AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - YOAKUM DISTRICT

Last Update: Tuesday, November 29, 2016
ITEMS 100 6002 TO 169 6003
Items Items Bid Code Range
0100 - 0169
0247 - 0275
0310 - 0361
0400 - 0496
0500 - 0560
0610 - 0686
0752 - 0788
0800 - 0800
4001 - 4055
5001 - 5036
6001 - 6057
100 6002 - 169 6003
Item No Description Units November 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 6002 PREPARING ROW STA 10.250 1,795.00000 115.300 3,266.22958 13
100 6003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     12.000 800.00000 1
100 6004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     6.000 1,966.66667 2
100 6005 PREP ROW (TREE) (24" - 30"DIA) EA     1.000 4,000.00000 1
100 6006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     15.000 2,138.66667 2
100 6007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     12.000 5,010.00000 2
104 6001 REMOVING CONC (PAV) SY     22,854.000 11.60191 3
104 6009 REMOVING CONC (RIPRAP) SY     224.000 25.89714 5
104 6010 REMOVING CONC (RIPRAP) CY     12.000 50.00000 1
104 6011 REMOVING CONC (MEDIANS) SY     586.000 6.00000 1
104 6014 REMOVING CONC (FOUNDATIONS) CY     2.000 385.00000 1
104 6021 REMOVING CONC (CURB) LF     3,679.000 7.14488 2
104 6022 REMOVING CONC (CURB AND GUTTER) LF     1,198.000 2.00000 1
105 6005 REMOVING STAB BASE AND ASPH PAV (3") SY     4,896.000 1.50000 1
105 6014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY     8,726.000 6.48000 1
105 6018 REMOVING STAB BASE AND ASPH PAV (7") SY     4,440.000 4.00000 1
105 6044 REMOVING STAB BASE AND ASPH PAV (10") SY     2,104.000 6.00000 1
110 6001 EXCAVATION (ROADWAY) CY 1,948.000 10.65000 74,295.000 12.61228 18
110 6002 EXCAVATION (CHANNEL) CY     292.000 22.26027 3
110 6003 EXCAVATION (SPECIAL) CY     125.000 30.00000 1
112 6001 SUBGRADE WIDENING (ORD COMP) STA     1,470.990 541.10797 6
132 6005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     15,094.000 16.91855 11
132 6006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 1,307.000 15.40000 215,570.000 16.94284 5
132 6021 EMBANKMENT (VEHICLE) (ORD COMP) (TY C) CY 240.000 75.00000 57,639.000 10.80392 9
132 6037 EMB (FINAL) (DC) (TYE) (CSBE) (EMB FND IMPR CY     2,656.000 45.00000 1
134 6001 BACKFILL (TY A) STA     1,189.860 179.99522 4
134 6002 BACKFILL (TY B) STA     1,538.010 151.35765 3
134 6004 BACKFILL (TY A OR B) STA 353.740 143.14398 1,998.410 112.96770 5
150 6001 BLADING STA     15.800 182.94177 2
150 6002 BLADING HR 161.000 115.89360 1,166.000 100.39080 32
158 6002 SPEC EXCAV WORK (BACKHOE) HR     45.000 45.00000 1
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY     60,821.000 1.10308 2
162 6002 BLOCK SODDING SY     444.000 11.00000 1
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     1,948.000 1.99384 3
164 6002 BROADCAST SEED (PERM) (RURAL) (SANDY) AC     5.000 1,500.00000 1
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 5,000.000 1.00000 27,141.000 .36592 4
164 6009 BROADCAST SEED (TEMP) (WARM) SY     1,304.000 1.07012 4
164 6011 BROADCAST SEED (TEMP) (COOL) SY     1,304.000 1.07012 4
164 6021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     362,098.000 .25912 7
164 6022 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) AC     20.000 1,475.00000 1
164 6023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY 7,375.000 .25000 243,494.000 .41311 8
164 6029 CELL FBR MLCH SEED (TEMP) (WARM) SY 1,844.000 .35000 151,391.000 .25867 15
164 6030 CELL FBR MLCH SEED (TEMP) (WARM) AC     5.000 495.00000 1
164 6031 CELL FBR MLCH SEED (TEMP) (COOL) SY 1,844.000 .35000 151,391.000 .25867 15
164 6032 CELL FBR MLCH SEED (TEMP) (COOL) AC     5.000 495.00000 1
168 6001 VEGETATIVE WATERING MG 62.100 109.50000 7,583.670 19.35921 23
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 230.000 1.30000 230.000 1.30000 1
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     32.000 5.30000 1