| Item No |
Description |
Units |
October 31, 2009 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 4007 2001 |
PEDESTRIAN TRUSS BRIDGE SPAN (100 FT) |
EA |
|
|
2.000 |
80,000.00000 |
1 |
| 4007 2002 |
PEDESTRIAN TRUSS BRIDGE SPAN (130 FT) |
EA |
|
|
1.000 |
145,000.00000 |
1 |
| 4007 2014 |
PEDESTRIAN TRUSS BRIDGE SPAN (90FT) |
EA |
|
|
2.000 |
70,000.00000 |
1 |
| 4016 2001 |
MODULAR BRIDGE JOINT SYSTEM (9 IN) |
LF |
|
|
56.000 |
1,500.00000 |
1 |
| 4022 2001 |
INTRLOCK ARTICULATING CONC BLKS (4" MIN |
SF |
|
|
37,597.000 |
4.01512 |
3 |
| 4036 2008 |
SOUND WALL (HORIZ SCHEME) (12 FT) |
LF |
|
|
3,013.020 |
214.00000 |
1 |
| 4116 2001 |
SOIL NAIL ANCHORS |
LF |
|
|
1,590.000 |
30.00000 |
1 |
| 4157 2001 |
PRC C SPAN CULV (28FT SPAN) (9FT9IN RISE |
LF |
|
|
26.420 |
3,000.00000 |
1 |
| 4178 2002 |
HLMR BEARING (F - 1500) |
EA |
|
|
4.000 |
10,000.00000 |
1 |
| 4178 2003 |
HLMR BEARING (F - 2000) |
EA |
|
|
4.000 |
10,000.00000 |
1 |
| 4178 2004 |
HLMR BEARING (GE - 1000) |
EA |
|
|
12.000 |
10,000.00000 |
1 |
| 4178 2005 |
HLMR BEARING (GE - 500) |
EA |
|
|
8.000 |
10,000.00000 |
1 |
| 4178 2006 |
HLMR BEARING (E - 1500) |
EA |
|
|
4.000 |
10,000.00000 |
1 |
| 4178 2007 |
HLMR BEARING (E - 2000) |
EA |
|
|
4.000 |
10,000.00000 |
1 |
| 4191 2001 |
CARBON FIBER REINF POLY CONC STRENGTHE |
SF |
|
|
365.000 |
51.20000 |
1 |
| 4241 2001 |
EMBEDD GALVANIC ANODES CORROSI MITIGAT |
EA |
|
|
429.000 |
34.98000 |
1 |
| 4348 2001 |
HDPE PIPE (8") |
LF |
|
|
28.000 |
18.00000 |
1 |
| 4361 2001 |
CABLE ASSEMBLY (1 / 2 INCH DIA) |
LF |
|
|
2,280.000 |
129.00000 |
1 |
| 4361 2002 |
CABLE ASSEMBLY (1 INCH DIA) |
LF |
|
|
276.000 |
129.00000 |
1 |
| 4371 2001 |
MSE WALL GAP SEALING |
LF |
|
|
1,100.000 |
18.00000 |
1 |
| 4372 2001 |
CLEAN / SEAL / PAVEMENT JOINTS (EGP METHOD |
LF |
|
|
1,324.000 |
13.00000 |
1 |
| 4375 2001 |
CLEAN / SEAL JOINT (RET WALL) (EGP METHOD |
LF |
|
|
3,020.000 |
23.00000 |
1 |
| 4382 2001 |
SPECIAL TRACKWORK (PWR TURNOUT) (NO 14) |
EA |
|
|
1.000 |
139,800.00000 |
1 |
| 4382 2002 |
SPECIAL TRACKWORK (PWR TURNOUT) (NO 15) |
EA |
|
|
1.000 |
144,300.00000 |
1 |
| 4382 2003 |
SPECIAL TRACKWORK (TURNOUT) (NO 15) |
EA |
|
|
2.000 |
118,350.00000 |
1 |
| 4385 2001 |
RR BRIDGE CONSTR (STL H - PILE) (14X89 HP) |
LF |
|
|
3,360.000 |
15.80000 |
1 |
| 4385 2002 |
RR BRIDGE CONSTR (DBL TRACK) (COTTON) |
LF |
|
|
60.000 |
4,620.00000 |
1 |
| 4385 2003 |
RR BRIDGE CONSTR (DBL TRACK) (GLENMORE) |
LF |
|
|
120.000 |
4,200.00000 |
1 |
| 4386 2001 |
RR CONSTRUCTION (NEW TRACK) (STD RAIL) |
LF |
|
|
9,582.000 |
162.50000 |
1 |
| 4386 2002 |
RR CONSTRUCTION (NEW TRACK) (HH RAIL) |
LF |
|
|
2,019.000 |
175.00000 |
1 |
| 4386 2003 |
RR CONSTRUCTION (RECONSTRUCTION TRACK) |
LF |
|
|
9,836.000 |
10.00000 |
1 |
| 4386 2004 |
RR CONSTRUCTION (TIE REPLACEMENT) |
EA |
|
|
210.000 |
95.00000 |
1 |
| 4386 2005 |
RR CONSTRUCTION (REMOVE EXIST TURNOUT) |
EA |
|
|
6.000 |
5,235.00000 |
1 |
| 4386 2006 |
RR CONSTRUCTION (REMOVE EXIST TRACK) |
LF |
|
|
855.000 |
11.00000 |
1 |
| 4386 2007 |
SPECIAL TRACKWORK (WALKWAY BALLAST) |
TON |
|
|
1,000.000 |
34.50000 |
1 |
| 4386 2008 |
RR CONSTRUCT (BALLAST SHIFTED TRACK) |
TON |
|
|
3,246.000 |
40.00000 |
1 |
| 4432 2001 |
TRENCH DRAIN (12" X 18") |
LF |
7.000 |
520.00000 |
7.000 |
520.00000 |
1 |
| 4459 2001 |
BIRD GUARD |
LF |
|
|
3,291.000 |
12.00000 |
1 |
| 4460 2001 |
STEEL PIPE PILING (24" DIA X 3 / 4") |
LF |
|
|
1,204.000 |
150.00000 |
1 |
| 4471 2001 |
TRACK BALLAST (INSTALL) |
CY |
|
|
218.000 |
50.00000 |
1 |
| 4472 2001 |
SURFACING AND TAMPING TRACK |
LF |
|
|
600.000 |
8.50000 |
1 |
| 4473 2001 |
FURN & INST RR WOOD TIES TY UPRR |
EA |
|
|
205.000 |
88.00000 |
1 |
| 4474 2001 |
PRECST CONC RR GR CROSS TY UPRR |
LF |
|
|
350.000 |
324.00000 |
1 |