AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - BRYAN DISTRICT

Last Update: Friday, May 3, 2013
ITEMS 100 2001 TO 169 2006
Items Items Bid Code Range
0100 - 0169
0216 - 0276
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0687
0784 - 0784
1122 - 1122
2022 - 2066
3165 - 3248
4592 - 4614
5049 - 5680
6007 - 6834
7380 - 7380
8260 - 8920
100 2001 - 169 2006
Item No Description Units April 30, 2013 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     1.000 6,000.00000 1
100 2002 PREPARING ROW STA 24.200 1,250.00000 682.608 1,163.42293 20
100 2003 PREPARING ROW (TREE) (5" TO 12" DIA) EA 8.000 300.00000 63.000 126.98413 8
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA 6.000 400.00000 48.000 251.87500 7
100 2006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     15.000 215.00000 1
100 2007 PREP ROW (TREE) (GREATER THAN 24" DIA) EA     7.000 442.85714 2
100 2008 PREPARING ROW (TREE) (0" TO 6" DIA) EA     15.000 105.00000 1
100 2011 PREPARING ROW (TREE) (24" TO 36" DIA.) EA 4.000 500.00000 17.000 583.52941 6
100 2012 PREP ROW (TREE) (18" - 36" DIA.) EA     7.000 700.00000 1
100 2014 PREPARING ROW (TREE) (20" TO 42" DIA) EA     1.000 1,500.00000 1
104 2001 REMOVING CONC (PAV) SY     5,990.000 6.69644 4
104 2009 REMOVING CONC (RIPRAP) SY 414.000 10.00000 1,842.100 7.18142 5
104 2011 REMOVING CONC (MEDIANS) SY     240.000 15.00000 1
104 2014 REMOVING CONC (FOUNDATIONS) CY     2.400 35.78750 1
104 2015 REMOVING CONC (SIDEWALKS) SY     685.000 12.92089 3
104 2017 REMOVING CONC (DRIVEWAYS) SY     5,364.600 8.56911 7
104 2021 REMOVING CONC (CURB) LF     274.500 7.08732 2
104 2022 REMOVING CONC (CURB AND GUTTER) LF     6,018.000 5.50000 1
104 2023 REMOVING CONC (CTB) LF     52.000 71.58000 1
104 2027 REMOVING CONC (APPR SLAB) SY     122.000 20.00000 1
104 2028 REMOVING CONC (MISC) SY     1,382.000 19.51158 2
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     626.000 4.00000 1
104 2036 REMOVING CONC (SIDEWALK OR RAMP) SY     4,111.000 10.00000 1
104 2040 REMOVING CONC (PAVERS) SY     324.600 5.34649 2
104 2041 REMOVING CONC (GND BOX W / APRON) EA     8.000 10.74000 1
104 2045 REMOVE CONC (MISC) EA     4.000 2,000.00000 1
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     3,520.000 3.00000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     49,555.000 4.06328 2
105 2026 REMOVE STAB BASE & ASPH PAV (13" - 18") SY     467.000 20.00000 1
105 2058 REMOVING STAB BASE & ASPH PAV (10" - 12" SY     735.000 12.50000 1
105 2063 REMOVE STAB BASE AND ASPH PAV (1" - 3") SY     32,600.000 1.00000 1
105 2066 REMOVING STAB BASE AND ASPH PAV (10") SY     4,219.000 4.50000 1
106 2001 OBLITERATING ABANDONED ROAD STA     271.690 345.87765 2
106 2002 OBLITERATING ABANDONED ROAD SY     20,466.000 3.50000 1
110 2001 EXCAVATION (ROADWAY) CY 226.000 13.00000 202,647.040 4.18797 20
110 2002 EXCAVATION (CHANNEL) CY     2,308.480 8.70768 5
110 2003 EXCAVATION (SPECIAL) CY     333.000 11.45345 2
110 2004 EXCAVATION (ROADWAY AND CHANNEL) CY     8,860.000 10.00000 1
112 2001 SUBGRADE WIDENING (ORD COMP) STA     2,438.940 203.75519 5
112 2002 SUBGRADE WIDENING (DENS CONT) STA     290.161 756.98750 2
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     7,271.000 6.00000 1
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     1,920.000 7.25000 1
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     27,922.000 10.22593 6
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY 9,845.000 13.00000 444,195.390 5.68592 14
132 2022 EMBANKMENT (VEHICLE) (DENS CONT) (TY C) CY     10,000.000 5.00000 1
134 2001 BACKFILL (TY A) STA     921.110 50.00000 1
134 2002 BACKFILL (TY B) STA     161.000 75.00000 1
134 2004 BACKFILL (TY A OR B) STA     3,132.321 62.33013 10
134 2006 BACKFILL (TY A) LF     91,607.000 2.50000 1
150 2001 BLADING STA     564.560 45.26295 3
150 2002 BLADING HR 5.000 90.00000 41.000 90.00000 3
152 2005 ROAD GRADER WORK (ORD COMP) LF     60,762.000 1.00000 1
158 2002 SPEC EXCAV WORK (BACKHOE) HR     40.000 150.03000 1
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR     50.000 90.00000 1
158 2006 SPEC EXCAV WORK (VEHICLE) CY     10,000.000 5.00000 1
160 2001 FURNISHING AND PLACING TOPSOIL (4") STA     1,982.500 92.71287 6
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     359,226.000 .84331 10
161 2001 COMPOST MANUF TOPSOIL (BOS) (4") STA     562.000 500.00000 1
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY 17,320.000 .90000 237,278.000 1.15897 6
161 2014 COMPOST MANUF TOPSOIL (BOS OR PB) (4") SY     5,838.000 2.50000 1
162 2002 BLOCK SODDING SY     50,030.000 2.82429 9
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     450,717.000 .10157 11
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 17,320.000 .11000 215,738.000 .11898 4
164 2007 BROADCAST SEED (PERM) (URBAN) (CLAY) SY     167.000 5.50000 1
164 2009 BROADCAST SEED (TEMP) (WARM) SY 8,660.000 .10000 691,856.500 .08146 21
164 2011 BROADCAST SEED (TEMP) (COOL) SY 8,660.000 .10000 691,855.500 .08568 21
164 2015 STRAW / HAY MLCH SEED (PERM) (RURAL) (CLAY) SY     93,478.000 .08000 1
164 2021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     12,610.000 .30000 1
164 2023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     132,221.000 .22000 1
164 2025 CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) SY     33,630.000 .25000 1
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     193,975.000 .19629 2
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     63,279.000 .21159 4
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY     63,279.000 .21159 4
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     3,679.000 .45000 1
164 2035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY     345,248.000 .06000 1
164 2041 DRILL SEEDING (TEMP) (WARM) SY     1,840.000 .60000 1
164 2043 DRILL SEEDING (TEMP) (COOL) SY     1,840.000 .33000 1
168 2001 VEGETATIVE WATERING MG 1,732.000 24.00000 25,097.342 8.50058 25
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY     16,900.000 .78935 2
169 2003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY     8,000.000 1.00000 1
169 2006 SOIL RETENTION BLANKETS (CL 2) (TY F) SY     3,200.000 1.00000 1