Letting Schedule for Dallas District (FY 2015)

Last Update: Tuesday, September 29, 2015
Dallas District (FY 2015)
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall

Collin County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0091-09-015 BS 289C Actual JUL 2015 $32,000 10 RAILROAD GRADE CROSSING REPLANKING
0135-11-018 US 380 Actual NOV 2014 $57,978,706 3 WIDEN 4 TO 6 LANES DIVIDED, ADD NEW 4 / 6 LANE ACCESS ROADS AT
0135-12-029 FM 3537 Actual JUN 2015 $529,267 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND IRRIGATION SYSTEM
0549-03-027 SH 121 Actual MAY 2015 $43,893,899 3 WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE DIVIDED ROADWAY
0619-01-023 FM 6 Actual JUN 2015 $3,493,547 6 REPLACE BRIDGE AND APPROACHES
0619-03-059 FM 544 Actual JUL 2015 $172,800 10 RAILROAD GRADE CROSSING REPLANKING
0918-24-143 CS Actual APR 2015 $3,414,288 ROW WIDEN FROM 4 TO 6 LANE DIVIDED WEST OF PARKWOOD BLVD;
0918-24-177 CS Actual OCT 2014 $633,000 3 REDESIGN CROSSWALK AND TRAFFIC CALMING DEVICES
1392-01-040 FM 1378 Actual DEC 2014 $2,696,579 8 BASE REPAIR AND OVERLAY
2056-01-048 FM 2551 Actual OCT 2014 $373,100 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND
2679-03-010 FM 2514 Actual MAR 2015 $6,339,339 3 REALIGN HIGHWAY FROM FM 1378 SOUTHEAST TO NEAR LAVON PARKWAY
3392-01-008 FM 2786 Actual DEC 2014 $15,799,703 3 WIDEN 2 TO 4 LANE DIVIDED (SIX LANE ULTIMATE) WITH

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-02-045 SH 78 Actual FEB 2015 $7,779,617 5 9 INTERSECTION IMPROVEMENTS
0009-02-063 SH 78 Actual MAR 2015 $2,560,389 1 MILL, CONCRETE FULL DEPTH REPAIR, OVERLAY & PAVEMENT MARKINGS
0048-01-061 SH 342 Actual FEB 2015 $842,515 1 REHABILITATION OF TRAFFIC SIGNALS
0091-06-058 SH 289 Actual APR 2015 $2,360,163 1 MILL, CONCRETE FULL DEPTH REPAIR, OVERLAY & PAVEMENT MARKINGS
0092-02-123 SH 310 Actual MAY 2015 $2,145,801 6 PAINTING OF BRIDGE AND CONCRETE STRUCTURE REPAIR
0095-02-114 US 80 Actual APR 2015 $936,970 8 INSTALL PROTECTION
0095-10-053 US 80 Actual DEC 2014 $1,322,288 1 CONCRETE FULL DEPTH REPAIR ON JUGHANDLES AND FRONTAGE ROADS
0196-03-256 IH 35E Actual JUN 2015 $7,335,235 1 MILL & INLAY MAINLANES AND SHOULDERS, PAVEMENT MARKINGS AND
0197-02-108 US 175 Actual SEP 2014 $96,431,455 ROW EXTEND US 175;RECONSTRUCT INTERCHANGE WITH SM WRIGHT / SH
0353-04-098 SS 348 Actual APR 2015 $679,177 1 FULL DEPTH REPAIR CONCRETE PAVEMENT
0353-05-082 SL 12 Actual MAY 2015 $6,736,852 8 INTERSECTION IMPROVEMENTS
0581-01-140 SL 12 Actual OCT 2014 $268,951 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SCHRUB PLANTING
0581-02-141 SL 12 Actual MAR 2015 $2,761,595 1 FULL DEPTH REPAIR CONCRETE PAVEMENT AND OVERLAY ON FRONTAGE
0918-00-213 NR Actual FEB 2015 $3,300,000 7 PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY
0918-00-249 VA Actual APR 2015 $5,280,000 5 PURCHASE OF TRANSIT VEHICLES, BUSES, TO EXPAND SERVICE
0918-00-252 VA Actual JAN 2015 $3,590,680 3 ON - SYSTEM FRONTAGE ROAD SIGNAL IMPROVEMENTS FOR INCIDENT
0918-00-253 VA Actual JAN 2015 $1,612,120 3 OFF - SYSTEM FRONTAGE ROAD SIGNAL IMPROVEMENTS FOR INCIDENT
0918-47-076 VA Actual AUG 2015 $22,382,585 3 DFW INTERNATIONAL AIRPORT LIGHT RAIL TRANSIT CONNECTION
0918-47-086 CS Actual JUN 2015 $15,000,000 3 PH 2 - COLORADO / BECKLEY TO ZANG / DAVIS; CONSTRUCT DALLAS CBD
0918-47-087 CS Actual JUN 2015 $7,872,531 3 PH 3 - UNION STATION / HOUSTON ST TO YOUNG / INWOOD @ CONVENTION
0918-47-088 VA Actual JUN 2015 $8,000,000 3 RAIL VEHICLE PURCHASE
0918-47-092 VA Actual JUL 2015 $184,082 3 CBD SIGNAGE & WAYFINDING
0918-47-100 VA Actual MAR 2015 $3,464,886 10 CONSTRUCT CURB RAMPS ALONG IH 20, IH 45, SL 12, SL 310,
0918-47-101 CS Actual JUL 2015 $802,955 3 INSTALL TRAFFIC SIGNAL
0918-47-102 CS Actual APR 2015 $128,677 8 INSTALL LED FLASHING CHEVRONS AND HIGH FRICTION SURFACE
2374-01-172 IH 635 Actual APR 2015 $3,126,591 5 ITS INSTALLATION
2374-01-176 IH 635 Actual FEB 2015 $6,763,281 5 CONVERT HOV LANES TO EXPRESS LANES
2374-03-077 IH 20 Actual JUN 2015 $7,377,286 ROW CONSTRUCT FRONTAGE ROADS AND RAMPS CONNECTING IH 20

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0081-04-040 US 377 Actual JUL 2015 $323,544 10 LANDSCAPE DEVELOPMENT TO INLCUDE TREE AND SHRUB PLANTING AND
0081-06-037 US 377 Actual MAY 2015 $950,001 1 TRAFFIC SIGNAL IMPROVEMENTS
0081-13-051 IH 35W Actual NOV 2014 $375,631 1 INSTALL GUIDE SIGNS
0135-10-053 US 377 Actual SEP 2014 $256,066 1 TRAFFIC SIGNAL INSTALLATION
0353-02-063 SH 114 Actual FEB 2015 $30,580,029 3 CONSTRUCT INTERCHANGE
0619-05-036 FM 544 Actual SEP 2014 $35,390,958 7 REPLACE BRIDGE AND APPROACHES
0918-46-259 CS Actual OCT 2014 $1,328,511 3 CONSTRUCT BIKE TRAIL WITHIN RAIL ROW CONNECTING HEBRON,
0918-46-269 PW Actual APR 2015 $1,587,179 10 REHABILITATE PARK ROADS, PARKING LOTS AND CAMPSITE PULLOUTS
1315-01-025 FM 1385 Actual SEP 2014 $9,063,184 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1785-01-035 FM 407 Actual JUL 2015 $498,172 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING & IRRIGATION
1950-01-036 FM 407 Actual FEB 2015 $1,063,701 1 FULL - DEPTH CONCRETE PAVEMENT REPAIR AND PAVEMENT MARKINGS
2681-01-022 FM 2499 Actual MAY 2015 $448,057 3 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING & IRRIGATION

Ellis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0048-03-087 US 77 Actual DEC 2014 $268,750 1 REHABILITATION OF TRAFFIC SIGNALS
0048-04-079 IH 35E Actual AUG 2015 126,414,964 1 RECONSTRUCT AND WIDEN FROM 4 LANES TO 6 LANES
0092-03-048 IH 45 Actual MAY 2015 $806,249 1 INSTALL GUIDE SIGNS
0568-01-046 SH 34 Actual JAN 2015 $199,164 1 TEXTURE SHOULDERS AND CENTER LINE TEXTURING
0568-01-049 SH 34 Actual JUL 2015 $30,080 10 RAILROAD GRADE CROSSING REPLANKING
0596-02-038 FM 66 Actual SEP 2014 $1,798,062 6 REPLACE BRIDGE AND APPROACHES
0596-02-039 FM 66 Actual JUN 2015 $3,421,432 6 REPLACE BRIDGES AND APPROACHES
0596-02-042 FM 66 Actual JUL 2015 $2,085,056 8 ADD LEFT TURN LANE
0596-02-043 FM 66 Actual JUL 2015 $4,255,416 1 WIDEN, SAFETY TREAT FIXED OBJECTS AND CENTERLINE TEXTURING
0918-22-086 CR Actual APR 2015 $934,145 6 REPLACE BRIDGE AND APPROACHES
1051-01-042 FM 664 Actual MAR 2015 $11,142,221 1 REPAIR, ADD SAFETY SHOULDERS AND RESURFACE ROADWAY
1051-01-050 FM 664 Actual JUL 2015 $36,000 10 RAILROAD GRADE CROSSING REPLANKING
1051-02-017 FM 876 Actual FEB 2015 $1,721,378 6 REPLACE BRIDGE AND APPROACHES
1159-01-022 FM 875 Actual JUN 2015 $3,724,841 6 REPLACE BRIDGE AND APPROACHES
1159-02-032 FM 879 Actual JUN 2015 $9,549,753 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1211-01-018 FM 984 Actual JAN 2015 $2,333,447 6 REPLACE BRIDGE AND APPROACHES
1451-01-020 FM 55 Actual MAY 2015 $2,010,621 6 REPLACE BRIDGES AND APPROACHES
1451-01-023 FM 55 Actual MAR 2015 $4,975,102 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1451-01-025 FM 55 Actual AUG 2015 $1,530,409 6 REPLACE BRIDGE AND APPROACHES

Kaufman County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0095-11-008 FM 688 Actual APR 2015 $832,285 1 SPOT BASE REPAIR, MILLING, OVERLAY AND PAVEMENT MARKING.
0095-14-023 IH 20 Actual SEP 2014 $10,697,870 1 INSIDE AND OUTSIDE SHOULDERS AND RAMPS
0173-04-047 SH 34 Actual JUN 2015 $989,767 1 REHABILITATION OF EXISTING FOUR LANE DIVIDED ROADWAY
0173-05-037 SH 34 Actual APR 2015 $1,485,049 1 TEXTURIZE SHOULDERS WITH PROFILE PAVEMENT MARKERS,
0197-04-078 US 175 Actual MAR 2015 $278,867 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE PLANTING & IRRIGATION
0495-01-060 SS 557 Actual FEB 2015 $6,239,596 3 CONSTRUCT PHASE 1 (4 - LANES) OF ULTIMATE 8 LANE BRIDGE PLUS
0697-03-027 FM 429 Actual DEC 2014 $207,203 8 TEXTURIZE SHOULDERS (PROFILE PAVEMENT MARKERS) , CENTERLINE
1092-01-017 FM 741 Actual FEB 2015 $4,550,316 1 PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAY
1494-02-008 FM 1565 Actual JAN 2015 $1,652,146 1 PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAY
2512-03-007 FM 2728 Actual SEP 2014 $4,288,102 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
2588-01-015 FM 548 Actual NOV 2014 $204,935 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING AND

Navarro County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0092-06-101 IH 45 Actual JUL 2015 $58,762,184 1 WIDEN FREEWAY FROM 4 TO 6 LANES
0093-01-098 IH 45 Actual JUL 2015 $71,994,840 1 WIDEN FREEWAY FROM 4 TO 6 LANES
0122-01-039 US 287 Actual MAY 2015 $3,949,888 1 WIDEN PAVEMENT FROM 42' TO 57' AND CONSTRUCT LEFT TURN LANE
0162-04-055 SH 31 Actual DEC 2014 $4,312,719 1 FULL DEPTH CONCRETE REPAIR, LEVEL - UP AND OVERLAY

Rockwall County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-12-209 IH 30 Actual NOV 2014 $190,692 8 INSTALLATION OF SAFETY LIGHTING
1015-01-022 FM 3549 Actual FEB 2015 $2,576,275 1 REHABILITATE EXISTING ROADWAY
1015-01-025 FM 549 Actual JUN 2015 $7,749,473 8 PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAY


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract