAY SPECIALTIES, INC.(1.43%)
PIONEER UTILITIES, INC.(5.08%)
MURRAY CONSTRUCTION(0.33%)
SPEEDY PAVING(0.43%)
W. W. FOUNDATION DRILLING, LTD.(0.55%)
S & S PAINTING (0.02%)
GK CONSTRUCTION, LLC (0.04%)
ENVIRONMENTAL SAFETY SERVICES, INC.(0.06%)
PRIMATE CONSTRUCTION, INC. (0.02%)
Contract # 11113201
Totals 14209380.49 0.00 13551373.76 95.3

CountyHAYS
Highway RM 12
From W OF OAKWOOD LP
To E OF RANCHO ENCINO DR/FALCONWOOD DR
CSJ 0285-03-053
Proj ID STP 2013(759)MM
Work Type INSTALL CENTER TURN LANE & SHLDRS
 
1.640 1923900.41 78537.19 78537.19 4.0
Work Order 01-06-14
Work Began 03-18-14
Work Completed  
Time Computed 01-22-14
Contract Working Days 126
Addl Days Granted 0
Working Days Charged 7
Percent Time Used 5
Contractor(s)
DEAN WORD COMPANY, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0285-03-053
AUSTIN WOOD RECYCLING(1.54%)
FLASHER EQUIPMENT COMPANY(3.00%)
ROADWAY SPECIALTIES, INC.(8.14%)
Contract # 08133247
Totals 1923900.41 78537.19 78537.19 4.0

CountyWILLIAMSON
Highway SH 95
From BELL COUNTY LINE
To FM 971 WEST
CSJ 0320-03-091
Proj ID STP 2012(307)
Work Type UPGRADE TO SUPER 2
 
5.590 3350557.08 0.00 3647426.81 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-26-12
Work Began 06-11-12
Work Completed  
Time Computed 06-15-12
Contract Working Days 281
Addl Days Granted 0
Working Days Charged 281
Percent Time Used 100
Contractor(s)
JAMES CONSTRUCTION GROUP, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 0320-03-091
ENVIRONMENTAL SAFETY SERVICES, INC.(0.18%)
J.D. RAMMING PAVING CO., LTD.( 50.21%)
D. I. J. CONSTRUCTION, INC.(1.99%)
N-LINE TRAFFIC MAINTENANCE, L.P. (1.39%)
JCS LOGISTICS, LLC (3.17%)
J.E.D. TRUCKING, INC.(0.00%)
FRANK PRASIFKA & SONS, INC.(0.41%)
EDGAR GALAVAN DBA TRISA TRUCKING (0.39%)
TIM ARMSTRONG TRUCKING, INC. (0.14%)
JUAN MALDONADO DBA KRUNC TRANSPORTATION(0.29%)
CTBX, INC. (1.35%)
TEXAS TRUCKING COMPANY, INC. (0.00%)
PENNTEX MILLING, LLC (0.25%)
PANTHER CREEK TRANSPORTATION, INC. (0.00%)
BLACKTOPPER TECHNOLOGY, INC. (4.18%)
Contract # 03123226
Totals 3350557.08 0.00 3647426.81 99.9

CountyWILLIAMSON
Highway FM 112
From AT BRUSHY CREEK WEST RELIEF
To (STR 14-246-0334-01-026)
CSJ 0334-01-030
Proj ID BR 2013(842)
Work Type REPLACE BRIDGE & APPROACHES
 
0.122 682347.00 161424.50 282369.35 41.3
CountyWILLIAMSON
Highway FM 112
From AT BRUSHY CREEK EAST RELIEF
To (STR 14-246-0334-01-027)
CSJ 0334-01-031
Proj ID BR 2013(842)
Work Type REPLACE BRIDGE & APPROACHES
 
0.152 727144.40 195347.35 215137.35 29.5
Work Order 10-17-13
Work Began 02-17-14
Work Completed  
Time Computed 01-15-14
Contract Working Days 155
Addl Days Granted 0
Working Days Charged 25
Percent Time Used 16
Contractor(s)
CHASCO CONSTRUCTORS
SUBCONTRACTOR(S) FOR CCSJ: 0334-01-030
LHOIST NORTH AMERICA (0.33%)
FLASHER EQUIPMENT COMPANY(0.33%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.85%)
ABC EROSION CONTROL, INC.(2.78%)
MCKINNEY DRILLING COMPANY( 12.49%)
APAC-TEXAS, INC. (7.07%)
ROADWAY SPECIALTIES, INC.(2.21%)
Contract # 07133037
Totals 1409491.40 356771.85 497506.70 35.2

CountyWILLIAMSON
Highway SH 29
From US 183
To CEDAR HOLLOW ROAD
CSJ 0337-01-035
Proj ID STP 2014(519)
Work Type PAVEMENT REPAIR & OVERLAY
 
6.924 3556401.05 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 71
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0337-01-035
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03143033
Totals 3556401.05 0.00 0.00 0.0

CountyHAYS
Highway SH 123
From AT CLOVIS BARKER ROAD
To .
CSJ 0366-01-068
Proj ID STP 2013(851)HES
Work Type ADD LEFT TURN LANE
 
0.237 791190.30 60852.52 416655.92 52.6
Work Order 09-26-13
Work Began 01-13-14
Work Completed  
Time Computed 10-12-13
Contract Working Days 67
Addl Days Granted 0
Working Days Charged 29
Percent Time Used 43
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0366-01-068
FLASHER EQUIPMENT COMPANY(3.07%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.54%)
ROADWAY SPECIALTIES, INC.(4.96%)
Contract # 07133022
Totals 791190.30 60852.52 416655.92 52.6

page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7