| Item No | Description | Units | January 31, 2012 | Twelve Month Moving | Usage | ||
|---|---|---|---|---|---|---|---|
| Quantity | Avg Bid | Quantity | Avg Bid | ||||
| 204 2003 | SPRINKLING (DUST CONTROL) | MG | 303.000 | 35.23960 | 2 | ||
| 216 2001 | PROOF ROLLING | HR | 629.000 | 63.21145 | 3 | ||
| 247 2044 | FL BS (CMP IN PLC) (TY A GR 4) (FNAL POS | CY | 279.000 | 22.99000 | 1 | ||
| 247 2103 | FL BS (RDWY DEL) (TY A GR 3) (IN VEH) | CY | 72,070.000 | 23.00000 | 1 | ||
| 247 2216 | FL BS (CMP IN PLACE) (TY E GR 4) (4") | SY | 38,824.000 | 3.90000 | 1 | ||
| 247 2260 | FL BS (CMP IN PLC) (TY D) (GR 3) (8") | SY | 46,394.000 | 10.00000 | 1 | ||
| 251 2036 | REWORK BS MTL (TY D) (8") (DENS CONT) | SY | 551,184.000 | 1.50000 | 1 | ||
| 260 2002 | LIME (HYDRATED LIME (SLURRY) ) | TON | 432.000 | 250.00000 | 1 | ||
| 260 2006 | LIME TRT (EXST MATL) (6") | SY | 185,582.000 | 2.87742 | 2 | ||
| 260 2016 | LIME (HYD, COM, OR QK (SLURRY) ) | TON | 2,556.500 | 240.00000 | 1 | ||
| 275 2001 | CEMENT | TON | 4,160.500 | 115.00617 | 2 | ||
| 275 2019 | CEMENT TREAT (SUBGRADE) (6") | SY | 443.000 | 8.00000 | 1 | ||
| 275 2031 | CEMENT TREAT (NEW BASE) (10") | SY | 148,942.000 | 1.30000 | 1 | ||
| 275 2043 | CEMENT TREAT (EXIST MATL) (14") | SY | 1,360.000 | 1.65000 | 1 | ||
| 275 2070 | CEMENT TREAT (MX EXST MTL & NW BS) (7.5" | SY | 151,222.000 | .04000 | 1 | ||
| 292 2007 | ASPHALT STAB BASE (GR 2) (PG 64) | TON | 17,367.460 | 56.00000 | 1 | ||
| | ||||
|