Monthly State Let Construction Report For Fort Worth District As Of Apr 11, 2014 Page 3 Of 5

Last Update: Friday, April 11, 2014
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyPALO PINTO
Highway SH 254
From FM 4 IN GRAFORD
To US 281
CSJ 0539-04-035
Proj ID STP 2013(539)
Work Type HMAC OVERLAY AND BASE REPAIR
 
11.191 2066986.35 0.00 144146.40 6.9
Work Order 07-31-13
Work Began 09-23-13
Work Completed  
Time Computed 08-16-13
Contract Working Days 89
Addl Days Granted 0
Working Days Charged 27
Percent Time Used 30
Contractor(s)
ZACK BURKETT CO.
SUBCONTRACTOR(S) FOR CCSJ: 0539-04-035
W.S. CONSTRUCTION COMPANY(3.93%)
COTHRAN TRUCKING, LLC(2.87%)
TOTAL HIGHWAY MAINTENANCE, LLC (3.51%)
LONE STAR BARRIER SERVICES, LLC(2.01%)
CHEROKEE SERVICES(0.23%)
RICE ENVIRONMENTAL SERVICES(1.07%)
TEX OP CONSTRUCTION, LP(2.37%)
Contract # 04133225
Totals 2066986.35 0.00 144146.40 6.9

CountyPARKER
Highway FM 113
From FM 113 AT N RIPPY BRANCH (STR. #3)
To .
CSJ 0717-02-019
Proj ID BR 2013(540)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.070 446097.30 0.00 437779.95 98.1
Work Order 09-04-13
Work Began 09-23-13
Work Completed  
Time Computed 09-20-13
Contract Working Days 72
Addl Days Granted 0
Working Days Charged 70
Percent Time Used 97
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0717-02-019
ACTION SERVICES(1.64%)
PEACHTREE CONSTRUCTION, LTD. ( 15.99%)
LONE STAR HIGHWAY PRODUCTS, INC. (6.73%)
Contract # 06133230
Totals 446097.30 0.00 437779.95 98.1

CountyTARRANT
Highway FM 156
From 1000 FT NORTH OF AVONDALE-HASLETT
To 500 FT SOUTH OF AVONDALE-HASLETT RD
CSJ 0718-02-065
Proj ID STP 2013(954)
Work Type GR, BS, AND PAVEMENT
 
0.852 403357.75 2770.00 404734.35 99.9
Work Order 09-17-13
Work Began 10-21-13
Work Completed  
Time Computed 10-03-13
Contract Working Days 35
Addl Days Granted 0
Working Days Charged 54
Percent Time Used 154
Contractor(s)
ED BELL CONSTRUCTION COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0718-02-065
CROSSROADS, L.P. (1.29%)
SIGNATURE CONTRACTING SERVICES, L.L.C. (4.98%)
FORTSON CONTRACTING, INC.(2.48%)
PEACHTREE CONSTRUCTION, LTD. ( 21.40%)
STRIPING TECHNOLOGY, L.P.(1.84%)
BRENDA PRICE TRUCKING(0.00%)
Contract # 08133261
Totals 403357.75 2770.00 404734.35 99.9

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To DISTRICTWIDE FY 14
CSJ 0902-00-126
Proj ID STP 1302(027)
Work Type CONCRETE REPAIR
 
0.100 1413335.00 340507.67 1037874.56 73.4
Work Order 08-19-13
Work Began 10-21-13
Work Completed  
Time Computed 10-19-13
Contract Working Days 365
Addl Days Granted 0
Working Days Charged 164
Percent Time Used 44
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-126
W.O.E. CONSTRUCTION(2.37%)
BRENDA PRICE TRUCKING(2.36%)
Contract # 07133010
Totals 1413335.00 340507.67 1037874.56 73.4

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To DISTRICTWIDE
CSJ 0902-00-133
Proj ID STP 2013(552)
Work Type TRAFFIC SIGNAL INSTALLATION
 
0.100 815000.00 20474.50 425640.96 52.2
Work Order 04-23-13
Work Began 07-23-13
Work Completed  
Time Computed 07-23-13
Contract Working Days 365
Addl Days Granted 0
Working Days Charged 246
Percent Time Used 67
Contractor(s)
DURABLE SPECIALTIES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-133
ROADMASTER, INC. (1.45%)
DYNAMIC VISION CO., INC. (6.56%)
Contract # 03133030
Totals 815000.00 20474.50 425640.96 52.2

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To DISTRICT WIDE FY 2013
CSJ 0902-00-134
Proj ID NH 2013(957)G
Work Type SIGN STUCTURES
 
41.900 476055.25 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 128
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-134
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04143241
Totals 476055.25 0.00 0.00 0.0

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To DISTRICTWIDE
CSJ 0902-00-136
Proj ID STP 2014(353)G
Work Type TRAFFIC SIGNALS
 
0.100 1275000.00 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-12-14
Work Began 00-00-00
Work Completed  
Time Computed 03-28-14
Contract Working Days 365
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
DURABLE SPECIALTIES, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-136
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 01143223
Totals 1275000.00 0.00 0.00 0.0

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To ON FM 1187 AND FM 731
CSJ 0902-00-139
Proj ID STP 2014(663)
Work Type LANDSCAPING
 
0.100 317349.10 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 107
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
LANDSCAPE CONTRACTING AND IRRIGATION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-00-139
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04143237
Totals 317349.10 0.00 0.00 0.0

CountyJACK
Highway CR
From SQUAW MOUNTAIN RD OVER W FRK TRINIT
To .
CSJ 0902-40-022
Proj ID BR 2008(528)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.083 364644.20 87183.98 171453.98 47.0
Work Order 01-17-14
Work Began 02-19-14
Work Completed  
Time Computed 02-02-14
Contract Working Days 120
Addl Days Granted 0
Working Days Charged 29
Percent Time Used 24
Contractor(s)
HODGES AND SON CONSTRUCTION COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-40-022
TOTAL HIGHWAY MAINTENANCE, LLC (1.05%)
DUSTY ALLEN, INC.(2.69%)
PRIMATE CONSTRUCTION, INC. (0.90%)
STRIPING TECHNOLOGY, L.P.(1.06%)
LANCO TURF & SEEDING, INC. (3.17%)
Contract # 12133017
Totals 364644.20 87183.98 171453.98 47.0

CountyTARRANT
Highway CS
From AT HARRISON LANE
To ON PIPELINE RD IN HURST
CSJ 0902-48-186
Proj ID STP 94(82)MM
Work Type INTERSECTION IMPROVEMENTS
 
0.010 801805.98 16000.00 105490.00 13.1
Work Order 10-24-13
Work Began 01-15-14
Work Completed  
Time Computed 11-09-13
Contract Working Days 111
Addl Days Granted 0
Working Days Charged 5
Percent Time Used 4
Contractor(s)
O. TREVINO CONSTRUCTION, LLC
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-186
BRENDA PRICE TRUCKING(0.00%)
ROAD MASTER STRIPING LLC (0.41%)
GJ SEEDING, LLC(2.31%)
ALTUS TRAFFIC MANAGEMENT LLC (0.49%)
DURABLE SPECIALTIES, INC.( 12.07%)
DUSTROL, INC.(1.01%)
EROSION CONTROL MANAGEMENT SERVICES(0.50%)
MIKE ALBERT, INC.( 15.82%)
REYNOLDS ASPHALT & CONSTRUCTION COMPANY(4.62%)
W.O.E. CONSTRUCTION(0.17%)
Contract # 08133062
Totals 801805.98 16000.00 105490.00 13.1

CountyTARRANT
Highway CS
From W 7TH ST OVER THE TRINITY
To .
CSJ 0902-48-505
Proj ID BR 2006(767)
Work Type REPL BR & APPRS
 
0.559 24150158.45 113093.55 23760138.09 98.3
Work Order 08-10-11
Work Began 05-07-12
Work Completed  
Time Computed 08-26-11
Contract Working Days 327
Addl Days Granted 0
Working Days Charged 327
Percent Time Used 100
Contractor(s)
SUNDT CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-505
COWTOWN TRAFFIC CONTROL, INC.(0.06%)
C.T. AND S. METALWORKS, INC. (1.16%)
CAIN FENCE (0.07%)
HIGHWAY TECHNOLOGIES, INC. (0.00%)
INDUS CONSTRUCTION, L.P. (1.83%)
MICA CORPORATION (2.46%)
NORTH TEXAS CONTRACTING, INC.(1.06%)
SCOTT DERR PAINTING CO, LLC(1.62%)
TEX OP CONSTRUCTION, LP(0.05%)
TEXAS ENVIRONMENTAL MANAGEMENT, INC(1.41%)
VSTRUCTURAL LLC(3.46%)
BURKHALTER RIGGING, INC. (7.22%)
PEACHTREE CONSTRUCTION, LTD. (0.30%)
ATS DRILLING, INC. (4.50%)
GREAT WESTERN ERECTORS (0.23%)
LINDAMOOD DEMOLITION, INC. (3.04%)
PENHALL COMPANY(0.04%)
CROSSROADS, L.P. (0.10%)
BRENDA PRICE TRUCKING(0.03%)
SKAGGS ROAD BORING INC.(0.00%)
STRIPING TECHNOLOGY, L.P.(0.10%)
INLET STRUCTURE SPECIALTIES LTD. (0.21%)
A R DANIEL CONSTRUCTION SERVICES, INC. (0.22%)
GREEN SCAPING(0.00%)
EROSION PREVENTION PRODUCTS(1.35%)
Contract # 06113245
Totals 24150158.45 113093.55 23760138.09 98.3

CountyTARRANT
Highway CS
From SOUTH STEWART STREET AT ASH CREEK
To IN AZLE
CSJ 0902-48-506
Proj ID BR 2003(356)
Work Type REPLACE BR & APPRS
 
0.135 799000.00 0.00 65370.91 8.1
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 03-06-12
Work Began 00-00-00
Work Completed  
Time Computed 06-05-12
Contract Working Days 84
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
EMPIRE CIVIL CONSTRUCTION, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-506
ACTION SERVICES(0.35%)
FORTSON CONTRACTING, INC.(1.63%)
GJ SEEDING, LLC(2.58%)
PEACHTREE CONSTRUCTION, LTD. (5.65%)
TEXAS SHAFTS, INC. (6.70%)
TOTAL HIGHWAY MAINTENANCE, LLC (0.35%)
Contract # 01123025
Totals 799000.00 0.00 65370.91 8.1

CountyTARRANT
Highway CS
From PRECINCT LINE RD. AT WALKER BRANCH
To FORT WORTH
CSJ 0902-48-539
Proj ID BR 2006(132)
Work Type REPLACE BRIDGE
 
0.138 2287447.40 0.00 0.00 0.0
CountyTARRANT
Highway CS
From SH 10; ON PRECINCT LINE ROAD
To N OF TRAMMEL DAVIS; IN FT. WORTH
CSJ 0902-48-680
Proj ID HP 2007(860)
Work Type GR, DR, STR & PAVING
 
0.642 4245929.63 0.00 0.00 0.0
CountyTARRANT
Highway CS
From TRINITY BLVD; IN FORT WORTH
To AT PRECINCT LINE ROAD
CSJ 0902-48-793
Proj ID CM 2013(785)
Work Type GR, DR, PAVEMENT
 
0.420 3954288.21 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-08-13
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 315
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HAYDON BUILDING CORP.
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-539
TOTAL HIGHWAY MAINTENANCE, LLC (0.77%)
SCOTT DERR PAINTING CO, LLC(0.13%)
TEX OP CONSTRUCTION, LP(0.62%)
STAR OPERATIONS, INC.(2.74%)
PREMIER PAVING, LTD. (8.52%)
BREDA COMPANY, INC.(0.76%)
SUNDANCE FENCE & IRON, LLC (0.19%)
Contract # 08133013
Totals 10487665.24 0.00 0.00 0.0

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To IN TARRANT COUNTY
CSJ 0902-48-822
Proj ID NH 2012(353)
Work Type CONSTRUCT CURB RAMPS
 
0.001 3378473.70 110226.12 3272258.98 97.2
Work Order 06-08-12
Work Began 07-16-12
Work Completed  
Time Computed 06-24-12
Contract Working Days 283
Addl Days Granted 133
Working Days Charged 429
Percent Time Used 103
Contractor(s)
KEN-DO CONTRACTING, LP
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-822
ROAD MASTER STRIPING LLC (7.83%)
MEL"S ELECTRIC SERVICE, INC. ( 21.22%)
TEX OP CONSTRUCTION, LP(0.11%)
ALLIANCE TRUCKING(0.18%)
APAC-TEXAS, INC. (0.07%)
CHAPAS TRUCKING(0.11%)
Contract # 03123020
Totals 3378473.70 110226.12 3272258.98 97.2

CountyTARRANT
Highway CS
From ARBROOK BLVD
To BARDIN ROAD, IN ARLINGTON
CSJ 0902-48-838
Proj ID CC 902-48-838
Work Type GRADING, STRUCTURES AND PAVEMENT
 
0.740 10457967.33 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 380
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
RAGLE CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-838
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04143005
Totals 10457967.33 0.00 0.00 0.0

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To IN TARRANT COUNTY
CSJ 0902-48-844
Proj ID STP 2014(071)
Work Type CURB RAMPS
 
0.001 1813396.74 45095.79 176678.45 9.7
Work Order 01-17-14
Work Began 02-10-14
Work Completed  
Time Computed 02-02-14
Contract Working Days 216
Addl Days Granted 0
Working Days Charged 31
Percent Time Used 14
Contractor(s)
LEGENDS LANDSCAPES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-844
ALTUS TRAFFIC MANAGEMENT LLC (0.66%)
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC.(7.68%)
Contract # 10133220
Totals 1813396.74 45095.79 176678.45 9.7

CountyTARRANT
Highway VA
From VARIOUS LOCATIONS
To TARRANT COUNTY ONLY FY 2013
CSJ 0902-48-849
Proj ID STP 2013(836)
Work Type BRIDGE REPAIR
 
0.100 2687139.38 0.00 0.00 0.0
Work Order 11-05-13
Work Began 00-00-00
Work Completed  
Time Computed 11-21-13
Contract Working Days 175
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
SILVER CREEK CONSTRUCTION, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-48-849
PEACHTREE CONSTRUCTION, LTD. ( 45.90%)
VIKING CONSTRUCTION, INC.(1.14%)
Contract # 07133234
Totals 2687139.38 0.00 0.00 0.0

CountyERATH
Highway CR
From CR 266 AT GREEN CREEK
To .
CSJ 0902-49-063
Proj ID BR 2009(105)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.100 457947.66 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 04-02-14
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 51
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ELLIS-MCGINNIS CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0902-49-063
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 02143229
Totals 457947.66 0.00 0.00 0.0

CountyERATH
Highway VA
From VARIOUS LOCATIONS
To AROUND STEPHENVILLE
CSJ 0902-49-066
Proj ID STP 2012(569)
Work Type LANDSCAPE ENHANCEMENT
 
0.282 379628.18 2310.00 328298.91 86.4
Work Order 06-18-12
Work Began 10-01-12
Work Completed  
Time Computed 07-04-12
Contract Working Days 63
Addl Days Granted 0
Working Days Charged 60
Percent Time Used 95
Contractor(s)
JAY MILLS CONTRACTING, INCORPORATED
SUBCONTRACTOR(S) FOR CCSJ: 0902-49-066
MEMCO(6.42%)
LONE OAK LANDSCAPE LLC ( 50.03%)
Contract # 05123017
Totals 379628.18 2310.00 328298.91 86.4

CountyERATH
Highway VA
From US 377/SH 108 INTERSECTION
To BU377J/LILLIAN ST; IN STEPHENVILLE
CSJ 0902-49-067
Proj ID STP 2013(193)
Work Type LANDSCAPE ENHANCEMENT
 
0.100 137204.63 209.57 130693.61 95.2
Work Order 09-26-13
Work Began 10-21-13
Work Completed  
Time Computed 10-12-13
Contract Working Days 36
Addl Days Granted 0
Working Days Charged 24
Percent Time Used 66
Contractor(s)
ALL AROUND LAWN CARE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0902-49-067
MEMCO( 14.55%)
Contract # 06133010
Totals 137204.63 209.57 130693.61 95.2