AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - HOUSTON DISTRICT

Last Update: Thursday, November 20, 2014
ITEMS 100 2001 TO 169 2007
Items Items Bid Code Range
0100 - 0193
0247 - 0292
0305 - 0368
0400 - 0497
0500 - 0560
0610 - 0690
0720 - 0788
1009 - 1146
2034 - 2305
3061 - 3275
4007 - 4679
5050 - 5969
6006 - 6986
7224 - 7661
8020 - 8997
9009 - 9009
100 2001 - 169 2007
170 2001 - 193 2019
Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     74.857 3,689.07049 4
100 2002 PREPARING ROW STA     1,822.520 21,177.01243 28
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA     197.000 164.80203 2
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     116.000 250.00000 1
100 2006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     1.000 830.55000 1
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     15.000 650.00000 1
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     36.000 35.00000 1
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     73.000 94.60329 3
100 2011 PREPARING ROW (TREE) (24" TO 36" DIA.) EA     44.000 35.00000 1
104 2001 REMOVING CONC (PAV) SY     513,635.330 5.07053 22
104 2009 REMOVING CONC (RIPRAP) SY     63,061.440 4.59694 15
104 2011 REMOVING CONC (MEDIANS) SY     449.000 25.89755 2
104 2014 REMOVING CONC (FOUNDATIONS) CY     56.000 263.39286 2
104 2015 REMOVING CONC (SIDEWALKS) SY     4,649.950 5.69245 10
104 2017 REMOVING CONC (DRIVEWAYS) SY 166.000 25.50000 7,351.480 7.42719 10
104 2021 REMOVING CONC (CURB) LF     38,324.000 3.37953 15
104 2022 REMOVING CONC (CURB AND GUTTER) LF     37,577.000 2.34125 3
104 2023 REMOVING CONC (CTB) LF     7,050.000 5.25797 4
104 2024 REMOVING CONC (RETAINING WALLS) SY     4,627.000 24.20333 6
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     12,766.000 2.93702 2
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY 42.000 30.60000 236.000 34.55025 4
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     699.000 10.82546 4
104 2037 REMOVE CONC (RAIL) LF     12,890.000 8.56137 5
104 2040 REMOVING CONC (PAVERS) SY     4,677.000 5.00000 1
104 2042 REMOVING CONC (MOVABLE BARRIER) LF     10,820.000 4.00000 1
104 2044 REMOVING CONC (FLUME) SY     670.000 10.00000 2
104 2054 REMOVING CONCRETE (MOW STRIP) LF     6,814.000 7.60801 4
105 2002 REMOVING STAB BASE AND ASPH PAV (2") SY     254.000 6.00000 1
105 2005 REMOVING STAB BASE AND ASPH PAV (3") SY     10,712.000 2.25000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     11,705.000 4.46675 4
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     14,605.640 1.88247 5
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     685.000 5.00000 1
105 2014 REMOVING STAB BASE & ASPH PAV (7" - 12") SY     16,191.000 13.78979 3
105 2015 REMOVING STAB BASE & ASPH PAV (8" - 10") SY     13,284.000 4.00000 1
105 2018 REMOVING STAB BASE AND ASPH PAV (7") SY     4,993.000 2.70000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     219,707.890 4.44613 5
105 2021 REMOVING STAB BASE AND ASPH PAV (0 - 4") SY     657.000 3.30000 1
105 2022 REMOVING STAB BASE AND ASPH PAV (13") SY     604.000 10.50000 1
105 2026 REMOVE STAB BASE & ASPH PAV (13" - 18") SY     209.000 10.00000 1
105 2029 REMOVE STAB BASE & ASPH PAV (24") SY     13,148.000 4.30000 1
105 2036 REMOVING STAB BASE & ASPH PAV (15" - 20") SY     5,763.000 4.07000 1
105 2037 REMOVING STAB BASE AND ASPH PAV (0" - 16" SY     1,168.050 8.15410 2
105 2039 REMOVE STAB BASE AND ASPH PAV (6" - 20") SY     666,667.000 2.16093 2
105 2041 REMOVING STAB BASE AND ASPH PAV (8") SY     1,919.000 4.52449 2
105 2043 REMOVING STAB BASE & ASPH PAV (0 - 6") SY     8,268.000 4.69127 2
105 2044 REMOVING STAB BASE AND ASPH PAV (10") SY     1,397.000 10.00000 1
105 2049 REMOVING STAB BASE & ASPH PAV (4" - 22") SY     73,863.000 3.00000 1
105 2060 REMOVING STAB BASE & ASPH PAV (15" - 20" SY     2,061.000 9.00000 1
105 2065 REMOVING STAB BASE AND ASPH PAV (1") SY     10,647.000 4.00000 1
105 2069 REMOVING STAB BASE & ASPH PAV (4" - 6" SY     165,806.000 2.06935 2
105 2070 REMOVING STAB BASE & ASPH PAV (6" - 8" SY     5,773.000 3.00000 1
105 2074 REMOVING STAB BASE AND ASPH PAV (4") SY     56,318.000 2.32000 1
105 2076 REMOV STAB BASE AND ASPH PAV (2" - 15") SY     3,084.000 2.58000 1
105 2084 REM STAB BASE & ASPH (6" - 12") SY     56,333.000 3.00000 1
110 2001 EXCAVATION (ROADWAY) CY     1,570,371.400 6.51875 33
110 2002 EXCAVATION (CHANNEL) CY     30,999.000 10.21504 8
110 2003 EXCAVATION (SPECIAL) CY     225,375.630 6.81847 5
112 2001 SUBGRADE WIDENING (ORD COMP) STA     33.630 1,410.79393 2
112 2002 SUBGRADE WIDENING (DENS CONT) STA 9.690 2,900.00000 516.070 697.75612 7
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     69,584.000 10.06540 4
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     1,187.000 19.00000 1
132 2003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     27.000 50.00000 1
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     9,584.000 6.00000 1
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     2,588.400 28.11266 3
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     1,988,830.700 3.59452 28
132 2034 EMB (FNL) (DC) (TYC) (CSBE) (RWALL FND IMPR CY     4,222.000 44.00000 1
132 2036 EMBANK (FINAL) (DC) (TY E) (CSBE) CY     171,371.390 23.18148 10
132 2037 EMB (FNL) (DC) (TYE) (CSBE) (RWALL FND IMPR CY     19,381.000 21.36938 3
134 2001 BACKFILL (TY A) STA     2,695.870 243.44337 9
134 2002 BACKFILL (TY B) STA     2.000 250.00000 1
134 2003 BACKFILL (TY C) STA     12.580 250.00000 1
134 2004 BACKFILL (TY A OR B) STA 9.690 1,000.00000 1,322.490 187.01427 8
150 2002 BLADING HR     530.000 67.92453 5
156 2001 BULLDOZER WORK HR     46.000 140.78261 2
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     36,048.000 1.00000 1
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY 21.000 10.00000 21.000 10.00000 1
160 2005 FURNISHING AND PLACING TOPSOIL CY     10,344.000 23.42616 6
161 2008 EROSION CONTROL COMPOST (2") SY     27,434.000 1.02000 1
161 2009 EROSION CONTROL COMPOST CY     26,632.000 18.76038 7
161 2012 GENERAL USE COMPOST CY     26,008.000 20.30921 8
161 2017 COMPOST MANUF TOPSOIL (BIP) (4") SY 1,338.000 3.25000 473,135.340 .76622 13
161 2023 EROSION CONTROL COMPOST (4") SY     897.000 4.00000 1
162 2002 BLOCK SODDING SY 352.000 3.70881 2,252,345.540 2.68575 43
162 2003 STRAW OR HAY MULCH SY 1,338.000 .40000 1,418,334.650 .18805 24
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     166,947.000 .11896 3
164 2009 BROADCAST SEED (TEMP) (WARM) SY     172,973.890 .11831 7
164 2014 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY AC     .250 1,600.00000 1
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     445.000 3.00000 1
164 2037 DRILL SEEDING (PERM) (URBAN) (SANDY) SY     428,753.340 .14218 8
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     22,457.000 .13712 2
164 2041 DRILL SEEDING (TEMP) (WARM) SY     41,951.000 .10907 2
164 2045 STRAW OR HAY MULCHING SY     9,772.000 .20000 1
164 2048 STRAW / HAY MLCH SEED (TEMP) (WARM) AC     .250 1,100.00000 1
164 2051 DRILL SEED (TEMP) (WARM OR COOL) SY     849,043.560 .13479 17
164 2052 BROADCAST SEED (PERM) (SPECIAL MIX) SY 1,008.000 .50000 214,962.860 .17403 7
166 2001 FERTILIZER AC .276 500.00000 739.118 534.70608 42
168 2001 VEGETATIVE WATERING MG 34.520 68.77173 91,133.251 12.48256 44
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     1,494.000 2.00000 1
169 2002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY     12,028.000 1.28000 1
169 2007 SOIL RETENTION BLANKETS (CL 2) (TY G) SY     8,733.000 4.34000 1