Letting Schedule for Ft Worth District (FY 2018)

Last Update: Monday, May 21, 2018
Ft Worth District (FY 2018)
Erath | Hood | Jack | Johnson | Palo Pinto | Parker | Tarrant | Wise |

Erath County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0343-03-028SH 108ActualMar 2018$9,079,6871WIDEN PAVEMENT, EXTEND CULVERTS, SEAL COAT, PAVEMENT MARKING
2578-01-023FM 2481ActualOct 2017$78,36610REBUILD CHANNEL EMBANKMENT W/ ROCK RIP RAP & CONCRETE
0079-05-057US 67ActualDec 2017$9,554,9091SEAL COAT MAIN LANES

Hood County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
3123-01-015FM 4ActualOct 2017$57,76610FLOW-ABLE FILL MATERIAL TO ADD STRUCTURAL CAPACITY UNDER THE
0080-11-001US 377ApprovedAug 2018$76,281,2161CONSTRUCT 0 TO 4 LANE DIVIDED ROADWAY WITH GRADE SEPARATION
0385-02-029FM 4ActualOct 2017$2,657,8851WIDEN PAVEMENT AND ADD SHOULDERS

Jack County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
1309-01-033US 380ActualFeb 2018$4,142,1191REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0902-40-027CRActualApr 2018$487,4476REPLACE BRIDGE

Johnson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
3372-01-016FM 3391ActualMay 2018$2,217,6861REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS
2417-02-016FM 2331ApprovedJul 2018$1,726,3151REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS,
0014-03-095IH 35WActualMay 2018$10,982,2481REPAIR CONCRETE FAILURES, MILL, HMAC OVERLAY, PAVEMENT
0259-05-077US 67ApprovedJul 2018$199,3233LANDSCAPING IN MEDIAN OF US 67 & GREENBELT BETWEEN US 67 &
3207-01-011FM 3136ActualMay 2018$5,913,8051WIDEN PAVEMENT, EXTEND CULVERTS, PAVEMENT MARKING
0014-03-096IH 35WActualMay 2018$565,6868SAFETY LIGHTING

Palo Pinto County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0902-39-021CRActualMar 2018$855,1226REPLACE BRIDGE AND APPROACHES

Parker County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0171-03-067SH 199ActualApr 2018$3,990,4071REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0365-01-046SH 171ActualApr 2018$908,3161REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0008-03-116US 180ActualApr 2018$4,758,0161REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0902-38-123VAActualFeb 2018$1,148,5733BIKE & PEDESTRIAN TRAIL; TRAFFIC SIGNAL
0008-03-107IH 20ActualFeb 2018$2,800,8031FRONTAGE ROADS - REPAIR BASE FAILURES, MILL, HMAC OVERLAY,
1601-02-032FM 1884ActualMay 2018$113,7413INSTALLATION OF TRAFFIC ACTUATED SIGNAL
0008-09-036FM 5ActualMay 2018$5,652,5921REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
1179-03-010FM 2552ActualApr 2018$1,877,9401REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS

Tarrant County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0902-90-054VATentativeAug 2018$1,000,0005DEVELOP AND IMPLEMENT TRAFFIC SIGNAL COORDINATION IN 9
0008-13-239IH 820ApprovedAug 2018$710,1301RECONSTRUCT DAMAGED RIPRAPS
0902-00-215VATentativeAug 2018$3,000,0003MANAGED LANE SYSTEM, IMPLEMENT TECHNOLOGY TO DETECT AUTO
0902-90-058VAActualOct 2017$2,462,4747MOBILITY ASST PATROL THAT PROVIDES ASST TO STRANDED MOTORIST
0902-90-034VATentativeAug 2018$20,000,0003CONSTRUCTION OF EAST-WEST CONNECTOR 0 TO 4 LANES DIVIDED
0080-07-097US 377ApprovedAug 2018$178,8441INSTALLATION OF TRAFFIC SIGNAL
0902-90-024VAActualOct 2017$889,5623BIKE AND PEDESTRIAN TRAIL EXTENSION
0902-90-052VATentativeAug 2018$300,0005ITS EQUIPMENT UPGRADE FOR TECHNOLOGY ADVANCES
0008-13-221IH 820ActualDec 2017$210,561,6631RM TO TRIN:RECON TO 6 LNS + AUX,&CONST IH 820/SH 121 DIR CON
0902-90-055VATentativeAug 2018$50,0005ITS QUALITY IMPLEMENTATION - ENSURE EFFECTIVE USE OF ITS
0902-90-042VATentativeAug 2018$25,0003DIRECT STATE CHARGES FOR TEX RAIL CONNECTION_PROJECTS
0902-90-051VATentativeAug 2018$300,0005ITS EQUIPMENT UPGRADES FOR TECHNOLOGY ADVANCES
0353-03-099SH 114ActualNov 2017$1,819,2093LANDSCAPE ENHANCEMENT
0172-09-036US 287ApprovedAug 2018$2,700,0005INSTALLATION OF ITS FIBER & EQUIPMENT
0902-00-169VATentativeAug 2018$400,0003EMISSIONS REDUCTION STRATEGIES FOR OZONE PRECURSORS INCL VOC
0902-90-031VAActualNov 2017$2,494,6863PEDESTRIAN AND BIKE TRAIL
0353-03-102SH 114TentativeAug 2018$62,3343RELOCATE ITS FIBER OPTIC CABLE DUE TO CONFLICT WITH TEX RAIL
0718-02-045FM 156ApprovedAug 2018$52,555,0011WIDEN 2 TO 4 LANE DIVIDED
0902-00-168VATentativeAug 2018$400,0003EMISSIONS REDUCTION STRATEGIES FOR OZONE PRECURSORS INCL VOC
0902-00-172VATentativeAug 2018$2,500,0005REGIONAL MINOR INTERSECTION EQUIP PRGRAM POOL FOR FUTURE
0364-01-148SH 121ApprovedAug 2018$30,000,0001RECONSTRUCT SHOULDER FOR PEAK HOUR UTILIZATION
0902-00-209VAApprovedAug 2018$1,000,0001BRIDGE MAINTENANCE
2374-05-082IH 20ActualOct 2017$1,036,2323CONSTRUCT NEW TEXAS UTURN
0902-00-214VATentativeAug 2018$660,0007MULTIPURPOSE AUTOMATID VEHICLE DESIGN, DEVELOPMENT, TESTING,
0902-00-213VAApprovedAug 2018$1,760,5701CONCRETE PAVEMENT REPAIR, SPOT REPAIRS VARIOUS LOCATIONS
0902-00-205VAApprovedAug 2018$2,613,55210CONSTRUCT CURB RAMS AT VARIOUS LOCATIONS ALONG BU 67-M IN
0902-00-180VATentativeAug 2018$100,0007BOTTLENECK REMOVAL THROUGH USE OF FREEWAY SHOULDERS
0902-00-178VATentativeAug 2018$312,5007PROGRAM OVERSIGHT COORDINATION, INCLUDING DEPT STREAMLINING
0902-00-187VATentativeAug 2018$400,0007M&O CORRIDOR STUDIES & CAPITAL ASSET MANAGEMENT
0902-00-186VATentativeAug 2018$650,0007LAND USE/TRANS & BIKE/PED INIT INCL BIKE/PED PLANNING,
0902-90-056VATentativeAug 2018$50,0005ITS QUALITY IMPLEMENTATION - ENSURE EFFECTIVE USE OF ITS
0008-05-027SH 180ActualMay 2018$7,359,5691REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0363-01-146SH 26ActualMay 2018$358,09811INSTALLATION OF LANDSCAPING AND IRRIGATION WITHIN MEDIANS OF
0172-06-092US 287ActualApr 2018$857,7473INT IMPROV; UPGRADE TRAFFIC SIGNAL; VEHICLE & PED ILLUM &
2266-02-139SH 360ActualMar 2018$2,063,8131REPAIR CONCRETE PAVEMENT FAILURES, DIAMOND GRIND, PAVEMENT
0014-02-051IH 35WActualJan 2018$2,809,15611INSTALLATION OF ITS FIBER AND EQUIPMENT
0902-48-744CRActualMay 2018$2,677,6586REPLACE AND RELOCATE BRIDGE AND APPROACH
0902-90-094CSTentativeAug 2018$250,00082018 FEDERAL RR SIGNAL PROGRAM
0902-90-093CSTentativeAug 2018$250,00082018 FEDERAL RR SIGNAL PROGRAM
0902-90-100VATentativeAug 2018$1,250,0007TEXAS AUTOMATED VEHICLES PROVING GROUND ALONG THE IH 30
0014-16-276IH 35WApprovedJun 2018$977,4556REPLACE BRIDGE & APPROACH RAILING/ADD SAFETY END
0094-02-133SH 10ApprovedJun 2018$400,00010INSTALLATION OF LANDSCAPING AND IRRIGATION WITHIN MEDIANS OF
0902-90-018CSActualJan 2018$918,3243REAL TIME TRAVELER INFORMATION WITH HIGH SPEED COMMUNICATION
2266-02-086SH 360ActualFeb 2018$61,767,9532MWIDEN & RECONSTRUCT 6 TO 8 LANES
0902-48-874VAActualFeb 2018$3,308,8631DFW CONNECTOR COMPREHENSIVE MAINTENANCE AGREEMENT FY18
0902-00-175VATentativeAug 2018$291,3507CONGESTION MGMT OPERATIONS & DATA ARCHIVING, REG ITS ARCH,
1068-02-146IH 30ActualJan 2018$2,720,77711INSTALLATION OF ITS FIBER, ITS EQUIPMENT, SATELLITE BUILDING
0747-04-073FM 157ActualMar 2018$340,0003INSTALLATION OF FULL TRAFFIC SIGNAL & CROSSWALK
1330-01-063FM 1187ActualMar 2018$2,531,6991REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
1978-01-056FM 1938ActualMar 2018$2,714,2241REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0902-90-027VAActualMar 2018$366,646310' MULTI USE TRAIL ON N SIDE OF MT. RD; SRTS RIDGEVIEW ELEM
0902-48-827VAActualJan 2018$832,9423CITY OF FORT WORTH CORRIDOR REDEVELOPMENT PROGRAM
0902-00-147VAActualJan 2018$1,514,0971NON-SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION
0902-90-086VATentativeAug 2018$20,000,0005CONSTRUCTION OF NEW COMMUTER RAIL LINE
0902-00-182VAActualOct 2017$1,175,0003DEVELOP AND IMPLEMENT 511 TRAVELER INFORMATION SYSTEM
0902-90-074VATentativeAug 2018$5,000,0007COMPLETION OF THE DFW CORE EXPRESS HIGH SPEED RAIL PROJECT
0172-02-074BU 287PActualDec 2017$1,180,4573PEDESTRIAN AND BIKE TRAIL
0902-90-087VATentativeAug 2018$133,0003UPGRADE TRAFFIC SIGNALS BY INSTALLING COMMUNICATION
0172-09-034US 287ActualOct 2017$2,190,4743SUBLETT EXIT RAMP RELOCATION (US 287 SB TO SUBLETT RD)
1068-01-219IH 30ApprovedJul 2018$469,48210LANDSCAPE ENHANCEMENT
2681-02-008FM 2499ApprovedJul 2018$1,399,0553LANDSCAPE ENHANCEMENT
0902-00-184VAActualOct 2017$750,0003REVENUE & PROJECT TRACKING, SOFTWARE DEVELOPMENT, & FISCAL
0902-48-688VAApprovedJul 2018$1,302,3003CLOSE EAST 1ST XING @ UPRR; INSTALL MEDIAN @ PEACH @ BNSF;
0902-90-026VAApprovedJul 2018$1,785,0003INTERSECTION/SIGNAL IMPROVEMENTS; TRAIL; PEDESTRIAN
0902-90-060VATentativeAug 2018$2,091,0007VANPOOL PROGRAM FY 18; OPER VANPOOL SUBSIDY INITIATIVE FOR
0902-90-045VAApprovedJun 2018$1,241,2983CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
0902-90-091CSTentativeAug 2018$250,00082018 FEDERAL RR SIGNAL PROGRAM
0902-90-025VAApprovedJun 2018$1,558,6743LYNN CREEK LINEAR PARK TRAIL EXTENSION FROM END POINT OF
0008-15-046IH 820ActualJan 2018$3,826,6911DIAMOND GRIND MAINLANES,SURFACE TREATMENT BRIDGES
0902-90-092CSTentativeAug 2018$250,00082018 FEDERAL RR SIGNAL PROGRAM
0902-00-159VAActualDec 2017$1,740,0003SCHOOL BUS, CLEAN TECHNOLOGY REVOLVING LOAN PROGRAM,
0081-02-069US 377ApprovedJul 2018$439,44911LANDSCAPING IMPROVEMENTS
1603-03-040FM 1709ApprovedJun 2018$3,655,1931REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0902-90-090CSTentativeAug 2018$250,00082018 FEDERAL RR SIGNAL PROGRAM

Wise County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
1179-01-043FM 920ApprovedJun 2018$3,315,1751REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS
0352-01-061SH 114ApprovedJun 2018$4,988,3641MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0134-12-005BU 380FApprovedAug 2018$832,83811REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0134-07-074US 380TentativeAug 2018$3,1873INSTALL MEMORIAL HIGHWAY SIGNS (JAMES BENNETT)
0902-20-099CRApprovedAug 2018$587,0216REPLACE BRIDGE AND APPROACHES
0902-20-111CRApprovedJul 2018$555,4396REPLACE BRIDGE AND APPROACHES


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract