Letting Schedule for June, 2018 County (FY 2018)

Last Update: Monday, May 14, 2018
June, 2018 (FY 2018)(see Links)
SEP 2017 | OCT 2017 | NOV 2017 | DEC 2017 | JAN 2018 | FEB 2018 | MAR 2018 | APR 2018 | MAY 2018 | JUN 2018 | JUL 2018 | AUG 2018 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
Description
0911-00-075Angelina/
Lufkin
VAApproved$2,625,02410CONSTRUCT CURB RAMPS ON VARIOUS LOCATIONS IN THE LUFKIN
0328-04-044Atascosa/
San Antonio
SH 97Approved$4,060,7791REHABILITATE EXISTING ROADWAY
0145-01-032Bailey/
Lubbock
US 70Approved$203,3718SAFETY
0124-05-029Baylor/
Wichita Falls
US 183Approved$5,712,2641ADD SHOULDERS
0231-03-146Bell/
Waco
US 190Approved$4,422,9241ROADWAY RECONFIGURATION TO IMPROVE TURNING MOVEMENTS
2452-03-112Bexar/
San Antonio
SL 1604Approved$47,312,6151EXPAND FROM 4 LANE DIVIDED TO 4 LANE EXPRESSWAY
2255-01-085Bexar/
San Antonio
SL 1604Approved$0ROWUTILITY ONLY
2452-02-118Bexar/
San Antonio
SL 1604Approved$807,6492MINTERSECTION OPERATIONAL IMPROVEMENTS- EB TO WB TURNAROUND
2452-02-119Bexar/
San Antonio
SL 1604Approved$7,218,6672MINTERSECTION OPERATIONAL IMPROVEMENTS- CONSTRUCT 4
2452-03-118Bexar/
San Antonio
SL 1604Approved$13,687,5511RECONFIGURE RAMPS, CONSTRUCT TURNAROUNDS AT BULVERDE
0073-08-193Bexar/
San Antonio
IH 37Approved$99,55410LANDSCAPE PLANTING AND IRRIGATION
0017-10-275Bexar/
San Antonio
IH 35Approved$9,183,7781SPOT BASE REPAIR, MILL, OVERLAY AND PAVEMENT MARKINGS
1479-01-024Bexar/
San Antonio
SL 1604Approved$30,562,9482MEXPAND FROM 2 LANES TO 4 LANE DIVIDED
0111-09-043Brazoria/
Houston
BS 288BApproved$195,05710LANDSCAPE DEVELOPMENT
2938-02-022Brazoria/
Houston
FM 2917Approved$3,438,9781PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY
0480-01-039Brown/
Brownwood
SH 279Approved$1,134,5458IMPROVE GUARDRAIL TO DESIGN STANDARDS,INCREASE SUPERELEVATI
0186-04-032Burleson/
Bryan
SH 36Approved$101,80810GOVERNORS COMMUNITY ACHIEVEMENT AWARD PROJECT TO IMPROVE
1198-01-022Burnet/
Austin
RM 963Approved$7,838,9691PROVIDE ADDITIONAL PAVED SURFACE
0535-03-025Caldwell/
Austin
IH 10Approved$3,563,9171BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ON
0006-07-079Callahan/
Abilene
IH 20Approved$7,402,1951MILL AND OVERLAY
0220-03-031Cameron/
Pharr
US 281Approved$12,330,2051REHAB EXISTING ROADWAY
0945-03-009Cass/
Atlanta
FM 3129Approved$11,184,8781IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXED
0762-03-018Chambers/
Beaumont
FM 1409Approved$20,132,6023CONSTRUCT A 2 LANE HIGHWAY ON A NEW LOCATION
0206-03-061Cherokee/
Tyler
US 79Approved$8,258,5571WIDEN ROADWAY FOR PASSING LANES-SUPER2
0925-08-019Childress/
Childress
CRApproved$1,530,1296REPLACEMENT OF EXISTING BRIDGE FACILITY
2679-02-008Collin/
Dallas
FM 2514Approved$17,190,3493RECONSTRUCT 2 LANE RURAL TO 4 LANE (ULTIMATE 6 LANE) URBAN
0716-02-042Colorado/
Yoakum
FM 109Approved$3,553,8151ADD SHOULDERS
0907-15-005Concho/
San Angelo
CSApproved$896,1553SIDEWALKS, LIGHTING, AND BENCHES
0092-14-093Dallas/
Dallas
IH 345Approved$950,7401BRIDGE DECK REPAIR AND ABUTMENT & BENT WORK
1068-04-174Dallas/
Dallas
IH 30Approved$1,710,1621MILL AND PLACE PERMEABLE FRICTION COURSE
2964-01-048Dallas/
Dallas
SH 161Approved$20,388,1711WIDEN AND RECONSTRUCT 4 (6 LANES DURING PEAK TRAVEL) TO 8
1068-04-119Dallas/
Dallas
IH 30Approved$40,967,49111CONSTRUCT 0 TO 4 LANE FRONTAGE ROADS
0197-02-121Dallas/
Dallas
US 175Approved$4,473,9131SLOPE FAILURE REPAIRS
0197-02-125Dallas/
Dallas
US 175Approved$5,441,2741MILL, FULL DEPTH PVMT. REPAIR, ACP OVERLAY AND PAVEMENT
0081-03-061Denton/
Dallas
US 377Approved$1,264,1711INSTALLATION OF TRAFFIC SIGNALS
0042-07-067Donley/
Childress
US 287Approved$7,344,3501REHABILITATION OF EXISTING ROAD
0004-07-129Ector/
Odessa
IH 20Approved$1,969,8156BRIDGE REPAIR
0924-00-099El Paso/
El Paso
VAApproved$2,097,7831FY 2018 BRIDGE MAINTENANCE
0924-06-498El Paso/
El Paso
CSApproved$5,200,0003STREET MEDIAN/PARKWAY LANDSCAPING
0092-03-050Ellis/
Dallas
IH 45Approved$3,019,4331SLOPE FAILURE REPAIR
1317-01-015Ellis/
Dallas
FM 1183Approved$10,922,7831RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
0918-22-157Ellis/
Dallas
VAApproved$4,752,3601REPLACE TURNDOWNS AND GUARDRAILS
0535-06-044Fayette/
Yoakum
IH 10Approved$11,621,5891PAVEMENT REPAIR AND SURFACING
0296-02-033Fisher/
Abilene
US 180Approved$1,989,1146BRIDGE REPLACEMENT
0192-01-093Fort Bend/
Houston
SH 6Approved$7,100,0603WIDEN FROM 6 TO 8 LANES
0675-01-072Freestone/
Bryan
IH 45Approved$2,179,1206INSTALLATION OF CRASH WALLS
0500-04-106Galveston/
Houston
IH 45Approved$163,165,0382MRECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE
0153-02-043Gonzales/
Yoakum
US 183Approved$2,348,9026MISC BRIDGE REPAIR
0901-19-181Grayson/
Paris
CRApproved$1,224,7656BRIDGE REPLACEMENT
0545-04-051Gregg/
Tyler
SH 42Approved$514,4816CLEAN & PAINT STEEL GIRDERS, CONCRETE & STEEL PILE REPAIR
0535-02-046Guadalupe/
San Antonio
IH 10Approved$18,118,7571BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ON
0920-03-034Hardin/
Beaumont
CRApproved$718,1366REPLACE BRIDGE
0912-72-416Harris/
Houston
VAApproved$6,653,7503CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &
0912-70-086Harris/
Houston
CRApproved$232,7818IMPROVE TRAFFIC SIGNAL AT INTERSECTION
0271-07-318Harris/
Houston
IH 10Approved$536,49310LANDSCAPE DEVELOPMENT
0912-72-372Harris/
Houston
VAApproved$5,253,7503CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &
0271-16-145Harris/
Houston
IH 610Approved$552,4506CONCRETE DECK REPAIR, CONCRETE STRUCTURE REPAIR ON RAIL,
0912-72-365Harris/
Houston
VAApproved$4,031,0003IMPLEMTATION OF AUTOMATED PARKING GUIDANCE SYSTEM, INCLUDING
0502-01-214Harris/
Houston
SH 225Approved$3,679,0071UPGRADE ILLUMINATION
3050-03-021Harris/
Houston
FM 2978Approved$6,911,6302MREPLACE BRIDGE AND APPROACHES
0912-72-420Harris/
Houston
VAApproved$910,6206RECONSTRUCT APPROACH SLAB, RECONSTRUCT ABUTMENT BACKWALL
0912-72-417Harris/
Houston
VAApproved$5,252,5003CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &
0720-03-133Harris/
Houston
SH 249Approved$450,4951RESTRIPE TO 8 MAIN LANES AND RE-ALIGN CTB
0096-07-045Harrison/
Atlanta
US 80Approved$872,7951IMPROVE TRAFFIC SIGNAL AND ADD LEFT TURN LANE
2094-01-038Hidalgo/
Pharr
FM 2220Approved$12,595,6791WIDEN TO 6 LANE
0039-02-066Hidalgo/
Pharr
US 83Approved$8,119,9641OVERLAY
0227-06-026Hockley/
Lubbock
US 385Approved$23,854,11611REHABILITATION OF EXISTING ROADWAY
0117-06-045Houston/
Lufkin
SH 21Approved$13,912,2451RECONSTRUCT PAVEMENT AND ADD PASSING LANES
3034-01-005Houston/
Lufkin
FM 2967Approved$1,786,9171RECONSTRUCT AND WIDEN PAVEMENT
0911-28-041Houston/
Lufkin
CRApproved$637,1276REPLACE BRIDGE AND APPROACHES
0932-01-090Jefferson/
Beaumont
FM 365Approved$11,009,9306REPLACE BRIDGE AND APPROACHES
0200-14-085Jefferson/
Beaumont
US 69Approved$7,083,4616REPAINT STEEL MEMBERS, REPLACE BACK WALLS AND APPROACH SLABS
0254-03-079Jim Wells/
Corpus Christi
US 281Approved$9,555,9081BASE REPAIR AND OVERLAY (SB LANES)
0100-05-184Karnes/
Corpus Christi
US 181Approved$5,646,2951RECONSTRUCT INTERSECTION
0270-04-006Karnes/
Corpus Christi
BS 72-BApproved$1,875,6061REHAB ROADWAY
0095-03-093Kaufman/
Dallas
US 80Approved$9,293,4581MILL AND OVERLAY EXISTING ROADWAY
0141-09-070Kimble/
San Angelo
IH 10Approved$8,419,4501ACP OVERLAY
0102-04-103Kleberg/
Corpus Christi
US 77Approved$810,4301SAFETY LIGHTING
0515-06-024Lavaca/
Yoakum
FM 957Approved$1,628,8718UPGRADE BRDG GUARDRAIL AND PROVIDE ADDITIONAL PAVED SURFACE
0913-29-037Lavaca/
Yoakum
CRApproved$1,440,1586REPLACE BRIDGE AND APPROACHES
0028-03-105Liberty/
Beaumont
US 90Approved$862,4998IMPROVE TRAFFIC SIGNALS
0909-40-074Limestone/
Waco
CRApproved$1,132,2336REHABILITATE BRIDGE AND APPROACHES
0475-03-064Madison/
Bryan
OSRApproved$21,338,5341REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING,
1717-02-023Midland/
Odessa
FM 1787Approved$8,051,2851ROADWAY RESTORATION
0013-01-010Montague/
Wichita Falls
US 81Approved$1,943,2088MILLED EDGELINE RUMBLE STRIPS
0912-37-228Montgomery/
Houston
CRApproved$1,165,8986REPLACE BRIDGE AND APPROACHES (NBI #12170AA0495001)
1259-01-042Montgomery/
Houston
FM 1097Approved$14,690,6442MWIDEN FROM 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE
0704-05-022Motley/
Childress
FM 94Approved$6,496,0161WIDENING OF NON-FREEWAY FACILITY
0918-18-135Navarro/
Dallas
VAApproved$4,564,3941REPLACE TURNDOWNS AND GUARDRAILS
0092-13-023Navarro/
Dallas
BI 45-FApproved$10,015,1751MINOR DRAINAGE PAVEMENT OVERLAY
0394-03-040Panola/
Atlanta
FM 699Approved$1,232,9171RECONSTRUCT INTERSECTION WITH CONCRETE PAVING
0189-01-011Red River/
Paris
SH 37Approved$3,333,7948SAFETY TREAT FIXED OBJECTS, TEXTURIZE SHOULDERS
1423-01-034Refugio/
Corpus Christi
FM 1360Approved$1,348,8941SAFETY TRT FIXED OBJ, WIDEN LANES, WIDEN PAVED SHOULDERS
0169-08-024Roberts/
Amarillo
US 60Approved$13,141,34211THICK OVERLAY AND JCP JOINT REPAIR
0049-08-065Robertson/
Bryan
US 190Approved$8,980,5531CONSTRUCT TURN LANES AND PFC OVERLAY
0395-02-041San Jacinto/
Lufkin
SH 150Approved$14,555,5941RECONSTRUCT PAVEMENT AND ADD PASSING LANES
0424-01-058Smith/
Tyler
SH 31Approved$1,878,6501RESURFACE ROADWAY W/PFC & UPGRADE BRIDGE RAIL & GUARD FENCE
0495-04-065Smith/
Tyler
IH 20Approved$14,463,4791REALIGN & LENGTHEN WB EXIT & EB ENTRANCE RAMPS FOR US 69
1603-03-040Tarrant/
Ft Worth
FM 1709Approved$3,655,1931REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS
0902-90-045Tarrant/
Ft Worth
VAApproved$1,241,2983CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
0902-90-025Tarrant/
Ft Worth
VAApproved$1,558,6743LYNN CREEK LINEAR PARK TRAIL EXTENSION FROM END POINT OF
0094-02-133Tarrant/
Ft Worth
SH 10Approved$400,00010INSTALLATION OF LANDSCAPING AND IRRIGATION WITHIN MEDIANS OF
0014-16-276Tarrant/
Ft Worth
IH 35WApproved$977,4556REPLACE BRIDGE & APPROACH RAILING/ADD SAFETY END
0908-00-087Taylor/
Abilene
VAApproved$1,065,69811SPOT PAVEMENT REPAIR
0360-05-029Throckmorton/
Wichita Falls
US 380Approved$3,013,3361FULL DEPTH REPAIR AND OVERLAY
0264-07-032Tom Green/
San Angelo
SL 306Approved$4,253,1821ACP OVERLAY
0440-06-018Travis/
Austin
SH 130Approved$68,200,7773ADD ONE LANE IN EACH DIRECTION
0914-00-410Travis/
Austin
VAApproved$2,324,7011INSTALL OR REBUILD TRAFFIC SIGNALS
0700-03-142Travis/
Austin
SH 71Approved$4,092,0611TOM AND PFC-F OVERLAY
0022-06-051Val Verde/
Laredo
US 90Approved$468,7611REHABILITATION OF EXISTING ROADWAY
0910-12-131Van Zandt/
Tyler
CSApproved$271,2123CONSTRUCT SIDEWALKS CONNECTING PUBLIC HOUSING TO EDGEWOOD
0917-19-050Washington/
Bryan
CSApproved$365,6496REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES,
0086-01-091Webb/
Laredo
SH 359Approved$28,648,5381PROFILE EDGELINE MARKINGS, PROFILE CENTERLINE MARKINGS
0922-33-170Webb/
Laredo
CSApproved$1,056,2503ZACATE CREEK MULTI-USE ALTERNATIVE TRANSPORTATION TRAIL
0043-09-135Wichita/
Wichita Falls
IH 44Approved$8,930,3591MILL & OVERLAY
0802-02-053Wichita/
Wichita Falls
FM 369Approved$5,502,1621ENCLOSE DRAINAGE DITCH
0015-08-153Williamson/
Austin
IH 35Approved$1,825,12710LANDSCAPING AND IRRIGATION
1202-01-020Williamson/
Austin
FM 972Approved$10,460,5041REHAB, ADD SHOULDER & SAFETY TREAT
0151-03-041Williamson/
Austin
SH 29Approved$1,469,4453INTERSECTION IMPROVEMENTS TO ADD TURN LANES AND IMPROVE
0204-01-069Williamson/
Austin
US 79Approved$2,752,8343INTERSECTION IMPROVEMENTS AT E PALM VALLEY BLVD AND HARRELL
0292-02-040Winkler/
Odessa
SH 18Approved$10,995,86111ROADWAY REHABILITATION
0352-01-061Wise/
Ft Worth
SH 114Approved$4,988,3641MILL, HMAC OVERLAY, PAVEMENT MARKINGS
1179-01-043Wise/
Ft Worth
FM 920Approved$3,315,1751REPAIR BASE FAILURES, HMAC OVERLAY, PAVEMENT MARKINGS
0461-08-023Yoakum/
Lubbock
SH 214Approved$36,716,40111SUPER 2


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract