Letting Schedule for December, 2019 County (FY 2020)

Last Update: Monday, October 19, 2020

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

December, 2019 (FY 2020)(see Links)
SEP 2019 | OCT 2019 | NOV 2019 | DEC 2019 | JAN 2020 | FEB 2020 | MAR 2020 | APR 2020 | MAY 2020 | JUN 2020 | JUL 2020 | AUG 2020 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
DescriptionDBE Goal
0058-01-019Anderson/
Tyler
SH 294Actual$15,142,6911PREVENTIVE MAINTENANCE0.0
0176-03-097Angelina/
Lufkin
US 59Actual$140,904,32211CONSTRUCT NEW ROADWAY LANES10.0
0042-04-043Armstrong/
Amarillo
US 287Actual$8,362,5131SURFACING/ROADWAY RESTORATION6.0
0114-04-069Bastrop/
Austin
US 290Actual$1,790,9211PREVENTIVE MAINTENANCE0.0
0017-03-066Bexar/
San Antonio
IH 35Actual$374,42810LANDSCAPE DEVELOPMENT0.0
3276-01-020Borden/
Abilene
FM 1054Actual$10,685,0761SEAL COAT0.0
0945-01-042Bowie/
Atlanta
SH 93Actual$1,630,46910CONSTRUCT PEDESTRIAN INFRASTRUCTURE6.0
0192-02-056Brazoria/
Houston
SH 6Actual$347,3896BRIDGE MAINTENANCE0.0
0598-02-126Brazoria/
Houston
SH 288Actual$2,558,8273INTERSECTION IMPROVEMENT0.0
0212-03-066Brazos/
Bryan
SH 30Actual$279,0788HAZARD ELIMINATION & SAFETY0.0
0331-04-072Cameron/
Pharr
PR 100Actual$6,530,0003HIKE AND/OR BIKE0.0
0762-03-018Chambers/
Beaumont
FM 1409Actual$16,732,6033NEW ARTERIAL0.0
0224-02-045Clay/
Wichita Falls
US 287Actual$3,003,9726BRIDGE REPLACEMENT7.5
0266-08-013Colorado/
Yoakum
BS 71-FActual$4,618,3196BRIDGE MAINTENANCE8.0
0446-02-037Colorado/
Yoakum
UA 90Actual$3,321,4106BRIDGE REPLACEMENT7.0
0092-01-052Dallas/
Dallas
US 175Actual$73,915,42211REHABILITATE EXISTING ROADWAY15.0
0037-05-053Dimmit/
Laredo
US 83Actual$600,6608HAZARD ELIMINATION & SAFETY0.0
0714-05-021Eastland/
Brownwood
FM 2461Actual$1,481,0961REHABILITATE EXISTING ROADWAY5.0
0004-07-130Ector/
Odessa
IH 20Actual$991,7606BRIDGE MAINTENANCE0.0
0167-02-063El Paso/
El Paso
BU 54-AActual$3,063,3311SURFACING/ROADWAY RESTORATION8.0
0259-01-036Erath/
Ft Worth
US 67Actual$14,250,5591CONSTRUCT NEW ROAD8.5
2940-02-011Fort Bend/
Houston
FM 2919Actual$1,075,7631SURFACING/ROADWAY RESTORATION5.0
0275-11-083Gray/
Amarillo
IH 40Actual$9,878,1121HIGHWAY IMPROVEMENT4.0
1947-02-016Hardin/
Beaumont
FM 1293Actual$4,954,4151SURFACING/ROADWAY RESTORATION8.0
3256-02-098Harris/
Houston
SL 8Actual$645,8161HIGHWAY IMPROVEMENT7.5
0389-13-062Harris/
Houston
SH 146Actual$420,7906BRIDGE MAINTENANCE0.0
1685-01-113Harris/
Houston
FM 1960Actual$1,310,3338TRAFFIC SIGNAL IMPROVEMENTS0.0
1258-04-063Harris/
Houston
FM 1093Actual$12,234,5491SURFACING/ROADWAY RESTORATION8.0
0912-72-573Harris/
Houston
VAActual$2,997,19911INSTALL NOISE BARRIER7.0
0285-03-061Hays/
Austin
RM 12Actual$2,014,0631PREVENTIVE MAINTENANCE0.0
0014-07-104Hill/
Waco
IH 35Actual$1,658,8768HAZARD ELIMINATION & SAFETY0.0
0009-09-107Hopkins/
Paris
IH 30Actual$11,952,4301PREVENTIVE MAINTENANCE0.0
0083-02-056Hopkins/
Paris
SH 11Actual$2,367,1601PREVENTIVE MAINTENANCE0.0
0548-04-021Howard/
Abilene
SH 176Actual$9,893,25311REHABILITATE EXISTING ROADWAY7.5
0693-01-036Howard/
Abilene
SH 350Actual$11,823,23011SURFACING/ROADWAY RESTORATION6.5
0002-06-054Hudspeth/
El Paso
IH 10Actual$4,128,4291PREVENTIVE MAINTENANCE0.0
2555-01-012Kaufman/
Dallas
FM 2578Actual$8,850,8941REHABILITATE EXISTING ROADWAY10.0
0522-01-023Kaufman/
Dallas
SH 243Actual$1,318,1453INTERSECTION IMPROVEMENT0.0
0036-02-010Kerr/
San Antonio
US 83Actual$621,9381RESURFACE ROADWAY0.0
0036-01-015Kimble/
San Angelo
US 83Actual$13,843,5981PREVENTIVE MAINTENANCE0.0
0483-01-056La Salle/
Laredo
SH 97Actual$68,346,99311WIDEN ROAD - ADD LANES AND SHOULDERS8.0
0045-15-012Lamar/
Paris
FM 1510Actual$2,581,2411PREVENTIVE MAINTENANCE0.0
0269-02-063Lavaca/
Yoakum
US 77Actual$3,447,3656BRIDGE REPLACEMENT7.5
0913-29-036Lavaca/
Yoakum
CRActual$733,5716REHABILITATE BRIDGE0.0
1664-01-019Limestone/
Waco
FM 1633Actual$7,678,6361REHABILITATE EXISTING ROADWAY9.0
2687-01-013Llano/
Austin
RM 2147Actual$2,284,5331ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDED CAPACITY8.0
0783-01-097Lubbock/
Lubbock
SL 289Actual$1,834,7701SURFACING/ROADWAY RESTORATION0.0
0380-17-005Martin/
Odessa
SH 349Actual$7,661,93711HIGHWAY IMPROVEMENT6.0
0913-21-051Matagorda/
Yoakum
CRActual$756,7003SURFACING/ROADWAY RESTORATION0.0
1187-02-018Mclennan/
Waco
FM 938Actual$681,0886BRIDGE REPLACEMENT5.0
0380-09-092Midland/
Odessa
SH 349Actual$36,384,39011HIGHWAY IMPROVEMENT5.0
0084-01-090Morris/
Atlanta
US 259Actual$2,372,9608HAZARD ELIMINATION & SAFETY0.0
1407-01-029Nacogdoches/
Lufkin
FM 1275Actual$1,633,9321RESURFACE ROADWAY0.0
0074-06-242Nueces/
Corpus Christi
IH 37Actual$6,437,3021HIGHWAY IMPROVEMENT8.0
0007-08-030Palo Pinto/
Ft Worth
SH 16Actual$12,937,7861PREVENTIVE MAINTENANCE0.0
0052-01-042Parmer/
Lubbock
US 70Actual$14,801,5421SURFACING/ROADWAY RESTORATION7.5
0558-09-037Reagan/
San Angelo
SH 137Actual$5,878,35711PREVENTIVE MAINTENANCE0.0
0189-04-022Red River/
Paris
SH 37Actual$8,209,8751REHABILITATE EXISTING ROADWAY7.5
0480-08-027San Saba/
Brownwood
FM 45Actual$5,696,0611BRIDGE REPLACEMENT7.0
0094-01-033Tarrant/
Ft Worth
SH 183Actual$6,129,3151RAILROAD CROSSING IMPROVEMENTS0.0
0364-01-157Tarrant/
Ft Worth
SH 121Actual$1,617,0111INSTALL TRAFFIC SIGNAL0.0
0011-01-038Taylor/
Abilene
SH 351Actual$5,055,70910CONSTRUCT PEDESTRIAN INFRASTRUCTURE7.5
0677-01-023Taylor/
Abilene
FM 707Actual$7,726,4711SEAL COAT0.0
0914-00-429Travis/
Austin
VAActual$858,4511PREVENTIVE MAINTENANCE0.0
0646-02-029Van Zandt/
Tyler
FM 47Actual$5,107,3408INSTALL/UPGRADE DRAINAGE STRUCTURE(S)8.0
0370-05-052Victoria/
Yoakum
BU 77-SActual$7,629,96510SURFACING/ROADWAY RESTORATION7.5
0903-03-115Wichita/
Wichita Falls
CSActual$2,124,4403HIKE AND/OR BIKE0.0
2211-02-028Williamson/
Austin
FM 1460Actual$2,171,9871PREVENTIVE MAINTENANCE0.0
0914-05-206Williamson/
Austin
VAActual$1,408,6461PREVENTIVE MAINTENANCE0.0
0440-02-019Williamson/
Austin
SH 195Actual$828,3958HIGHWAY IMPROVEMENT3.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract