| Item No |
Description |
Units |
April 30, 2013 |
Twelve Month Moving |
Usage |
| Quantity |
Avg Bid |
Quantity |
Avg Bid |
| 100 2001 |
PREPARING ROW |
AC |
40.680 |
5,810.47198 |
152.090 |
32,316.58557 |
9 |
| 100 2002 |
PREPARING ROW |
STA |
616.040 |
22,191.83137 |
2,663.310 |
14,528.55372 |
30 |
| 100 2003 |
PREPARING ROW (TREE) (5" TO 12" DIA) |
EA |
|
|
25.000 |
500.00000 |
1 |
| 100 2009 |
PREPARING ROW (TREE) (6" TO 24" DIA) |
EA |
|
|
24.000 |
266.84000 |
1 |
| 100 2010 |
PREPARING ROW (TREE) (10" TO 48" DIA) |
EA |
|
|
7.000 |
1,200.00000 |
1 |
| 103 2001 |
DISPOSAL OF WATER WELLS |
EA |
|
|
10.000 |
4,350.00000 |
2 |
| 104 2001 |
REMOVING CONC (PAV) |
SY |
836,628.000 |
3.43892 |
1,857,588.050 |
4.11112 |
30 |
| 104 2009 |
REMOVING CONC (RIPRAP) |
SY |
52,794.000 |
3.67083 |
100,695.000 |
4.07559 |
25 |
| 104 2010 |
REMOVING CONC (RIPRAP) |
CY |
|
|
9.380 |
300.00000 |
1 |
| 104 2011 |
REMOVING CONC (MEDIANS) |
SY |
3,959.000 |
6.37888 |
9,529.000 |
6.81944 |
12 |
| 104 2014 |
REMOVING CONC (FOUNDATIONS) |
CY |
|
|
3.200 |
340.00000 |
1 |
| 104 2015 |
REMOVING CONC (SIDEWALKS) |
SY |
|
|
1,292.560 |
8.85514 |
9 |
| 104 2017 |
REMOVING CONC (DRIVEWAYS) |
SY |
15,254.000 |
4.83980 |
33,492.710 |
4.89089 |
15 |
| 104 2020 |
REMOVING CONC (OTHER APPURTENANCES) |
CY |
|
|
226.000 |
75.00000 |
1 |
| 104 2021 |
REMOVING CONC (CURB) |
LF |
1,944.000 |
4.64918 |
44,003.950 |
4.24974 |
22 |
| 104 2022 |
REMOVING CONC (CURB AND GUTTER) |
LF |
896.000 |
5.00000 |
2,037.000 |
2.75945 |
2 |
| 104 2023 |
REMOVING CONC (CTB) |
LF |
51,906.000 |
3.95582 |
96,856.000 |
3.81588 |
5 |
| 104 2024 |
REMOVING CONC (RETAINING WALLS) |
SY |
6,977.000 |
12.30000 |
16,832.000 |
19.84505 |
4 |
| 104 2025 |
REMOVE CONC (WINGWALL) |
CY |
|
|
1.000 |
1,500.00000 |
1 |
| 104 2027 |
REMOVING CONC (APPR SLAB) |
SY |
153.000 |
40.00000 |
278.000 |
26.51079 |
2 |
| 104 2028 |
REMOVING CONC (MISC) |
SY |
70.000 |
27.00000 |
183.000 |
28.04590 |
4 |
| 104 2029 |
REMOVING CONC (CURB OR CURB & GUTTER) |
LF |
21,869.000 |
.91000 |
34,767.000 |
2.49774 |
7 |
| 104 2031 |
REMOVING CONC (HEADWALL) |
CY |
|
|
23.600 |
216.94915 |
2 |
| 104 2032 |
REMOVING CONC (WHEELCHAIR RAMP) |
SY |
45.000 |
27.00000 |
223.000 |
22.94709 |
5 |
| 104 2036 |
REMOVING CONC (SIDEWALK OR RAMP) |
SY |
8,765.000 |
7.24831 |
22,175.000 |
5.59311 |
11 |
| 104 2037 |
REMOVE CONC (RAIL) |
LF |
22,333.000 |
6.69526 |
73,781.000 |
14.28459 |
10 |
| 104 2040 |
REMOVING CONC (PAVERS) |
SY |
143.000 |
11.50000 |
2,483.000 |
3.12090 |
5 |
| 104 2044 |
REMOVING CONC (FLUME) |
SY |
109.000 |
9.10000 |
1,239.000 |
5.36069 |
2 |
| 104 2047 |
REMOVING CONC (INTER ART CONC BLOCKS) |
SY |
|
|
4,165.000 |
2.00000 |
1 |
| 104 2054 |
REMOVING CONCRETE (MOW STRIP) |
LF |
16,252.000 |
2.76273 |
21,188.000 |
3.31189 |
4 |
| 105 2005 |
REMOVING STAB BASE AND ASPH PAV (3") |
SY |
|
|
2,030.000 |
4.40000 |
1 |
| 105 2008 |
REMOVING STAB BASE AND ASPH PAV (6") |
SY |
|
|
159,314.000 |
2.62343 |
3 |
| 105 2011 |
REMOVING STAB BASE AND ASPH PAV (2" - 6" |
SY |
16,197.000 |
1.29000 |
21,785.000 |
2.05491 |
3 |
| 105 2013 |
REMOVING STAB BASE & ASPH PAV (9") |
SY |
|
|
2,432.000 |
4.00000 |
1 |
| 105 2014 |
REMOVING STAB BASE & ASPH PAV (7" - 12") |
SY |
|
|
30,219.000 |
2.92796 |
3 |
| 105 2016 |
REMOVING STAB BASE & ASPH PAV (16") |
SY |
|
|
4,170.000 |
8.50000 |
1 |
| 105 2018 |
REMOVING STAB BASE AND ASPH PAV (7") |
SY |
|
|
6,323.000 |
3.00000 |
2 |
| 105 2019 |
REMOVING STAB BASE & ASPH PAV (14") |
SY |
|
|
301.000 |
10.00000 |
1 |
| 105 2020 |
REMOVING STAB BASE & ASPH PAV (12") |
SY |
180,537.000 |
1.81000 |
186,365.790 |
1.92378 |
5 |
| 105 2021 |
REMOVING STAB BASE AND ASPH PAV (0 - 4") |
SY |
81,375.000 |
1.03000 |
81,375.000 |
1.03000 |
1 |
| 105 2022 |
REMOVING STAB BASE AND ASPH PAV (13") |
SY |
329,141.000 |
2.09000 |
357,029.000 |
2.21732 |
2 |
| 105 2026 |
REMOVE STAB BASE & ASPH PAV (13" - 18") |
SY |
|
|
58,982.000 |
5.63760 |
6 |
| 105 2030 |
REMOVING STAB BASE & ASPH PAV (8" - 14") |
SY |
|
|
71.000 |
25.00000 |
1 |
| 105 2034 |
REMOVING STAB BASE AND ASPH PAV (1" - 9") |
SY |
|
|
123,965.000 |
1.81000 |
1 |
| 105 2037 |
REMOVING STAB BASE AND ASPH PAV (0" - 16" |
SY |
|
|
2,108.000 |
5.64469 |
2 |
| 105 2038 |
REMOVING STAB BASE AND ASPH PAV (11") |
SY |
|
|
3,737.000 |
4.50000 |
1 |
| 105 2041 |
REMOVING STAB BASE AND ASPH PAV (8") |
SY |
8,999.000 |
11.00000 |
23,923.000 |
5.69507 |
3 |
| 105 2043 |
REMOVING STAB BASE & ASPH PAV (0 - 6") |
SY |
|
|
890.190 |
10.00000 |
1 |
| 105 2044 |
REMOVING STAB BASE AND ASPH PAV (10") |
SY |
972.000 |
11.00000 |
10,621.000 |
4.45692 |
4 |
| 105 2046 |
REMOVING STAB BASE & ASPH PAV (0" - 10") |
SY |
|
|
250,935.000 |
3.14143 |
3 |
| 105 2052 |
REMOVE STAB BASE & ASPH PAV (4" - 5") |
SY |
852.000 |
10.00000 |
2,659.000 |
6.60211 |
2 |
| 105 2055 |
REMOVING STAB BASE AND ASPH PAV (9" - 14" |
SY |
|
|
1,329.000 |
10.00000 |
1 |
| 105 2058 |
REMOVING STAB BASE & ASPH PAV (10" - 12" |
SY |
|
|
6,233.000 |
4.00000 |
1 |
| 105 2063 |
REMOVE STAB BASE AND ASPH PAV (1" - 3") |
SY |
107,365.000 |
.77000 |
107,365.000 |
.77000 |
1 |
| 105 2066 |
REMOVING STAB BASE AND ASPH PAV (10") |
SY |
|
|
2,347.000 |
3.00000 |
1 |
| 105 2069 |
REMOVING STAB BASE & ASPH PAV (4" - 6" |
SY |
3,640.000 |
5.00000 |
3,640.000 |
5.00000 |
1 |
| 105 2070 |
REMOVING STAB BASE & ASPH PAV (6" - 8" |
SY |
|
|
37,853.000 |
2.00000 |
1 |
| 105 2083 |
REMOVE STAB BASE & ASPH PAV (0" - 11.25" |
SY |
|
|
386,934.000 |
4.00000 |
1 |
| 105 2084 |
REM STAB BASE & ASPH (6" - 12") |
SY |
485,422.000 |
2.00000 |
581,628.000 |
2.06693 |
4 |
| 105 2088 |
REMOVING STAB BASE AND ASPH PAV (0" - 5") |
SY |
|
|
85,383.000 |
2.00000 |
1 |
| 105 2090 |
RMV STAB BS & ASPH PAV (11.5" - 22") |
SY |
|
|
30,889.000 |
6.00000 |
1 |
| 105 2096 |
REMOV STAB BASE AND ASPH PAV (0" - 12") |
SY |
13,435.000 |
2.32000 |
13,435.000 |
2.32000 |
1 |
| 110 2001 |
EXCAVATION (ROADWAY) |
CY |
220,985.000 |
6.56042 |
1,420,976.710 |
5.45677 |
39 |
| 110 2002 |
EXCAVATION (CHANNEL) |
CY |
101,217.000 |
5.23000 |
454,834.380 |
5.59703 |
14 |
| 110 2003 |
EXCAVATION (SPECIAL) |
CY |
146,190.000 |
6.00000 |
929,321.000 |
5.73064 |
8 |
| 110 2004 |
EXCAVATION (ROADWAY AND CHANNEL) |
CY |
|
|
220.000 |
6.35000 |
1 |
| 112 2001 |
SUBGRADE WIDENING (ORD COMP) |
STA |
|
|
70.100 |
590.66163 |
4 |
| 112 2002 |
SUBGRADE WIDENING (DENS CONT) |
STA |
|
|
558.890 |
521.80356 |
10 |
| 132 2001 |
EMBANKMENT (FINAL) (ORD COMP) (TY A) |
CY |
|
|
530.150 |
11.81307 |
3 |
| 132 2002 |
EMBANKMENT (FINAL) (DENS CONT) (TY A) |
CY |
|
|
4,579.000 |
2.30203 |
2 |
| 132 2004 |
EMBANKMENT (FINAL) (DENS CONT) (TY B) |
CY |
|
|
1,980.000 |
14.00000 |
1 |
| 132 2005 |
EMBANKMENT (FINAL) (ORD COMP) (TY C) |
CY |
2,931.000 |
4.09000 |
3,377.000 |
4.64601 |
2 |
| 132 2006 |
EMBANKMENT (FINAL) (DENS CONT) (TY C) |
CY |
723,422.000 |
4.84645 |
2,021,310.370 |
4.31539 |
40 |
| 132 2008 |
EMBANKMENT (FINAL) (DENS CONT) (TY D) |
CY |
|
|
300.000 |
17.00000 |
1 |
| 132 2013 |
EMBANKMENT (ORIGINAL) (ORD COMP) (TY C) |
CY |
75.000 |
25.00000 |
7,330.000 |
7.78943 |
6 |
| 132 2036 |
EMBANK (FINAL) (DC) (TY E) (CSBE) |
CY |
47,313.000 |
24.85289 |
156,602.800 |
26.54427 |
9 |
| 132 2037 |
EMB (FNL) (DC) (TYE) (CSBE) (RWALL FND IMPR |
CY |
13,827.000 |
23.07196 |
62,178.000 |
31.91365 |
8 |
| 132 2038 |
EMB (FINAL) (DC) (TYE) (CSBE) (EMB FND IMPR |
CY |
|
|
26,871.800 |
28.10822 |
2 |
| 132 2039 |
EMB (FNL) (DC) (TYE) (CSBE) (RWALL RNF VOL) |
CY |
|
|
11,714.000 |
33.00000 |
1 |
| 134 2001 |
BACKFILL (TY A) |
STA |
660.000 |
75.00000 |
1,066.890 |
121.93150 |
4 |
| 134 2004 |
BACKFILL (TY A OR B) |
STA |
716.920 |
486.46125 |
3,877.510 |
236.21769 |
18 |
| 150 2001 |
BLADING |
STA |
|
|
136.000 |
293.38000 |
1 |
| 150 2002 |
BLADING |
HR |
|
|
185.000 |
68.91892 |
3 |
| 156 2001 |
BULLDOZER WORK |
HR |
|
|
52.000 |
163.41000 |
1 |
| 160 2001 |
FURNISHING AND PLACING TOPSOIL (4") |
STA |
|
|
60.120 |
356.00000 |
1 |
| 160 2003 |
FURNISHING AND PLACING TOPSOIL (4") |
SY |
|
|
483,863.000 |
.26345 |
4 |
| 160 2005 |
FURNISHING AND PLACING TOPSOIL |
CY |
|
|
2,562.000 |
30.00000 |
1 |
| 161 2006 |
COMPOST MANUF TOPSOIL (PB) |
CY |
|
|
2,505.000 |
40.00000 |
1 |
| 161 2009 |
EROSION CONTROL COMPOST |
CY |
72.000 |
30.00000 |
1,567.000 |
20.86874 |
3 |
| 161 2012 |
GENERAL USE COMPOST |
CY |
|
|
730.000 |
31.48285 |
2 |
| 161 2014 |
COMPOST MANUF TOPSOIL (BOS OR PB) (4") |
SY |
29,756.000 |
1.00000 |
54,744.000 |
.77177 |
2 |
| 161 2017 |
COMPOST MANUF TOPSOIL (BIP) (4") |
SY |
192,720.000 |
1.27837 |
1,283,321.780 |
1.09041 |
22 |
| 161 2020 |
COMPOST MANUF TOPSOIL (BIP) (6") |
SY |
137.000 |
5.48000 |
137.000 |
5.48000 |
1 |
| 162 2002 |
BLOCK SODDING |
SY |
62,264.000 |
2.63977 |
585,409.440 |
2.91494 |
46 |
| 162 2003 |
STRAW OR HAY MULCH |
SY |
392,888.000 |
.23204 |
2,484,877.160 |
.15826 |
34 |
| 164 2005 |
BROADCAST SEED (PERM) (URBAN) (SANDY) |
SY |
|
|
21,739.000 |
.10000 |
1 |
| 164 2009 |
BROADCAST SEED (TEMP) (WARM) |
SY |
|
|
301,774.600 |
.10137 |
11 |
| 164 2013 |
STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY |
SY |
|
|
9,250.000 |
.11000 |
1 |
| 164 2033 |
DRILL SEEDING (PERM) (RURAL) (SANDY) |
SY |
|
|
133,984.000 |
.06000 |
1 |
| 164 2034 |
DRILL SEEDING (PERM) (RURAL) (SANDY) |
AC |
|
|
4.180 |
500.00000 |