Monthly State Let Construction Report For Fort Worth District As Of Dec 9, 2016 Page 2 Of 5

Last Update: Friday, December 9, 2016
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyTARRANT
Highway US 287
From 1.00 M SOUTH TURNER WARNELL RD
To WALNUT CREEK DRIVE
CSJ 0172-09-033
Proj ID CC 172-9-33
Work Type GR, BS, DR, STR, AND PAV
 
2.877 4196348.59 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 277
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0172-09-033
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 11163022
Totals 4196348.59 0.00 0.00 0.0

CountyPALO PINTO
Highway US 281 ETC
From JACK COUNTY LINE
To NE 21ST STREET
CSJ 0249-08-041
Proj ID STP 2016(148)
Work Type SEAL COAT
 
209.169 8069594.95 363677.70 8389991.80 99.9
Work Order 01-29-16
Work Began 05-03-16
Work Completed  
Time Computed 05-03-16
Contract Working Days 97
Addl Days Granted 0
Working Days Charged 93
Percent Time Used 95
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0249-08-041
FLAT LINE, INC.( 15.28%)
BARRICADES PLUS, LLC (1.26%)
BRYDL CONTRACTING, INC.(0.62%)
INNOVATIVE ROADWAY SOLUTIONS LLC (0.25%)
Contract # 10153210
Totals 8069594.95 363677.70 8389991.80 99.9

CountyPALO PINTO
Highway US 281
From AT BRAZOS RIVER
To .
CSJ 0250-02-039
Proj ID BR 1402(032)
Work Type GR, BS, HMAC, DR, STR, BR, SIGN, PVT MK
 
1.082 5829658.60 17816.40 5821594.38 99.8
Work Order 12-02-14
Work Began 04-13-15
Work Completed  
Time Computed 02-02-15
Contract Working Days 273
Addl Days Granted 0
Working Days Charged 256
Percent Time Used 93
Contractor(s)
ELLIS-MCGINNIS CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0250-02-039
PREMIER PAVING, LTD. ( 10.91%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (1.17%)
MCL CONTRACTING, LLC (0.58%)
SCOTT DERR PAINTING CO (0.30%)
PRIMATE CONSTRUCTION, INC. (0.16%)
DUSTROL, INC.(0.15%)
TEXAS SHAFTS, INC. (5.84%)
STRIPING TECHNOLOGY, L.P.(0.55%)
FORTSON CONTRACTING, INC.(1.31%)
STORM WATER MANAGEMENT, INC. (0.80%)
SAN-ANN-CO., INC.(0.48%)
JAY MILLS CONTRACTING, INCORPORATED( 12.64%)
Contract # 08143236
Totals 5829658.60 17816.40 5821594.38 99.8

CountyERATH
Highway US 281
From PALO PINTO COUNTY LINE
To BU 377J, IN STEPHENVILLE
CSJ 0250-03-046
Proj ID STP 1602(432)
Work Type GR, BS, STRUCTURES AND PAVEMENT
 
46.331 24891249.31 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-16-16
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 367
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0250-03-046
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08163004
Totals 24891249.31 0.00 0.00 0.0

CountyERATH
Highway SH 6
From FM 847
To CR 303
CSJ 0258-01-028
Proj ID NH 1502(540)
Work Type GR, BS, DR, STR, PVT
 
8.194 6192975.15 842006.87 5619978.88 90.7
Work Order 11-10-15
Work Began 01-25-16
Work Completed  
Time Computed 12-11-15
Contract Working Days 272
Addl Days Granted 26
Working Days Charged 189
Percent Time Used 63
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0258-01-028
LUZ LERMA CONSTRUCTION, INC. ( 15.49%)
D. I. J. CONSTRUCTION, INC.(1.75%)
TEXAS ALTERNATIVE GRASSER, INC.(1.27%)
NORTHEASTERN PAVERS, INC.( 15.23%)
FORTSON CONTRACTING, INC.(0.44%)
Contract # 08153021
Totals 6192975.15 842006.87 5619978.88 90.7

CountyERATH
Highway US 281
From AT SH 6
To .
CSJ 0258-02-057
Proj ID STP 1502(541)HES
Work Type GRADE SEPARATION, SURF TREATMENT
 
1.073 6592271.78 60763.50 3246950.35 49.2
Work Order 11-12-15
Work Began 01-06-16
Work Completed  
Time Computed 12-13-15
Contract Working Days 303
Addl Days Granted 8
Working Days Charged 127
Percent Time Used 40
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0258-02-057
SCOTT DERR PAINTING CO, LLC(0.12%)
D. I. J. CONSTRUCTION, INC.(1.37%)
PEACHTREE CONSTRUCTION, LTD. ( 15.50%)
ANALYTICAL TECHNOLOGY CONSULTANTS, INC.(1.15%)
LUZ LERMA CONSTRUCTION, INC. (5.03%)
TEXAS ALTERNATIVE GRASSER, INC.(0.36%)
LIRA ELECTRIC(2.09%)
ODUM SERVICES, L.P.(0.23%)
ELLIS-MCGINNIS CONSTRUCTION CO.(5.60%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (0.47%)
JUST GROOVING, LTD.(0.03%)
TOTAL HIGHWAY MAINTENANCE, LLC (3.78%)
FARR FOUNDATION, INC.(2.91%)
MCL CONTRACTING, LLC (0.04%)
MCL CONTRACTING, LLC (0.11%)
Contract # 08153219
Totals 6592271.78 60763.50 3246950.35 49.2

CountySOMERVELL
Highway US 67
From CR 2021
To ERATH COUNTY LINE
CSJ 0259-02-050
Proj ID NH 2016(831)
Work Type MILL AND OVERLAY
 
8.952 8834162.22 1848253.20 3178831.15 35.9
Work Order 08-23-16
Work Began 10-18-16
Work Completed  
Time Computed 09-23-16
Contract Working Days 125
Addl Days Granted 0
Working Days Charged 25
Percent Time Used 20
Contractor(s)
NORTHEASTERN PAVERS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0259-02-050
LUZ LERMA CONSTRUCTION, INC. (0.71%)
TIN MAN WELDING SERVICES (0.84%)
TOTAL HIGHWAY MAINTENANCE, LLC (2.58%)
COWBELL TRAFFIC SERVICES, INC. (0.27%)
Contract # 06163231
Totals 8834162.22 1848253.20 3178831.15 35.9

CountyJOHNSON
Highway US 67
From PPROX. SH 174
To 0.72 MI WEST OF SPUR 102
CSJ 0259-06-001
Proj ID NH 2013(835)
Work Type GRADING, STRUCTURES, BASE, & SURF
 
3.860 28488425.86 640565.95 22309774.20 78.3
Work Order 12-17-13
Work Began 04-30-14
Work Completed  
Time Computed 04-17-14
Contract Working Days 606
Addl Days Granted 79
Working Days Charged 662
Percent Time Used 96
Contractor(s)
LONE STAR CIVIL CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0259-06-001
COWTOWN TRAFFIC CONTROL, INC.(0.10%)
A.M.S. COMPANY, INC. ( 23.62%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (0.51%)
RUSSO CORPORATION(1.73%)
AR DANIEL CONSTRUCTION SERVICES, INC.(0.69%)
W.O.E. CONSTRUCTION(0.21%)
BANDA TRUCKING COMPANY (0.66%)
DUSTIN ALLEN, INC. (1.00%)
INDUS CONSTRUCTION, L.P. (0.89%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.78%)
TEX OP CONSTRUCTION, LP(0.11%)
HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, INC (1.53%)
PREMIER PAVING, LTD. (8.34%)
PEAK COMMUNICATIONS LLC(0.05%)
DOUBLE S CONSTRUCTION(0.05%)
A+ GRANITE AND STONE DCOR (0.05%)
BRAZOS VALLEY HYDRO SEEDING(1.09%)
SHALOM SERVICES CORPORATION(0.18%)
CROSS ROADS, L.P.(0.01%)
3I CONSTRUCTION, LLC (0.18%)
WG ENGINEERING & CONSTRUCTION, LLC (0.29%)
Contract # 09133004
Totals 28488425.86 640565.95 22309774.20 78.3

CountyJOHNSON
Highway US 67
From AT CR 213
To IN VENUS
CSJ 0260-01-056
Proj ID STP 1602(433)
Work Type LANDSCAPING AND IRRIGATION
 
0.200 56819.85 0.00 0.00 0.0
Work Order 09-21-16
Work Began 00-00-00
Work Completed  
Time Computed 10-22-16
Contract Working Days 20
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
AALC, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0260-01-056
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08163247
Totals 56819.85 0.00 0.00 0.0

CountyWISE
Highway FM 51
From DENTON COUNTY LINE
To FM 1204
CSJ 0312-03-030
Proj ID STP 2016(833)
Work Type HMAC OVERLAY
 
31.228 5354817.26 0.00 29750.00 0.5
Work Order 04-07-16
Work Began 00-00-00
Work Completed  
Time Computed 05-08-16
Contract Working Days 128
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0312-03-030
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03163004
Totals 5354817.26 0.00 29750.00 0.5

CountyWISE
Highway FM 51
From TRAVIS ROAD
To SH 114
CSJ 0313-01-052
Proj ID STP 2016(587)HRR
Work Type PROFILE PAVEMENT MARKERS
 
5.728 43245.49 0.00 11497.02 26.5
CountyWISE
Highway FM 51
From 1.8 MILES SOUTH OF US81 (DAVID ST)
To SH 114
CSJ 0313-01-053
Proj ID STP 2016(586)
Work Type HMAC OVERLAY
 
7.102 2145194.15 44795.64 2047070.18 95.4
Work Order 03-01-16
Work Began 08-16-16
Work Completed  
Time Computed 04-01-16
Contract Working Days 107
Addl Days Granted 0
Working Days Charged 56
Percent Time Used 52
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0313-01-053
DUSTROL, INC.(3.40%)
ALTUS TRAFFIC MANAGEMENT LLC (0.31%)
SYNERGY SIGNS & SERVICES, LLC(0.03%)
TRP CONSTRUCTION GROUP, LLC(4.21%)
WEST TEXAS RUMBLE STRIP(0.26%)
TRANSPORT TRUST(1.96%)
Contract # 01163019
Totals 2188439.64 44795.64 2058567.20 94.0

CountyPARKER
Highway IH 20
From IH20 WB FR AT PATRICK CREEK
To .
CSJ 0314-01-077
Proj ID BR 2015(563)
Work Type GR, DR, STRUC, AND PAVEMENT
 
0.100 1309705.35 45319.89 1308381.14 99.9
Work Order 03-23-15
Work Began 09-14-15
Work Completed  
Time Computed 04-08-15
Contract Working Days 148
Addl Days Granted 0
Working Days Charged 236
Percent Time Used 159
Contractor(s)
IEA INC.
SUBCONTRACTOR(S) FOR CCSJ: 0314-01-077
FORTSON CONTRACTING, INC.(1.93%)
LINDAMOOD DEMOLITION, INC. (2.39%)
EROSION CONTROL MANAGEMENT SERVICES(1.12%)
TEXOP CONSTRUCTION (0.49%)
W. W. FOUNDATION DRILLING, LTD.(5.26%)
NORTHEASTERN PAVERS, INC.( 10.65%)
TRP CONSTRUCTION GROUP, LLC(0.28%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.41%)
Contract # 02153218
Totals 1309705.35 45319.89 1308381.14 99.9

CountyTARRANT
Highway SH 114
From DOVE ROAD
To KIMBALL AVE
CSJ 0353-03-095
Proj ID NH 2012(065)
Work Type LANDSCAPING
 
2.537 410000.00 44967.10 363875.50 91.3
Work Order 08-19-15
Work Began 04-11-16
Work Completed  
Time Computed 09-19-15
Contract Working Days 85
Addl Days Granted 10
Working Days Charged 113
Percent Time Used 118
Contractor(s)
AALC, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0353-03-095
AQUA BORE(4.69%)
BUYERS BARRICADES, INC.(1.95%)
Contract # 07153265
Totals 410000.00 44967.10 363875.50 91.3

CountyTARRANT
Highway SH 26
From HALL-JOHNSON ROAD
To BROWN TRAIL
CSJ 0363-01-139
Proj ID STP 2014(154)TE
Work Type GRADING, BASE, DRAINAGE AND PAVEMENT
 
3.900 38223663.07 177850.54 1027358.40 2.6
Work Order 03-29-16
Work Began 11-07-16
Work Completed  
Time Computed 04-29-16
Contract Working Days 555
Addl Days Granted 0
Working Days Charged 12
Percent Time Used 2
Contractor(s)
JAGOE-PUBLIC COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0363-01-139
BREDA COMPANY, INC.(0.67%)
ODUM SERVICES, L.P.(0.05%)
TRANSPORT TRUST(0.00%)
W.O.E. CONSTRUCTION(0.18%)
ROADWAY SOLUTIONS, INC.(7.74%)
USA EROSION, INC.(2.25%)
ALTUS TRAFFIC MANAGEMENT LLC (0.34%)
TEXAS BOMANITE (1.61%)
STRIPING TECHNOLOGY, L.P.(0.74%)
OSCAR ORDUNO, INC. (0.23%)
STRIPING SYSTEMS, INC. (0.00%)
ASHLAR CONTRACTING COMPANY (6.26%)
JACKSON CONSTRUCTION, LTD. ( 14.96%)
GOLDEN TREE MAINTENANCE(0.14%)
DUSTROL, INC.(2.46%)
JSS BORI GROUP, LLC(5.66%)
TEXAS SHAFTS, INC. (0.67%)
ARK CONTRACTING SERVICES, LLC(0.50%)
C.T. AND S. METALWORKS, INC. (0.14%)
Contract # 02163201
Totals 38223663.07 177850.54 1027358.40 2.6

CountyTARRANT
Highway SH 26
From GAYLORD TRAIL DRIVE
To GRAPEVINE MILLS BOULEVARD SOUTH
CSJ 0364-06-011
Proj ID STP 2011(227)TE
Work Type CROSSWALKS, ADA RAMPS & IMPROVEMENTS
 
1.360 1240195.30 0.00 948968.29 92.9
CountyTARRANT
Highway VA
From GAYLORD TEXAN; IN GRAPEVINE
To NORTH OF GRAPEVINE MILLS MALL
CSJ 0902-48-663
Proj ID HP 2013(083)
Work Type GR, DR, STRUCTURE AND PAVEMENT
 
1.000 308901.54 0.00 218043.97 70.5
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-17-14
Work Began 05-20-14
Work Completed  
Time Computed 02-02-14
Contract Working Days 179
Addl Days Granted 0
Working Days Charged 439
Percent Time Used 245
Contractor(s)
LEGENDS LANDSCAPES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0364-06-011
PORTER INTERNATIONAL CONSTRUCTION LLC(0.00%)
COWTOWN REDI MIX, INC. (0.00%)
ED BELL CONSTRUCTION COMPANY (0.00%)
GLS MASONRY, INC.(0.00%)
JE CASEY, LLC(0.00%)
TEXAS SHAFTS, INC. (0.00%)
A & A CONSTRUCTION (0.00%)
W.O.E. CONSTRUCTION(0.00%)
RAINMASTER IRRIGATION & JB LAWN SERVICE(0.00%)
Contract # 08133257
Totals 1549096.84 0.00 1167012.26 88.5

CountyPARKER
Highway FM 1885
From PARKER/PALO PINTO COUNTY LINE
To FM 52
CSJ 0539-05-015
Proj ID STP 1502(332)
Work Type GR, BS, DR, STRUC. AND PAVEMENT
 
5.943 5556310.37 291527.65 2732331.18 49.1
Work Order 08-03-15
Work Began 03-15-16
Work Completed  
Time Computed 09-02-15
Contract Working Days 299
Addl Days Granted 0
Working Days Charged 138
Percent Time Used 46
Contractor(s)
A. L. HELMCAMP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0539-05-015
J & M CONTRACTING, COMPANY ( 16.79%)
ALTUS TRAFFIC MANAGEMENT LLC (0.43%)
HJC FARMS, INC.(2.97%)
STRIPING TECHNOLOGY, L.P.(1.37%)
Contract # 06153244
Totals 5556310.37 291527.65 2732331.18 49.1

CountyERATH
Highway FM 914
From FM 847
To SH 6
CSJ 0550-03-024
Proj ID STP 2015(770)HES
Work Type GRADING, BASE, DRAINAGE, STRUCTURE & PVT
 
8.926 3426804.42 81828.10 3124055.36 91.1
Work Order 03-29-16
Work Began 05-09-16
Work Completed  
Time Computed 04-25-16
Contract Working Days 215
Addl Days Granted 0
Working Days Charged 125
Percent Time Used 58
Contractor(s)
KNIFE RIVER CORPORATION - SOUTH
SUBCONTRACTOR(S) FOR CCSJ: 0550-03-024
ODUM SERVICES, L.P.(0.64%)
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (6.45%)
D.I.J. CONSTRUCTION, INC (3.23%)
LINDAMOOD DEMOLITION, INC. (0.78%)
M & D FOUNDATION DRILLING INDUSTRIES, INC. (1.47%)
MCL CONTRACTING, LLC (0.08%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.64%)
BEAR CREEK CONSTRUCTION, LLC ( 11.36%)
SAN-ANN-CO., INC.(1.29%)
JUST GROOVING, LTD.(0.09%)
SOUTH TEXAS PAINTING COMPANY (0.13%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.09%)
Contract # 02163238
Totals 3426804.42 81828.10 3124055.36 91.1

CountyTARRANT
Highway FM 157
From MITCHELL STREET; IN ARLINGTON
To IH 20
CSJ 0747-04-065
Proj ID STP 1402(034)HRR
Work Type GR, BS AND PAVEMENT
 
3.795 5294353.95 600.16 8009722.85 99.9
Work Order 12-05-14
Work Began 02-11-15
Work Completed  
Time Computed 02-11-15
Contract Working Days 281
Addl Days Granted 94
Working Days Charged 375
Percent Time Used 100
Contractor(s)
THE FAIN GROUP, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0747-04-065
BEAN ELECTRICAL, INC.(1.29%)
BUYERS BARRICADES, INC.(0.91%)
DUSTROL, INC.(1.88%)
O. TREVINO CONSTRUCTION, LLC ( 16.17%)
PEACHTREE CONSTRUCTION, LTD. ( 27.01%)
STRIPING TECHNOLOGY, L.P.(2.49%)
WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.80%)
SUPER SURFACE, INC.(7.24%)
ORNELAS & SON"S TRUCKING (1.39%)
W.O.E. CONSTRUCTION(0.18%)
BRENDA PRICE TRUCKING(0.00%)
STRAIGHT LINE SAWING & SEALING (0.22%)
COWBOY TRUCKING(0.94%)
CLASSIC STEEL, LLC (0.50%)
DJ CONCRETE, LLC (6.62%)
STRIPE-A-ZONE, INC.(0.35%)
Contract # 08143213
Totals 5294353.95 600.16 8009722.85 99.9

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To DISTRICT WIDE FY 2013
CSJ 0902-00-134
Proj ID NH 2013(957)G
Work Type SIGN STUCTURES
 
41.900 476055.25 0.00 265131.99 70.1
Work Order 07-08-14
Work Began 01-05-15
Work Completed  
Time Computed 07-24-14
Contract Working Days 128
Addl Days Granted 0
Working Days Charged 245
Percent Time Used 191
Contractor(s)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-134
HIGHWAY TRAFFIC CONTROL & SERVICES, LLC(1.97%)
ODUM SERVICES, L.P.(1.73%)
DYNAMIC VISION CO., INC. (5.67%)
CREDENCE BUILDER, INC. ( 15.13%)
LAUGHLEY BRIDGE & CONSTRUCTION, INC. ( 11.29%)
Contract # 04143241
Totals 476055.25 0.00 265131.99 70.1

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To NCTCOG
CSJ 0902-00-138
Proj ID C 902-0-138
Work Type TXDOT MGMT SYSTEM OPERATION PROG
 
0.100 749479.32 303202.79 303202.79 40.4
Work Order 08-03-16
Work Began 10-31-16
Work Completed  
Time Computed 08-29-16
Contract Working Days 60
Addl Days Granted 9
Working Days Charged 27
Percent Time Used 39
Contractor(s)
FLORIDA TRAFFIC CONTROL DEVICES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-138
ALTUS TRAFFIC MANAGEMENT LLC ( 16.86%)
INTERSTATE BARRICADES & MARKINGS, INC. ( 14.62%)
Contract # 06163234
Totals 749479.32 303202.79 303202.79 40.4