Letting Schedule for Atlanta District (FY 2018)

Last Update: Monday, April 23, 2018
Atlanta District (FY 2018)
Bowie | Camp | Cass | Harrison | Morris | Panola | Titus | Upshur |

Bowie County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0010-19-012FM 991ActualMar 2018$1,975,6198SAFETY TREAT FIXED OBJECTS
0010-11-070US 67ActualOct 2017$3,572,0001SEAL COAT AND PAVEMENT MARKINGS
0218-01-095US 59ActualDec 2017$185,7408INSTALL ADVANCE INTERSECTION WARNING SIGNALS AND SIGNS,
0217-02-035US 71ActualNov 2017$397,2093IMPROVE TRAFFIC SIGNAL, INSTALL ADVANCE WARNING SIGNS,
0010-13-094US 67ActualMar 2018$1,101,2518INSTALL CONTINUOUS TURN LANE, MILLED EDGELINE RUMBLE STRIPS
0919-19-081CSTentativeAug 2018$250,0008RAILROAD CROSSING UPGRADES
0010-19-010FM 991ActualSep 2017$2,935,6688PROFILE CENTERLINE & EDGELINE MARKINGS
1231-01-071FM 989TentativeAug 2018$250,0008RAILROAD CROSSING UPGRADES

Camp County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0919-21-029CSActualOct 2017$332,9063CONSTRUCT SIDEWALKS TO CONNECT DOWNTOWN TO SCHOOL, PARK &

Cass County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0945-03-009FM 3129ApprovedJun 2018$9,415,9008IMPROVE GUARDRAIL TO DESIGN STANDARDS & SAFETY TREAT FIXED
0277-03-027SH 77ActualMar 2018$3,702,6778TEXTURIZE SHOULDERS & CL TEXTURING
0919-00-078VAApprovedJul 2018$690,00012018 DISTRICT SEAL COAT PAVEMENT MARKINGS
0946-01-044FM 250TentativeAug 2018$250,0008RAILROAD CROSSING UPGRADES

Harrison County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0096-07-045US 80ApprovedJun 2018$872,7958IMPROVE TRAFFIC SIGNAL AND ADD LEFT TURN LANE
0063-01-095US 59ActualJan 2018$2,928,5201RESURFACE EXISTING 4-LANE HIGHWAY
0096-07-049US 80ActualOct 2017$931,2008IMPROVE GUARDRAIL TO DESIGN STANDARDS
0919-03-053VAActualJan 2018$1,461,07410REHABILITATE ROADS,PARKING LOTS & CAMPSITES PULLOUTS IN
0919-03-061CRTentativeAug 2018$250,0008RAILROAD CROSSING UPGRADES
0495-08-110IH 20ApprovedMay 2018$1,969,2246BRIDGE PREVENTATIVE MAINTENANCE
0096-07-047US 80ActualSep 2017$471,1351INSTALL TRAFFIC SIGNAL
0843-06-021FM 450TentativeAug 2018$810,7198RAILROAD CROSSING UPGRADES

Morris County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0392-01-073US 259ApprovedJul 2018$5,800,0001RESURFACE EXISTING 4-LANE ROADWAY

Panola County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0063-10-013US 59ActualDec 2017$263,5868SAFETY LIGHTING AT INTERSECTION
0394-03-040FM 699ApprovedJun 2018$1,232,9171RECONSTRUCT INTERSECTION WITH CONCRETE PAVING
0207-04-036SH 43ActualJan 2018$2,624,8871RESURFACE EXISTING 2-LANE HIGHWAY
0393-03-034SH 149ActualDec 2017$4,561,9941REHABILITATE EXISTING 2-LANE HIGHWAY
0063-10-017US 59ActualApr 2018$5,079,22911RESURFACE EXISTING 4-LANE HIGHWAY

Titus County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
3404-01-016FM 3417ActualApr 2018$3,929,9611PROVIDE ADDITIONAL PAVED SURFACE WIDTH, MILLED EDGELINE
0010-06-043US 67ActualApr 2018$1,396,9268PROFILE CENTERLINE MARKINGS
0610-03-085IH 30ActualJan 2018$64,8906BRIDGE PREVENTATIVE MAINTENANCE
0221-05-090US 271ActualMar 2018$2,629,2241RESURFACE EXISTING 2-LANE HIGHWAY

Upshur County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
Description
0248-05-064US 271ApprovedMay 2018$5,482,1941RESURFACE EXISTING 4-LANE HIGHWAY


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract