TxDOT Expressway
Search:
   Home   |    Contact Us   |    Tools & Plug-Ins  
 
 
Last Update: Friday, December 19, 2008
ITEMS 100 2001 TO 193 2019
Items Items Bid Code Range
0100 - 0193
0216 - 0276
0305 - 0368
0400 - 0496
0500 - 0560
0610 - 0690
0780 - 0780
1018 - 1070
3108 - 3131
4115 - 4115
5049 - 5560
6007 - 6834
8025 - 8062
100 2001 - 193 2019
Item No Description Units December 31, 2008 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     84.583 4,296.33993 4
100 2002 PREPARING ROW STA 79.640 50.00000 843.710 801.49198 10
100 2004 PREPARING ROW (TREE) (12" TO 24" DIA) EA     3.000 470.00000 1
100 2005 PREP ROW (TREE) (24" - 30"DIA) EA     1.000 500.00000 1
100 2006 PREP ROW (TREE) (LESS THAN 24" DIA) EA     4.000 550.00000 1
100 2009 PREPARING ROW (TREE) (6" TO 24" DIA) EA     42.000 200.00000 1
100 2012 PREP ROW (TREE) (18" - 36" DIA.) EA     3.000 500.00000 1
100 2015 PREPARING ROW (HAND CLEARING) AC     27.895 1,313.13856 2
103 2001 DISPOSAL OF WATER WELLS EA     1.000 1,500.00000 1
104 2001 REMOVING CONC (PAV) SY     5,929.000 3.31540 2
104 2009 REMOVING CONC (RIPRAP) SY     739.000 13.31258 4
104 2010 REMOVING CONC (RIPRAP) CY     15.000 28.00000 1
104 2011 REMOVING CONC (MEDIANS) SY     234.000 15.00000 2
104 2013 REMOVING CONC (FOUNDATIONS) SY     175.000 40.00000 1
104 2015 REMOVING CONC (SIDEWALKS) SY     889.000 8.28684 2
104 2017 REMOVING CONC (DRIVEWAYS) SY     3,538.000 12.30073 3
104 2021 REMOVING CONC (CURB) LF     846.600 6.00000 1
104 2022 REMOVING CONC (CURB AND GUTTER) LF     6,893.000 4.75007 5
104 2023 REMOVING CONC (CTB) LF     75.000 20.00000 1
104 2028 REMOVING CONC (MISC) SY     7.000 100.00000 1
104 2029 REMOVING CONC (CURB OR CURB & GUTTER) LF     1,043.000 5.02349 2
104 2032 REMOVING CONC (WHEELCHAIR RAMP) SY     6.600 111.00000 1
105 2008 REMOVING STAB BASE AND ASPH PAV (6") SY     11,262.000 3.75226 2
105 2011 REMOVING STAB BASE AND ASPH PAV (2" - 6" SY     6,214.000 4.75748 3
105 2013 REMOVING STAB BASE & ASPH PAV (9") SY     990.000 8.70000 1
105 2020 REMOVING STAB BASE & ASPH PAV (12") SY     402.000 5.75000 1
105 2047 REMOVING STAB BASE & ASPH PAV (1.5") SY     31,760.000 1.07000 1
105 2052 REMOVE STAB BASE & ASPH PAV (4" - 5") SY     13,229.000 2.50000 1
105 2058 REMOVING STAB BASE & ASPH PAV (10" - 12" SY     2,286.000 3.60000 1
105 2073 REMOV STAB BASE AND ASPH PAV (22") SY     4,280.000 7.82477 2
106 2001 OBLITERATING ABANDONED ROAD STA     11.500 610.00000 1
106 2002 OBLITERATING ABANDONED ROAD SY     6,185.000 4.02941 2
110 2001 EXCAVATION (ROADWAY) CY 17,380.000 4.50000 391,636.000 4.29443 14
110 2002 EXCAVATION (CHANNEL) CY     1,244.000 14.54948 4
110 2003 EXCAVATION (SPECIAL) CY     23.000 100.00000 1
112 2001 SUBGRADE WIDENING (ORD COMP) STA     585.620 117.31280 2
112 2002 SUBGRADE WIDENING (DENS CONT) STA     339.300 218.81786 5
132 2001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY 1,946.000 3.00000 1,956.000 3.49591 2
132 2002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     2,250.000 11.56667 2
132 2004 EMBANKMENT (FINAL) (DENS CONT) (TY B) CY     277,276.000 4.76765 5
132 2005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     2,674.000 11.34630 3
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     41,911.000 4.22712 3
132 2011 EMBANKMENT (ORIGINAL) (ORD COMP) (TY B) CY     504.000 22.00000 1
132 2014 EMBANKMENT (ORIGINAL) (DENS CONT) (TY C) CY     2,753.000 10.00000 1
134 2001 BACKFILL (TY A) STA     1,133.200 268.96398 4
134 2002 BACKFILL (TY B) STA     416.400 195.99496 5
150 2001 BLADING STA     2,442.280 62.56762 7
158 2003 SPEC EXCAV WORK (HYD EXCAVATOR) HR     95.000 150.00000 3
158 2004 SPEC EXCAV WORK (FRONT - END LOADER) HR     100.000 70.00000 1
160 2001 FURNISHING AND PLACING TOPSOIL (4") STA     728.990 60.27723 3
160 2003 FURNISHING AND PLACING TOPSOIL (4") SY     26,302.000 1.35052 6
160 2004 FURNISHING AND PLACING TOPSOIL (6") SY     2,118.000 5.00000 1
161 2002 COMPOST MANUF TOPSOIL (BOS) (4") SY 29,051.000 .95000 545,066.000 1.17585 5
161 2023 EROSION CONTROL COMPOST (4") SY     43,693.000 3.30000 1
161 2025 GENERAL USE COMPOST (2") SY     23,394.000 2.02050 2
161 2026 COMPOST MANUF TOPSOIL (BOS OR PB) (6") SY     1,858.000 3.00000 1
162 2002 BLOCK SODDING SY     137,389.000 2.81490 11
164 2001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY     5,380.000 .49587 2
164 2003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 29,051.000 .08000 189,571.000 .43564 2
164 2009 BROADCAST SEED (TEMP) (WARM) SY 29,051.000 .05000 109,619.000 .08282 6
164 2011 BROADCAST SEED (TEMP) (COOL) SY 29,051.000 .04000 109,619.000 .07766 6
164 2012 BROADCAST SEED (TEMP) (COOL) AC     51.003 400.00000 1
164 2013 STRAW / HAY MLCH SEED (PERM) (RURAL) (SANDY SY     121,820.000 .21911 2
164 2017 STRAW / HAY MLCH SEED (PERM) (URBAN) (SANDY SY     12,615.000 .30000 1
164 2021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     173,369.000 .18002 4
164 2025 CELL FBR MLCH SEED (PERM) (URBAN) (SANDY) SY     194,997.000 .19050 2
164 2027 CELL FBR MLCH SEED (PERM) (URBAN) (CLAY) SY     37,331.000 .19073 2
164 2029 CELL FBR MLCH SEED (TEMP) (WARM) SY     202,849.000 .17847 6
164 2031 CELL FBR MLCH SEED (TEMP) (COOL) SY     202,849.000 .18203 6
164 2034 DRILL SEEDING (PERM) (RURAL) (SANDY) AC     51.003 450.00000 1
164 2039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     184,913.000 .09000 1
164 2041 DRILL SEEDING (TEMP) (WARM) SY     92,458.000 .09000 1
164 2043 DRILL SEEDING (TEMP) (COOL) SY     92,458.000 .09000 1
166 2002 FERTILIZER TON     2.300 1,000.00000 1
168 2001 VEGETATIVE WATERING MG 2,092.000 6.00000 33,671.570 8.52321 18
169 2001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 29,051.000 .80000 76,099.000 .95456 2
170 2001 IRRIGATION SYSTEM LS     1.000 75,000.00000 1
170 2006 IRRIGATION SYSTEM LOCATION A LS     1.000 26,000.00000 1
192 2001 PLANT MATERIAL (4" CNTR) EA     310.000 2.50000 1
192 2003 PLANT MATERIAL (3 - GAL) EA     125.000 16.12000 2
192 2006 PLANT MATERIAL (30 - GAL) EA     181.000 188.59116 2
192 2009 PLANT MATERIAL (GROUP I) EA     146.000 121.84932 2
192 2010 PLANT MATERIAL (GROUP II) EA     376.000 115.00000 1
192 2011 PLANT MATERIAL (GROUP III) EA     567.000 9.50000 1
192 2016 PLANT BED PREPARATION SY     23,394.000 1.51975 2
192 2019 PLANT MATERIAL (SEEDLING) EA     6,658.000 4.20000 1
192 2021 PLANT MATERIAL (5 GAL) (TREE) EA     2,016.000 24.00000 1
192 2023 PLANT MATERIAL (15 GAL) (TREE) EA     4.000 130.00000 1
192 2024 PLANT MATERIAL (30 GAL) (TREE) EA     20.000 250.00000 1
192 2028 PLANT MATERIAL (1 GAL) (SHRUB) EA     250.000 6.00000 1
192 2029 PLANT MATERIAL (2 GAL) (SHRUB) EA     27.000 14.00000 1
192 2031 PLANT MATERIAL (5 GAL) (SHRUB) EA     152.000 24.21382 2
192 2033 PLANT MATERIAL (15 GAL) (SHRUB) EA     89.000 127.30337 2
193 2001 PLANT MAINTENANCE MO     12.000 1,000.00000 1
193 2003 PLANT REPLACEMENT (1 - GAL) EA     82.000 7.43293 2
193 2004 PLANT REPLACEMENT (3 - GAL) EA     13.000 13.53846 2
193 2005 PLANT REPLACEMENT (5 - GAL) EA     214.000 21.66355 2
193 2006 VEGETATIVE WATERING MG     933.000 25.00000 1
193 2007 IRRIGATION SYSTEM OPER AND MAINT MO     24.000 780.00000 2
193 2008 PLANT REPLACEMENT (4" POT) EA     31.000 1.50000 1
193 2009 PLANT REPLACEMENT (15 GAL) EA     58.000 93.70690 2
193 2010 PLANT REPLACEMENT (30 GAL) EA     20.000 179.75000 2
193 2012 PLANT MAINTENANCE (SCH A) MO     12.000 1,060.00000 1
193 2018 PLANT REPLACEMENT (2 GAL) EA     3.000 10.00000 1
193 2019 PLANT REPLACEMENT (SEEDLING) EA     666.000 4.30000 1
 
spacer spacer
Disclaimer | Accessibility Policy | Privacy and Security Policy | Open Records | TxDOT Contacts