Letting Schedule for May, 2018 County (FY 2018)

Last Update: Monday, May 14, 2018
May, 2018 (FY 2018)(see Links)
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
Description
0109-02-026Anderson/
Tyler
US 287Actual$4,115,7231REPAIR & RESURFACE ROADWAY
0911-38-069Angelina/
Lufkin
CRActual$359,6756REPLACE BRIDGE AND APPROACHES
0200-02-039Angelina/
Lufkin
US 69Actual$72,924,6321WIDEN FROM 2 LANES TO 4 LANE DIVIDED RURAL
0613-02-063Atascosa/
San Antonio
SH 16Actual$5,233,3361REPLACE EXISTING BRIDGE
0156-06-052Baylor/
Wichita Falls
US 82Actual$4,156,8571RE-ALIGN ROADWAY
0909-36-153Bell/
Waco
CSApproved$489,2493CONSTRUCT ROUNDABOUT IN HARKER HEIGHTS
0232-05-016Bell/
Waco
FM 2305Actual$852,5131SEAL AND OVERLAY
0025-02-160Bexar/
San Antonio
IH 10Actual$112,476,0871EXPAND FROM 4 TO 6 LANE EXPRESSWAY
0017-10-280Bexar/
San Antonio
IH 35Actual$5,055,0111CONSTRUCT SIDEWALKS ALONG FRONTAGE ROADS
0521-06-144Bexar/
San Antonio
IH 410Actual$1,449,2471HIGH MAST AND CONTINUOUS ILLUMINATION
0072-12-198Bexar/
San Antonio
IH 10Actual$1,462,4231INTERSECTION AND OPERATIONAL IMPROVEMENTS
0017-09-104Bexar/
San Antonio
IH 35Actual$387,59410LANDSCAPE PLANTING AND IRRIGATION
0915-00-168Bexar/
San Antonio
VAActual$1,413,50710CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN ATASCOSA,
3508-01-028Bexar/
San Antonio
SH 151Actual$10,221,1961OVERLAY & PAVEMENT MARKINGS ON FRONTAGE ROADS
0915-00-179Bexar/
San Antonio
VAActual$1,504,86510CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN BANDERA AND
1024-01-074Chambers/
Beaumont
FM 565Actual$1,939,1391WIDEN PAVED SURFACE WIDTH, INSTALL CONTINUOUS TURN LANE
0123-03-021Cherokee/
Tyler
US 84Actual$2,950,2231PLANE, REPAIR & RESURFACE ROADWAY
0636-01-038Coleman/
Brownwood
SH 153Actual$2,320,0198MILLED EDGELINE/CENTERLINE RUMBLE STRIPS
0091-03-027Collin/
Dallas
SH 289Actual$1,374,6311INSTALLATION OF TRAFFIC SIGNALS
0823-01-029Cooke/
Wichita Falls
FM 373Actual$3,305,2401EXTEND CULVERTS
7106-05-001Crane/
Odessa
RL SOActual$5,637,290RLREHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS
0229-03-035Crane/
Odessa
US 385Actual$26,011,7061WIDENING TO AN ULTIMATE 4-LANE DIVIDED HIGHWAY
7107-04-001Crockett/
San Angelo
RL SOActual$435,505RLREHABILITATION OF SOUTH ORIENT RR TO 25 MPH TRACK SPEEDS
0040-01-050Dallam/
Amarillo
US 87Actual$11,406,9188MILLED EDGELINE RUMBLE STRIPS
2374-02-143Dallas/
Dallas
IH 635Actual$345,6105CONSTRUCT SIDEWALKS ON APPROACHES & IMPLEMENT PEDESTRIAN
0095-13-040Dallas/
Dallas
IH 20Actual$3,371,47310LANDSCAPE TREATMENT OF RIGHT OF WAY AND MEDIANS
0918-00-273Dallas/
Dallas
VAActual$1,640,0003AIR QUALITY MARKETING AND EDUCATION PROGRAM
0918-47-176Dallas/
Dallas
CSActual$3,519,86611DRAINAGE IMPROVEMENTS
0143-09-070Dewitt/
Yoakum
US 87Actual$107,99710LANDSCAPE DEVELOPMENT ON US 87 IN CUERO
0127-02-142Eastland/
Brownwood
US 183Actual$15,696,9541RECONSTRUCT URBAN ROADWAY
0004-06-036Ector/
Odessa
IH 20Actual$6,517,1258INSTALL MEDIAN BARRIER
0924-06-547El Paso/
El Paso
CSActual$985,5583CONSTRUCTION OF PEDESTRIAN AND BIKE ENHANCEMENTS (TO INCLUDE
1051-01-037Ellis/
Dallas
FM 664Actual$30,899,00711WIDEN FROM 2 LANES TO 6 LANES URBAN DIVIDED, INCLUDING
1394-02-026Ellis/
Dallas
FM 1387Actual$1,128,5878SAFETY TREAT FIXED OBJECTS,CONSTRUCT PAVED SHOULDERS (1-4FT)
1257-01-049Fort Bend/
Houston
FM 1092Actual$2,554,1827CONSTRUCT DEDICATED TURN LANES, UPGRADE TRAFFIC SIGNALS AND
0017-06-084Frio/
San Antonio
IH 35Actual$15,802,9051REHAB EXISTING FRONTAGE ROADS
0367-02-075Galveston/
Houston
SH 87Actual$18,290,22511REHABILITATE AND RAISE ROADWAY
0045-04-066Grayson/
Paris
SH 56Actual$498,4503CONSTRUCT SHARED USE PATH AND STREETSCAPE
0500-03-583Harris/
Houston
IH 45Actual$2,091,8661RESTORATION OF FRONTAGE ROADS
0912-72-333Harris/
Houston
CSActual$948,2186REPLACE BRIDGE AND APPROACHES (NBI #12102B36609271)
0912-72-366Harris/
Houston
CRActual$5,097,0003CONSTRUCT GEOMETRIC IMPROVEMENTS AND ITS/TRAFFIC SIGNAL
0389-05-116Harris/
Houston
SH 146Actual$192,651,7362MWIDEN TO 6-LANES WITH 4-LANE EXPRESS LANES
3510-06-015Harris/
Houston
SH 99Actual$2,359,2601CONSTRUCT SOUNDWALL
3256-01-111Harris/
Houston
SL 8Actual$473,75010LANDSCAPE DEVELOPMENT
1005-02-001Harris/
Houston
FM 525Actual$1,905,0261REMOVE BOTTLENECK BY WIDENING FROM 2 TO 4 LANES DIVIDED
0843-06-021Harrison/
Atlanta
FM 450Actual$810,7198RAILROAD CROSSING UPGRADES
0495-08-110Harrison/
Atlanta
IH 20Actual$1,975,5996BRIDGE PREVENTATIVE MAINTENANCE
0109-06-040Houston/
Lufkin
SH 19Actual$890,1568IMPROVE GUARDRAIL TO DESIGN STANDARD/SAFETY TREAT FIXED
0005-05-111Howard/
Abilene
IH 20Actual$573,3228INSTALL MEDIAN BARRIER
0415-01-025Jeff Davis/
El Paso
SH 118Actual$233,3528IMPROVE GUARDRAIL TO DESIGN STANDARDS
0028-07-052Jefferson/
Beaumont
US 90Actual$277,6786UPGRADE BRIDGE AND APPROACH RAILING
3207-01-011Johnson/
Ft Worth
FM 3136Actual$5,913,8051WIDEN PAVEMENT, EXTEND CULVERTS, PAVEMENT MARKING
3372-01-016Johnson/
Ft Worth
FM 3391Actual$2,217,6861REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS
0014-03-095Johnson/
Ft Worth
IH 35WActual$10,982,2481REPAIR CONCRETE FAILURES, MILL, HMAC OVERLAY, PAVEMENT
0014-03-096Johnson/
Ft Worth
IH 35WActual$565,6868SAFETY LIGHTING
0100-10-015Karnes/
Corpus Christi
BU 181FActual$5,545,32812018 DISTRICT WIDE SEAL COAT PROJECT LOW CONTROL CSJ
0751-01-046Kaufman/
Dallas
FM 148Approved$12,737,0003WIDEN EXISTING HIGHWAY FROM TWO LANE RURAL
0045-08-038Lamar/
Paris
US 82Actual$174,4718INSTALL INTERSECTION FLASHING BEACON
0231-01-056Lampasas/
Brownwood
US 190Actual$1,221,6751PLANING AND ACP OVERLAY
0334-05-032Lee/
Austin
FM 141Actual$1,265,8051LEVEL-UP & SEAL COAT
1206-01-018Live Oak/
Corpus Christi
FM 1358Actual$2,850,5751REPLACE BRIDGE AND APPROACHES
0071-05-031Mason/
Austin
US 87Actual$3,081,5541REPAIR, LEVEL-UP & SEAL COAT
0605-01-064Matagorda/
Yoakum
FM 457Actual$3,100,2091PAVEMENT REPAIR AND RESURFACING
2561-01-011Mcculloch/
Brownwood
SH 71Actual$2,743,8201REHAB EXISTING ROADWAY
0542-05-017Mcmullen/
San Antonio
US 59Actual$187,88312018 HOT RUBBER SEAL PROJECT
0380-09-087Midland/
Odessa
BS 349CActual$8,411,6441ROADWAY REHABILITATION
0720-02-074Montgomery/
Houston
SH 249Approved$59,356,2363CONSTRUCT 4 LANE TOLLWAY WITH GRADE SEPARATIONS AT DECKER
1407-02-023Nacogdoches/
Lufkin
FM 1638Actual$2,764,6828SAFETY TREAT FIXED OBJECTS; PROVIDE ADDITIONAL PAVED SURFACE
0893-01-034Nacogdoches/
Lufkin
FM 226Actual$1,082,9448IMPROVE GUARDRAIL TO DESIGN STANDARDS,SAFETY TREAT FIXED
0997-03-007Navarro/
Dallas
FM 667Actual$20,052,5631REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS
0916-00-086Nueces/
Corpus Christi
VAActual$1,361,8101DISTRICT WIDE SIGN REPLACEMENT
0916-35-207Nueces/
Corpus Christi
CSApproved$168,5209HAWK SIGNAL AT OCEAN DR AND DEL MAR
0916-00-068Nueces/
Corpus Christi
VAApproved$1,200,0007PEDESTRIAN & BIKE FACILITIES IMPROVEMENTS
0916-35-206Nueces/
Corpus Christi
VAApproved$522,5003DESIGNATION OF BICYCLE BOULEVARDS WITH PAVEMENT MARKINGS AND
0916-00-067Nueces/
Corpus Christi
VAApproved$1,030,0003UPGRADE/INSTALL TRAFFIC SIGNALS AND ADD RIGHT TURN LANE
0617-01-196Nueces/
Corpus Christi
SH 358Actual$6,115,7311NOVACHIP ROADWAY
0102-01-116Nueces/
Corpus Christi
BS 44DActual$3,202,15112018 HOT RUBBER SEAL PROJECT
0102-01-088Nueces/
Corpus Christi
SH 44Actual$34,109,7271UPGRADE FROM 4-LN DIVIDED HWY TO 4-LN FREEWAY W/FTRG
0883-02-086Orange/
Beaumont
FM 105Actual$1,372,4191PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE
0008-09-036Parker/
Ft Worth
FM 5Actual$5,652,5921REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
1601-02-032Parker/
Ft Worth
FM 1884Actual$113,7413INSTALLATION OF TRAFFIC ACTUATED SIGNAL
0168-01-029Parmer/
Lubbock
US 60Actual$19,960,3741REHABILITATION OF EXISTING ROADWAY
0928-02-020Polk/
Lufkin
FM 350Actual$1,793,3948IMPROVE GUARDRAIL TO DESIGN STANDARDS, SAFETY TREAT FIXED
0090-05-095Potter/
Amarillo
SL 279Actual$1,519,7508IMPROVE TRAFFIC SIGNALS
1639-01-014Reeves/
Odessa
FM 1450Actual$8,074,5131ROADWAY REHABILITATION
0626-01-007Reeves/
Odessa
PR 30BActual$448,56510REHABILITATE STATE PARK ROADS AND PARKING LOTS
0139-04-045Reeves/
Odessa
US 285Actual$30,721,8311ROADWAY WIDENING TO A MODIFIED SUPER 2
1015-01-023Rockwall/
Dallas
FM 3549Actual$10,231,29911WIDEN FROM 2 LANE RURAL TO 4 LANE URBAN DIVIDED
0158-01-080Runnels/
San Angelo
US 67Actual$95,8351REPAIR BRIDGE RAILINGS
0138-04-046Rusk/
Tyler
US 259Actual$5,863,0951REPAIR & REPAVE ROADWAY-NBL ONLY
0907-26-004Schleicher/
San Angelo
CSActual$517,1293SIDEWALKS AND TRAFFIC SAFETY IMPROVEMENTS
0902-48-744Tarrant/
Ft Worth
CRActual$2,677,6586REPLACE AND RELOCATE BRIDGE AND APPROACH
0363-01-146Tarrant/
Ft Worth
SH 26Actual$358,09811INSTALLATION OF LANDSCAPING AND IRRIGATION WITHIN MEDIANS OF
0008-05-027Tarrant/
Ft Worth
SH 180Actual$7,359,5691REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0006-04-072Taylor/
Abilene
IH 20Actual$697,9096REPLACE BRIDGE AND APPROACH RAILING OR
0006-18-058Taylor/
Abilene
BI 20-RActual$6,206,4821OVERLAY AND TRAFFIC SIGNAL UPGRADES
0914-00-398Travis/
Austin
VAActual$1,940,4881FY 2018 SITE SPECIFIC SIGNALS
1200-03-055Travis/
Austin
FM 973Actual$420,7633CONSTRUCT RIGHT AND LEFT TURN LANES
0877-03-025Tyler/
Beaumont
FM 256Actual$598,9116REPLACE BRIDGE AND APPROACHES
0248-05-064Upshur/
Atlanta
US 271Actual$5,482,1941RESURFACE EXISTING 4-LANE HIGHWAY
0088-05-085Victoria/
Yoakum
US 59Actual$23,861,0681UPGRADE TO RURAL FREEWAY
0088-06-004Victoria/
Yoakum
BU 59-TActual$367,3688IMPROVE TRAFFIC SIGNALS
2350-01-057Victoria/
Yoakum
SL 463Actual$6,933,3901PAVEMENT REPAIR AND RESURFACING
0913-09-073Wharton/
Yoakum
CRActual$1,100,4386REPLACE BRIDGE AND APPROACHES
0043-06-088Wilbarger/
Wichita Falls
US 70Actual$1,713,0731MILL HOT MIX ON BRIDGE AND APPROACHES
1378-02-053Williamson/
Austin
RM 1431Actual$988,63511INSTALLATION OF A SOUND WALL ALONG THE NORTH RIGHT OF WAY
1566-01-011Williamson/
Austin
FM 1660Actual$2,446,7551DEPTH REPAIR, UNDERSEAL & THIN OV
0320-03-092Williamson/
Austin
SH 95Actual$404,9156BRIDGE WIDENING & REPLACE APPROACHES
0320-03-099Williamson/
Austin
SH 95Actual$858,4186REPLACE DECK AND STRUCTURAL REPAIRS
0910-35-035Wood/
Tyler
CSActual$870,7513W COKE RD PEDESTRIAN SAFE RT & WINNSBORO ELEMENTARY SRTS


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract