Letting Schedule for September, 2014 (FY 2015)

Last Update: Tuesday, September 29, 2015
September, 2014 (FY 2015) (see Links)
SEP 2014 | OCT 2014 | NOV 2014 | DEC 2014 | JAN 2015 | FEB 2015 | MAR 2015 | APR 2015 | MAY 2015 | JUN 2015 | JUL 2015 | AUG 2015
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0891-02-019 Anderson/
Tyler
FM 323 Actual $1,884,148 8 INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS
0176-02-094 Angelina/
Lufkin
BU 59-G Actual $11,387,556 6 REPLACE RAILROAD UNDERPASS
0073-03-063 Atascosa/
San Antonio
US 281 Actual $478,929 8 SAFETY TREAT FIXED OBJECTS
0265-05-071 Bastrop/
Austin
SH 71 Actual $13,669,975 7 CONSTRUCT OVERPASS
0073-08-170 Bexar/
San Antonio
IH 37 Actual $2,166,182 8 INSTALL CABLE BARRIER SYSTEM IN CENTER MEDIAN
0073-08-171 Bexar/
San Antonio
US 281 Actual $463,311 8 PLACE INVERTED PROFILE PAVEMENT MARKINGS ALONG EDGELINES
0010-19-009 Bowie/
Atlanta
FM 991 Actual $1,071,821 8 REPLACE BRIDGE AND APPROACHES
2687-02-018 Burnet/
Austin
RM 2147 Actual $2,455,662 1 ADD LEFT TURN LANE
0913-19-026 Calhoun/
Yoakum
CR Actual $219,242 6 REPLACE BRIDGE AND APPROACHES
0039-07-231 Cameron/
Pharr
IH 69E Actual $3,609,481 1 SEAL COAT
0220-03-028 Cameron/
Pharr
US 281 Actual $7,709,997 1 REHABILITATE AND WIDEN ROADWAY (SUPER 2)
0331-01-042 Cameron/
Pharr
SH 100 Actual $536,749 8 TEXTURIZE SHOULDERS (PROFILE PAVEMENT MARKERS) , CENTERLINE
1138-02-015 Cameron/
Pharr
FM 803 Actual $10,494,854 11 REALIGN & WIDEN TO 4 LANES
2243-01-009 Cameron/
Pharr
FM 106 Actual $15,555,191 3 RECONSTRUCT COUNTY ROAD - 2 LANE W / SHLDRS
1365-03-026 Coleman/
Brownwood
FM 1176 Actual $692,591 6 UPGRADE GUARDRAIL AND SAFETY TREAT STRUCTURES
0257-05-042 Comanche/
Brownwood
SH 6 Actual $3,990,282 1 RECONSTRUCT ROADWAY
0040-02-021 Dallam/
Amarillo
US 87 Actual $9,457,160 1 SEALCOAT
0197-02-108 Dallas/
Dallas
US 175 Actual $96,431,455 ROW EXTEND US 175;RECONSTRUCT INTERCHANGE WITH SM WRIGHT / SH
0135-10-053 Denton/
Dallas
US 377 Actual $256,066 1 TRAFFIC SIGNAL INSTALLATION
0619-05-036 Denton/
Dallas
FM 544 Actual $35,390,958 7 REPLACE BRIDGE AND APPROACHES
1315-01-025 Denton/
Dallas
FM 1385 Actual $9,063,184 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0007-03-087 Eastland/
Brownwood
IH 20 Actual $321,299 8 INSTALL MEDIAN BARRIER
0924-06-449 El Paso/
El Paso
VA Actual $1,991,413 10 CONSTRUCT CURB RAMPS ALONG IH 10, LP 375, FM 76, FM 659,
0924-06-495 El Paso/
El Paso
CS Actual $2,085,000 3 CONSTRUCT PEDESTRIAN OVERPASSES
1046-03-006 El Paso/
El Paso
SS 601 Actual $879,924 5 INTERSECTION IMPROVEMENTS
2121-01-088 El Paso/
El Paso
IH 10 Actual $6,087,829 ROW REHAB AND OPERATIONAL IMPROVEMENTS
0596-02-038 Ellis/
Dallas
FM 66 Actual $1,798,062 6 REPLACE BRIDGE AND APPROACHES
0146-05-033 Foard/
Childress
US 70 Actual $4,032,532 1 MILL, CEMENT TREAT AND ACP OVERLAY
0166-03-031 Freestone/
Bryan
SH 75 Actual $9,728,738 1 SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT
0912-73-201 Galveston/
Houston
VA Actual $34,155 10 DISPOSAL OF DEBRIS AS A RESULT OF HURRICANE IKE
0913-22-044 Gonzales/
Yoakum
CR Actual $323,837 6 REPLACE BRIDGE AND APPROACHES
0047-03-075 Grayson/
Paris
SH 5 Actual $3,711,918 1 SHOULDER REPAIR AND SEAL COAT
0381-02-020 Hall/
Childress
SH 256 Actual $5,030,825 1 SEAL COAT
0389-13-057 Harris/
Houston
SH 146 Actual $224,351 1 1" MILLING, 1" ACP OVERLAY OF SHOULDERS / GORE AREAS AND
0500-03-572 Harris/
Houston
IH 45 Actual $28,468,889 ROW CONSTRUCT ENTRANCE AND EXIT RAMPS, REMOVE AND REPLACE
0912-00-509 Harris/
Houston
VA Actual $3,708,936 1 REPAIR BRIDGE APPROACH SLABS
1258-04-060 Harris/
Houston
FM 1093 Actual $493,967 8 IMPROVE TRAFFIC SIGNAL
0062-07-084 Harrison/
Atlanta
US 59 Actual $670,083 8 INSTALL SAFETY LIGHTING
0063-01-085 Harrison/
Atlanta
US 59 Actual $545,315 8 IMPROVE TRAFFIC SIGNAL AND REALIGN / CONFIGURE LEFT TURN LANES
0919-03-050 Harrison/
Atlanta
CR Actual $469,995 6 REPLACE BRIDGE AND APPROACHES
0080-04-095 Hood/
Fort Worth
US 377 Actual $2,044,370 1 HMAC OVERLAY
0009-09-099 Hopkins/
Paris
IH 30 Actual $1,210,345 8 TEXTURIZED SHOULDERS (ROLLED IN OR MILLED IN)
0336-01-046 Houston/
Lufkin
SH 7 Actual $10,296,163 1 RECONSTRUCT PAVEMENT AND ADD PASSING LANES & SHLDRS
0366-06-039 Karnes/
Corpus Christi
SH 123 Actual $4,771,138 1 REHAB AND ADD PASSING LANES
0095-14-023 Kaufman/
Dallas
IH 20 Actual $10,697,870 1 INSIDE AND OUTSIDE SHOULDERS AND RAMPS
2512-03-007 Kaufman/
Dallas
FM 2728 Actual $4,288,102 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0072-06-071 Kendall/
San Antonio
IH 10 Actual $3,536,441 1 RECONFIGURE RAMPS FRONTAGE ROADS AND INTERSECTIONS
0193-02-038 Kerr/
San Antonio
SH 39 Actual $2,473,920 6 REPLACE NARROW BRIDGE & APPROACHES
0242-01-025 Liberty/
Beaumont
SH 61 Actual $3,935,278 1 RESTORE EXISTING ROADWAY
0382-03-031 Limestone/
Waco
SH 7 Actual $6,079,900 8 RECONSTRUCT BASE AND RESURFACE
1191-04-022 Limestone/
Waco
FM 937 Actual $1,049,361 6 REHABILITATE BRIDGE AND APPROACHES
0783-01-096 Lubbock/
Lubbock
SL 289 Actual $106,834 11 MISCELLANEOUS CONSTRUCTION
0110-03-053 Montgomery/
Houston
SH 75 Actual $1,747,731 1 BASE REPAIR AND 1.5" ACP O / L
0338-02-041 Montgomery/
Houston
SH 105 Actual $2,574,452 1 BASE REPAIR AND 1.5" ACP O / L
0912-37-221 Montgomery/
Houston
CR Actual $1,378,509 6 REPLACE BRIDGE AND APPROACHES (NBI# 12170AA0150001)
0008-02-072 Parker/
Fort Worth
US 180 Actual $2,644,391 1 MICROSURFACING AND PAVEMENT MARKERS
0904-00-156 Potter/
Amarillo
VA Actual $646,972 11 CRACK SEAL
0203-03-044 Rains/
Paris
US 69 Actual $4,635,056 1 WIDEN TO 2 LANE W / CTWLTL
0371-02-068 Refugio/
Corpus Christi
US 77 Actual $800,471 1 INSTALL MEDIAN BARRIER
0034-03-017 Runnels/
San Angelo
US 83 Actual $1,744,478 8 CENTERLINE TEXTURING
0118-10-055 San Augustine/
Lufkin
SH 21 Actual $3,381,562 1 INTERSECTION IMPROVEMENTS INCLUDING INSTALLATION OF TRAFFIC
0910-00-094 Smith/
Tyler
VA Actual $296,129 1 DISTRICT WIDE THERMOPLASTIC PAVEMENT MARKINGS PROGRAM
1103-04-027 Starr/
Pharr
FM 755 Actual $10,733,925 1 REALIGNMENT WITH PARTIAL WIDENING TO 4 LANES
0171-05-095 Tarrant/
Fort Worth
SH 199 Actual $1,000,000 7 CORRIDOR ANALYSIS & DEVELOP MASTER PLAN FOR CORRIDOR; ADDIT.
0902-00-131 Tarrant/
Fort Worth
VA Actual $1,587,885 1 FY15 CONCRETE PAVEMENT REPAIR VARIOUS LOCATIONS; SPOT REPAIR
0902-00-132 Tarrant/
Fort Worth
VA Actual $930,000 1 PAVEMENT MARKINGS FOR FY 14 SEAL COATS
0034-02-042 Taylor/
Abilene
US 83 Actual $424,466 8 TEXTURIZE SHOULDERS (ROLLED IN OR MILLED IN) , CENTERLINE
0054-01-030 Taylor/
Abilene
US 84 Actual $618,929 8 TEXTURIZE SHOULDERS (PROFILE PAVEMENT MARKINGS)
0010-07-051 Titus/
Atlanta
US 67 Actual $7,431,527 1 SEAL COAT
0914-00-321 Travis/
Austin
VA Actual $495,078 1 FY 2014 SIGNING
1200-03-052 Travis/
Austin
FM 973 Actual $3,332,551 3 REHAB RDWY, ADD 6' SHOULDERS
0395-01-029 Walker/
Bryan
SH 150 Actual $5,846,147 1 REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING,
0089-07-147 Wharton/
Yoakum
US 59 Actual $160,088 10 GREEN RIBBON LANDSCAPING
0903-00-075 Wichita/
Wichita Falls
VA Actual $3,132,333 10 CONSTRUCT CURB RAMPS AT VAR LOCATIONS IN CLAY, COOKE AND
1310-03-025 Wise/
Fort Worth
FM 2264 Actual $3,983,918 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH, PROPOSED 2 - 12'LANES


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract