Letting Schedule for Houston District (FY 2018)

Last Update: Monday, June 18, 2018
Houston District (FY 2018)
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller |

Brazoria County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1524-01-082SH 288ActualJan 2018$14,310,2581REMOVE AND REPLACE CONCRETE PAVEMENT4.0
0912-31-273CRActualOct 2017$7,117,7073WIDEN FROM 2 TO 4-LANES DIVIDED WITH CURB AND GUTTER0.0
1004-01-063FM 524ActualJan 2018$441,9198SAFETY TREAT FIXED OBJECTS0.0
0178-04-005FM 523ActualMar 2018$1,033,1208IMPROVE TRAFFIC SIGNALS0.0
0598-03-059SH 288ActualFeb 2018$1,967,0003CONSTRUCT TRUCK WEIGH FACILITY0.0
0586-01-066SH 332ActualMar 2018$3,248,2121SEAL COAT,LEVEL-UP,WITH LOOP DETECTORS AND 1.5" ACP OVERLAY0.0
0912-31-292VAApprovedJul 2018$1,624,7553CONSTRUCT SHADOW CREEK BIKE AND PEDESTRIAN TRAIL0.0
0912-31-311CRApprovedJul 2018$33,184,0003RECONSTRUCT & WIDEN FROM 2 TO 4 LANES, ADD MEDIAN &0.0
0192-03-017SH 6ActualFeb 2018$1,872,0061PAVEMENT REPAIR AND ASPHALTIC CONCRETE PAVEMENT OVERLAY0.0
0178-02-089SH 35ApprovedJul 2018$3,335,3461DIAMOND GRINDING MAINLANES AND 1.5" ACP OVERLAY ON SHOULDERS0.0
0111-09-043BS 288BActualJun 2018$195,05710LANDSCAPE DEVELOPMENT0.0
2524-02-022FM 2611ApprovedAug 2018$9,621,2166REPLACE BRIDGE AND APPROACHES (NBI# 12020252402001)4.5
2938-02-022FM 2917ActualJun 2018$3,438,9781PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY0.0

Fort Bend County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1414-05-014FM 1462ActualOct 2017$967,4511BASE REPAIR AND 1.5" ACP OVERLAY0.0
0111-03-031FM 521ActualOct 2017$36,714,1832MWIDEN TO 4-LANE DIVIDED SECTION6.0
1258-02-037FM 1093ActualFeb 2018$954,2901BASE REPAIR AND 1.5" ACP OVERLAY0.0
1257-01-049FM 1092ActualMay 2018$2,554,1827CONSTRUCT DEDICATED TURN LANES, UPGRADE TRAFFIC SIGNALS AND5.5
0543-02-063FM 359ActualOct 2017$17,156,1473CONSTRUCT TWO 2-LANE FRONTAGE ROADS0.0
0089-18-003SL 540ApprovedJul 2018$1,743,0831CONSTRUCTUION OF MICELLANEOUS WORK CONSISTING OF BASE REPAIR0.0
0543-03-067FM 762ActualJan 2018$36,101,6751WIDEN TO 4 LANES DIVIDED8.5
0027-06-051US 90AApprovedJul 2018$15,843,9921ADD 10-FOOT SHOULDERS, OVERLAY AND REPLACE BRIDGE CULVERTS3.0
0192-01-093SH 6ActualJun 2018$7,095,4203WIDEN FROM 6 TO 8 LANES6.0
0543-02-065FM 359ApprovedJul 2018$18,616,7722MWIDEN TO 4 LANES ARTERIAL, NON TOLL0.0
0912-34-198CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 743731H)0.0
0912-34-194VATentativeAug 2018$3,500,0005REIMBURSEMENT FOR FORT BEND COUNTY TRANSNIT ADMINISTRATION0.0

Galveston County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0389-06-107SH 146ActualDec 2017$221,1531RAISE APPROACH AT BRIDGE0.0
0367-02-075SH 87ActualMay 2018$18,290,22511REHABILITATE AND RAISE ROADWAY2.5
0912-73-208VATentativeAug 2018$2,454,0003CONSTRUCT PARK AND RIDE WITH 400 AUTO AND 40 BUS PARKING0.0
0912-73-204CRApprovedAug 2018$3,626,8606REHABILITATE BRIDGE (NBI# 12085B00790001)0.0
0912-73-195CRApprovedAug 2018$1,560,0006REPLACE BRIDGE AND APPROACHES (NBI# 12085C00138048)0.0
0500-04-106IH 45ActualJun 2018$189,474,6522MRECONSTRUCT PAVEMENT TO 8 MAIN LANES AND 2 2-LANE FRONTAGE8.0
0500-01-145IH 45ActualMar 2018$1,613,5661BASE REPAIR, MILLING, SEAL COAT, 1 IN TOM C AND 3/4 IN TOM F0.0
0978-02-078FM 3436ActualMar 2018$658,3131REPLACE MBGF, 1 IN LEVEL UP AND 1 IN TOM0.0

Harris County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0912-72-481CSActualApr 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-00-553VAActualOct 2017$2,400,0003METRO STAR VANPOOL PROGRAM (FY 2017)0.0
0912-00-527VAActualOct 2017$400,0001FREEWAY FLOW SIGNAL CONTROLLER UPGRADE0.0
0912-72-482CSActualApr 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0500-03-620IH 45ActualApr 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0271-17-173IH 610ActualApr 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-413VAActualApr 2018$1,989,7601CONSTRUCT 10' SHARED USE PATH5.5
0508-01-356IH 10ActualApr 2018$3,605,2755INSTALL ITS EQUIPMENT & INFRASTRUCTURE - 144-STRAND FIBER0.0
0912-72-486CSActualApr 2018$24,96310REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-485CSActualApr 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0508-01-360IH 10ActualSep 2017$595,04910LANDSCAPING ENHANCEMENT0.0
0912-72-487CSActualApr 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-72-483CSActualApr 2018$21,03610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-00-522VAActualOct 2017$2,035,4111TRAFFIC SIGNAL UPGRADES (SITE SPECIFFIC)0.0
0027-10-071US 90AActualOct 2017$3,457,3586REPLACE BRIDGE AND APPROACHES (NBI# 12102002710037)5.0
0912-72-484CSActualApr 2018$18,53610REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND0.0
0912-00-571VAActualOct 2017$100,00010SHRP2 RELIABILITY AND DATA ANALYSIS TOOLS IMPLEMENTATION0.0
0912-00-523VAActualDec 2017$1,543,4461INSTALL TRAFFIC SIGNALS (SITE SPECIFIC)0.0
0912-00-464VAActualJan 2018$2,500,0003COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND0.0
3256-01-109SL 8ActualNov 2017$597,08011CONSTRUCT 6 TO 8 FT SIDEWALK4.0
0271-17-163IH 610ActualDec 2017$55,609,7282MDEDICATED BUS LANE7.5
0178-01-036SH 35ActualMar 2018$1,742,0281CONCRETE REPAIR, PLANING, SEAL COAT, 1" TOM & PAV MARKINGS0.0
1062-02-026FM 2100ActualFeb 2018$260,2511PROP LEFT & RIGHT TURN LANES,SHOULDER WIDENING,MILLING,0.0
1685-05-108SH 6ActualJan 2018$1,840,9588INSTALL SAFETY LIGHTING3.5
0976-01-039FM 865ActualFeb 2018$3,521,4691BASE REPAIR, MILLING, SEAL COAT, TOM OVERLAY, STRIPING, CURB0.0
0912-72-419CRActualOct 2017$18,55710EROSION REPAIR0.0
0912-00-524VAActualMar 2018$1,500,0001UPGRADE DMS BOARDS (NON LETTING)0.0
0177-06-086IH 69ActualApr 2018$8,052,62410SHORE UP BENTS, REPAIR ACP PAV FAILURES AND REESTABLISH0.0
0028-02-092US 90ActualApr 2018$1,932,5415INSTALL ITS EQUIPMENT & INFRSTRUCTURE (FIBER TRUNK LINE, CLO0.0
0912-71-386MHActualNov 2017$20,207,01411CONSTRUCT 4-LN DIVIDED (RAISED MEDIAN) URBAN STREET FACILITY8.0
0912-71-799CSActualNov 2017$2,846,48811SHARED USE PATH AND BRIDGE RESTORATION3.5
0912-00-551VAActualNov 2017$3,875,0003CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLE0.0
0912-00-521VAActualMar 2018$4,000,0001ITS SUPPORT (TRANSTAR) (NON-LET)0.0
0389-05-116SH 146ActualMay 2018$192,651,7362MWIDEN TO 6-LANES WITH 4-LANE EXPRESS LANES7.0
0271-16-144IH 610ApprovedAug 2018$500,51710LANDSCAPE DEVELOPMENT0.0
0912-70-125CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755624C)0.0
0912-70-126CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758192R)0.0
0912-70-122CSTentativeAug 2018$583,5908FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 518E)0.0
0912-70-123CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 089370C)0.0
0912-70-124CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755622N)0.0
0271-14-236IH 610ApprovedAug 2018$576,47810LANDSCAPE DEVELOPMENT0.0
0271-06-120IH 10ApprovedAug 2018$2,126,8501EROSION REPAIR AND CHANNEL PROTECTION0.0
0177-11-154IH 69ApprovedAug 2018$2,441,4878HIGH FRICTION SURFACE TREATMENT ON CURVE0.0
0912-72-370CSTentativeAug 2018$3,523,0003RECONSTRUCT & WIDEN SIDEWALKS AND ADA RAMPS AND INSTALLATION0.0
0912-72-531CRTentativeAug 2018$55,8013EROSION REPAIR (NBI #121020AA2430001 & 121020AA2430002)0.0
0271-16-140IH 610ApprovedAug 2018$115,527,5421RECONSTRUCT MAINLANES, FRONTAGE ROAD AND CONSTRUCT OVERPASS0.0
0912-00-546VATentativeAug 2018$3,750,0003METRO STAR VANPOOL PROGRAM (FY 2017)0.0
0912-00-547VATentativeAug 2018$2,400,0003METRO STAR VANPOOL PROGRAM (FY 2018)0.0
0720-03-143SH 249ApprovedAug 2018$4,030,0818INTERCONNECT SIGNALS0.0
0912-00-539VATentativeAug 2018$8,000,0007REGIONAL FREEWAY INCIDENT MANAGEMENT-TOWINIG (FY2017/2018)0.0
0912-00-500VATentativeAug 2018$1,380,0005COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. FUNDING INCLUDING0.0
0912-00-541VATentativeAug 2018$2,000,0007REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES0.0
0912-00-581VATentativeAug 2018$17,878,12410HOUSTON CONNECTSMART0.0
0912-00-584VATentativeAug 2018$1,742,0003CONDUCT PUBLIC OUTREACH FOR TRANSPORTATION SAFETY IN THE0.0
0912-70-120CSTentativeAug 2018$622,8028FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 517X)0.0
0912-00-548VATentativeAug 2018$3,750,0003METRO STAR VANPOOL PROGRAM (FY 2018)0.0
0912-00-549VATentativeAug 2018$4,438,0003TRAVEL DEMAND MANAGEMENT, MARKETING, OUTREACH AND PUBLIC0.0
0912-00-552VATentativeAug 2018$15,000,0003CLEAN CITIES/CLEAN VEHICLES PROGRAM (ENGINE/VEHICLE0.0
0110-05-128IH 45ApprovedAug 2018$304,7596REPLACE/RESET BEARING PADS0.0
0502-01-214SH 225ActualJun 2018$3,679,0071UPGRADE ILLUMINATION0.0
0271-16-145IH 610ActualJun 2018$552,4506CONCRETE DECK REPAIR, CONCRETE STRUCTURE REPAIR ON RAIL,0.0
0271-07-318IH 10ActualJun 2018$536,49310LANDSCAPE DEVELOPMENT0.0
0912-72-372VAApprovedJun 2018$5,253,7503CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &0.0
0912-72-365VAApprovedJun 2018$4,031,0003IMPLEMTATION OF AUTOMATED PARKING GUIDANCE SYSTEM, INCLUDING0.0
0912-70-086CRActualJun 2018$232,7818IMPROVE TRAFFIC SIGNAL AT INTERSECTION0.0
0912-72-366CRActualMay 2018$5,097,0003CONSTRUCT GEOMETRIC IMPROVEMENTS AND ITS/TRAFFIC SIGNAL0.0
0912-72-333CSActualMay 2018$948,2186REPLACE BRIDGE AND APPROACHES (NBI #12102B36609271)4.5
0500-03-583IH 45ActualMay 2018$2,091,8661RESTORATION OF FRONTAGE ROADS0.0
3510-06-015SH 99ActualMay 2018$2,359,2601CONSTRUCT SOUNDWALL0.0
3256-01-111SL 8ActualMay 2018$473,75010LANDSCAPE DEVELOPMENT0.0
1005-02-001FM 525ActualMay 2018$1,905,0261REMOVE BOTTLENECK BY WIDENING FROM 2 TO 4 LANES DIVIDED4.0
0912-00-531VAApprovedJul 2018$2,024,3801INSTALL NEW TRAFFIC SIGNALS0.0
0720-03-133SH 249ApprovedJul 2018$450,4951RESTRIPE TO 8 MAIN LANES AND RE-ALIGN CTB0.0
0500-03-588IH 45ApprovedJul 2018$5,245,7201RECONSTRUCT FRONTAGE ROADS (IH 45 NB TO EB IH 610; DETROIT1.5
0050-06-090US 290ApprovedAug 2018$1,171,00210LANDSCAPE DEVELOPMENT0.0
1685-05-118SH 6ApprovedJul 2018$2,743,36610CURB RAMPS, SIDEWALK, AND MISC PEDESTRIAN ELEMENTS ALONG6.5
0912-72-075CSApprovedJul 2018$21,680,3203RECONSTRUCT CLINTON DRIVE7.5
0912-72-420VAActualJun 2018$910,6206RECONSTRUCT APPROACH SLAB, RECONSTRUCT ABUTMENT BACKWALL0.0
0912-72-417VAApprovedJun 2018$5,252,5003CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &0.0
0912-72-416VAApprovedJun 2018$6,653,7503CONSTRUCT GEOMETRIC IMPROVEMENTS AND TRAFFIC SIGNAL &0.0
0114-12-011US 290ApprovedJul 2018$2,267,39210LANDSCAPE DEVELOPMENT0.0
3050-03-021FM 2978ActualJun 2018$7,143,7642MREPLACE BRIDGE AND APPROACHES3.5
0976-01-042FM 865ActualJun 2018$250,0008INSTALL GRADE CROSSING WARNING DEVICES0.0

Montgomery County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0912-37-234CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755879Y)0.0
0523-08-014FM 1488ApprovedAug 2018$3,901,2451BASE REPAIR, OCST, 2IN HMA LEVEL-UP, 2IN HMA OVERLAY0.0
3158-01-032FM 3083ApprovedAug 2018$8,511,3472MWIDEN TO 4-LANE DIVIDED URBAN0.0
0912-37-235CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755892M)0.0
0177-14-010SL 494ApprovedAug 2018$15,219,8192MRECONSTRUCT AND WIDEN TO 4 LANE DIVIDED URBAN SECTION0.0
0912-37-236CRTentativeAug 2018$250,0008FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755882G)0.0
1400-04-037FM 1774ActualApr 2018$19,008,4602MWIDEN TO 4-LANE DIVIDED RURAL5.5
0720-02-086SH 249ActualNov 2017$238,2651INSTALL PAVEMENT MARKINGS0.0
1259-01-042FM 1097ActualJun 2018$14,992,9792MWIDEN FROM 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE6.0
3538-01-045SH 242ActualApr 2018$24,580,7752MCONSTRUCT GRADE SEPARATION6.5
0912-37-228CRActualJun 2018$1,165,8986REPLACE BRIDGE AND APPROACHES (NBI #12170AA0495001)4.5
0110-04-199IH 45ApprovedAug 2018$1,391,2686REPLACE/RESET BEARING PADS, REPLACE BRIDGE DECK0.0
0912-37-229CRActualOct 2017$1,534,5746REPLACE BRIDGE AND APPROACHES (NBI #12170AA0435002)5.0
1986-01-063FM 1314ApprovedJul 2018$2,193,8401BASE REPAIR, OCST, 2IN HMA LEVEL-UP, 2IN HMA OVERLAY0.0
3635-01-001SH 249ActualNov 2017$299,257,1803CONSTRUCT 4 LANE TOLLWAY IN SECTIONS0.0
2744-01-011FM 2854ActualMar 2018$22,853,7551RECONSTRUCT TO 4 LANE DIVIDED CURB AND GUTTER6.5

Waller County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0523-01-030FM 1098ActualJan 2018$570,0043TRANSPORTATION & ACCESS MANAGEMENT0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract