Tabulation of Bids for Project BR 2019(360)

Last Update: Wednesday, June 02, 2021

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:VAN ZANDTLet Date:03/05/21
Type:BRIDGE REPLACEMENTSeq No:3216
Time:233 WORKING DAYSProject ID:BR 2019(360)
Highway:CRContract #:03213216
Length:0.000CCSJ:0910-12-134
Limits: 
From:CR 2918 AT STEVE CREEK RELIEFCheck:$27,000
To:STR#AA2918101, 1.25 MI S OF FM 1256Misc Cost:
Estimate$1,349,294.81% Over/UnderCompany
Bidder 1$1,247,129.38-7.57%EAST TEXAS BRIDGE, INC.
Bidder 2$1,286,583.58-4.65%HIGHWAY 19 CONSTRUCTION LLC
Bidder 3$1,338,328.00-0.81%STATELINE CONSTRUCTION, LLC
Bidder 4$1,371,140.20+1.62%HODGES AND SON CONSTRUCTION COMPANY, INC.
Bidder 5$1,437,437.72+6.53%PIERCE R & B LLC
Bidder 6$1,509,885.00+11.90%FRITCHER CONSTRUCTION SERVICES
Bidder 7$1,587,004.20+17.62%A. L. HELMCAMP, INC.
Bidder 8$1,609,570.00+19.29%DREWERY CONSTRUCTION COMPANY, INCORPORATED
Bidder 9$1,647,471.72+22.10%ED BELL CONSTRUCTION COMPANY
Bidder 10$2,382,442.88+76.57%SEFBO PIPELINE BRIDGE, INCORPORATED
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA13.750800.001
2
3
4
5
6
7
8
9
10
1,400.000
1,000.000
1,700.000
2,300.000
2,250.000
2,500.000
2,000.000
1,100.000
5,250.000
14,001.850
1056011REMOVING STAB BASE AND ASPH PAV (2"-6")SY1,811.0005.001
2
3
4
5
6
7
8
9
10
4.000
10.000
7.000
6.000
14.500
4.000
10.000
12.000
5.000
9.600
1106001EXCAVATION (ROADWAY)CY84.0008.001
2
3
4
5
6
7
8
9
10
17.000
25.000
17.000
15.000
35.000
10.000
90.000
57.000
20.000
89.050
1326005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY1,103.00020.001
2
3
4
5
6
7
8
9
10
13.000
25.000
16.000
20.000
18.000
20.000
20.000
26.000
33.000
20.660
1646054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY4,406.0001.001
2
3
4
5
6
7
8
9
10
0.830
1.500
1.000
2.000
0.800
2.000
0.800
0.800
1.580
1.140
1646055BONDED FBR MTRX SEED (TEMP)(WARM)SY2,204.0000.701
2
3
4
5
6
7
8
9
10
0.800
0.010
1.000
2.000
0.820
2.000
0.800
0.800
0.750
1.130
1646056BONDED FBR MTRX SEED (TEMP)(COOL)SY2,204.0000.701
2
3
4
5
6
7
8
9
10
0.800
0.010
1.000
2.000
0.820
2.000
0.800
0.800
0.750
1.130
1686001VEGETATIVE WATERINGMG97.20011.001
2
3
4
5
6
7
8
9
10
4.000
10.000
10.000
1.000
25.000
20.000
22.000
38.000
73.500
192.000
2756001CEMENTTON62.000150.001
2
3
4
5
6
7
8
9
10
165.000
180.000
192.000
200.000
207.000
170.000
200.000
180.000
210.000
192.000
2756011CEMENT TREAT(EXIST MATL)(8")SY3,295.0002.001
2
3
4
5
6
7
8
9
10
4.000
10.000
7.250
12.000
7.500
3.000
16.000
8.000
7.000
3.780
3406106003D-GR HMA(SQ) TY-D PG64-22TON1,087.000150.001
2
3
4
5
6
7
8
9
10
127.000
130.000
140.000
145.000
142.000
150.000
150.000
170.000
157.500
216.000
4006005CEM STABIL BKFLCY135.000150.001
2
3
4
5
6
7
8
9
10
180.000
180.000
225.000
225.000
225.000
200.000
165.000
178.000
225.000
113.780
4166002DRILL SHAFT (24 IN)LF834.000150.001
2
3
4
5
6
7
8
9
10
150.000
145.000
141.000
120.000
169.000
141.000
160.000
165.000
175.000
210.000
4166003DRILL SHAFT (30 IN)LF462.000165.001
2
3
4
5
6
7
8
9
10
160.000
159.000
150.000
125.000
174.000
150.000
170.000
225.000
185.000
219.600
4206013CL C CONC (ABUT)CY86.000875.001
2
3
4
5
6
7
8
9
10
950.000
992.000
985.000
1,100.000
1,050.000
1,310.000
1,200.000
840.000
1,250.000
1,290.000
4226005REINF CONC SLAB (BOX BEAM)SF1,701.00015.001
2
3
4
5
6
7
8
9
10
15.000
18.000
17.750
20.000
16.000
24.000
25.000
19.400
25.000
54.000
4226007REINF CONC SLAB (SLAB BEAM)SF2,860.00015.001
2
3
4
5
6
7
8
9
10
15.000
15.000
17.750
20.000
19.500
32.000
35.000
19.400
25.000
62.400
4226023SHEAR KEYCY8.600350.001
2
3
4
5
6
7
8
9
10
400.000
350.000
400.000
600.000
520.000
730.000
1,000.000
315.000
250.000
540.000
4256001PRESTR CONC BOX BEAM (4B20)LF258.000190.001
2
3
4
5
6
7
8
9
10
200.000
237.000
230.000
200.000
193.000
174.000
200.000
220.000
225.000
307.080
4256002PRESTR CONC BOX BEAM (5B20)LF129.000175.001
2
3
4
5
6
7
8
9
10
200.000
237.000
230.000
200.000
227.000
174.000
200.000
275.000
300.000
423.360
4256010PRESTR CONC SLAB BEAM (5SB12)LF542.500175.001
2
3
4
5
6
7
8
9
10
210.000
237.000
187.000
210.000
203.000
174.000
230.000
243.000
275.000
246.100
4326033RIPRAP (STONE PROTECTION)(18 IN)CY1,134.000125.001
2
3
4
5
6
7
8
9
10
125.000
104.000
130.000
120.000
125.000
120.000
110.000
147.000
95.000
144.000
4326045RIPRAP (MOW STRIP)(4 IN)CY80.000500.001
2
3
4
5
6
7
8
9
10
450.000
400.000
415.000
500.000
475.000
1,475.000
555.000
400.000
550.000
540.000
4506006RAIL (TY T223)LF454.000100.001
2
3
4
5
6
7
8
9
10
95.000
98.000
110.000
140.000
115.000
210.000
190.000
89.000
120.000
150.000
4966009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA4.00015,000.001
2
3
4
5
6
7
8
9
10
5,000.000
5,000.000
7,500.000
6,000.000
6,000.000
7,500.000
10,000.000
8,400.000
12,500.000
39,300.000
5006001MOBILIZATIONLS1.000124,092.511
2
3
4
5
6
7
8
9
10
100,000.000
100,000.000
110,000.000
120,000.000
140,000.000
98,000.000
140,000.000
205,000.000
133,000.000
250,000.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO12.0004,200.001
2
3
4
5
6
7
8
9
10
1,000.000
1,205.000
1,500.000
2,000.000
2,000.000
1,000.000
2,000.000
1,900.000
3,150.000
3,000.000
5066002002ROCK FILTER DAMS (INSTALL) (TY 2)LF140.00030.001
2
3
4
5
6
7
8
9
10
33.000
30.000
38.000
5.000
37.000
40.000
38.000
37.000
30.250
120.000
5066011002ROCK FILTER DAMS (REMOVE)LF140.00010.001
2
3
4
5
6
7
8
9
10
6.000
10.000
12.000
1.000
11.000
15.000
10.000
10.500
15.400
120.000
5066029002EARTHWORK (EROSN & SEDMT CONT, IN VEH)CY80.00025.001
2
3
4
5
6
7
8
9
10
15.000
10.000
15.000
5.000
50.000
20.000
47.000
25.000
21.000
114.260
5066030002BACKHOE WORK (EROSION & SEDMT CONT)HR60.000100.001
2
3
4
5
6
7
8
9
10
20.000
10.000
35.000
5.000
75.000
85.000
65.000
150.000
84.000
132.960
5066038002TEMP SEDMT CONT FENCE (INSTALL)LF2,512.0002.501
2
3
4
5
6
7
8
9
10
2.600
2.000
2.750
1.000
2.650
3.000
2.800
2.650
1.650
2.280
5066039002TEMP SEDMT CONT FENCE (REMOVE)LF2,512.0001.001
2
3
4
5
6
7
8
9
10
0.500
1.000
1.250
1.000
0.760
1.000
0.750
0.750
0.170
0.720
5066046002TRACKHOE WORK (EROSION & SEDMT CONT)HR60.000140.001
2
3
4
5
6
7
8
9
10
20.000
10.000
45.000
5.000
75.010
115.000
90.000
175.000
105.000
150.000
5406001001MTL W-BEAM GD FEN (TIM POST)LF400.00020.001
2
3
4
5
6
7
8
9
10
23.000
20.000
23.000
20.000
21.000
22.000
22.000
22.000
20.350
25.800
5406021001MTL THRIE-BEAM GD FEN (TIM POST)EA16.0001,600.001
2
3
4
5
6
7
8
9
10
1,500.000
1,600.000
1,500.000
1,500.000
1,370.000
1,435.000
1,400.000
2,600.000
2,084.150
1,656.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA16.0002,700.001
2
3
4
5
6
7
8
9
10
2,700.000
2,300.000
2,650.000
2,600.000
2,420.000
2,565.000
2,500.000
2,600.000
2,640.000
2,520.000
5526003WIRE FENCE (TY C)LF200.00012.001
2
3
4
5
6
7
8
9
10
25.000
17.000
17.000
20.000
14.990
15.000
13.000
16.000
55.000
18.000
6586014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA16.00020.001
2
3
4
5
6
7
8
9
10
20.000
30.000
17.000
30.000
29.490
16.000
26.000
16.000
24.200
71.630
6586062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA16.00035.001
2
3
4
5
6
7
8
9
10
30.000
75.000
27.000
30.000
29.000
26.000
26.000
26.000
36.850
411.280
50706001STEEL FENCE (REMOVE)LF191.00010.001
2
3
4
5
6
7
8
9
10
10.000
5.000
10.000
5.000
10.000
10.000
5.000
10.500
27.500
6.000
50706002STEEL FENCE (INSTALL)LF205.00015.001
2
3
4
5
6
7
8
9
10
40.000
25.000
45.000
40.000
35.000
52.000
15.000
47.000
55.000
32.100
60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY56.000120.001
2
3
4
5
6
7
8
9
10
100.000
100.000
110.000
95.000
125.000
100.000
300.000
150.000
157.500
500.000