Letting Schedule for May, 2015 (FY 2015)

Last Update: Tuesday, September 29, 2015
May, 2015 (FY 2015) (see Links)
SEP 2014 | OCT 2014 | NOV 2014 | DEC 2014 | JAN 2015 | FEB 2015 | MAR 2015 | APR 2015 | MAY 2015 | JUN 2015 | JUL 2015 | AUG 2015
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
2959-01-009 Angelina/
Lufkin
FM 706 Actual $638,069 8 SAFETY TREAT FIXED OBJECTS
0328-03-032 Atascosa/
San Antonio
SH 97 Actual $11,864,972 1 REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND
0328-05-037 Atascosa/
San Antonio
SH 97 Actual $17,494,208 1 REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND
0187-03-064 Austin/
Yoakum
SH 36 Actual $10,535,006 1 CONSTRUCT AUXILLARY LANES
0913-20-085 Austin/
Yoakum
CR Actual $442,957 6 REPLACE BRIDGE AND APPROACHES
0024-07-058 Bexar/
San Antonio
US 90 Actual $22,716,470 1 FRONTAGE ROAD, INTERSECTION & RAMP OPERATIONAL IMPROVEMENTS
0610-07-098 Bowie/
Atlanta
IH 30 Actual $3,821,271 1 REPLACE BRIDGE AND APPROACHES
0506-01-103 Brazos/
Bryan
FM 60 Actual $1,327,052 1 OVERLAY CONSISTING OF AN HMA OVERLAY AND PAVEMENT MARKINGS
0921-06-248 Cameron/
Pharr
CR Actual $1,371,237 6 REPLACE BRIDGE & APPROACHES
0218-03-083 Cass/
Atlanta
US 59 Actual $5,059,589 1 OVERLAY N.B. LANES WITH CONCRETE PAVEMENT
0391-04-024 Clay/
Wichita Falls
SH 148 Actual $2,379,349 11 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0824-03-016 Clay/
Wichita Falls
FM 172 Actual $1,215,643 8 WIDEN PAVEMENT
0549-03-027 Collin/
Dallas
SH 121 Actual $43,893,899 3 WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE DIVIDED ROADWAY
0782-01-033 Cooke/
Wichita Falls
FM 678 Actual $3,375,961 8 WIDEN PAVMENT AND OVERLAY
1609-01-026 Cooke/
Wichita Falls
FM 1630 Actual $1,225,607 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTHS
3308-01-012 Cooke/
Wichita Falls
FM 3092 Actual $1,969,043 1 WIDEN PAVEMENT AND OVERLAY
0055-06-031 Coryell/
Waco
US 84 Actual $5,618,426 1 REHABILITATE ROADWAY AND ADD PASSING LANES
0092-02-123 Dallas/
Dallas
SH 310 Actual $2,145,801 6 PAINTING OF BRIDGE AND CONCRETE STRUCTURE REPAIR
0353-05-082 Dallas/
Dallas
SL 12 Actual $6,736,852 8 INTERSECTION IMPROVEMENTS
0525-01-020 Delta/
Paris
SH 19 Actual $4,018,604 6 REPLACE BRIDGE AND APPROACHES
0081-06-037 Denton/
Dallas
US 377 Actual $950,001 1 TRAFFIC SIGNAL IMPROVEMENTS
2681-01-022 Denton/
Dallas
FM 2499 Actual $448,057 3 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING & IRRIGATION
0143-08-087 Dewitt/
Yoakum
US 87 Actual $930,045 1 UPGRADE TRAFFIC SIGNALS
0155-01-038 Dewitt/
Yoakum
US 183 Actual $4,639,995 1 PAVEMENT REPAIR AND RESURFACING
0007-04-122 Eastland/
Brownwood
IH 20 Actual $3,326,657 1 PLANE, ACP OVERLAY, STRIPING
0001-04-094 El Paso/
El Paso
US 62 Actual $682,967 11 FY 2015 GREEN RIBBON PROGRAM
0092-03-048 Ellis/
Dallas
IH 45 Actual $806,249 1 INSTALL GUIDE SIGNS
1451-01-020 Ellis/
Dallas
FM 55 Actual $2,010,621 6 REPLACE BRIDGES AND APPROACHES
0909-38-072 Falls/
Waco
CR Actual $1,169,676 6 REPLACE BRIDGE AND APPROACHES
0543-02-055 Fort Bend/
Houston
FM 359 Actual $27,124,548 1 RAILROAD GRADE SEPARATION ELEVATED T
0838-03-023 Fort Bend/
Houston
FM 361 Actual $976,506 6 REPLACE BRIDGE AND APPROACHES NBI#12080083803014
2105-01-020 Fort Bend/
Houston
FM 2234 Actual $31,094,830 3 RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 - LANE DIVIDED RURAL
0275-11-077 Gray/
Amarillo
IH 40 Actual $3,565,812 1 OVERLAY WBL
0495-07-072 Gregg/
Tyler
IH 20 Actual $5,584,278 1 OVERLAY WITH PFC WITHIN THE MPO BOUNDARY - SECTIONS
0535-01-072 Guadalupe/
San Antonio
IH 10 Actual $29,174,029 3 CONSTRUCT FRONTAGE ROADS AND OPERATIONAL IMPROVEMENTS
0915-46-040 Guadalupe/
San Antonio
VA Actual $744,487 3 COLLEGE STREET / CEDAR STREET SIDEWALK NETWORK EXPANSION
0050-06-079 Harris/
Houston
US 290 Actual $33,430,701 1 WIDEN TO 6 MAIN LANES WITH AUXILIARY LANES AND MILL ACP AND
0050-06-086 Harris/
Houston
US 290 Actual $36,840,375 2M WIDEN TO 8 MAIN LANES WITH AUXILIARY LANES AND TWO 2 - LANE
0912-72-302 Harris/
Houston
VA Actual $1,755,575 1 CONSTRUCT 10' SHARED USE PATH
3510-05-036 Harris/
Houston
SH 99 Actual $3,107,271 3 CONSTRUCT SB FRONTAGE ROAD AND U - TURNS
0016-02-138 Hays/
Austin
IH 35 Actual $1,477,885 8 IMPROVE GUARDRAIL TO STANDARDS
0030-06-056 Hemphill/
Amarillo
US 60 Actual $19,606,573 1 REHAB
0400-02-048 Hopkins/
Paris
SH 19 Actual $1,267,814 1 OVERLAY
0068-07-050 Howard/
Abilene
US 87 Actual $12,331,797 1 PLANE EXIST TRAVEL LANES, UNDERSEAL, ASPHALT CONCRETE
0548-04-019 Howard/
Abilene
SH 176 Actual $8,697,658 1 PLANE EXISTING TRAVEL LANES, CEMENT TREAT SUBGRADE, BRIDGE
1872-02-017 Howard/
Abilene
FM 846 Actual $9,519,744 1 REHABILITATE AND WIDEN EXISTING ROADWAY, CULVERT EXTENSIONS,
0213-08-089 Jasper/
Beaumont
US 190 Actual $4,313,473 1 ADD PASSING LANES
0307-01-147 Jefferson/
Beaumont
SH 87 Actual $3,454,612 6 REHAB BRIDGE
0920-00-117 Jefferson/
Beaumont
VA Actual $718,878 10 INSTALL LANDSCAPING
2429-01-011 Jim Wells/
Corpus Christi
FM 2508 Actual $3,489,736 8 WIDEN ROADWAY
1690-01-112 Lamar/
Paris
SL 286 Actual $1,981,524 8 OVERLAY EXISTING HIGHWAY
0324-02-022 Lavaca/
Yoakum
SH 95 Actual $2,310,816 1 PAVEMENT REPAIR AND SURFACING
0028-03-100 Liberty/
Beaumont
US 90 Actual $2,871,187 8 SAFETY TREAT FIXED OBJECTS
1808-01-028 Live Oak/
Corpus Christi
FM 534 Actual $2,602,994 8 WIDEN ROADWAY
0577-01-028 Mason/
Austin
RM 386 Actual $1,151,527 8 SAFETY TREAT FIXED OBJECTS
0923-24-013 McCulloch/
Brownwood
CR Actual $844,453 6 REPLACE BRIDGE AND APPROACHES
1102-01-042 McCulloch/
Brownwood
SH 71 Actual $3,342,927 1 WIDEN SUBGRADE, ADD PASSING LANES, STRUCTURES, AND SURFACE
1718-01-034 Midland/
Odessa
SH 349 Actual $521,417 11 INSTALL TRAFFIC SIGNALS
0110-04-193 Montgomery/
Houston
IH 45 Actual $148,510 1 ADJUST SB FEEDER ROAD CONFIGURATION TO RETAIN 3 LANES
0177-05-093 Montgomery/
Houston
IH 69 Actual $7,416,768 3 CONSTRUCT NEW 2 - LANE FRONTAGE ROAD
0122-01-039 Navarro/
Dallas
US 287 Actual $3,949,888 1 WIDEN PAVEMENT FROM 42' TO 57' AND CONSTRUCT LEFT TURN LANE
0305-03-041 Newton/
Beaumont
SH 87 Actual $74,993 8 CENTERLINE TEXTURING AND TEXTURIZE SHOULDERS
1284-01-070 Orange/
Beaumont
FM 1130 Actual $2,917,602 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0063-12-019 Panola/
Atlanta
BU 59-D Actual $1,791,586 1 PLANE AND RESURFACE EXISTING 2 - LANE HIGHWAY
0341-02-046 Polk/
Lufkin
US 287 Actual $1,220,777 1 ADD LT & RT TURN LANES AT PLANT ENTRANCE
0041-07-104 Potter/
Amarillo
US 87 Actual $2,367,195 1 OVERLAY
0203-03-042 Rains/
Paris
US 69 Actual $1,742,912 1 HOT MIX OVERLAY
0441-09-043 Reeves/
Odessa
IH 10 Actual $13,024,032 1 UPGRADE TO STANDARDS FREEWAY
0540-06-015 Robertson/
Bryan
FM 1373 Actual $1,204,459 6 REPLACE BRIDGE AND APPROAHCES
0206-07-057 Rusk/
Tyler
US 79 Actual $5,221,369 1 REHABILITATE OUTSIDE LANES, PLANE & RESURFACE REST OF PVTMT
0809-04-046 San Augustine/
Lufkin
US 96 Actual $3,951,204 6 REPLACE BRIDGE AND APPROACHES
0507-02-053 San Patricio/
Corpus Christi
FM 631 Actual $3,133,384 8 WIDEN ROADWAY
0907-11-005 Sterling/
San Angelo
CR Actual $618,053 6 REPLACE BRIDGE AND APPROACHES
0008-16-036 Tarrant/
Fort Worth
IH 20 Actual $3,864,790 1 ADD 3 LEFT TURN LANES TO BRIDGE OVER IH 20
0902-48-582 Tarrant/
Fort Worth
CS Actual $546,968 3 WESTRIDGE VILLAGE PEDESTRIAN DISTRICT INCLUDING CAMP BOWIE,
0033-06-106 Taylor/
Abilene
US 83 Actual $2,435,990 1 SPOT REPAIR, SEAL & ASPHALT CONCRETE OVERLAY
0159-01-041 Tom Green/
San Angelo
US 277 Actual $1,302,612 1 MICROSURFACING OR THIN OVERLAY MIX
0914-00-343 Travis/
Austin
VA Actual $614,705 1 FY 2015 SITE - SPECIFIC SIGNALS
0914-00-381 Travis/
Austin
VA Actual $994,912 10 CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS ALONG FM 1100, SL
0914-04-292 Travis/
Austin
CS Actual $311,425 3 TREAT CURVE USING HIGH FRICTION SURFACE COURSE
0913-27-064 Victoria/
Yoakum
CR Actual $254,387 6 REPLACE BRIDGE AND APPROACHES
0237-03-032 Webb/
Laredo
SH 44 Actual $12,273,762 1 REHABILITATION OF EXISTING HIGHWAY
2150-04-060 Webb/
Laredo
FM 1472 Actual $137,712 8 INSTALL RAISED MEDIAN
2150-04-061 Webb/
Laredo
FM 1472 Actual $3,645,675 1 CONCRETE PAVEMENT
0913-09-053 Wharton/
Yoakum
CR Actual $629,675 6 REPLACE BRIDGE AND APPROACHES
2632-01-009 Wheeler/
Childress
FM 2697 Actual $3,144,808 1 WIDENING OF A NON - FREEWAY FACILITY
0802-02-052 Wichita/
Wichita Falls
FM 369 Actual $1,792,484 1 ENCLOSE DRAINAGE DITCH
2644-01-010 Wichita/
Wichita Falls
FM 2650 Actual $4,231,187 1 EXTEND CULVERTS AND ADD SHOULDERS
0986-01-042 Williamson/
Austin
FM 619 Actual $1,143,839 6 REPLACE BRIDGE


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract