AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - YOAKUM DISTRICT

Last Update: Monday, March 31, 2014
ITEMS 400 2005 TO 462 2024
Items Items Bid Code Range
0100 - 0192
0247 - 0275
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0685
0740 - 0740
1018 - 1122
2082 - 2122
3235 - 3278
4569 - 4569
5261 - 5434
6834 - 6834
8020 - 8251
400 2005 - 462 2024
462 2030 - 496 2016
Item No Description Units March 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
400 2005 CEM STABIL BKFL CY     2,862.000 77.06014 19
400 2006 CUT & RESTORING PAV SY     384.000 131.74779 5
400 2023 CEM STAB BKFL (BEHIND ABUTMENT) CY     453.400 100.00000 1
401 2001 FLOWABLE BACKFILL CY     19.000 115.00000 1
402 2001 TRENCH EXCAVATION PROTECTION LF     154.000 59.78052 3
403 2001 TEMPORARY SPL SHORING SF     8,695.000 29.43182 7
407 2005 SHEET PILING (PZ - 22) SF     3,740.000 40.58824 2
409 2001 PRESTR CONC PIL (16 IN SQ) LF     1,012.000 105.28063 2
409 2002 PRESTR CONC PIL (18 IN SQ) LF     3,436.000 78.89756 2
409 2003 PRESTR CONC PIL (20 IN SQ) LF     3,112.000 185.00000 1
409 2016 PRESTR CONC PIL (18 IN SQ) (HPC) LF     1,020.000 111.76216 2
409 2017 PRESTR CONC PIL (20 IN SQ) (HPC) LF     1,300.000 160.00000 1
416 2001 DRILL SHAFT (18 IN) LF     202.000 190.43000 1
416 2002 DRILL SHAFT (24 IN) LF     3,592.000 111.36705 3
416 2003 DRILL SHAFT (30 IN) LF     189.000 142.00000 1
416 2004 DRILL SHAFT (36 IN) LF     4,384.000 234.43764 2
416 2009 DRILL SHAFT (66 IN) LF     336.000 540.29000 1
416 2015 DRILL SHAFT (NON - REINFORCED) (12 IN) LF     12.000 78.75000 1
416 2018 DRILL SHAFT (SIGN MTS) (24 IN) LF     384.000 135.80977 4
416 2029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF     120.000 150.50000 2
420 2003 CL C CONC (ABUT) CY     627.400 893.71852 11
420 2004 CL C CONC (BENT) CY     808.200 1,063.33086 9
420 2013 CL C CONC (MISC) CY     11.000 600.00000 1
420 2029 CL S CONC (SLAB) CY     859.800 678.47274 8
420 2031 CL S CONC (SHEAR KEY) CY     12.600 400.00000 1
420 2033 CL S CONC (APPR SLAB) CY     264.400 400.00000 1
420 2041 CL C CONC (ABUT) (HPC) CY     24.000 908.00000 1
420 2042 CL C CONC (BENT) (HPC) CY     8.300 1,158.00000 1
420 2051 CL C CONC (COLUMN) CY     44.600 1,200.00000 1
420 2064 CL A CONC (PLUG) EA     4.000 700.00000 1
420 2068 CL S CONC (HPC) (SLAB) CY     40.700 797.50000 1
420 2104 CL A CONC (FLUME) CY     95.000 400.00000 1
420 2295 CLASS H CONC (CAP) CY     213.000 700.00000 1
420 2296 CLASS S CONC (CLOSURE POUR) CY     5.200 1,500.00000 1
422 2001 REINF CONC SLAB SF     91,006.000 15.13149 3
423 2001 RETAINING WALL (MSE) SF     64,409.000 26.00000 1
425 2006 PRESTR CONC BOX BEAM (4B20) LF     376.000 200.00000 1
425 2007 PRESTR CONC BOX BEAM (5B20) LF     188.000 200.00000 1
425 2014 PRESTR CONC SLAB BEAM (4SB12) LF     3,393.440 115.71407 4
425 2015 PRESTR CONC SLAB BEAM (5SB12) LF     986.000 112.19574 2
425 2016 PRESTR CONC SLAB BEAM (4SB15) LF     2,869.960 131.07228 4
425 2017 PRESTR CONC SLAB BEAM (5SB15) LF     3,710.910 135.92609 3
425 2064 PRESTR CONC GIRDER (TX28) LF     3,420.000 113.92105 2
425 2065 PRESTR CONC GIRDER (TX34) LF     6,003.000 120.00000 1
425 2067 PRESTR CONC GIRDER (TX46) LF     3,261.500 145.00000 1
426 2001 POST - TENSIONING (GROUTED) MKF     691.000 95.00000 1
427 2002 CONCRETE PAINT FINISH SF     21,600.000 .25000 1
428 2001 CONC SURF TREAT (CLASS I) SY     1,266.000 5.37970 2
432 2001 RIPRAP (CONC) (4 IN) CY     321.700 351.23920 2
432 2002 RIPRAP (CONC) (5 IN) CY     1,127.400 348.04497 10
432 2019 RIPRAP (STONE PROTECTION) (12 IN) CY     123.000 185.00000 1
432 2033 RIPRAP (STONE COMMON) (DRY) (12 IN) CY     648.000 138.14377 6
432 2038 RIPRAP (CONC) (CL A ) CY     4.600 500.00000 1
432 2039 RIPRAP (MOW STRIP) (4 IN) CY     377.000 351.24029 3
432 2041 RIPRAP (STONE COMMON) (DRY) (18 IN) CY     14.000 357.50000 1
432 2072 RIPRAP (CONC) (CL B) (RR8 & RR9) CY     35.000 300.00000 1
432 2084 RIPRAP (CONC) (CL B) (4") CY     293.000 376.22867 2
438 2002 CLEAN AND SEAL EXIST JOINTS LF 2,160.000 14.50000 2,440.000 14.71803 2
438 2004 CLEAN AND SEAL JOINTS LF     1,410.000 22.23574 2
442 2015 STR STL (MISCELLANEOUS) (DOMESTIC) LB     209.000 10.00000 1
442 2048 STRUCTURAL STEEL (MISC NON - BRIDGE) LB     862.000 8.00000 1
450 2143 RAILING (TY T551) LF     1,304.000 47.47239 2
450 2146 RAIL (TY T552) LF     320.000 53.00000 1
450 2161 RAIL (TY T223) LF     3,548.000 103.84502 11
450 2166 RAIL (TY C223) LF     304.000 150.00000 1
450 2167 RAIL (TY T551) (RETROFIT) LF     452.000 105.00000 1
450 2194 RAIL (TY T223) (RAC - R) LF     280.000 300.00000 1
450 2195 RAIL (TY T223) (SPL) LF     4,700.000 100.00000 1
450 2206 RAIL (TY T223) (HPC) LF     174.000 94.00000 1
452 2002 REMOV RAIL (METAL ELEMENTS) LF     1,767.660 7.64365 2
452 2008 REMOV RAIL (CTB) LF     630.000 15.00000 1
454 2001 SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF     159.000 90.00000 1
454 2004 ARMOR JOINT LF     274.000 84.79197 4
454 2005 ARMOR JOINT (WITH SEAL) LF     665.000 78.94205 5
454 2009 SEALED EXPANSION JOINT (5 IN) (SEJ - A) LF     350.700 94.00000 1
460 2003 CMP (GAL STL 18 IN) LF     110.000 169.72727 2
460 2004 CMP (GAL STL 24 IN) LF     187.000 118.24733 4
460 2005 CMP (GAL STL 30 IN) LF     32.000 194.80000 1
460 2009 CMP (GAL STL 48 IN) LF     12.000 381.10000 1
460 2014 CMP AR (GAL STL DES 2) LF     42.000 54.22000 1
460 2015 CMP AR (GAL STL DES 3) LF     27.000 170.70000 1
460 2016 CMP AR (GAL STL DES 4) LF     15.000 296.35000 1
460 2017 CMP AR (GAL STL DES 5) LF     92.000 106.94402 2
462 2001 CONC BOX CULV (3 FT X 2 FT) LF     575.000 125.41043 3
462 2002 CONC BOX CULV (3 FT X 3 FT) LF     5.000 285.00000 1
462 2003 CONC BOX CULV (4 FT X 2 FT) LF     44.000 360.00000 1
462 2004 CONC BOX CULV (4 FT X 3 FT) LF     20.000 474.94000 1
462 2006 CONC BOX CULV (5 FT X 2 FT) LF     689.000 235.10781 5
462 2007 CONC BOX CULV (5 FT X 3 FT) LF     140.000 190.00000 1
462 2008 CONC BOX CULV (5 FT X 4 FT) LF     458.000 200.00000 1
462 2009 CONC BOX CULV (5 FT X 5 FT) LF     90.000 380.00000 1
462 2010 CONC BOX CULV (6 FT X 3 FT) LF     97.000 467.88660 2
462 2011 CONC BOX CULV (6 FT X 4 FT) LF     131.000 398.70000 1
462 2012 CONC BOX CULV (6 FT X 5 FT) LF     144.000 466.83750 2
462 2014 CONC BOX CULV (7 FT X 3 FT) LF     85.000 357.37412 2
462 2015 CONC BOX CULV (7 FT X 4 FT) LF     295.000 433.32732 2
462 2020 CONC BOX CULV (8 FT X 5 FT) LF     19.500 530.00000 1
462 2021 CONC BOX CULV (8 FT X 6 FT) LF     8.500 650.00000 1
462 2023 CONC BOX CULV (8 FT X 8 FT) LF     12.000 680.00000 1
462 2024 CONC BOX CULV (9 FT X 5 FT) LF     365.600 469.82757 2