Letting Schedule for April, 2015 (FY 2015)

Last Update: Tuesday, September 29, 2015
April, 2015 (FY 2015) (see Links)
SEP 2014 | OCT 2014 | NOV 2014 | DEC 2014 | JAN 2015 | FEB 2015 | MAR 2015 | APR 2015 | MAY 2015 | JUN 2015 | JUL 2015 | AUG 2015
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0205-07-075 Anderson/
Tyler
US 79 Actual $2,318,825 1 PLANE, REPAIR & RESURFACE ROADWAY
0548-05-046 Andrews/
Odessa
SH 176 Actual $8,504,245 1 CONSTRUCT PASSING LANES
0156-05-049 Archer/
Wichita Falls
US 277 Actual $14,393,281 1 UPGRADE TO 4 LANE DIVIDED FACILITY
0291-04-024 Bandera/
San Antonio
SH 16 Actual $4,845,061 8 WIDEN NARROW ROADWAY AND ADD SHOULDERS
0914-18-092 Bastrop/
Austin
CR Actual $542,983 6 REPLACE BRIDGE & APPROACHES
0914-18-102 Bastrop/
Austin
VA Actual $1,227,538 10 OVERLAY ROADS, PARKING LOTS AND CAMPSITE PULLOUTS WITHIN
0101-01-066 Bee/
Corpus Christi
US 181 Actual $4,088,364 1 SPOT BASE REPAIR AND OVERLAY - SB LANE ONLY
1063-02-015 Bee/
Corpus Christi
FM 888 Actual $1,649,169 1 REPLACE BRIDGE AND APPROACHES
0849-01-047 Bexar/
San Antonio
FM 471 Actual $1,772,935 ROW INSTALL RAISED MEDIAN
0915-12-536 Bexar/
San Antonio
VA Actual $1,249,995 3 SAN ANTONIO MUNICIPAL BIKE SHARE B - CYCLE URBAN CORE
3228-02-013 Bosque/
Waco
FM 1713 Actual $2,623,030 6 REPAINT BRIDGE
0046-04-060 Bowie/
Atlanta
US 82 Actual $407,780 1 WIDEN TO ADD CENTER TWO WAY LEFT TURN LANE
1003-01-091 Brazoria/
Houston
FM 523 Actual $7,475,839 1 ONE COURSE SURFACE TREATMENT, RICH BOTTOM LAYER AND 1.5 IN
1524-01-078 Brazoria/
Houston
SH 332 Actual $3,739,397 1 PAVEMENT REPAIR, MILLING, BASE REPAIR, 1.5 IN ACP OVERLAY
0054-07-081 Brown/
Brownwood
US 84 Actual $2,342,955 1 PLANE, ACP OVERLAY
0480-01-032 Brown/
Brownwood
SH 279 Actual $1,716,374 8 UPGRADE GUARDRAIL AND SAFETY TREAT STRUCTURES
0914-22-065 Caldwell/
Austin
VA Actual $405,129 10 REPAIR AND RESURFACE ROADWAY
0508-02-118 Chambers/
Beaumont
IH 10 Actual $313,765 6 BRIDGE REPAIR
0054-04-104 Coleman/
Brownwood
US 84 Actual $547,100 8 TEXTURIZE SHOULDERS AND CENTERLINE
0918-24-143 Collin/
Dallas
CS Actual $3,414,288 ROW WIDEN FROM 4 TO 6 LANE DIVIDED WEST OF PARKWOOD BLVD;
0446-02-035 Colorado/
Yoakum
US 90A Actual $3,589,080 1 ACP OVERLAY
0091-06-058 Dallas/
Dallas
SH 289 Actual $2,360,163 1 MILL, CONCRETE FULL DEPTH REPAIR, OVERLAY & PAVEMENT MARKINGS
0095-02-114 Dallas/
Dallas
US 80 Actual $936,970 8 INSTALL PROTECTION
0353-04-098 Dallas/
Dallas
SS 348 Actual $679,177 1 FULL DEPTH REPAIR CONCRETE PAVEMENT
0918-00-249 Dallas/
Dallas
VA Actual $5,280,000 5 PURCHASE OF TRANSIT VEHICLES, BUSES, TO EXPAND SERVICE
0918-47-102 Dallas/
Dallas
CS Actual $128,677 8 INSTALL LED FLASHING CHEVRONS AND HIGH FRICTION SURFACE
2374-01-172 Dallas/
Dallas
IH 635 Actual $3,126,591 5 ITS INSTALLATION
0918-46-269 Denton/
Dallas
PW Actual $1,587,179 10 REHABILITATE PARK ROADS, PARKING LOTS AND CAMPSITE PULLOUTS
0037-05-050 Dimmit/
Laredo
US 83 Actual $5,193,957 1 RESURFACE OF EXISTING HIGHWAY
0714-05-020 Eastland/
Brownwood
FM 2461 Actual $2,442,865 8 REHABILITATION OF EXISTING ROADWAY, GRADING, STRUCTURES,
0004-07-121 Ector/
Odessa
IH 20 Actual $10,110,073 1 EXTEND ON / OFF RAMPS
0005-13-055 Ector/
Odessa
IH 20 Actual $9,922,718 1 EXTEND ON / OFF RAMPS
0924-06-446 El Paso/
El Paso
CS Actual $97,000,000 3 DESIGN / CONSTRUCT / PROCURE ROADWAY / PEDESTRIAN / OTHER ELEMENTS
0918-22-086 Ellis/
Dallas
CR Actual $934,145 6 REPLACE BRIDGE AND APPROACHES
0453-08-017 Floyd/
Lubbock
SH 207 Actual $6,982,819 11 REHABILITATION OF EXISTING ROAD
0057-02-034 Freestone/
Bryan
US 84 Actual $2,499,252 8 SAFETY WORK CONSISTING OF TEXTURIZING SHOULDERS BY PLACING
0500-04-126 Galveston/
Houston
IH 45 Actual $4,689,019 1 TRACKLESS TACK, 1 IN TOM - F & 1 IN ACP OVERLAY
0500-04-127 Galveston/
Houston
IH 45 Actual $4,583,511 1 TRACK FREE TACK COAT - HOT APPLIED, 1 IN CAM AND 1 IN THIN
0500-04-129 Galveston/
Houston
IH 45 Actual $4,920,505 1 TRACK FREE TACK COAT, 1 IN CAM AND 1 IN THIN OVERLAY MIX
0069-02-028 Glasscock/
San Angelo
US 87 Actual $15,257,442 1 ACP OVERLAY
2342-01-011 Goliad/
Corpus Christi
FM 2442 Actual $747,427 8 WIDEN ROADWAY
0643-05-046 Grimes/
Bryan
FM 244 Actual $1,787,891 8 SAFETY WORK CONSISTING OF INCREASING SUPERELEVATION
0917-17-056 Grimes/
Bryan
PW Actual $198,744 10 MISCELLANEOUS WORK CONSISTING OF PLACING NEW BASE MATERIAL
0177-11-150 Harris/
Houston
IH 69 Actual $1,777,777 1 SEAL BRIDGE DECK CRACKING
0502-01-211 Harris/
Houston
SH 225 Actual $684,682 1 PAVEMENT MARKINGS
0495-08-086 Harrison/
Atlanta
IH 20 Actual $4,874,784 1 REPLACE BRIDGE AND APPROACHES
0640-01-044 Harrison/
Atlanta
FM 31 Actual $837,049 1 REHABILITATE PAVEMENT ON EXISTING 2 LANE RURAL HIGHWAY
3283-01-014 Harrison/
Atlanta
FM 2625 Actual $4,532,167 1 REHABILITATE PAVEMENT ON EXISTING 2 LANE RURAL HIGHWAY
0285-03-057 Hays/
Austin
RM 12 Actual $3,090,649 3 ADD CENTER TURN LANE AND SHOULDERS
0198-02-027 Henderson/
Tyler
US 175 Actual $37,849,155 1 WIDEN 2 LNS TO 4 - LANE DIVIDED RURAL WITH DEPRESSED MEDIAN
0039-03-102 Hidalgo/
Pharr
BU 83-S Actual $961,180 8 INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT
0921-02-319 Hidalgo/
Pharr
VA Actual $1,475,632 10 CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS ALONG FM 491,
0117-06-044 Houston/
Lufkin
SH 21 Actual $11,812,490 1 RECONSTRUCT AND ADD PASSING LANES
1156-02-021 Howard/
Abilene
FM 821 Actual $9,379,400 1 SUBGRADE WIDENING, LIME TREATED EXIST BASE, FLEX BASE, 2CST,
0412-01-022 Irion/
San Angelo
SH 163 Actual $12,380,995 1 SEAL COAT
0249-05-028 Jack/
Fort Worth
US 281 Actual $428,016 8 TEXTURIZE SHOULDERS - ROLLED IN OR MILLED IN - AND CENTERLINE
0348-06-023 Karnes/
Corpus Christi
FM 99 Actual $8,219,037 1 REHAB ROADWAY
0095-11-008 Kaufman/
Dallas
FM 688 Actual $832,285 1 SPOT BASE REPAIR, MILLING, OVERLAY AND PAVEMENT MARKING.
0173-05-037 Kaufman/
Dallas
SH 34 Actual $1,485,049 1 TEXTURIZE SHOULDERS WITH PROFILE PAVEMENT MARKERS,
0157-02-045 Knox/
Childress
US 277 Actual $2,909,057 1 REHABILITATION OF EXISTING ROAD
0473-02-036 Lee/
Austin
SH 21 Actual $440,310 1 INSTALL CONTINUOUS TURN LANE
3114-01-012 Lee/
Austin
FM 180 Actual $4,218,821 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0074-02-072 Live Oak/
Corpus Christi
IH 37 Actual $3,901,795 1 NOVACHIP ROADWAY - SB LANES ONLY
0117-05-046 Madison/
Bryan
SH 21 Actual $260,260 8 SAFETY WORK CONSISTING OF PLACING CENTERLINE TEXTURING
0062-06-054 Marion/
Atlanta
US 59 Actual $2,267,007 1 RECONSTRUCT INTERSECTION WITH CONCRETE PAVING
1101-01-013 Marion/
Atlanta
FM 805 Actual $1,172,293 8 SAFE TREAT FIXED OBJECTS & WIDEN LN
1895-03-019 Marion/
Atlanta
FM 726 Actual $1,614,012 6 REPLACE BRIDGE AND APPROACHES
0833-03-035 McLennan/
Waco
FM 1637 Actual $27,836,848 1 RECONSTRUCT AND WIDEN FROM TWO TO FOUR LANES WITH RAISED
2311-01-037 McLennan/
Waco
FM 3051 Actual $432,181 3 LANDSCAPE ENHANCEMENT CONSISTING OF RETAINING WALLS AND
0005-14-080 Midland/
Odessa
IH 20 Actual $11,801,427 1 EXTEND ON / OFF RAMPS
0005-14-081 Midland/
Odessa
IH 20 Actual $8,726,124 1 EXTEND ON / OFF RAMPS
3158-01-037 Montgomery/
Houston
FM 3083 Actual $4,452,712 1 BASE REPAIR AND 1.5 IN ACP O / L
0920-06-032 Newton/
Beaumont
CR Actual $313,162 6 REPLACE BRIDGE AND APPROACHES
0074-06-222 Nueces/
Corpus Christi
IH 37 Actual $5,938,687 1 MILL, UNDERSEAL AND OVERLAY
0030-01-031 Ochiltree/
Lubbock
US 83 Actual $1,135,663 8 CENTERLINE TEXTURING
1179-02-034 Parker/
Fort Worth
FM 920 Actual $596,006 8 CENTERLINE TEXTURING
0629-04-010 Pecos/
Odessa
FM 11 Actual $1,325,351 1 PAVEMENT STRUCTURE RESTORATION
1876-01-030 Polk/
Lufkin
FM 1988 Actual $3,278,223 6 REPLACE BRIDGE AND APPROACHES
0534-01-020 Randall/
Amarillo
PR 5 Actual $3,768,710 10 REPLACE CONCRETE WATER CROSSINGS
2635-02-028 Randall/
Amarillo
SL 335 Actual $20,341,481 1 PAVEMENT, STRUCTURE AND DRAINAGE
0441-09-044 Reeves/
Odessa
IH 10 Actual $11,422,284 1 UPGRADE TO STANDARDS FREEWAY
0074-03-042 San Patricio/
Corpus Christi
IH 37 Actual $3,195,081 1 MILL, SEAL AND OVERLAY - SB LANES ONLY
1790-02-038 Smith/
Tyler
SL 323 Actual $3,363,192 1 REPAIR PAVEMENT & RESURFACE ROADWAY
0008-13-229 Tarrant/
Fort Worth
IH 820 Actual $675,365 8 CONVERT MEDIAN BARRIER
0014-15-039 Tarrant/
Fort Worth
US 81 Actual $177,985 8 INSTALL TRAFFIC SIGNAL
0094-02-129 Tarrant/
Fort Worth
SH 183 Actual $191,094 3 LANDSCAPE ENHANCEMENT
0902-90-012 Tarrant/
Fort Worth
VA Actual $91,590 5 ITS EQUIPMENT UPGRADES FOR TECHNOLOGY ADVANCES
0902-90-014 Tarrant/
Fort Worth
VA Actual $3,525,000 5 ADD 1.3 MILES OF TRACK TO CREATE A SECOND TRACK SECTION FOR
0902-90-022 Tarrant/
Fort Worth
VA Actual $2,720,000 5 TRANSIT BUS PURCHASES FOR TARRANT COUNTY
0663-03-027 Taylor/
Abilene
FM 1235 Actual $4,552,100 8 REHABILITATE AND WIDEN EXISTING ROADWAY, INSTALL CORRUGATED
0908-00-079 Taylor/
Abilene
VA Actual $402,152 1 INSTL NEW SFT LIGHT AT B120 - M / FM 1544;REM & REPLC SFT LIGHT
1655-01-026 Taylor/
Abilene
FM 1750 Actual $2,672,190 8 SPOT REPAIR, SPOT LEVEL - UP, SEAL & 0VERLAY
0113-09-071 Travis/
Austin
SL 343 Actual $320,047 1 RESURFACE ROADWAY
0114-03-025 Travis/
Austin
US 290 Actual $1,623,286 6 REPLACE BRIDGE
0341-04-071 Tyler/
Beaumont
US 287 Actual $419,596 6 UPGRADE BRIDGE AND APPROACH RAILING
0299-01-065 Val Verde/
Laredo
US 277 Actual $3,427,509 1 RESURFACE OF EXISTING HIGHWAY
0088-05-093 Victoria/
Yoakum
US 59 Actual $2,446,596 1 ACP OVERLAY
0315-06-038 Washington/
Bryan
SH 105 Actual $1,124,479 8 SAFETY WORK CONSISTING OF SAFETY TREATING FIXED OBJECTS
0043-09-123 Wichita/
Wichita Falls
IH 44 Actual $1,634,013 1 FULL DEPTH REPAIR, MILLING & OVERLAY
0681-01-021 Wichita/
Wichita Falls
FM 171 Actual $4,534,927 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0903-30-044 Wilbarger/
Wichita Falls
CR Actual $366,361 6 REPLACE BRIDGE AND APPROACHES
0273-04-035 Williamson/
Austin
US 183 Actual $1,300,087 8 INSTALL CONTINUOUS TURN LANE, CONSTRUCT PAVED SHOULDERS
0683-01-085 Williamson/
Austin
SH 45 Actual $2,492,121 3 CONSTRUCT SPLIT DIAMOND INTERSECTION
1202-03-015 Williamson/
Austin
FM 1063 Actual $758,521 6 REPLACE BRIDGE
1378-06-011 Williamson/
Austin
FM 3406 Actual $4,776,175 1 WIDEN TO 5 - LANE WITH CENTER LEFT TURN LANE
0903-27-026 Young/
Wichita Falls
CR Actual $685,496 6 REPLACE BRIDGE AND APPROACHES


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract