Detail Letting Schedule for Harris County (FY 2020)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Harris County (FY 2020) |
CCSJ: 0027-09-106 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | UA 90 | Let Status: | Actual |
Project ID: | ER 1802(219) | CSJ: | 0027-09-106 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT SL 8 WSR/SAM HOUSTON PKWY WSR | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $18,536 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0027-09-106 | ||
---|---|---|---|
Length: | 0 | ||
Estimate: | $18,536 | ||
Actual: | |||
CCSJ: 0027-09-108 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | US 90A | Let Status: | Actual |
Project ID: | ER 1802(621) | CSJ: | 0027-09-108 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT SAM HOUSTON PARKWAY (SL 8) | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $18,536 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0027-09-108 | ||
Length: | 0 | ||
Estimate: | $18,536 | ||
Actual: | |||
CCSJ: 0028-01-099 |
|||
District: | HOUSTON | Let Date: | Apr 2020 |
Highway: | UA 90 | Let Status: | Actual |
Project ID: | NH 2020(693) | CSJ: | 0028-01-099 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | IH 610 | ESTIMATE: | $1,535,715 |
Length: | 1.5 | Actual | $1,366,271 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0028-01-099 | ||
Length: | 1.5 | ||
Estimate: | $1,535,715 | ||
Actual: | $1,366,271 | ||
CCSJ: 0028-01-104 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | BU 90-U | Let Status: | Actual |
Project ID: | ER 1802(639) | CSJ: | 0028-01-104 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT JOHN RALSTON ROAD | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $18,066 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0028-01-104 | ||
Length: | 0 | ||
Estimate: | $18,066 | ||
Actual: | |||
CCSJ: 0028-02-100 |
|||
District: | HOUSTON | Let Date: | Jun 2020 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | C 28-2-100 | CSJ: | 0028-02-100 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | HUNTING BAYOU | Fund Cat: | 10 |
Limits To: | LINDSTROM ROAD | ESTIMATE: | $1,997,043 |
Length: | 15.6 | Actual | $1,321,444 |
District: | HOUSTON | Let Date: | Jun 2020 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | C 177-7-121 | CSJ: | 0177-07-121 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | FM 1960 | Fund Cat: | 10 |
Limits To: | LITTLE YORK ROAD | ESTIMATE: | $99,418 |
Length: | 10.2 | Actual | $45,662 |
District: | HOUSTON | Let Date: | Jun 2020 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | C 177-11-156 | CSJ: | 0177-11-156 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | LITTLE YORK ROAD | Fund Cat: | 10 |
Limits To: | H 10 | ESTIMATE: | $248,539 |
Length: | 6.8 | Actual | $119,609 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0028-02-100 | ||
Length: | 32.6 | ||
Estimate: | $2,345,000 | ||
Actual: | $1,486,714 | ||
CCSJ: 0110-06-143 |
|||
District: | HOUSTON | Let Date: | Nov 2019 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | STP 2020(204)HES | CSJ: | 0110-06-143 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT WEST ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $575,951 |
Length: | 0.2 | Actual | $485,208 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0110-06-143 | ||
Length: | 0.2 | ||
Estimate: | $575,951 | ||
Actual: | $485,208 | ||
CCSJ: 0111-01-096 |
|||
District: | HOUSTON | Let Date: | Oct 2019 |
Highway: | FM 521 | Let Status: | Actual |
Project ID: | STP 2020(055)HES | CSJ: | 0111-01-096 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT FUQUA STREET | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $287,469 |
Length: | 0.2 | Actual | $226,988 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0111-01-096 | ||
Length: | 0.2 | ||
Estimate: | $287,469 | ||
Actual: | $226,988 | ||
CCSJ: 0177-06-088 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | ER 1802(629) | CSJ: | 0177-06-088 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT WEST FORK SAN JACINTO RIVER | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $86,243 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0177-06-088 | ||
Length: | 0 | ||
Estimate: | $86,243 | ||
Actual: | |||
CCSJ: 0271-15-093 |
|||
District: | HOUSTON | Let Date: | Nov 2019 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | NH 1902(321) | CSJ: | 0271-15-093 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | AT HOUSTON SHIP CHANNEL BRIDGE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $4,150,971 |
Length: | 1.2 | Actual | $3,159,416 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0271-15-093 | ||
Length: | 1.2 | ||
Estimate: | $4,150,971 | ||
Actual: | $3,159,416 | ||
CCSJ: 0389-12-092 |
|||
District: | HOUSTON | Let Date: | Apr 2020 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | NH 2020(695) | CSJ: | 0389-12-092 |
Description: | INTERSECTION IMPROVEMENT | Handling Code: | |
Limits From: | AT BARBOURS CUT BLVD | Fund Cat: | 11 |
Limits To: | . | ESTIMATE: | $738,805 |
Length: | 0.2 | Actual | $496,375 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0389-12-092 | ||
Length: | 0.2 | ||
Estimate: | $738,805 | ||
Actual: | $496,375 | ||
CCSJ: 0389-13-062 |
|||
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | BR 2020(414) | CSJ: | 0389-13-062 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | AT SPUR 330 (SH 146NB TO SPUR 330WB) | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $326,490 |
Length: | 0.7 | Actual | $268,696 |
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | BR 2020(413) | CSJ: | 0271-07-320 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | IH 10 EB EXIT RAMP AT | Fund Cat: | 6 |
Limits To: | IH 10 EB EXIT RAMP RP-4G | ESTIMATE: | $50,400 |
Length: | 0.3 | Actual | $45,400 |
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | BR 2020(413) | CSJ: | 0500-03-628 |
Description: | BRIDGE MAINTENANCE | Handling Code: | |
Limits From: | AT SL 8 (SB TO WB CONNECTOR) | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $43,900 |
Length: | 0.3 | Actual | $36,652 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0389-13-062 | ||
Length: | 1.3 | ||
Estimate: | $420,790 | ||
Actual: | $350,748 | ||
CCSJ: 0500-03-637 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | C 500-3-637 | CSJ: | 0500-03-637 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | IH 10 | Fund Cat: | 10 |
Limits To: | NYACK DRIVE | ESTIMATE: | $495,114 |
Length: | 17.0 | Actual | $510,981 |
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | UA 90 | Let Status: | Actual |
Project ID: | C 27-9-110 | CSJ: | 0027-09-110 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | FORT BEND/ HARRIS COUNTY LINE | Fund Cat: | 10 |
Limits To: | HOLMES ROAD | ESTIMATE: | $99,257 |
Length: | 5.1 | Actual | $65,646 |
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | C 271-15-95 | CSJ: | 0271-15-095 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | MANCHESTER STREET | Fund Cat: | 10 |
Limits To: | SHIP CHANNEL | ESTIMATE: | $3,148 |
Length: | 1.2 | Actual | $5,139 |
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | C 271-16-157 | CSJ: | 0271-16-157 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | BRAES BAYOU | Fund Cat: | 10 |
Limits To: | IH 45 | ESTIMATE: | $381,112 |
Length: | 0.0 | Actual | $379,136 |
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | C 271-17-177 | CSJ: | 0271-17-177 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | WESTPARK DRIVE | Fund Cat: | 10 |
Limits To: | BRAES BAYOU | ESTIMATE: | $17,844 |
Length: | 3.0 | Actual | $18,283 |
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | SH 225 | Let Status: | Actual |
Project ID: | C 502-1-233 | CSJ: | 0502-01-233 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | SH 146 | Fund Cat: | 10 |
Limits To: | JORDAN STREET | ESTIMATE: | $255,948 |
Length: | 0.0 | Actual | $220,136 |
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | C 502-1-534 | CSJ: | 0502-01-234 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | WEST BROADWAY STREET | Fund Cat: | 10 |
Limits To: | SH 225 | ESTIMATE: | $92,263 |
Length: | 1.5 | Actual | $132,991 |
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-72-589 | CSJ: | 0912-72-589 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | IH 45 | Fund Cat: | 10 |
Limits To: | SH 3 | ESTIMATE: | $340,464 |
Length: | 1.1 | Actual | $223,214 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0500-03-637 | ||
Length: | 28.9 | ||
Estimate: | $1,685,149 | ||
Actual: | $1,555,526 | ||
CCSJ: 0500-03-640 |
|||
District: | HOUSTON | Let Date: | Mar 2020 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | NH 2020(663) | CSJ: | 0500-03-640 |
Description: | REPAIR ROADWAY | Handling Code: | |
Limits From: | IH 610 SL | Fund Cat: | 1 |
Limits To: | SIMS BAYOU | ESTIMATE: | $4,043,131 |
Length: | 1.3 | Actual | $2,587,343 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0500-03-640 | ||
Length: | 1.3 | ||
Estimate: | $4,043,131 | ||
Actual: | $2,587,343 | ||
CCSJ: 0508-01-353 |
|||
District: | HOUSTON | Let Date: | Nov 2019 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | BR 2020(205) | CSJ: | 0508-01-353 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | AT WACO STREET | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $6,676,829 |
Length: | 0.1 | Actual | $6,382,061 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0508-01-353 | ||
Length: | 0.1 | ||
Estimate: | $6,676,829 | ||
Actual: | $6,382,061 | ||
CCSJ: 0508-01-355 |
|||
District: | HOUSTON | Let Date: | Oct 2019 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2020(058) | CSJ: | 0508-01-355 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | MAGNOLIA AVENUE | Fund Cat: | 1 |
Limits To: | JOHN MARTIN ROAD | ESTIMATE: | $728,699 |
Length: | 5.8 | Actual | $594,850 |
District: | HOUSTON | Let Date: | Oct 2019 |
Highway: | SS 330 | Let Status: | Actual |
Project ID: | NH 2020(058) | CSJ: | 0508-07-288 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | SH 146 | ESTIMATE: | $610,909 |
Length: | 4.9 | Actual | $538,059 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0508-01-355 | ||
Length: | 10.7 | ||
Estimate: | $1,339,608 | ||
Actual: | $1,132,908 | ||
CCSJ: 0508-01-357 |
|||
District: | HOUSTON | Let Date: | May 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2020(059)TP | CSJ: | 0508-01-357 |
Description: | BICYCLE AND PEDESTRIAN IMPROVEMENTS | Handling Code: | |
Limits From: | FM 526 | Fund Cat: | 9 |
Limits To: | GREENS BAYOU | ESTIMATE: | $371,770 |
Length: | 2.2 | Actual | $300,272 |
District: | HOUSTON | Let Date: | May 2020 |
Highway: | FM 526 | Let Status: | Actual |
Project ID: | STP 2020(059)TP | CSJ: | 0980-02-018 |
Description: | BICYCLE AND PEDESTRIAN IMPROVEMENTS | Handling Code: | |
Limits From: | NOLA CT | Fund Cat: | 9 |
Limits To: | IH 10 | ESTIMATE: | $6,774,583 |
Length: | 1.6 | Actual | $5,199,188 |
List Showing Order Proposal Request Bid List Bid Tabulations Award Status Back... | Totals for 0508-01-357 | ||
Length: | 3.8 | ||
Estimate: | $7,146,353 | ||
Actual: | $5,499,460 | ||
CCSJ: 0508-01-359 |
|||
District: | HOUSTON | Let Date: | Sep 2019 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2020(025) | CSJ: | 0508-01-359 |
Description: | CONSTRUCT RAMPS | Handling Code: | |
Limits From: | JOHN MARTIN | Fund Cat: | 3 |
Limits To: | GARTH | ESTIMATE: | $4,165,790 |
Length: | 0.9 | Actual | $4,637,319 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0508-01-359 | ||
Length: | 0.9 | ||
Estimate: | $4,165,790 | ||
Actual: | $4,637,319 | ||
CCSJ: 0508-01-369 |
|||
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | ER 1802(631) | CSJ: | 0508-01-369 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | XX |
Limits From: | AT SAN JACINTO RIVER | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $11,182,989 |
Length: | 0.5 | Actual | $0 |
Back... | Totals for 0508-01-369 | ||
Length: | 0.5 | ||
Estimate: | $11,182,989 | ||
Actual: | |||
CCSJ: 0508-01-382 |
|||
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | ER 2B20(297) | CSJ: | 0508-01-382 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT SAN JACINTO RIVER | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $6,709,604 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0508-01-382 | ||
Length: | 0 | ||
Estimate: | $6,709,604 | ||
Actual: | |||
CCSJ: 0508-01-383 |
|||
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | ER 2B20(298) | CSJ: | 0508-01-383 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT SAN JACINTO RIVER | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $142,135 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0508-01-383 | ||
Length: | 0 | ||
Estimate: | $142,135 | ||
Actual: | |||
CCSJ: 0720-03-132 |
|||
District: | HOUSTON | Let Date: | Nov 2019 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | NH 2020(054) | CSJ: | 0720-03-132 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | 0.31 MILES SOUTH OF CHASEWOOD PARK DRIVE | Fund Cat: | 1 |
Limits To: | BW 8 | ESTIMATE: | $403,965 |
Length: | 4.7 | Actual | $302,189 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0720-03-132 | ||
Length: | 4.7 | ||
Estimate: | $403,965 | ||
Actual: | $302,189 | ||
CCSJ: 0720-03-141 |
|||
District: | HOUSTON | Let Date: | Oct 2019 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | NH 2020(060) | CSJ: | 0720-03-141 |
Description: | CONSTRUCT RAMPS | Handling Code: | |
Limits From: | 0.10 MI S OF CHASEWOOD PARK DR | Fund Cat: | 1 |
Limits To: | 0.09 MI S OF SPRING CYPRESS RD | ESTIMATE: | $2,615,465 |
Length: | 1.2 | Actual | $2,241,514 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0720-03-141 | ||
Length: | 1.2 | ||
Estimate: | $2,615,465 | ||
Actual: | $2,241,514 | ||
CCSJ: 0720-03-145 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | ER 1802(634) | CSJ: | 0720-03-145 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT OLD FOLTIN RD | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $18,521 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0720-03-145 | ||
Length: | 0 | ||
Estimate: | $18,521 | ||
Actual: | |||
CCSJ: 0912-00-541 |
|||
District: | HOUSTON | Let Date: | Mar 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1902(134) | CSJ: | 0912-00-541 |
Description: | ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | XX |
Limits From: | AT HOUSTON TRANSTAR | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $2,000,000 |
Length: | 0.0 | Actual | $2,050,000 |
Back... | Totals for 0912-00-541 | ||
Length: | 0 | ||
Estimate: | $2,000,000 | ||
Actual: | $2,050,000 | ||
CCSJ: 0912-00-546 |
|||
District: | HOUSTON | Let Date: | Oct 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(290)MM | CSJ: | 0912-00-546 |
Description: | REGIONAL COMMUTE ALTERNATIVES PROGRAM | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $3,750,000 |
Length: | 0.0 | Actual | $3,750,000 |
Back... | Totals for 0912-00-546 | ||
Length: | 0 | ||
Estimate: | $3,750,000 | ||
Actual: | $3,750,000 | ||
CCSJ: 0912-00-547 |
|||
District: | HOUSTON | Let Date: | Sep 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2020(289) | CSJ: | 0912-00-547 |
Description: | REGIONAL COMMUTE ALTERNATIVES PROGRAM | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $2,400,000 |
Length: | 0.0 | Actual | $2,400,000 |
Back... | Totals for 0912-00-547 | ||
Length: | 0 | ||
Estimate: | $2,400,000 | ||
Actual: | $2,400,000 | ||
CCSJ: 0912-00-555 |
|||
District: | HOUSTON | Let Date: | Jan 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(785)MM | CSJ: | 0912-00-555 |
Description: | ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | XX |
Limits From: | AT HOUSTON TRANSTAR | Fund Cat: | 7 |
Limits To: | . | ESTIMATE: | $2,000,000 |
Length: | 0.0 | Actual | $2,000,000 |
Back... | Totals for 0912-00-555 | ||
Length: | 0 | ||
Estimate: | $2,000,000 | ||
Actual: | $2,000,000 | ||
CCSJ: 0912-00-556 |
|||
District: | HOUSTON | Let Date: | Sep 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(196)MM | CSJ: | 0912-00-556 |
Description: | REGIONAL TRAVEL MANAGEMENT PROGRAM | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $8,000,000 |
Length: | 0.0 | Actual | $8,000,000 |
Back... | Totals for 0912-00-556 | ||
Length: | 0 | ||
Estimate: | $8,000,000 | ||
Actual: | $8,000,000 | ||
CCSJ: 0912-00-574 |
|||
District: | HOUSTON | Let Date: | Mar 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(892) | CSJ: | 0912-00-574 |
Description: | ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $5,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-00-574 | ||
Length: | 0 | ||
Estimate: | $5,000,000 | ||
Actual: | |||
CCSJ: 0912-00-577 |
|||
District: | HOUSTON | Let Date: | Jan 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(504) | CSJ: | 0912-00-577 |
Description: | INSTALL TRAFFIC SIGNAL | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,954,891 |
Length: | 0.0 | Actual | $1,438,223 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0912-00-577 | ||
Length: | 0 | ||
Estimate: | $1,954,891 | ||
Actual: | $1,438,223 | ||
CCSJ: 0912-00-578 |
|||
District: | HOUSTON | Let Date: | Feb 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(597) | CSJ: | 0912-00-578 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $2,452,481 |
Length: | 0.0 | Actual | $1,780,190 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-00-578 | ||
Length: | 0 | ||
Estimate: | $2,452,481 | ||
Actual: | $1,780,190 | ||
CCSJ: 0912-00-594 |
|||
District: | HOUSTON | Let Date: | Mar 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(889) | CSJ: | 0912-00-594 |
Description: | COMMUNICATION SYSTEM | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $3,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-00-594 | ||
Length: | 0 | ||
Estimate: | $3,000,000 | ||
Actual: | |||
CCSJ: 0912-00-599 |
|||
District: | HOUSTON | Let Date: | Apr 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(975)MM | CSJ: | 0912-00-599 |
Description: | ENGINEERING DESIGN/STUDY | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 3 |
Limits To: | VARIOUS LOCATIONS | ESTIMATE: | $5,100,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-00-599 | ||
Length: | 0 | ||
Estimate: | $5,100,000 | ||
Actual: | |||
CCSJ: 0912-00-614 |
|||
District: | HOUSTON | Let Date: | Mar 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(903)MM | CSJ: | 0912-00-614 |
Description: | ENGINEERING DESIGN/STUDY | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 3 |
Limits To: | VARIOUS LOCATIONS | ESTIMATE: | $950,000 |
Length: | 0.0 | Actual | $900,000 |
Back... | Totals for 0912-00-614 | ||
Length: | 0 | ||
Estimate: | $950,000 | ||
Actual: | $900,000 | ||
CCSJ: 0912-00-617 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2B20(274) | CSJ: | 0912-00-617 |
Description: | TRANSIT | Handling Code: | TR |
Limits From: | UNIVERSITY BLVD | Fund Cat: | 5 |
Limits To: | DOWNTOWN HOUSTON | ESTIMATE: | $4,504,864 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-00-617 | ||
Length: | 0 | ||
Estimate: | $4,504,864 | ||
Actual: | |||
CCSJ: 0912-00-618 |
|||
District: | HOUSTON | Let Date: | Jun 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2B20(084) | CSJ: | 0912-00-618 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $1,500,000 |
Length: | 0.0 | Actual | $1,500,000 |
Back... | Totals for 0912-00-618 | ||
Length: | 0 | ||
Estimate: | $1,500,000 | ||
Actual: | $1,500,000 | ||
CCSJ: 0912-00-619 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2B20(058) | CSJ: | 0912-00-619 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | VARIOUS LOCATIONS (IH 45, IH 10, IH 69, | Fund Cat: | 8 |
Limits To: | SH 6, SH 105, SH 225 & US 290) | ESTIMATE: | $2,079,072 |
Length: | 160.3 | Actual | $2,662,025 |
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2B20(058) | CSJ: | 0912-00-620 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $333,997 |
Length: | 19.8 | Actual | $394,755 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-00-619 | ||
Length: | 180.1 | ||
Estimate: | $2,413,069 | ||
Actual: | $3,056,781 | ||
CCSJ: 0912-00-621 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2B20(059) | CSJ: | 0912-00-621 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $1,365,814 |
Length: | 1.3 | Actual | $1,598,405 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-00-621 | ||
Length: | 1.3 | ||
Estimate: | $1,365,814 | ||
Actual: | $1,598,405 | ||
CCSJ: 0912-70-157 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | ER 1802(620) | CSJ: | 0912-70-157 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | COMMERCE AT TRAVIS | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $18,536 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-70-157 | ||
Length: | 0 | ||
Estimate: | $18,536 | ||
Actual: | |||
CCSJ: 0912-72-179 |
|||
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | CR | Let Status: | Actual |
Project ID: | CC 912-72-179 | CSJ: | 0912-72-179 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | XX |
Limits From: | PORT ROAD, SH 146 | Fund Cat: | 3 |
Limits To: | CRUISE STREET | ESTIMATE: | $12,900,000 |
Length: | 0.0 | Actual | $18,894,468 |
Back... | Totals for 0912-72-179 | ||
Length: | 0 | ||
Estimate: | $12,900,000 | ||
Actual: | $18,894,468 | ||
CCSJ: 0912-72-348 |
|||
District: | HOUSTON | Let Date: | Mar 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2018(113) | CSJ: | 0912-72-348 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | RED BLUFF RD NB | Fund Cat: | 6 |
Limits To: | AT BIG ISLAND SLOUGH | ESTIMATE: | $1,603,225 |
Length: | 0.0 | Actual | $1,561,683 |
District: | HOUSTON | Let Date: | Mar 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2018(114) | CSJ: | 0912-72-349 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | RED BLUFF RD SB | Fund Cat: | 6 |
Limits To: | AT BIG ISLAND SLOUGH | ESTIMATE: | $1,335,106 |
Length: | 0.1 | Actual | $1,336,332 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0912-72-348 | ||
Length: | 0.1 | ||
Estimate: | $2,938,332 | ||
Actual: | $2,898,014 | ||
CCSJ: 0912-72-391 |
|||
District: | HOUSTON | Let Date: | May 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1802(783)MM | CSJ: | 0912-72-391 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | MEMORIAL DR; FROM BELTWAY 8 | Fund Cat: | 3 |
Limits To: | EAST OF TALLOWOOD RD | ESTIMATE: | $21,371,336 |
Length: | 0.9 | Actual | $20,384,047 |
List Showing Order Proposal Request Bid List Bid Tabulations Award Status Back... | Totals for 0912-72-391 | ||
Length: | 0.9 | ||
Estimate: | $21,371,336 | ||
Actual: | $20,384,047 | ||
CCSJ: 0912-72-392 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2020(327) | CSJ: | 0912-72-392 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | TR |
Limits From: | BRAZOS ST; FROM ELGIN ST | Fund Cat: | 3 |
Limits To: | PIERCE ST | ESTIMATE: | $5,144,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-392 | ||
Length: | 0 | ||
Estimate: | $5,144,000 | ||
Actual: | |||
CCSJ: 0912-72-393 |
|||
District: | HOUSTON | Let Date: | Jan 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2020(326) | CSJ: | 0912-72-393 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | TR |
Limits From: | WHEELER ST; FROM SP 527 | Fund Cat: | 3 |
Limits To: | CAROLNE ST | ESTIMATE: | $1,562,000 |
Length: | 0.0 | Actual | $1,562,000 |
Back... | Totals for 0912-72-393 | ||
Length: | 0 | ||
Estimate: | $1,562,000 | ||
Actual: | $1,562,000 | ||
CCSJ: 0912-72-394 |
|||
District: | HOUSTON | Let Date: | Jan 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2020(325) | CSJ: | 0912-72-394 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | TR |
Limits From: | W LITTLE YORK; FROM HOLLISTER DR | Fund Cat: | 3 |
Limits To: | N HOUSTON-ROSSLYN | ESTIMATE: | $2,743,000 |
Length: | 0.0 | Actual | $2,743,000 |
Back... | Totals for 0912-72-394 | ||
Length: | 0 | ||
Estimate: | $2,743,000 | ||
Actual: | $2,743,000 | ||
CCSJ: 0912-72-433 |
|||
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | CR | Let Status: | Actual |
Project ID: | ER 1802(023) | CSJ: | 0912-72-433 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | CYPRESSWOOD DRIVE AT | Fund Cat: | 10 |
Limits To: | CHAMPION FOREST DRIVE | ESTIMATE: | $17,245 |
Length: | 0.0 | Actual | $17,245 |
Back... | Totals for 0912-72-433 | ||
Length: | 0 | ||
Estimate: | $17,245 | ||
Actual: | $17,245 | ||
CCSJ: 0912-72-452 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1802(042) | CSJ: | 0912-72-452 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | HUFFMEISTER ROAD AT | Fund Cat: | 10 |
Limits To: | CYPRESS CORNER LANE | ESTIMATE: | $17,252 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-452 | ||
Length: | 0 | ||
Estimate: | $17,252 | ||
Actual: | |||
CCSJ: 0912-72-536 |
|||
District: | HOUSTON | Let Date: | Oct 2019 |
Highway: | CR | Let Status: | Actual |
Project ID: | FB 2020(061) | CSJ: | 0912-72-536 |
Description: | FERRY OPERATION PROJECTS | Handling Code: | |
Limits From: | INDEPENDENCE PKWY, SOUTH LANDING | Fund Cat: | 3 |
Limits To: | NORTH LANDING | ESTIMATE: | $3,812,045 |
Length: | 0.0 | Actual | $4,629,281 |
District: | HOUSTON | Let Date: | Oct 2019 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2020(062) | CSJ: | 0912-72-560 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | CROSBY LYNCHBURG AT | Fund Cat: | 6 |
Limits To: | HOUSTON SHIP CHANNEL | ESTIMATE: | $1,642,186 |
Length: | 0.1 | Actual | $1,422,664 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-72-536 | ||
Length: | 0.1 | ||
Estimate: | $5,454,231 | ||
Actual: | $6,051,945 | ||
CCSJ: 0912-72-537 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | TL | Let Status: | Actual |
Project ID: | ER 1802(752) | CSJ: | 0912-72-537 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | SL 8 AT SOUTH/EAST TOLL PLAZA | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $745,572 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-537 | ||
Length: | 0 | ||
Estimate: | $745,572 | ||
Actual: | |||
CCSJ: 0912-72-538 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | TL | Let Status: | Actual |
Project ID: | ER 1802(753) | CSJ: | 0912-72-538 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | SL 8 AT WESTH/SOUTH TOLL PLAZA | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $1,010,703 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-538 | ||
Length: | 0 | ||
Estimate: | $1,010,703 | ||
Actual: | |||
CCSJ: 0912-72-540 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | CR | Let Status: | Tentative |
Project ID: | ER 1802(755) | CSJ: | 0912-72-540 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | MARKET STREET NEAR IH 10/MONMOUTH | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $1,714,387 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-540 | ||
Length: | 0 | ||
Estimate: | $1,714,387 | ||
Actual: | |||
CCSJ: 0912-72-544 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | TL | Let Status: | Actual |
Project ID: | ER 1802(767) | CSJ: | 0912-72-544 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | SL 8 AT SOUTH/WEST TOLL PLAZA | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $27,622 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-544 | ||
Length: | 0 | ||
Estimate: | $27,622 | ||
Actual: | |||
CCSJ: 0912-72-545 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | ER 1802(768) | CSJ: | 0912-72-545 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | WESTPARK TOLLWAY | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $106,719 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-545 | ||
Length: | 0 | ||
Estimate: | $106,719 | ||
Actual: | |||
CCSJ: 0912-72-546 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | TL | Let Status: | Actual |
Project ID: | ER 1802(769) | CSJ: | 0912-72-546 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | SL 8 AT NORTH TOLL PLAZA | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $57,379 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-546 | ||
Length: | 0 | ||
Estimate: | $57,379 | ||
Actual: | |||
CCSJ: 0912-72-562 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | ER 2019(371) | CSJ: | 0912-72-562 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | WOODWAY AT POST OAK BRIDGE | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $37,800 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-562 | ||
Length: | 0 | ||
Estimate: | $37,800 | ||
Actual: | |||
CCSJ: 0912-72-563 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | ER 2019(372) | CSJ: | 0912-72-563 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT KINGSPOINT BRIDGE #608 | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $33,705 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-563 | ||
Length: | 0 | ||
Estimate: | $33,705 | ||
Actual: | |||
CCSJ: 0912-72-565 |
|||
District: | HOUSTON | Let Date: | Mar 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | CC 912-72-565 | CSJ: | 0912-72-565 |
Description: | MANAGED LANE SYSTEM TECHNOLOGY | Handling Code: | |
Limits From: | US 290, FROM WEST OF BARKER CYPRESS | Fund Cat: | 3 |
Limits To: | EAST OF WEST 34TH STREET | ESTIMATE: | $1,273,407 |
Length: | 16.5 | Actual | $776,519 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-72-565 | ||
Length: | 16.5 | ||
Estimate: | $1,273,407 | ||
Actual: | $776,519 | ||
CCSJ: 0912-72-573 |
|||
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2020(415) | CSJ: | 0912-72-573 |
Description: | INSTALL NOISE BARRIER | Handling Code: | |
Limits From: | US 290, FROM SOUTH OF LAKEVIEW DR | Fund Cat: | 11 |
Limits To: | SENATE AVENUE | ESTIMATE: | $2,997,199 |
Length: | 0.6 | Actual | $2,945,247 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-72-573 | ||
Length: | 0.6 | ||
Estimate: | $2,997,199 | ||
Actual: | $2,945,247 | ||
CCSJ: 0912-72-591 |
|||
District: | HOUSTON | Let Date: | Feb 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(813)TP | CSJ: | 0912-72-591 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | TR |
Limits From: | ELMSIDE SIDEPATH; FROM WESTHEIMER | Fund Cat: | 3 |
Limits To: | WESTPARK TRAIL | ESTIMATE: | $2,109,120 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-591 | ||
Length: | 0 | ||
Estimate: | $2,109,120 | ||
Actual: | |||
CCSJ: 0912-72-592 |
|||
District: | HOUSTON | Let Date: | Feb 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2020(814)TP | CSJ: | 0912-72-592 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | TR |
Limits From: | DEERWOOOD SHARED USE PATH | Fund Cat: | 3 |
Limits To: | VARIOUS LOCATIONS | ESTIMATE: | $1,300,083 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-592 | ||
Length: | 0 | ||
Estimate: | $1,300,083 | ||
Actual: | |||
CCSJ: 0912-72-593 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2B20(296) | CSJ: | 0912-72-593 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | TR |
Limits From: | VARIOUS LOCATIONS IN METRO SERVICE AREA | Fund Cat: | 5 |
Limits To: | . | ESTIMATE: | $30,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0912-72-593 | ||
Length: | 0 | ||
Estimate: | $30,000,000 | ||
Actual: | |||
CCSJ: 0912-72-595 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2020(890) | CSJ: | 0912-72-595 |
Description: | FERRY OPERATION PROJECTS | Handling Code: | |
Limits From: | INDEPENDENCE PKWY, | Fund Cat: | 3 |
Limits To: | AT LYNCHBURG FERRY NORTH LANDING | ESTIMATE: | $3,516,505 |
Length: | 0.0 | Actual | $2,787,309 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0912-72-595 | ||
Length: | 0 | ||
Estimate: | $3,516,505 | ||
Actual: | $2,787,309 | ||
CCSJ: 1258-04-062 |
|||
District: | HOUSTON | Let Date: | Mar 2020 |
Highway: | FM 1093 | Let Status: | Actual |
Project ID: | STP 2020(666) | CSJ: | 1258-04-062 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | FM 1464 | Fund Cat: | 1 |
Limits To: | SH 6 | ESTIMATE: | $2,195,547 |
Length: | 0.0 | Actual | $2,091,002 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1258-04-062 | ||
Length: | 0 | ||
Estimate: | $2,195,547 | ||
Actual: | $2,091,002 | ||
CCSJ: 1258-04-063 |
|||
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | FM 1093 | Let Status: | Actual |
Project ID: | STP 1902(183) | CSJ: | 1258-04-063 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | DUNVALE ROAD | Fund Cat: | 1 |
Limits To: | IH 610 | ESTIMATE: | $5,845,061 |
Length: | 3.4 | Actual | $5,461,949 |
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | FM 1093 | Let Status: | Actual |
Project ID: | STP 1902(183) | CSJ: | 1258-04-066 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | DAIRY ASHFORD | Fund Cat: | 1 |
Limits To: | DUNVALE ROAD | ESTIMATE: | $6,389,488 |
Length: | 5.5 | Actual | $6,430,739 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 1258-04-063 | ||
Length: | 8.9 | ||
Estimate: | $12,234,549 | ||
Actual: | $11,892,688 | ||
CCSJ: 1258-04-065 |
|||
District: | HOUSTON | Let Date: | Sep 2019 |
Highway: | FM 1093 | Let Status: | Actual |
Project ID: | STP 2017(976)TP | CSJ: | 1258-04-065 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | |
Limits From: | SOUTH KIRKWOOD ROAD | Fund Cat: | 3 |
Limits To: | WESTERLAND DRIVE | ESTIMATE: | $12,209,875 |
Length: | 3.6 | Actual | $12,691,073 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1258-04-065 | ||
Length: | 3.6 | ||
Estimate: | $12,209,875 | ||
Actual: | $12,691,073 | ||
CCSJ: 1685-01-109 |
|||
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2020(970)HES | CSJ: | 1685-01-109 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT MILLS ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $396,005 |
Length: | 0.2 | Actual | $306,785 |
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | STP 2017(749)HES | CSJ: | 0720-03-136 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT ANTOINE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $227,494 |
Length: | 0.2 | Actual | $202,671 |
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2020(970)HES | CSJ: | 1685-02-050 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT TREASCHWIG ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $240,635 |
Length: | 0.2 | Actual | $193,322 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1685-01-109 | ||
Length: | 0.6 | ||
Estimate: | $864,133 | ||
Actual: | $702,778 | ||
CCSJ: 1685-01-113 |
|||
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2020(416)HES | CSJ: | 1685-01-113 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT WUNDERLICH ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $525,024 |
Length: | 0.1 | Actual | $179,150 |
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2020(416)HES | CSJ: | 1685-01-114 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT CHAMPION FORREST DRIVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $304,509 |
Length: | 0.2 | Actual | $213,681 |
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2020(416)HES | CSJ: | 1685-01-115 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT CHAMPION DRIVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $247,291 |
Length: | 0.2 | Actual | $173,704 |
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2020(416)HES | CSJ: | 1685-01-116 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT BUTTE CREEK ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $233,509 |
Length: | 0.2 | Actual | $162,595 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1685-01-113 | ||
Length: | 0.7 | ||
Estimate: | $1,310,333 | ||
Actual: | $729,130 | ||
CCSJ: 1685-02-051 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | ER 1802(635) | CSJ: | 1685-02-051 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT RAYFORD RD | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $18,066 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 1685-02-051 | ||
Length: | 0 | ||
Estimate: | $18,066 | ||
Actual: | |||
CCSJ: 1685-03-058 |
|||
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | C 1685-3-58 | CSJ: | 1685-03-058 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | BF 1960A | Fund Cat: | 1 |
Limits To: | E. OF TWIGSWORTH LN | ESTIMATE: | $59,424,831 |
Length: | 4.0 | Actual | $56,096,943 |
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | ROW 1685-3-97 | CSJ: | 1685-03-097 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | BF 1960A | Fund Cat: | ROW |
Limits To: | E. OF TWIGSWORTH LN | ESTIMATE: | |
Length: | 4.0 | Actual | $2,102,357 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 1685-03-058 | ||
Length: | 8 | ||
Estimate: | $59,424,831 | ||
Actual: | $58,199,301 | ||
CCSJ: 1685-03-102 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | ER 1802(302) | CSJ: | 1685-03-102 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT WOODLAND HILLS DRIVE | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $11,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 1685-03-102 | ||
Length: | 0 | ||
Estimate: | $11,000 | ||
Actual: | |||
CCSJ: 1685-05-109 |
|||
District: | HOUSTON | Let Date: | Jan 2020 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | NH 2020(506) | CSJ: | 1685-05-109 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | 800' SOUTH OF MEMORIAL DR | Fund Cat: | 1 |
Limits To: | SCHILLER ST | ESTIMATE: | $5,926,469 |
Length: | 3.8 | Actual | $5,195,709 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 1685-05-109 | ||
Length: | 3.8 | ||
Estimate: | $5,926,469 | ||
Actual: | $5,195,709 | ||
CCSJ: 1685-05-123 |
|||
District: | HOUSTON | Let Date: | Apr 2020 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | STP 2020(697)HES | CSJ: | 1685-05-123 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT BRIAR HILLS PKWY | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $252,084 |
Length: | 0.2 | Actual | $207,829 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1685-05-123 | ||
Length: | 0.2 | ||
Estimate: | $252,084 | ||
Actual: | $207,829 | ||
CCSJ: 1685-05-128 |
|||
District: | HOUSTON | Let Date: | Apr 2020 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | STP 2020(698)HES | CSJ: | 1685-05-128 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT EMPANADA DRIVE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $376,610 |
Length: | 0.2 | Actual | $190,714 |
District: | HOUSTON | Let Date: | Apr 2020 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | STP 2020(698)HES | CSJ: | 1685-06-035 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT BISSONNET STEET | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $218,557 |
Length: | 0.2 | Actual | $197,146 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 1685-05-128 | ||
Length: | 0.4 | ||
Estimate: | $595,166 | ||
Actual: | $387,861 | ||
CCSJ: 1685-05-129 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | ER 1802(290) | CSJ: | 1685-05-129 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT PINE FOREST ROAD | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $18,065 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 1685-05-129 | ||
Length: | 0 | ||
Estimate: | $18,065 | ||
Actual: | |||
CCSJ: 3256-01-116 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | ER 1802(627) | CSJ: | 3256-01-116 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT BOHEME (SBFR) | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $147,262 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 3256-01-116 | ||
Length: | 0 | ||
Estimate: | $147,262 | ||
Actual: | |||
CCSJ: 3256-01-117 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | ER 1802(630) | CSJ: | 3256-01-117 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT TERRY HERSHEY TRAIL | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $156,850 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 3256-01-117 | ||
Length: | 0 | ||
Estimate: | $156,850 | ||
Actual: | |||
CCSJ: 3256-02-098 |
|||
District: | HOUSTON | Let Date: | Dec 2019 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | NH 2020(369) | CSJ: | 3256-02-098 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | EB EXIT RAMP | Fund Cat: | 1 |
Limits To: | MESA RD | ESTIMATE: | $645,816 |
Length: | 0.0 | Actual | $734,299 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 3256-02-098 | ||
Length: | 0 | ||
Estimate: | $645,816 | ||
Actual: | $734,299 | ||
CCSJ: 3256-03-097 |
|||
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | STP 2B20(012)HES | CSJ: | 3256-03-097 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT GENOA RED BLUFF ROAD NORTH | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $413,119 |
Length: | 0.2 | Actual | $373,035 |
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | STP 2B20(012)HES | CSJ: | 3256-03-098 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | AT FAIRMONT PARKWAY | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $354,398 |
Length: | 0.2 | Actual | $336,774 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 3256-03-097 | ||
Length: | 0.4 | ||
Estimate: | $767,517 | ||
Actual: | $709,810 | ||
CCSJ: 3256-03-100 |
|||
District: | HOUSTON | Let Date: | Aug 2020 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | ER 2019(974) | CSJ: | 3256-03-100 |
Description: | EMERGENCY RELIEF | Handling Code: | XX |
Limits From: | AT IH 10 (EAST) SATELLITE | Fund Cat: | 10 |
Limits To: | . | ESTIMATE: | $160,576 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 3256-03-100 | ||
Length: | 0 | ||
Estimate: | $160,576 | ||
Actual: | |||
CCSJ: 3256-04-077 |
|||
District: | HOUSTON | Let Date: | Jan 2020 |
Highway: | SL 8 | Let Status: | Actual |
Project ID: | STP 2020(508)HES | CSJ: | 3256-04-077 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | AT HILLCROFT AVENUE | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $630,426 |
Length: | 0.2 | Actual | $494,672 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 3256-04-077 | ||
Length: | 0.2 | ||
Estimate: | $630,426 | ||
Actual: | $494,672 | ||
CCSJ: 3510-06-007 |
|||
District: | HOUSTON | Let Date: | Nov 2019 |
Highway: | SH 99 | Let Status: | Actual |
Project ID: | CC 3510-6-7 | CSJ: | 3510-06-007 |
Description: | CONSTRUCT DIRECT CONNECTORS | Handling Code: | LC |
Limits From: | SH 99 AT SH 249 | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $92,053,763 |
Length: | 4.5 | Actual | $92,053,763 |
Back... | Totals for 3510-06-007 | ||
Length: | 4.5 | ||
Estimate: | $92,053,763 | ||
Actual: | $92,053,763 | ||
CCSJ: 3510-06-025 |
|||
District: | HOUSTON | Let Date: | Jul 2020 |
Highway: | SH 99 | Let Status: | Actual |
Project ID: | C 3510-6-25 | CSJ: | 3510-06-025 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | EAST OF US 290 | Fund Cat: | 3 |
Limits To: | EAST OF SH 249 | ESTIMATE: | $4,389,514 |
Length: | 13.6 | Actual | $3,179,979 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 3510-06-025 | ||
Length: | 13.6 | ||
Estimate: | $4,389,514 | ||
Actual: | $3,179,979 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |