| Item No |
Description |
Units |
November 30, 2009 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 305 2002 |
SALV, HAUL & STKPL RCL APH PV (0 TO 2" |
SY |
|
|
18,376.000 |
2.00000 |
1 |
| 305 2041 |
SALV HAUL & STKPL RCL APH PV (1 TO 5") |
SY |
|
|
1,033.000 |
4.00000 |
1 |
| 310 2020 |
PRIME COAT (SS - 1) |
GAL |
|
|
9,293.000 |
2.99527 |
2 |
| 314 2030 |
EMULS ASPH TREAT (PRIME COAT) (CSS - 1H) |
GAL |
|
|
841.000 |
4.00000 |
1 |
| 318 2001 |
A - R BINDER (TYPE II) |
TON |
|
|
1,800.000 |
728.60000 |
1 |
| 318 2305 |
AGGR (TY - PB GR - 4M SAC - A) |
CY |
|
|
9,741.000 |
85.24000 |
1 |
| 340 2106 |
D - GR HMA (METH) TY - D PG64 - 22 |
TON |
|
|
220.000 |
154.00000 |
2 |
| 341 2014 |
D - GR HMA (QCQA) TY - B PG70 - 22 |
TON |
|
|
2,932.000 |
94.00000 |
1 |
| 341 2047 |
D - GR HMA (QCQA) TY - C SAC - A PG70 - 22 |
TON |
|
|
231,635.000 |
66.22067 |
14 |
| 341 2063 |
D - GR HMA (QCQA) TY - C SAC - A PG76 - 22 |
TON |
|
|
56,446.000 |
80.20000 |
1 |
| 344 2290 |
PRF - DSGN - MX CMHB - F SAC - A PG70 - 22 |
TON |
|
|
40,660.000 |
79.50826 |
2 |
| 351 2002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (6") |
SY |
|
|
36,979.000 |
13.53160 |
3 |
| 351 2004 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (8") |
SY |
|
|
14,600.000 |
27.00342 |
4 |
| 351 2013 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR (4") |
SY |
|
|
35.000 |
140.00000 |
1 |
| 354 2001 |
PLAN & TEXT ASPH CONC PAV (0" TO 1") |
SY |
|
|
75,954.000 |
1.00000 |
1 |
| 354 2002 |
PLAN & TEXT ASPH CONC PAV (0" TO 2") |
SY |
|
|
69,059.000 |
1.96139 |
5 |
| 354 2021 |
PLANE ASPH CONC PAV (0" TO 2") |
SY |
|
|
1,447,647.000 |
.69114 |
10 |
| 354 2029 |
PLANE ASPH CONC PAV (0" TO 6") |
SY |
|
|
850.000 |
5.00000 |
1 |
| 360 2004 |
CONC PVMT (CONT REINF - CRCP) (11") |
SY |
|
|
12,015.000 |
45.00000 |
1 |
| 361 2002 |
FULL - DEPTH REPAIR CRCP (9") |
SY |
|
|
95.000 |
355.00000 |
1 |