AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - BRYAN DISTRICT

Last Update: Monday, September 15, 2014
ITEMS 500 2001 TO 560 2015
Items Items Bid Code Range
0100 - 0169
0216 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0740 - 0752
1018 - 1122
2151 - 2151
3246 - 3271
4116 - 4562
5172 - 5926
6007 - 6834
7380 - 7380
8020 - 8835
500 2001 - 560 2015
Item No Description Units August 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
500 2001 MOBILIZATION LS 4.000 275,250.07250 26.000 324,887.73692 26
502 2001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 30.000 2,600.00000 245.000 3,041.15902 26
508 2002 CONSTRUCTING DETOURS SY     1,770.000 35.00000 1
508 2005 CONSTRUCTING DETOURS (EBSS) SY     550.000 10.00000 1
512 2001 PORT CTB (FUR & INST) (SAFETY SH) (TY 1) LF     1,110.000 8.50000 1
512 2004 PORT CTB (FUR & INST) (SNGL SLP) (TY 1) LF     480.000 75.50000 2
512 2008 PORT CTB (FUR & INST) (LOW PROF) (TY 1) LF     20.000 22.39000 1
512 2009 PORT CTB (FUR & INST) (LOW PROF) (TY 2) LF     40.000 16.31000 1
512 2019 PORT CTB (MOVE) (SAFETY SH) (TY 1) LF     300.000 7.00000 1
512 2022 PORT CTB (MOVE) (SNGL SLP) (TY 1) LF     1,320.000 20.68182 2
512 2037 PORT CTB (REMOVE) (SAFETY SH) (TY 1) LF     1,110.000 8.00000 1
512 2040 PORT CTB (REMOVE) (SNGL SLP) (TY 1) LF     480.000 23.75000 2
512 2044 PORT CTB (REMOVE) (LOW PROF) (TY 1) LF     20.000 17.06000 1
512 2045 PORT CTB (REMOVE) (LOW PROF) (TY 2) LF     40.000 10.16000 1
514 2004 PERM CONC TRF BARR (SGL SLP) (TY 1) (42" LF     600.000 110.00000 1
514 2009 PERM CONC TRF BARR (SGL SLP) (TY 3) (48" LF     180.000 160.00000 1
514 2059 PERM CONC TRF BARR (SGL SLP) (TY 1) (48" LF     20.000 400.00000 1
528 2001 COLORED TEXTURED CONC (4") SY     175.000 100.00000 1
528 2004 LANDSCAPE PAVERS SY     5,488.000 60.45700 3
528 2006 COLORED TEXTURED CONC (5") SY     69.000 110.00000 1
528 2018 COLORED TEXTURED CONC (9") SY     23.000 200.00000 1
529 2001 CONC CURB (TY I) LF     60.000 20.00000 1
529 2002 CONC CURB (TY II) LF     5,798.000 15.00000 1
529 2004 CONC CURB & GUTTER (TY II) LF     324.000 30.00000 1
529 2005 CONC CURB (MONO) (TY I) LF     2,131.000 5.00000 1
529 2006 CONC CURB (MONO) (TY II) LF     1,685.000 5.00000 1
529 2009 CONCRETE CURB (SPECIAL) LF     93.000 31.00000 1
529 2010 CONC CURB AND GUTTER (TY II) (REINF) LF     7,621.000 14.65083 2
529 2037 CONC CURB (TY II) (REINF) LF     165.000 24.10303 2
529 2059 CONC CURB & GUTTER (TY I) (MOD) LF     926.000 13.00000 1
529 2096 CONC CURB (MONO) (TY II) (DOWEL) (REINF) LF     703.000 14.00000 1
530 2002 INTERSECTIONS (ACP) EA 5.000 3,500.00000 8.000 4,062.50000 2
530 2003 INTERSECTIONS (SURF TREAT) EA     1.000 4,000.00000 1
530 2007 DRIVEWAYS (CONC) EA 1.000 2,500.00000 23.000 6,434.78261 5
530 2008 DRIVEWAYS (ACP) EA 262.000 662.21374 518.000 771.96911 11
530 2009 DRIVEWAYS (SURF TREAT) EA 22.000 500.00000 374.000 591.57754 7
530 2010 DRIVEWAYS (CONC) SY     881.000 77.95119 4
530 2011 DRIVEWAYS (ACP) SY     3,858.000 41.23121 2
530 2012 DRIVEWAYS (SURF TREAT) SY     3,924.000 14.00000 1
530 2014 TURNOUTS (ACP) EA 1.000 2,000.00000 2.000 1,750.00000 2
530 2015 TURNOUTS (SURF TREAT) EA 33.000 700.00000 232.000 496.06034 6
530 2018 TURNOUTS (SURF TREAT) SY     1,160.000 22.00000 1
530 2058 DRIVEWAYS (OTHER) EA 44.000 700.00000 44.000 700.00000 1
530 2075 DRIVEWAYS (GRAVEL) SY     1,019.000 16.00000 1
531 2004 CONC SIDEWALKS (6") SY     8,833.000 50.00000 1
531 2005 CURB RAMPS (TY 1) EA     175.000 1,517.14286 3
531 2006 CURB RAMPS (TY 2) EA     61.000 1,983.60656 2
531 2007 CURB RAMPS (TY 3) EA     135.000 1,970.37037 2
531 2009 CURB RAMPS (TY 6) EA     41.000 2,000.00000 1
531 2010 CURB RAMPS (TY 7) EA     391.000 1,001.02302 2
531 2014 CURB RAMPS (TY 22) EA     6.000 2,950.00000 2
531 2017 CURB RAMPS (TY 21) EA     12.000 1,875.00000 2
531 2018 CURB RAMPS (SPECIAL) EA     8.000 4,000.00000 1
531 2024 CONC SIDEWALK (5") SY     2,042.000 37.00000 1
531 2038 CONC SIDEWALKS (STEPS) SY     17.000 200.00000 1
531 2040 CURB RAMPS (TY 5) EA     4.000 2,000.00000 1
531 2041 CURB RAMPS (TY 10) EA     75.000 1,973.33333 2
531 2065 CONC SIDEWALK (STEPS) SY     35.000 200.00000 1
531 2107 CURB RAMPS (TY - 12) EA     98.000 2,000.00000 1
533 2006 SHOULDER TEXTURING (MILLED) (ASPHALT) LF 107,153.000 .15000 820,770.000 .16541 9
536 2002 CONC MEDIAN SY     30.000 285.00000 1
536 2004 CONC DIRECTIONAL ISLAND SY     16.000 100.00000 1
536 2006 CONC MEDIAN (MONO NOSE) SY     5.000 240.00000 1
540 2001 MTL W - BEAM GD FEN (TIM POST) LF 5,044.000 19.58366 15,965.000 18.05648 15
540 2002 MTL W - BEAM GD FEN (STEEL POST) LF     587.500 20.50000 1
540 2003 MTL THRIE - BEAM GD FEN (TIM POST) LF     1,300.000 15.00000 1
540 2011 MTL BEAM GD FEN TRANS (THRIE - BEAM) EA 32.000 1,725.00000 128.000 1,462.85508 15
540 2012 MTL BEAM GD FEN TRANS (TL2) EA     7.000 1,143.57000 1
540 2013 MTL BEAM GD FEN TRANS (T101) EA     6.000 927.33333 2
540 2015 MTL W - BEAM GD FEN (TIM POST) RADIUS RAIL LF     15.000 48.15000 1
540 2025 TERMINAL ANCHOR SECTION (DRWY) (SPCL) EA     1.000 842.63000 1
540 2044 DOWNSTREAM ANCHOR TERMINAL (DAT) SECTION EA     1.000 1,100.00000 1
540 2045 MTL BM GD FEN (LONG SPAN SYSTEM) LF 200.000 26.00000 250.000 24.60000 2
542 2001 REMOVING METAL BEAM GUARD FENCE LF 8,050.000 2.52950 22,151.500 2.23655 14
542 2002 REMOVING TERMINAL ANCHOR SECTION EA 17.000 241.17647 55.000 213.63636 6
542 2003 RM MTL BM GD FEN TRANS (THRIE - BEAM) EA     10.000 125.00000 1
542 2005 RM MTL BM GD FENCE TRANS (T101) EA 4.000 1,000.00000 22.000 275.36364 4
544 2001 GUARDRAIL END TREATMENT (INSTALL) EA     51.000 1,963.23529 5
544 2002 GUARDRAIL END TREATMENT (MOVE & RESET) EA     1.000 1,100.00000 1
544 2003 GUARDRAIL END TREATMENT (REMOVE) EA 45.000 217.77778 120.000 208.66667 10
544 2004 GDRAIL END TRT (INST) (WOOD POST) (TY I) EA     38.000 2,020.21947 5
544 2006 GDRAIL END TRT (INST) (WOOD POST) (TY III EA 60.000 2,255.46667 102.000 2,266.74510 8
545 2001 CRASH CUSH ATTEN (INSTL) EA     2.000 5,000.00000 1
545 2002 CRASH CUSH ATTEN (MOVE & RESET) EA     6.000 650.00000 1
545 2003 CRASH CUSH ATTEN (REMOVE) EA     2.000 500.00000 1
545 2049 CRASH CUSH ATTEN (INSTL) (WORK ZONE) EA     2.000 19,200.00000 1
545 2050 CRASH CUSH ATTEN (MOV & RESET) (WORK ZONE) EA     2.000 1,500.00000 1
545 2051 CRASH CUSH ATTEN (REMOVE) (WORK ZONE) EA     2.000 1,000.00000 1
545 2089 CRASH CUSH ATTEN (INSTL) (R) (N) (TL3) EA     2.000 13,400.00000 1
545 2095 CRASH CUSH ATTEN (INSTL) (S) (N) (TL3) EA     4.000 9,550.00000 2
545 2101 CRASH CUSHION ATTENUATOR (REMOVE) EA     4.000 625.00000 2
550 2001 CHAIN LINK FENCE (INSTALL) (6') LF     586.000 20.00000 1
550 2003 CHAIN LINK FENCE (REMOVE) LF     586.000 3.00000 1
552 2003 WIRE FENCE (TY C) LF     131.000 25.00000 1
556 2008 PIPE UNDERDRAINS (TY 8) (6") LF     470.000 25.00000 1
560 2004 MAILBOX INSTALL - S (WC - POST) TY 3 FND EA 26.000 185.00000 51.000 196.80196 5
560 2005 MAILBOX INSTALL - D (WC - POST) TY 3 FND EA 3.000 213.33333 3.000 213.33333 2
560 2007 MAILBOX INSTALL - D (TWW - POST) TY 4 FND - T EA 5.000 250.00000 31.000 240.64516 7
560 2008 MAILBOX INSTALL - M (TWW - POST) TY 4 FND - T EA 6.000 543.33333 25.000 545.00000 6
560 2015 MAILBOX INSTALL - S (TWW - POST) TY 4 FND - TB EA 27.000 250.00000 232.000 219.78448 8