Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyWISE
Highway US 380 ETC
From CONCRETE PAVT EAST OF DECATUR
To DENTON COUNTY LINE
CSJ 0134-08-041
Proj ID NH 2008(741)
Work Type HMAC OVERLAY
 
21.158 4457152.78 1028645.25 4257486.08 95.5
Work Order 08-19-08
Work Began 09-04-08
Work Completed  
Time Computed 09-04-08
Contract Working Days 85
Addl Days Granted 0
Working Days Charged 48
Percent Time Used 56
Contractor(s)
AUSTIN BRIDGE & ROAD, LP
SUBCONTRACTOR(S) FOR CCSJ: 0134-08-041
TOTAL HIGHWAY MAINTENANCE, LLC (2.08%)
HIGHWAY TECHNOLOGIES, L.P. (0.44%)
TEX OP CONSTRUCTION, LP(0.30%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.13%)
VANCE BROTHERS, INC. (4.80%)
DUSTROL, INC. (ROANOKE)(0.23%)
Contract # 07083207
Totals 4457152.78 1028645.25 4257486.08 95.5

CountyJACK
Highway SH 199
From AT SNAKE CREEK
To .
CSJ 0171-01-025
Proj ID BR 2006(466)
Work Type REPL BRIDGE
 
0.246 2212198.81 0.00 2006268.17 92.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-02-06
Work Began 11-06-06
Work Completed  
Time Computed 10-18-06
Contract Working Days 160
Addl Days Granted 10
Working Days Charged 221
Percent Time Used 130
Contractor(s)
AUI CONTRACTORS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0171-01-025
SITESAFE PRODUCTS TEXAS(3.00%)
NOLAN ENVIRONMENTAL, LLC (1.36%)
CAPROCK SPECIALITY CONTRACTORS (0.19%)
STOMPER DEMOLITION (2.86%)
TEXAS SHAFTS, INC. (3.13%)
DUSTROL, INC.(0.99%)
PREMIER PAVING, LTD. (8.88%)
UNIVERSAL FENCE COMPANY, INC.(0.15%)
ODUM SERVICES, L.P.(2.63%)
TEXAS HIGHWAY MARKINGS, LLC(1.48%)
HORIZON SIGNAL TECHNOLOGIES, INC.(2.39%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(4.41%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(9.36%)
GUAJARDO STEEL (0.06%)
Contract # 08063026
Totals 2212198.81 0.00 2006268.17 92.5

CountyTARRANT
Highway SH 199
From 0.7 MI S OF DENVER TRAIL
To 0.6 MI N OF FM 1886
CSJ 0171-04-067
Proj ID STP 2007(233)MM
Work Type GRADING, DRAINAGE AND PAVEMENT
 
4.307 31788019.00 898273.54 20496109.50 64.4
Work Order 05-03-07
Work Began 06-11-07
Work Completed  
Time Computed 05-19-07
Contract Working Days 619
Addl Days Granted 19
Working Days Charged 391
Percent Time Used 61
Contractor(s)
TEXAS STERLING CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0171-04-067
CEN-TEX SEEDING, INC.(2.20%)
ATS DRILLING, L.P. (0.20%)
BANDA TRUCKING COMPANY (2.80%)
BREDA COMPANY, INC.(5.66%)
CPAV SPECIALTIES, LP (0.26%)
HARDSCAPE CONSTRUCTION SPECIALTIES (0.02%)
INLET STRUCTURE SPECIALTIES LTD. (2.81%)
MICA CORPORATION (4.00%)
ODUM SERVICES, L.P.(1.61%)
CRAIG OLDEN, INC.(1.19%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY( 13.99%)
ROADWAY TECHNOLOGIES, LLC. (0.03%)
UNITED RENTALS HIGHWAY TECHNOLOGIES (NEWELL RD-FTWORTH)(1.10%)
W.W. WEBBER, LLC (0.72%)
DURABLE SPECIALTIES, INC.(1.21%)
LAYFIELD CONSTRUCTION, INC (0.17%)
Contract # 02073201
Totals 31788019.00 898273.54 20496109.50 64.4

CountyTARRANT
Highway BU 287P
From ON ROSEDALE ST FROM IH 35W
To RIVERSIDE DR IN FORT WORTH
CSJ 0172-01-042
Proj ID HP 2008(828)
Work Type WIDEN GR, DR, BASE & SURF, & REPL R
 
1.050 14895063.03 0.00 0.00 0.0
CountyTARRANT
Highway MH
From ON ROSEDALE ST FROM RIVERSIDE DR
To US 287 IN FORT WORTH
CSJ 8649-02-004
Proj ID C 8649-2-4
Work Type WIDEN GR, DR, BASE & SURF
 
0.250 2290892.62 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-14-08
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 425
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TEXAS STERLING CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0172-01-042
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08083201
Totals 17185955.65 0.00 0.00 0.0

CountyTARRANT
Highway BU 287P ETC
From BERRY STREET
To MILLER AVENUE
CSJ 0172-01-049
Proj ID NH 2008(743)
Work Type MILL, REPAIR AND OVERLAY
 
8.946 8328541.17 1129611.61 3454488.26 41.4
Work Order 08-20-08
Work Began 09-11-08
Work Completed  
Time Computed 09-05-08
Contract Working Days 171
Addl Days Granted 0
Working Days Charged 59
Percent Time Used 34
Contractor(s)
APAC-TEXAS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0172-01-049
BATTSON CONTRACTING CO., INC.(2.19%)
J.L. STEEL, L.P. ( 14.80%)
CONCRETE CUTTING BY BOND (0.63%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (0.16%)
TEX OP CONSTRUCTION, LP(5.80%)
TOTAL HIGHWAY MAINTENANCE, LLC (3.22%)
VANCE BROTHERS, INC. (5.70%)
Contract # 07083204
Totals 8328541.17 1129611.61 3454488.26 41.4

CountyTARRANT
Highway US 287
From AT VICKERY BLVD
To .
CSJ 0172-06-068
Proj ID BR 2008(364)
Work Type REHAB BRIDGE
 
0.115 2898949.05 57640.00 712430.31 24.5
Work Order 04-09-08
Work Began 08-06-08
Work Completed  
Time Computed 04-25-08
Contract Working Days 213
Addl Days Granted 0
Working Days Charged 79
Percent Time Used 37
Contractor(s)
SCR CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0172-06-068
BREDA COMPANY, INC.(0.56%)
COWTOWN TRAFFIC CONTROL, INC.(0.58%)
DUSTROL, INC. (ROANOKE)(0.82%)
FARR FOUNDATION, INC.(0.78%)
FOUNDATION DRILLERS, INC.(0.91%)
INTEGRATED ROADWAY SERVICES, INC.(8.72%)
PREMIER PAVING, LTD. (2.48%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (0.57%)
STOMPER DEMOLITION COMPANY, INC. (1.72%)
TEXAS HIGHWAY MARKINGS, LLC(0.27%)
Contract # 02083206
Totals 2898949.05 57640.00 712430.31 24.5

CountyJOHNSON
Highway US 67 ETC
From ELLIS COUNTY LINE
To 0.7 MILE WEST OF IH 35W
CSJ 0260-01-050
Proj ID NH 2008(068)
Work Type SEAL COAT
 
309.295 8973983.88 232369.50 8021158.24 89.5
Work Order 11-07-07
Work Began 06-16-08
Work Completed  
Time Computed 11-23-07
Contract Working Days 80
Addl Days Granted 11
Working Days Charged 105
Percent Time Used 115
Contractor(s)
BRANNAN PAVING CO., LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0260-01-050
TEXAS HIGHWAY MARKINGS, LLC(9.18%)
Contract # 10073003
Totals 8973983.88 232369.50 8021158.24 89.5

CountyPARKER
Highway IH 20
From PALO PINTO COUNTY LINE
To 0.083 MILE EAST OF FM 113
CSJ 0314-01-072
Proj ID IM 20-4(258)
Work Type REHABILITATION OF EXISTING ROADWAY
 
8.181 27351161.65 0.00 26533022.72 99.7
Work Order 10-14-05
Work Began 11-21-05
Work Completed  
Time Computed 10-30-05
Contract Working Days 441
Addl Days Granted 77
Working Days Charged 648
Percent Time Used 125
Contractor(s)
W.W. WEBBER INC.
SUBCONTRACTOR(S) FOR CCSJ: 0314-01-072
INDUS CONSTRUCTION, L.P. ( 14.11%)
COWTOWN TRAFFIC CONTROL, INC.(0.33%)
PRIMATE CONSTRUCTION, INC. (0.07%)
TEXAS ALTERNATIVE GRASSER, INC.(0.12%)
S & S PAINTING (0.10%)
ODUM SERVICES, L.P.(1.26%)
UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON)(1.63%)
AUSTIN BRIDGE & ROAD, LP ( 25.98%)
Contract # 08053005
Totals 27351161.65 0.00 26533022.72 99.7

CountyPALO PINTO
Highway IH 20
From 0.07 MI EAST OF BARTON CREEK BRIDGE
To 0.30 MI EAST OF CR 193
CSJ 0314-03-049
Proj ID IM 0204(262)
Work Type GR, DR, BASE AND PAVEMENT
 
4.545 16542101.81 0.00 16409606.84 99.5
Work Order 04-04-07
Work Began 06-18-07
Work Completed  
Time Computed 04-20-07
Contract Working Days 251
Addl Days Granted 0
Working Days Charged 281
Percent Time Used 111
Contractor(s)
W.W. WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0314-03-049
CEN-TEX SEEDING, INC.(0.49%)
HJC FARMS, INC.(0.64%)
INDUS CONSTRUCTION, L.P. ( 15.12%)
SILVA CONTRACTING COMPANY, INC.( 29.29%)
SURFACE PREPARATION TECHNOLOGIES, INC. (0.24%)
UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON)(1.71%)
UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON)(0.22%)
Contract # 02073002
Totals 16542101.81 0.00 16409606.84 99.5

CountyPALO PINTO
Highway FM 4
From FM 4 AT TRIBUTARY TO PALO PINTO CRK
To .
CSJ 0314-06-032
Proj ID BR 2007(678)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.113 778337.64 141588.55 543946.00 69.8
Work Order 05-07-08
Work Began 06-16-08
Work Completed  
Time Computed 05-23-08
Contract Working Days 121
Addl Days Granted 0
Working Days Charged 116
Percent Time Used 95
Contractor(s)
BAKER BRIDGE, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0314-06-032
TEX OP CONSTRUCTION, LP(0.73%)
JONA CONTRACTING, INC. (4.03%)
PENHALL COMPANY(0.25%)
HIGHWAY TECHNOLOGIES (0.70%)
ROADWAY TECHNOLOGIES, LLC. (0.32%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(8.97%)
PEACHTREE CONSTRUCTION, LTD. (7.17%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (4.85%)
ROAD MASTER STRIPING LLC (0.33%)
Contract # 03083222
Totals 778337.64 141588.55 543946.00 69.8

CountyWISE
Highway SH 114 ETC
From LP 373
To FM 51
CSJ 0352-01-053
Proj ID STP 2009(068)
Work Type SEAL COAT
 
389.552 19495030.48 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-20-08
Work Began 00-00-00
Work Completed  
Time Computed 05-15-09
Contract Working Days 69
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
MISSOURI PETROLEUM PRODUCTS COMPANY LLC
SUBCONTRACTOR(S) FOR CCSJ: 0352-01-053
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10083203
Totals 19495030.48 0.00 0.00 0.0

CountyJOHNSON
Highway SH 171
From AT W INDUSTRIAL/CR 900/CR 1125
To IN CLEBURNE
CSJ 0365-03-038
Proj ID STP 2008(831)
Work Type TRAFFIC SIGNAL INSTALLATION
 
0.100 287214.48 18265.00 18265.00 6.3
Work Order 09-19-08
Work Began 11-18-08
Work Completed  
Time Computed 11-18-08
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 7
Percent Time Used 11
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0365-03-038
DURABLE SPECIALTIES, INC.( 24.42%)
NORTHEASTERN PAVERS, INC.( 26.24%)
Contract # 08083014
Totals 287214.48 18265.00 18265.00 6.3

CountyJOHNSON
Highway SH 171
From AT WINDMILL ROAD
To IN CLEBURNE
CSJ 0365-03-039
Proj ID CC 365-3-39
Work Type TRAFFIC SIGNAL INSTALLATION
 
0.407 525564.27 337834.15 415035.09 78.9
Work Order 09-23-08
Work Began 10-20-08
Work Completed  
Time Computed 10-09-08
Contract Working Days 42
Addl Days Granted 0
Working Days Charged 35
Percent Time Used 83
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0365-03-039
TEX OP CONSTRUCTION, LP(1.08%)
BATTSON CONTRACTING CO., INC.( 14.32%)
TOTAL HIGHWAY MAINTENANCE, LLC (4.79%)
PEACHTREE CONSTRUCTION, LTD. ( 40.20%)
Contract # 07083027
Totals 525564.27 337834.15 415035.09 78.9

CountyPALO PINTO
Highway FM 4
From IH 20
To HOOD C/L
CSJ 0385-01-018
Proj ID SFT 385-1-18
Work Type GRADING, BASE AND 2 CST
 
13.000 5350444.12 0.00 4502196.01 89.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 09-13-06
Work Began 10-19-06
Work Completed  
Time Computed 09-29-06
Contract Working Days 171
Addl Days Granted 14
Working Days Charged 285
Percent Time Used 154
Contractor(s)
W.W. WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0385-01-018
SILVA CONTRACTING COMPANY, INC.( 17.14%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (3.45%)
JONA CONTRACTING, INC. (2.01%)
UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON)(2.37%)
FARR FOUNDATION, INC.(1.79%)
J.V. CONCRETE CONSTRUCTION (9.01%)
Contract # 08063243
Totals 5350444.12 0.00 4502196.01 89.9

CountyHOOD
Highway SH 144
From CONTRARY CREEK ROAD
To FM 2425 (NORTH)
CSJ 0385-04-037
Proj ID STP 2006(111)
Work Type GRADING, STRUCTURES AND PAVEMENT
 
3.439 9756746.99 193639.46 9436733.20 99.2
Work Order 01-13-06
Work Began 09-11-06
Work Completed  
Time Computed 07-13-06
Contract Working Days 340
Addl Days Granted 138
Working Days Charged 498
Percent Time Used 104
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0385-04-037
RAMBO CONTRACTING, INC.( 10.93%)
CEN-TEX SEEDING, INC.(3.18%)
MURRAY CONSTRUCTION(0.54%)
DUSTROL, INC. (ROANOKE)(0.39%)
MICA CORPORATION (0.76%)
L & E HART ENTERPRISES, INC. (3.73%)
DURABLE SPECIALTIES, INC.(0.73%)
NORTHEASTERN PAVERS, INC.( 39.78%)
TEXAS HIGHWAY MARKINGS, LLC(0.75%)
FORTSON CONTRACTING, INC.(0.06%)
Contract # 12053205
Totals 9756746.99 193639.46 9436733.20 99.2

CountyHOOD
Highway SH 144
From AT AUTUMN RIDGE DRIVE
To IN GRANBURY
CSJ 0385-04-040
Proj ID CC 385-4-40
Work Type TRAFFIC SIGNAL INSTALLATION
 
0.100 94700.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 30
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DURABLE SPECIALTIES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0385-04-040
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 12083216
Totals 94700.00 0.00 0.00 0.0

CountyJACK
Highway FM 4
From FM 4 AT SALT CREEK
To .
CSJ 0391-07-023
Proj ID BR 2008(692)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.200 2388295.20 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 174
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
EARTH BUILDERS, L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0391-07-023
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10083006
Totals 2388295.20 0.00 0.00 0.0

CountyPARKER
Highway FM 1885
From FM 1885 AT ROCK CREEK
To .
CSJ 0539-05-013
Proj ID BR 2008(832)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.100 1060967.65 0.00 0.00 0.0
Work Order 09-18-08
Work Began 00-00-00
Work Completed  
Time Computed 10-04-08
Contract Working Days 120
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
COPPELL CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0539-05-013
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08083223
Totals 1060967.65 0.00 0.00 0.0

CountyPARKER
Highway PR 71
From US 180
To END; LAKE MINERAL WELLS STATE PARK
CSJ 0614-01-004
Proj ID STP 2008(833)
Work Type GRADING AND PAVEMENT
 
0.750 629808.37 60250.00 61750.00 9.8
CountyPARKER
Highway VA
From PR 71
To IN MINERAL WELLS STATE PARK
CSJ 0902-38-073
Proj ID C 902-38-73
Work Type GRADING, DRAINAGE AND PAVEMENT
 
0.100 1950999.67 442719.06 442719.06 22.6
Work Order 09-12-08
Work Began 10-27-08
Work Completed  
Time Computed 09-28-08
Contract Working Days 91
Addl Days Granted 0
Working Days Charged 18
Percent Time Used 19
Contractor(s)
THE LANE CONSTRUCTION CORPORATION
SUBCONTRACTOR(S) FOR CCSJ: 0614-01-004
HIGHWAY TECHNOLOGIES (0.40%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.42%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(2.30%)
NORTHEASTERN PAVERS, INC.(7.98%)
Contract # 08083219
Totals 2580808.04 502969.06 504469.06 19.5

CountyPARKER
Highway FM 1885
From FM 52
To FM 920
CSJ 0649-02-027
Proj ID SFT 649-2-27
Work Type GRADING, BASE AND 2 CST
 
17.500 6693926.84 87626.59 5597993.04 89.1
Work Order 10-17-06
Work Began 04-16-07
Work Completed  
Time Computed 04-16-07
Contract Working Days 178
Addl Days Granted 27
Working Days Charged 315
Percent Time Used 153
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0649-02-027
NORTHEASTERN PAVERS, INC.( 11.85%)
CEN-TEX SEEDING, INC.(1.76%)
UNITED RENTALS HIGHWAY TECHNOLOGIES, L.P. (HOUSTON)(1.27%)
FORTSON CONTRACTING, INC.(1.73%)
J.V. CONCRETE CONSTRUCTION (6.99%)
TEX OP CONSTRUCTION, LP(2.41%)
Contract # 09063232
Totals 6693926.84 87626.59 5597993.04 89.1