Letting Schedule for October, 2014 (FY 2015)
October, 2014 (FY 2015) | (see Links) |
SEP 2014 | OCT 2014 | NOV 2014 | DEC 2014 | JAN 2015 | FEB 2015 | MAR 2015 | APR 2015 | MAY 2015 | JUN 2015 | JUL 2015 | AUG 2015 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0792-04-045 | Bandera/ San Antonio |
FM 470 | Actual | $1,394,188 | 1 | INSTALL ADVANCE WARNING SIGNS, FLATTEN SIDE SLOPES, MBGF, & |
0133-05-026 | Baylor/ Wichita Falls |
SH 114 | Actual | $6,495,190 | 1 | SEAL COAT |
0909-36-147 | Bell/ Waco |
CS | Actual | $6,845,845 | 3 | RECONSTRUCT AND WIDEN TO ADD CONTINUOUS LEFT TURN LANE |
0025-02-201 | Bexar/ San Antonio |
IH 10 | Actual | $2,712,742 | 1 | SAFETY LIGHTING |
0915-12-511 | Bexar/ San Antonio |
CS | Actual | $12,259,301 | 3 | RECONSTRUCT ROADWAY AND REPLACE EXISTING SIDEWALKS, CURBS |
0915-12-530 | Bexar/ San Antonio |
VA | Actual | $2,958,588 | 10 | CONSTRUCT ADA CURB RAMPS AT VARIOUS LOCATION ALONG IH 410, |
0912-31-281 | Brazoria/ Houston |
VA | Actual | $497,361 | 1 | SPALL REPAIR (NON - SITE SPECIFIC) |
0924-35-020 | Brewster/ El Paso |
VA | Actual | $175,769 | 10 | PLACE BASE MATERIAL ENTRANCE / PARKING LOTS, ADDITIONAL BASE |
0913-19-027 | Calhoun/ Yoakum |
CR | Actual | $318,904 | 6 | REPLACE BRIDGE AND APPROACHES |
1438-01-021 | Calhoun/ Yoakum |
FM 1289 | Actual | $4,870,062 | 6 | REPLACE BRIDGE AND APPROACHES |
0925-00-062 | Childress/ Childress |
VA | Actual | $766,450 | 1 | DISTRICT WIDE CRACK SEAL |
0224-02-043 | Clay/ Wichita Falls |
US 287 | Actual | $612,772 | 1 | ADD ACCELERATION AND DECELERATION LANES |
0918-24-177 | Collin/ Dallas |
CS | Actual | $633,000 | 3 | REDESIGN CROSSWALK AND TRAFFIC CALMING DEVICES |
2056-01-048 | Collin/ Dallas |
FM 2551 | Actual | $373,100 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND |
0913-26-059 | Colorado/ Yoakum |
CR | Actual | $249,900 | 6 | REPLACE BRIDGE AND APPROACHES |
0567-01-025 | Coryell/ Waco |
FM 107 | Actual | $8,024,181 | 1 | SEAL COAT |
0581-01-140 | Dallas/ Dallas |
SL 12 | Actual | $268,951 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SCHRUB PLANTING |
0918-46-259 | Denton/ Dallas |
CS | Actual | $1,328,511 | 3 | CONSTRUCT BIKE TRAIL WITHIN RAIL ROW CONNECTING HEBRON, |
2121-02-137 | El Paso/ El Paso |
IH 10 | Actual | 158,778,403 | ROW | COLLECTOR DISTRIBUTOR LANES AND CONSTRUCT INTERCHANGE @ |
1498-01-012 | Fayette/ Yoakum |
FM 1579 | Actual | $185,135 | 6 | REHABILITATE BRIDGE AND APPROACHES |
0389-06-103 | Galveston/ Houston |
SH 146 | Actual | $369,996 | 8 | IMPROVE TRAFFIC SIGNAL |
0025-07-061 | Gonzales/ Yoakum |
SH 97 | Actual | $5,886,482 | 1 | SEAL COAT |
0920-03-078 | Hardin/ Beaumont |
CS | Actual | $76,999 | 3 | INSTALLATION OF RIGHT TURN LANE AT EAST CANDLESTICK DRIVE |
0920-03-079 | Hardin/ Beaumont |
CS | Actual | $504,664 | 3 | CONSTRUCT ADDITIONAL SIDEWALKS TO BOTH SIDES OF ROADWAY |
0271-15-086 | Harris/ Houston |
IH 610 | Actual | $4,114,147 | 1 | ASPHALT OVERLAY OF FRTG RDS AND CONNECTORS, ASPHALT SHOULDER |
0912-72-046 | Harris/ Houston |
VA | Actual | $960,080 | 3 | BASE REPAIR WITH CONCRETE PANEL REPLACEMENT, REPAIR & IMPROVE |
0912-72-276 | Harris/ Houston |
CS | Actual | $4,011,142 | 3 | INSTALL ADVANCED TRAFFIC CONTROL DEVICES AT HATSS |
0912-72-309 | Harris/ Houston |
VA | Actual | $1,880,145 | 3 | ARTERIAL TRAVEL TIME SYSTEM (EXPANDED COVERAGE, APPROX 650 |
0640-01-047 | Harrison/ Atlanta |
FM 31 | Actual | $1,234,567 | 8 | INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & |
1754-02-019 | Hays/ Austin |
RM 1826 | Actual | $746,843 | 3 | ADD TURN LANES & SHOULDERS |
1754-02-024 | Hays/ Austin |
RM 1826 | Actual | $605,145 | 8 | TEXTERIZED SHOULDERS (PROFILE PAVEMENT MARKERS) , CENTERLINE |
0902-51-015 | Hood/ Fort Worth |
VA | Actual | $882,845 | 3 | CONTRUCT HIKE / BIKE TRAIL "MOMENTS IN TIME"TRAIL PHASE II |
0546-06-017 | Hopkins/ Paris |
FM 71 | Actual | $1,903,182 | 1 | REHAB EXIST ROAD |
0786-01-080 | Jefferson/ Beaumont |
FM 364 | Actual | $647,658 | 11 | CONSTRUCT SIDEWALKS |
0920-00-112 | Jefferson/ Beaumont |
VA | Actual | $319,467 | 11 | INSTALL DYNAMIC MESSAGE SIGNS |
0920-38-250 | Jefferson/ Beaumont |
VA | Actual | $4,297,855 | 3 | INSTALL RAILROAD TRACK |
0446-01-047 | Lavaca/ Yoakum |
US 90A | Actual | $3,321,678 | 6 | REPLACE BRIDGE AND APPROACHES |
0073-14-007 | Live Oak/ Corpus Christi |
US 281A | Actual | $11,208,535 | 1 | DISTRICT WIDE SEAL COAT (2015 SEAL PROJECT LOW CONTROL CSJ) |
0917-31-015 | Madison/ Bryan |
CR | Actual | $653,337 | 6 | REPLACE BRIDGE AND APPROACHES |
0070-06-047 | McCulloch/ Brownwood |
US 87 | Actual | $2,729,953 | 1 | ADD PASSING LANES |
0920-30-081 | Orange/ Beaumont |
CR | Actual | $8,977,087 | 3 | CONSTRUCT RAILROAD GRADE SEPARATION |
0314-01-081 | Parker/ Fort Worth |
IH 20 | Actual | $8,460,305 | 1 | SEAL COAT FRONTAGE ROADS |
0034-05-039 | Runnels/ San Angelo |
US 83 | Actual | $14,622,336 | 6 | REPLACE BRIDGE DECKS |
0038-06-044 | Starr/ Pharr |
US 83 | Actual | $1,546,299 | 1 | SEAL COAT |
0902-00-137 | Tarrant/ Fort Worth |
VA | Actual | $979,265 | 1 | NON - SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION |
0902-48-867 | Tarrant/ Fort Worth |
VA | Actual | $285,791 | 3 | CONSTRUCT BICYCLE PATH / PEDESTRIAN PATH |
0902-90-008 | Tarrant/ Fort Worth |
VA | Actual | $1,501,000 | 3 | GENERAL MOTOR PLANT TECHNOLOGY PILOT PROJECT |
2374-06-005 | Tarrant/ Fort Worth |
IH 635 | Actual | $1,773,525 | 1 | MILL, BASE REPAIR, HMAC OVERLAY SH 121 CONNECTIONS |
0015-13-366 | Travis/ Austin |
IH 35 | Actual | $1,115,773 | 8 | IMPROVE TRAFFIC SIGNAL |
0265-01-110 | Travis/ Austin |
SH 71 | Actual | 110,500,000 | 11 | WIDEN ROADWAY AND CONSTRUCT OVERPASS |
0319-01-063 | Trinity/ Lufkin |
SH 94 | Actual | $1,039,601 | 8 | SAFETY TREAT FIXED OBJECTS |
0319-02-029 | Trinity/ Lufkin |
SH 94 | Actual | $1,785,217 | 8 | SAFETY TREAT FIXED OBJECTS |
1201-02-021 | Williamson/ Austin |
FM 487 | Actual | $9,058,441 | 1 | REHAB RDWY |
|