AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - BRYAN DISTRICT

Last Update: Friday, May 3, 2013
ITEMS 5049 2002 TO 5680 2001
Items Items Bid Code Range
0100 - 0169
0216 - 0276
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0687
0784 - 0784
1122 - 1122
2022 - 2066
3165 - 3248
4592 - 4614
5049 - 5680
6007 - 6834
7380 - 7380
8260 - 8920
5049 2002 - 5680 2001
Item No Description Units April 30, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
5049 2002 BIODGRD EROSION CONTROL LOGS (18" DIA) LF     1,964.000 7.25000 1
5172 2001 GEOGRID BASE REINFORCEMENT (TY A) SY     7,897.000 2.00000 1
5367 2002 CABLE BARRIER SYSTEM (TL - 4) LF     41,643.000 6.49000 1
5367 2006 CABLE BARRIER SYSTEM (TL - 4) (10' - 0") LF     1,744.000 9.00000 1
5367 2008 CABLE BARRIER TERMINAL SECTION (TL - 4) EA     46.000 2,200.00000 1
5369 2001 CENTERLINE TEXTURING STA     781.980 14.50000 1
5680 2001 BIKE RACK EA     5.000 153.14000 1