AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - EL PASO DISTRICT

Last Update: Tuesday, May 5, 2015
ITEMS 400 2001 TO 432 2084
Items Items Bid Code Range
0100 - 0193
0204 - 0275
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0760
1003 - 1122
2153 - 2322
3075 - 3283
4541 - 4671
5367 - 5957
6001 - 6834
7468 - 7468
8020 - 8983
9059 - 9059
400 2001 - 432 2084
432 2096 - 465 4122
466 2014 - 496 2025
Item No Description Units April 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
400 2001 STRUCT EXCAV CY     431.000 47.15777 2
400 2003 STRUCT EXCAV (PIPE) CY     1,242.700 8.89837 3
400 2004 STRUCT EXCAV (BRIDGE) CY     6,456.000 15.57000 1
400 2005 CEM STABIL BKFL CY     10,057.000 49.38847 5
400 2008 CUT & RESTORING PAV (ASPH) SY     700.000 45.00000 1
400 2016 CEMENT STAB BACKFILL (INLET OR MH) CY     1,110.000 62.49000 1
401 2001 FLOWABLE BACKFILL CY     591.000 90.00000 1
402 2001 TRENCH EXCAVATION PROTECTION LF     29,244.000 4.16242 7
403 2001 TEMPORARY SPL SHORING SF     198,339.000 14.60339 3
416 2001 DRILL SHAFT (18 IN) LF     3,126.000 110.75088 2
416 2002 DRILL SHAFT (24 IN) LF     3,550.000 101.02839 3
416 2003 DRILL SHAFT (30 IN) LF     118.000 145.08220 2
416 2004 DRILL SHAFT (36 IN) LF     22,637.000 153.61558 5
416 2005 DRILL SHAFT (42 IN) LF     5,806.000 197.38715 3
416 2006 DRILL SHAFT (48 IN) LF     12,575.000 227.64579 2
416 2007 DRILL SHAFT (54 IN) LF     300.000 290.00000 1
416 2008 DRILL SHAFT (60 IN) LF     4,228.000 296.49000 1
416 2016 DRILL SHAFT (SIGN MTS) (12 IN) LF     56.000 190.00000 1
416 2018 DRILL SHAFT (SIGN MTS) (24 IN) LF     134.000 223.73134 2
416 2022 DRILL SHAFT (SIGN MTS) (48 IN) LF     1,393.600 512.63619 3
416 2023 DRILL SHAFT (SIGN MTS) (54 IN) LF     666.000 640.00000 1
416 2026 DRILL SHAFT (HIGH MAST POLE) (60 IN) LF     2,039.000 650.13066 3
416 2027 DRILL SHAFT (HIGH MAST POLE) (66 IN) LF     195.000 665.96000 1
416 2029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF     362.000 298.45193 3
416 2030 DRILL SHAFT (TRF SIG POLE) (24 IN) LF     162.000 201.92444 2
416 2031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF     44.300 273.48081 2
416 2032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF     200.000 336.66520 3
416 2034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF     110.000 512.26000 1
416 6029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF     56.000 300.00000 1
416 6031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF     10.500 350.00000 1
416 6032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF     108.000 450.00000 1
420 2001 CL A CONC (MISC) CY     17.000 350.00000 1
420 2002 CL B CONC (FLUME) CY     101.000 500.00000 1
420 2003 CL C CONC (ABUT) CY     63.200 716.41614 2
420 2004 CL C CONC (BENT) CY     24.700 930.00000 1
420 2006 CL C CONC (RAIL FOUNDATION) CY     1,356.800 304.76033 3
420 2013 CL C CONC (MISC) CY     113.000 649.11504 2
420 2016 CL C CONC (COLLAR) EA     34.000 1,455.34882 4
420 2018 CL C CONC (FOOTING) (MASS PLACEMENT) CY     3,095.900 501.86745 2
420 2033 CL S CONC (APPR SLAB) CY     537.700 355.25758 2
420 2035 CL S CONC (CIP SLAB SPAN) CY     88.200 609.78991 1
420 2041 CL C CONC (ABUT) (HPC) CY     1,904.700 612.90218 3
420 2042 CL C CONC (BENT) (HPC) CY     1,193.700 697.73723 3
420 2051 CL C CONC (COLUMN) CY     6.300 2,500.00000 1
420 2061 CL S CONC (HPC) BAS CY     2,954.800 472.64598 2
420 2089 CL F CONC (CAP) (MASS PLACEMENT) CY     110.300 900.00000 1
420 2092 CL C CONC (CAP) (MASS PLACEMENT) (HPC) CY     4,012.600 773.76355 2
420 2093 CL C CONC (COLUMN) (MASS PLACE) (HPC) CY     3,974.600 677.47311 2
420 2104 CL A CONC (FLUME) CY     389.000 452.96319 3
420 2223 CL C CONC (COLUMN) (HPC) CY     1,165.700 943.32370 2
420 2269 CL C CONC (CAP) (HPC) CY     1,061.400 658.69125 2
420 2292 CL S CONC (BRIDGE SDWLK) (HPC) CY     203.200 518.76560 2
420 2311 CL S CONC (APPR SLAB) (SPECIAL) (HPC) CY     667.300 663.20000 1
420 6066 CL C CONC (RAIL FOUNDATION) CY     10.000 1,000.00000 1
422 2001 REINF CONC SLAB SF     3,240.000 18.00000 1
422 2003 REINF CONC SLAB (HPC) (CL S) SF     758,827.000 14.97240 3
422 2008 REINF CONC SLAB (EXT SLAB) (HPC) (CL S) SF     9,653.000 17.11000 1
423 2001 RETAINING WALL (MSE) SF     176,806.000 39.96715 2
423 2007 RETAINING WALL (SPREAD FOOTING) SF     6,666.000 45.36000 1
423 2011 RETAINING WALL (DRILL SHAFT) (FACIA) SF     5,203.000 56.44000 1
423 2012 RETAINING WALL (CAST - IN - PLACE) SF     221.000 43.60000 1
423 2013 RETAINING WALL (TIEBACK) SF     21,429.000 45.36000 1
425 2016 PRESTR CONC SLAB BEAM (4SB15) LF     1,479.380 210.00000 1
425 2017 PRESTR CONC SLAB BEAM (5SB15) LF     3,064.850 190.00000 1
425 2064 PRESTR CONC GIRDER (TX28) LF     9,189.000 167.40136 2
425 2065 PRESTR CONC GIRDER (TX34) LF     3,896.630 167.13000 1
425 2066 PRESTR CONC GIRDER (TX40) LF     7,512.620 166.75000 1
425 2067 PRESTR CONC GIRDER (TX46) LF     5,295.900 166.92000 1
425 2068 PRESTR CONC GIRDER (TX54) LF     27,821.740 173.29253 3
425 2069 PRESTR CONC GIRDER (TX62) LF     24,676.620 166.47000 1
425 2070 PRESTR CONC GIRDER (TX70) LF     3,360.000 200.00000 1
425 2097 PRESTR CONC GIRDER (TX82) LF     3,105.170 167.33000 1
427 2002 CONCRETE PAINT FINISH SF     27,682.000 1.50000 1
427 2006 BLAST FINISH SF     26,910.000 1.30000 1
427 2009 CONCRETE PAINT (EXISTING CONCRETE) SF     397,138.000 .30000 1
427 2010 CONCRETE PAINT (NEW CONCRETE) SF     121,026.000 .25000 1
428 2002 CONC SURF TREAT (CLASS II) SY     10,470.000 5.00000 1
429 2007 CNC STR REP (HORIZONTAL) SF     877.000 30.00000 1
429 2008 CNC STR REP (VERTICAL OR OVERHEAD) SF     5.000 100.00000 1
429 2011 CNC STR REP (REMOVE & REPLACE) CY     40.000 1,300.00000 1
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF     92.000 300.00000 1
430 2088 CL C CONC FOR EXT STR (CULV) (2 - 8'X5') LF     418.000 400.00000 1
430 2126 CL C CONC FOR EXT STR (ABUT) (HPC) CY     75.800 1,154.05989 1
430 2141 CL C CONC FOR EXT STR (CULV) (2 - 10'X10' LF     42.000 1,335.48000 1
430 2181 CL C CONC FOR EXT STR (HDWL & WINGS) CY     1.000 1,612.66000 1
432 2001 RIPRAP (CONC) (4 IN) CY     5,809.600 251.03044 4
432 2002 RIPRAP (CONC) (5 IN) CY     719.000 318.56342 4
432 2005 RIPRAP (STONE TY R) (DRY) (6 IN) CY     28.000 130.00000 1
432 2015 RIPRAP (STONE COMMON) (DRY) (6 IN) CY     127.000 168.03150 2
432 2019 RIPRAP (STONE PROTECTION) (12 IN) CY     83.000 186.46000 1
432 2021 RIPRAP (STONE PROTECTION) (18 IN) CY     730.000 119.15522 2
432 2023 RIPRAP (STONE PROTECTION) (24 IN) CY     195.000 70.00000 1
432 2033 RIPRAP (STONE COMMON) (DRY) (12 IN) CY     19.000 140.00000 1
432 2035 RIPRAP (CONC) (6 IN) CY     18.000 420.00000 1
432 2039 RIPRAP (MOW STRIP) (4 IN) CY     364.000 476.59341 2
432 2040 RIPRAP (MOW STRIP) (5 IN) CY     8.500 500.00000 1
432 2048 RIPRAP (CONC) (FLUME) CY     568.000 385.55641 3
432 2066 RIPRAP (CONC) (CL B) CY     295.000 350.00000 1
432 2072 RIPRAP (CONC) (CL B) (RR8 & RR9) CY     3,539.900 388.05000 1
432 2084 RIPRAP (CONC) (CL B) (4") CY     90.000 428.66667 2