Letting Schedule for Austin District (FY 2018)

Last Update: Monday, June 18, 2018
Austin District (FY 2018)
Bastrop | Burnet | Caldwell | Gillespie | Hays | Lee | Llano | Mason | Travis | Williamson |

Bastrop County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0265-13-022SL 230ActualJan 2018$471,7763ADA SIDEWALKS0.0
0322-01-049SH 95ApprovedAug 2018$1,192,4231MILL, SEAL & TOM OVERLAY0.0
0471-05-047SH 21ApprovedAug 2018$1,851,9088IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0

Burnet County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0252-02-054US 281ApprovedAug 2018$7,322,0801ADD CENTER LEFT TURN LANE AND SHOULDERS0.0
3005-02-006RM 690ApprovedJul 2018$2,312,0261PROVIDE ADDITIONAL PAVED SURFACE4.5
1198-01-022RM 963ActualJun 2018$7,455,6751PROVIDE ADDITIONAL PAVED SURFACE0.0
0533-01-020PR 4ApprovedJul 2018$1,789,6331LEVEL-UP AND SEAL COAT0.0
0150-05-048SH 29ActualDec 2017$5,310,0301EDGE MILL, REPAIR & TOM0.0
1349-03-013RM 1174ApprovedAug 2018$6,192,5101PROVIDE ADDITIONAL PAVED SURFACE0.0
0151-01-051SH 29ActualOct 2017$779,9491CONSTRUCTION OF CONTINUOUS LEFT TURN LANE0.0

Caldwell County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0914-22-070VATentativeAug 2018$225,0007LULING RELIEF ROUTE STUDY0.0
0286-03-017SH 80ApprovedAug 2018$5,805,4541LEVEL-UP, FULL DEPTH REPAIR AND TOM0.0
0153-01-014US 183ApprovedAug 2018$449,5311PAVEMENT REPAIR AND RESURFACING0.0
0153-01-013US 183ActualDec 2017$2,032,8851INTERSECTION IMPROVEMENTS4.0
0535-03-025IH 10ActualJun 2018$3,586,5811BASE REPAIR, SEALCOAT, OVERLAY AND PAVEMENT MARKINGS ON0.0

Gillespie County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0112-03-035US 290ApprovedAug 2018$4,789,9838IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0072-01-053US 87ActualNov 2017$1,115,1881MILL, SEAL & TOM0.0

Hays County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
2293-01-030FM 2439ApprovedAug 2018$474,1541RESURFACE ROADWAY0.0
0016-02-160IH 35ActualJan 2018$3,697,1921RESURFACE MAIN LANES0.0
0471-02-071SH 21ActualNov 2017$922,2501REPAIR LEVEL UP AND SEAL COAT0.0
0016-03-103IH 35ApprovedAug 2018$29,042,1191REPLACE BRIDGE & APPROACHES0.0
0285-03-059RM 12TentativeAug 2018$400,0023ENGINEERING, DESIGN, AND ROW PURCHASE TO ADD TURN LANES AND0.0

Lee County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0914-21-031CRActualJan 2018$368,1096REPLACE BRIDGE & APPROACHES0.0
0334-05-032FM 141ActualMay 2018$1,265,8051LEVEL-UP & SEAL COAT0.0
0114-07-080US 290ActualNov 2017$908,7566REHABILITATE BRIDGE FOR THE BRIDGE MAINTENANCE AND3.0
0211-02-026US 77ActualFeb 2018$6,505,8461LEVEL-UP, FULL DEPTH REPAIR AND TOM0.0
0116-01-039SH 21ApprovedAug 2018$13,483,5241LEVEL-UP, FULL DEPTH REPAIR AND TOM0.0

Llano County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0150-02-039SH 29ActualOct 2017$873,9806BRIDGE REHABILITATION- EROSION REPAIR. REHABILITATE BRIDGE0.0
0396-09-021RM 152ActualSep 2017$978,6043PEDESTRAIN TRAIL- SIDEWALKS3.5
0150-02-040SH 29ActualDec 2017$1,911,1141LEVEL-UP AND SEAL COAT0.0

Mason County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0071-05-031US 87ActualMay 2018$3,081,5541REPAIR, LEVEL-UP & SEAL COAT0.0

Travis County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0914-00-394VATentativeAug 2018$13HERO PROGRAM0.0
1378-01-040RM 1431TentativeAug 2018$856,5501CONSTRUCT LEFT & RIGHT TURN LANES @ BALCONES CANYONLANDS NWR0.0
0914-00-382VAActualJan 2018$773,12710CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS ALONG US 281,0.0
1200-02-032FM 973ActualSep 2017$938,2781INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT1.0
0914-04-305CRActualApr 2018$453,2546REPLACE BRIDGE AND APPROACHES0.0
0914-00-410VAActualJun 2018$2,179,2581INSTALL OR REBUILD TRAFFIC SIGNALS0.0
0914-00-398VAActualMay 2018$1,940,4881FY 2018 SITE SPECIFIC SIGNALS0.0
1200-03-055FM 973ActualMay 2018$420,7633CONSTRUCT RIGHT AND LEFT TURN LANES0.0
0440-06-018SH 130ActualJun 2018$59,530,7473ADD ONE LANE IN EACH DIRECTION0.0
0914-04-301VAActualJun 2018$566,6933CONSTRUCT SIDEWALKS AND TRAFFIC CALMING0.0
0113-13-175SH 71ApprovedAug 2018$4,669,0161MILL & INLAY0.0
0114-02-104US 290ApprovedJul 2018$83,100,0003DEVELOP AND CONSTRUCT TWO TOLLED DIRECT CONNECTORS AT0.0
0265-02-035SH 71ApprovedJul 2018$211,3693EXTEND WESTBOUND LEFT TURN LANE0.0
0683-07-008SH 45ApprovedJul 2018$3,508,09610LANDSCAPING AND IRRIGATION0.0
0914-04-302VAActualNov 2017$3,441,0303INSTALL PEDESTRIAN SAFETY DEVICES CITYWIDE0.0
0440-06-017SH 130ActualDec 2017$40,221,0633ADD ONE LANE IN EACH DIRECTION0.0
0914-04-300VAActualDec 2017$2,066,4373WIDEN TRAIL,INSTALL NEW BRIDGE, IMPROVE CROSSING FOR BIKE0.0
0914-04-229CSApprovedJul 2018$549,9186REPLACE BRIDGE AND APPROACHES0.0
2100-01-054RM 2222ApprovedJul 2018$13,214,1401RECONSTRUCT 4-LANE ROADWAY TO 6-LANE DIVIDED ROADWAY7.0
3417-03-024FM 734ApprovedJul 2018$439,0803ADDING 2ND LEFT TURN LANES TO TWO INTERSECTIONS TO CREATE0.0
0700-03-142SH 71ActualJun 2018$4,146,0791TOM AND PFC OVERLAY0.0
3417-03-023FM 734ActualDec 2017$271,6743CONSTRUCTION OF MEDIAN AND LEFT TURN LANE0.0
3417-01-029FM 734ApprovedAug 2018$2,897,5731PAVEMENT REPAIR, UNDERSEAL & OVERLAY0.0
1186-01-098FM 969ApprovedJul 2018$241,7718SAFETY LIGHTING0.0
0914-04-283VAActualJan 2018$2,168,0463CONSTRUCT SABINE STREET PEDESTRIAN & BICYCLE PROMENADE IN0.0
0914-00-412VATentativeAug 2018$1,000,0001FY 2018 NON-SITE SPECIFIC ITS IMPROVEMENTS_ON SL 1, IH 35 &0.0
0914-00-413VAApprovedAug 2018$563,2421RESTRIPING & REPLACEMENT OF RAISED PAVEMENT MARKINGS ON0.0
0914-00-403VAActualMar 2018$2,625,0007PURCHASE 6 BUSES FOR CARTS0.0
0914-00-393VAActualOct 2017$518,6353INSTALL SIDEWALKS4.5
0914-00-397VAActualMar 2018$1,621,2961FY 2018 NON-SITE SPECIFIC SIGNALS0.0
0114-20-011SL 212ActualFeb 2018$1,493,8121MILL AND INLAY0.0
1186-01-094FM 969ApprovedAug 2018$800,0001PEDESTRIAN FACILITY0.0

Williamson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1202-03-014FM 1063ActualDec 2017$1,291,5538UPGRADE METAL BEAM GUARD FENCE & SAFETY TREAT FIXED OBJECTS6.0
1200-01-027FM 973ActualFeb 2018$1,260,3011ONE COURSE SURFACE TREATMENT0.0
0320-03-099SH 95ActualMay 2018$858,4186REPLACE DECK AND STRUCTURAL REPAIRS0.0
0204-01-070US 79ActualApr 2018$150,9173LENGTHEN LEFT TURN LANE0.0
0914-05-189CRActualJan 2018$1,570,9523CONSTRUCT SIDEWALKS0.0
0320-03-092SH 95ActualMay 2018$404,9156BRIDGE WIDENING & REPLACE APPROACHES0.0
0683-01-095RM 620ActualJan 2018$1,728,1461MILL,SEAL & INLAY0.0
1566-02-019FM 1660ApprovedAug 2018$11,222,5221REHAB RDWY0.0
1378-02-053RM 1431ActualMay 2018$988,63511INSTALLATION OF A SOUND WALL ALONG THE NORTH RIGHT OF WAY0.0
0204-01-069US 79ApprovedJun 2018$2,752,8343INTERSECTION IMPROVEMENTS AT E PALM VALLEY BLVD AND HARRELL0.0
0151-03-041SH 29ApprovedJun 2018$1,983,2753INTERSECTION IMPROVEMENTS TO ADD TURN LANES AND IMPROVE0.0
0015-08-140IH 35ApprovedJul 2018$6,727,9402MBRIDGE REPLACEMENT3.0
1202-01-020FM 972ActualJun 2018$9,621,4911REHAB, ADD SHOULDER & SAFETY TREAT0.0
0683-01-094RM 620ActualOct 2017$566,6361MILL, OVERLAY, RESTRIPE FROM 4 LN DIVIDED TO 6 LN DIVIDED0.0
0015-17-028SS 158ApprovedAug 2018$1,231,8208IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0015-08-153IH 35ActualJun 2018$1,672,18210LANDSCAPING AND IRRIGATION0.0
1566-01-011FM 1660ActualMay 2018$2,446,7551DEPTH REPAIR, UNDERSEAL & THIN OV0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract