Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     14.300 7,709.09091 3
100 2002 PREPARING ROW STA     859.000 1,796.88176 7
104 2001 REMOVING CONC (PAV) SY     49,519.000 5.94378 4
104 2002 REMOVING CONC (PAV) CY     16.000 100.00000 1
104 2009 REMOVING CONC (RIPRAP) SY     59,671.000 8.78034 9
104 2011 REMOVING CONC (MEDIANS) SY     6,133.000 8.36152 3
104 2015 REMOVING CONC (SIDEWALKS) SY     2,728.000 5.04000 1
104 2017 REMOVING CONC (DRIVEWAYS) SY     3,567.500 11.73278 6
104 2021 REMOVING CONC (CURB) LF     84,790.000 1.75980 6
104 2022 REMOVING CONC (CURB AND GUTTER) LF     2,162.000 3.50000 1
104 2023 REMOVING CONC (CTB) LF     18,717.000 15.32612 4
104 2024 REMOVING CONC (RETAINING WALLS) SY     1,801.000 53.67053 2
104 2025 REMOVE CONC (WINGWALL) CY     31.000 175.63000 1
104 2028 REMOVING CONC (MISC) SY     386.000 13.28549 3
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     11,788.000 4.44761 5
104 2031 REMOVING CONC (HEADWALL) CY     97.000 184.49000 1
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     60.000 32.00000 2
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     997.500 14.44137 4
104 2037 REMOVE CONC (RAIL) LF     1,040.000 17.00000 1
104 2044 REMOVING CONC (FLUME) SY     9,153.000 11.47304 5
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     1,076.000 22.43810 2
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     105.000 117.00952 2
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     53.000 15.00000 1
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     192,062.000 1.38523 2
105 2022 REMOVING STAB BASE AND ASPH PAV (13") SY     394.000 30.00000 1
105 2046 REMOVING STAB BASE & ASPH PAV (0" - 10") SY     73,894.000 1.50000 1
105 2062 REMOVING STAB BASE AND ASPH PAV (4" - 16" SY     56,818.000 1.00000 1
105 2104 REMOVING STAB BASE AND ASPH PAV (10.5" SY     32,576.000 5.31000 1
110 2001 EXCAVATION (ROADWAY) CY     635,652.500 3.64587 9
110 2002 EXCAVATION (CHANNEL) CY     640.000 40.00000 1
110 2003 EXCAVATION (SPECIAL) CY     9,904.000 17.89219 10
112 2002 SUBGRADE WIDENING (DENS CONT) STA     4.680 700.00000 1
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     82,453.000 12.05600 5
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     853,401.000 5.68075 6
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     26,680.000 9.20971 4
132 2044 EMBANKMENT (FINAL) (DC) (TY C) (RWAL FND) CY     11,476.000 33.89000 1
134 2001 BACKFILL (TY A) STA     1,063.000 228.35000 1
134 2002 BACKFILL (TY B) STA     344.000 333.43023 2
134 2004 BACKFILL (TY A OR B) STA     459.000 63.18000 1
150 2002 BLADING HR     213.000 119.06103 4
156 2001 BULLDOZER WORK HR     8.000 200.00000 1
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     1,032.000 8.80000 1
170 2001 IRRIGATION SYSTEM LS     3.000 168,728.83333 3
192 2003 PLANT MATERIAL (3 - GAL) EA     1,138.000 20.00000 1
192 2004 PLANT MATERIAL (5 - GAL) EA     1,938.000 23.10000 1
192 2005 PLANT MATERIAL (15 - GAL) EA     203.000 110.00000 1
192 2007 PLANT MATERIAL (45 - GAL) EA     59.000 264.00000 1
192 2013 MULCH SY     1,856.000 13.20000 1
192 2014 PLANT SOIL MIX CY     445.000 61.56966 2
192 2015 LANDSCAPE EDGE LF     17,245.000 5.10676 2
192 2016 PLANT BED PREPARATION SY     1,496.000 1.70000 1
192 2017 VEGETATION BARRIER SY     43,978.000 1.04760 3
192 2023 PLANT MATERIAL (15 GAL) (TREE) EA     561.000 106.92959 3
192 2030 PLANT MATERIAL (3 GAL) (SHRUB) EA     1,055.000 20.08768 2
192 2031 PLANT MATERIAL (5 GAL) (SHRUB) EA     2,252.000 26.00000 1
192 2032 PLANT MATERIAL (10 GAL) (SHRUB) EA     790.000 110.00000 1
192 2033 PLANT MATERIAL (15 GAL) (SHRUB) EA     290.000 140.00000 1
192 2044 PLANT MATERIAL (MIN 2" CAL) (B & B) EA     118.000 220.00000 1
192 2057 PLANT MATERIAL (MIN 6' HT) EA     72.000 198.00000 1
192 2081 PLANT SOIL MIX (PLANTING SOIL) CY     1,989.000 8.00000 1
193 2001 PLANT MAINTENANCE MO     24.000 1,290.00000 2
193 2005 PLANT REPLACEMENT (5 - GAL) EA     389.000 27.50000 1
193 2006 VEGETATIVE WATERING MG     877.300 20.00000 1
193 2007 IRRIGATION SYSTEM OPER AND MAINT MO     24.000 1,290.00000 2
193 2009 PLANT REPLACEMENT (15 GAL) EA     40.000 126.50000 1
193 2016 PLANT REPLACEMENT (45 GAL) EA     13.000 286.00000 1