AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - EL PASO DISTRICT
Last Update: Friday, May 3, 2013
| ITEMS 204 2003 TO 275 2042 |
| Item No |
Description |
Units |
April 30, 2013 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 204 2003 |
SPRINKLING (DUST CONTROL) |
MG |
|
|
30.000 |
46.66667 |
2 |
| 216 2001 |
PROOF ROLLING |
HR |
32.000 |
100.00000 |
242.000 |
47.17355 |
5 |
| 247 2216 |
FL BS (CMP IN PLACE) (TY E GR 4) (4") |
SY |
|
|
6,054.000 |
4.40000 |
1 |
| 247 2237 |
FL BS (CMP IN PLC) (TY A OR B GR 4) (6") |
SY |
|
|
125,201.000 |
16.10000 |
1 |
| 247 2366 |
FL BS (CMP IN PLC) (TY A GR 5) (FNAL POS |
CY |
|
|
3,433.000 |
35.00000 |
1 |
| 247 2391 |
FL BS (RDWY DEL) (TY A GR 5) |
TON |
|
|
1,635.000 |
22.00000 |
1 |
| 247 2393 |
FL BS (RDWY DEL) (TY D GR 5) (FNAL POS) |
CY |
|
|
18,465.000 |
20.00000 |
1 |
| 260 2001 |
LIME (HYDRATED LIME (DRY) ) |
TON |
|
|
567.000 |
202.00000 |
1 |
| 260 2006 |
LIME TRT (EXST MATL) (6") |
SY |
|
|
50,407.000 |
2.50000 |
1 |
| 275 2001 |
CEMENT |
TON |
|
|
1,319.000 |
155.88931 |
3 |
| 275 2003 |
CEMENT TREAT (NEW BASE) (6") |
SY |
|
|
21,045.000 |
2.00000 |
1 |
| 275 2009 |
CEMENT TREAT (NEW BASE) (8") |
SY |
|
|
83,073.000 |
1.20000 |
1 |
| 275 2042 |
CEMENT TREAT (NEW BASE) (DC) (9") |
SY |
|
|
3,588.000 |
1.00000 |
1 |