ITEMS 2185 2001 TO 2314 2001
Items Items Bid Code Range
0100 - 0193
0204 - 0247
0305 - 0361
0400 - 0496
0500 - 0550
0610 - 0690
0740 - 0788
1003 - 1122
2185 - 2314
3268 - 3271
4191 - 4671
5367 - 5899
6006 - 6834
8020 - 8985
9059 - 9059
2185 2001 - 2314 2001
Item No Description Units August 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
2185 2001 AESTHETIC PEDESTRIAN RAILING LF     1,715.000 568.17000 1
2233 2002 LIGHTED TOWER (60') EA     4.000 406,311.75000 1
2233 2003 LIGHTED TOWER (80') EA     1.000 706,061.02000 1
2233 2004 LIGHTED TOWER (100') EA     1.000 789,273.15000 1
2265 2001 LANE CONTROL SIGNAL EQUIP (SIG HEAD) EA     5.000 10,000.00000 1
2265 2002 LANE CONTROL SIGNAL CONTROLLER EA     2.000 13,000.00000 1
2266 2001 RELOCATE LN CONT SIG EQUIP (SIG HEAD) EA     15.000 5,000.00000 1
2266 2002 LCS CABINET FOUNDATION EA     1.000 3,000.00000 1
2266 2003 REPROGRAM EXISTING MVD EA     12.000 3,300.00000 1
2266 2004 RELOCATE MVD POLE STRUCTURE EA     2.000 3,300.00000 1
2266 2005 REMOVE EXISTING DMS SYSTEM EA     2.000 16,000.00000 1
2290 2001 REMOVE, STOCKPILE, CLEAN & RELAY LOOSE AGG STA 16.400 1,400.00000 16.400 1,400.00000 1
2293 2001 SYSTEM INTEGRATION LS 2.000 59,000.00000 2.000 59,000.00000 1
2295 2001 INST LED ROADWAY ILLUM ASSEMBLIES EA 6.000 6,300.00000 6.000 6,300.00000 1
2312 2001 REMOVE CCTV FIELD EQUIPMENT EA 2.000 2,500.00000 2.000 2,500.00000 1
2313 2001 REMOVAL OF EXISTING CABLES (FIBER) LF 25,632.000 3.20000 25,632.000 3.20000 1