Lady Bird Lake Segment (Holly Street to SH 71/Ben White Boulevard)
I-35 Capital Express Central Project
The project will add two high-occupancy-vehicle (HOV) managed lanes in both directions along I-35. In addition, the project will reconstruct the Lady Bird Lake bridge, construct a single-point urban interchange (SPUI) at Riverside Drive that will accommodate future Capital Metro light rail routes, add a pedestrian-only bridge at Woodland Avenue, and improve bicycle and pedestrian paths along the corridor.
Funding
- TxDOT and CAMPO
Schedule
- Anticipated construction start: Late 2024
- Anticipated construction completion: 2031, weather permitting
Contractor
- TBD