AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - EL PASO DISTRICT

Last Update: Friday, August 1, 2014
ITEMS 100 2001 TO 193 2017
Items Items Bid Code Range
0100 - 0193
0204 - 0275
0305 - 0368
0400 - 0496
0500 - 0550
0610 - 0690
0740 - 0788
1003 - 1122
2064 - 2266
3267 - 3271
4191 - 4671
5367 - 5899
6006 - 6834
8020 - 8985
9059 - 9059
100 2001 - 193 2017
Item No Description Units July 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC 12.300 2,458.53659 19.550 7,173.40153 6
100 2002 PREPARING ROW STA 130.300 3,703.76055 581.930 3,062.53329 5
100 2013 PREP ROW (TREE) (2" TO 12" DIA) EA     47.000 700.00000 1
104 2001 REMOVING CONC (PAV) SY 1,827.000 20.00000 27,405.000 21.01912 3
104 2002 REMOVING CONC (PAV) CY     16.000 100.00000 1
104 2009 REMOVING CONC (RIPRAP) SY 3,306.000 10.00000 27,493.000 15.98163 9
104 2011 REMOVING CONC (MEDIANS) SY     3,304.000 9.71308 3
104 2015 REMOVING CONC (SIDEWALKS) SY     3,345.000 9.23139 3
104 2017 REMOVING CONC (DRIVEWAYS) SY 121.000 27.60331 3,122.500 12.65744 6
104 2021 REMOVING CONC (CURB) LF 3,062.000 1.22730 15,102.000 6.76983 5
104 2023 REMOVING CONC (CTB) LF 17,630.000 15.43137 18,607.000 15.80024 4
104 2024 REMOVING CONC (RETAINING WALLS) SY     39.000 566.03000 1
104 2028 REMOVING CONC (MISC) SY 88.000 21.36364 88.000 21.36364 2
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF 5,626.000 2.32172 32,005.000 3.20739 5
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY 60.000 32.00000 294.000 16.87755 4
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     899.500 13.10080 4
104 2044 REMOVING CONC (FLUME) SY 230.000 45.43478 346.000 39.45665 5
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY 898.000 25.30000 898.000 25.30000 1
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY 101.000 100.00000 2,977.000 9.18912 2
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     53.000 15.00000 1
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY 1,097.000 11.00000 2,294.000 10.47820 2
105 2039 REMOVE STAB BASE AND ASPH PAV (6" - 20") SY     40,310.000 2.00000 1
105 2062 REMOVING STAB BASE AND ASPH PAV (4" - 16" SY     31,565.000 4.00000 1
105 2104 REMOVING STAB BASE AND ASPH PAV (10.5" SY     32,576.000 5.31000 1
110 2001 EXCAVATION (ROADWAY) CY 25,972.500 9.56290 94,275.500 9.21972 10
110 2003 EXCAVATION (SPECIAL) CY 2,543.000 23.01121 9,406.450 22.50344 11
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY 82,006.000 12.01318 83,385.000 12.11785 8
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY 911.000 30.00000 56,674.000 10.16754 4
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY 48.000 100.00000 48.000 100.00000 1
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     1,750.000 9.00000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     8,876.000 7.00000 1
134 2001 BACKFILL (TY A) STA 1,063.000 228.35000 1,261.000 261.58291 2
134 2002 BACKFILL (TY B) STA     321.000 300.00000 1
134 2004 BACKFILL (TY A OR B) STA     459.000 63.18000 1
150 2002 BLADING HR 43.000 109.30233 224.000 93.90625 7
156 2001 BULLDOZER WORK HR     8.000 200.00000 1
158 2005 SPEC EXCAV WORK (ORIGINAL) CY     1,353.000 30.00000 1
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY 1,032.000 8.80000 1,032.000 8.80000 1
161 2011 GENERAL USE COMPOST (1") SY     1,030.000 14.57476 3
170 2001 IRRIGATION SYSTEM LS 2.000 175,593.25000 7.000 123,955.21429 7
192 2003 PLANT MATERIAL (3 - GAL) EA     1,184.000 20.31081 2
192 2004 PLANT MATERIAL (5 - GAL) EA 1,938.000 23.10000 2,000.000 23.37590 2
192 2005 PLANT MATERIAL (15 - GAL) EA 203.000 110.00000 203.000 110.00000 1
192 2007 PLANT MATERIAL (45 - GAL) EA 59.000 264.00000 59.000 264.00000 1
192 2013 MULCH SY 1,856.000 13.20000 3,552.000 10.43925 4
192 2014 PLANT SOIL MIX CY 445.000 61.56966 643.000 74.01944 3
192 2015 LANDSCAPE EDGE LF 9,543.000 6.00000 24,237.000 4.56278 4
192 2016 PLANT BED PREPARATION SY 1,496.000 1.70000 2,085.000 29.46916 2
192 2017 VEGETATION BARRIER SY 18,233.000 1.10000 84,466.000 1.71073 7
192 2023 PLANT MATERIAL (15 GAL) (TREE) EA 69.000 150.00000 644.000 112.74457 5
192 2030 PLANT MATERIAL (3 GAL) (SHRUB) EA     2,120.000 22.62618 4
192 2031 PLANT MATERIAL (5 GAL) (SHRUB) EA 2,252.000 26.00000 4,698.000 27.86015 4
192 2032 PLANT MATERIAL (10 GAL) (SHRUB) EA 790.000 110.00000 790.000 110.00000 1
192 2033 PLANT MATERIAL (15 GAL) (SHRUB) EA 290.000 140.00000 290.000 140.00000 1
192 2035 PLANT MATERIAL (MIN 4' HT) (B & B) EA     20.000 350.00000 1
192 2042 PLANT MATERIAL (MIN 1" CAL) (B & B) EA     18.000 300.00000 1
192 2044 PLANT MATERIAL (MIN 2" CAL) (B & B) EA 118.000 220.00000 118.000 220.00000 1
192 2056 PLANT MATERIAL (MIN 6'HT) (BARE ROOT) EA     150.000 120.00000 1
192 2057 PLANT MATERIAL (MIN 6' HT) EA 72.000 198.00000 72.000 198.00000 1
192 2058 PLANT MATERIAL (20 GAL) (TREE) EA     56.000 176.58929 2
192 2081 PLANT SOIL MIX (PLANTING SOIL) CY     2,044.000 12.86595 4
193 2001 PLANT MAINTENANCE MO 12.000 1,980.00000 41.000 1,057.02439 5
193 2004 PLANT REPLACEMENT (3 - GAL) EA     223.000 25.09417 3
193 2005 PLANT REPLACEMENT (5 - GAL) EA 389.000 27.50000 508.000 27.97146 4
193 2006 VEGETATIVE WATERING MG     877.300 20.00000 1
193 2007 IRRIGATION SYSTEM OPER AND MAINT MO 12.000 1,980.00000 41.000 867.07317 5
193 2009 PLANT REPLACEMENT (15 GAL) EA 40.000 126.50000 46.000 128.00000 2
193 2016 PLANT REPLACEMENT (45 GAL) EA 13.000 286.00000 13.000 286.00000 1
193 2017 PLANT REPLACEMENT (20 GAL) EA     10.000 182.10000 2