AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AUSTIN DISTRICT

Last Update: Friday, October 31, 2014
ITEMS 432 2033 TO 462 2045
Items Items Bid Code Range
0100 - 0193
0216 - 0275
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0740 - 0760
1003 - 1122
2090 - 2277
3233 - 3283
4022 - 4668
5217 - 5926
6006 - 6834
7529 - 7529
8020 - 8973
9035 - 9035
400 2001 - 432 2031
432 2033 - 462 2045
462 2060 - 465 4117
465 4122 - 467 2254
467 2260 - 496 2074
Item No Description Units October 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
432 2033 RIPRAP (STONE COMMON) (DRY) (12 IN) CY     575.000 64.60000 2
432 2035 RIPRAP (CONC) (6 IN) CY     10.200 648.07255 2
432 2036 RIPRAP (STONE TY R) (DRY) (12 IN) CY     60.000 200.00000 1
432 2039 RIPRAP (MOW STRIP) (4 IN) CY 380.030 438.51759 2,610.830 426.74298 36
432 2040 RIPRAP (MOW STRIP) (5 IN) CY     322.630 469.53817 2
432 2041 RIPRAP (STONE COMMON) (DRY) (18 IN) CY     164.500 128.79848 3
432 2048 RIPRAP (CONC) (FLUME) CY     44.000 826.00000 1
432 2050 RIPRAP (CONC) (CL B) (5 IN) CY     750.000 317.84667 2
432 2051 RIPRAP (STONE PROTECTION) (DRY) CY 19.000 115.51000 27.000 140.54407 2
432 2057 RIPRAP (STONE TY R) (DRY) (24 IN) CY     36.000 143.00000 1
432 2059 RIPRAP (STONE TY R) (DRY) (12 IN) CY     67.700 161.64092 2
432 2065 RIPRAP (CONC) (4 IN) (STAMPED) CY     188.000 500.00000 1
432 2066 RIPRAP (CONC) (CL B) CY 1.400 1,300.00000 15.400 418.18182 2
432 2072 RIPRAP (CONC) (CL B) (RR8 & RR9) CY     84.000 325.00000 1
434 2049 ELASTOMERIC BEAR (EE5) EA     14.000 1,500.00000 1
438 2001 CLEAN EXIST JOINTS LF     2,010.500 16.11625 4
438 2002 CLEAN AND SEAL EXIST JOINTS LF     2,180.000 24.22202 3
438 2010 CLEAN AND SEAL EXIST JOINTS (CL - 3) LF     196.000 43.57143 2
439 2004 CONC OVERLAY (2 IN) SY     264.300 75.00000 1
442 2002 STR STL (PLATE GIRDER) LB     1,860,000.000 1.45000 1
442 2047 STRUCTURAL STEEL (MISCELLANEOUS BRIDGE) LB     1,588.000 8.08564 2
442 2048 STRUCTURAL STEEL (MISC NON - BRIDGE) LB     4,486.000 11.96363 7
450 2013 RAIL (TY SSTR) LF     5,371.000 52.21560 2
450 2025 RAIL (TY PR1) LF     8,252.900 64.76601 5
450 2028 RAIL (TY C411) (MOD) LF     4,950.000 85.00000 1
450 2064 RAIL (TY C221) LF     1,322.000 88.20682 3
450 2071 RAIL (TY C402) LF     189.000 110.93000 1
450 2076 RAIL (HANDRAIL) (TY E) LF     133.000 110.00000 1
450 2077 RAIL (HANDRAIL) (TY F) LF     3,512.000 78.39095 3
450 2080 RAIL (TY T221) LF     181.000 60.90000 1
450 2126 RAIL (TY T402) LF     359.100 120.00000 1
450 2143 RAILING (TY T551) LF     11,641.300 43.12133 6
450 2146 RAIL (TY T552) LF     1,384.000 66.26012 2
450 2154 RAIL (TY T1W) LF     212.000 185.06415 2
450 2160 RAIL (TY T221) (RETROFIT) LF     297.000 204.50313 2
450 2161 RAIL (TY T223) LF     3,478.860 89.86106 10
450 2165 RAIL (TY C1W) LF     1,579.100 153.89842 2
450 2167 RAIL (TY T551) (RETROFIT) LF     191.000 150.00000 1
450 2169 RAIL (TY C221) (MOD) LF     799.000 120.00000 1
450 2615 RAIL (TY C1W) (MOD) (RETROFIT) LF     385.000 160.00000 1
452 2001 REMOV RAIL (CONC ELEMENTS) LF     854.000 44.28066 3
452 2002 REMOV RAIL (METAL ELEMENTS) LF     509.000 19.55992 3
452 2004 REMOV RAIL (CONC PARAPET & MTL ELMNTS) LF     187.000 49.68000 1
452 2010 REMOV RAIL (PEDESTRIAN) LF     58.000 3.50000 1
454 2001 SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF     2,385.840 95.40619 10
454 2004 ARMOR JOINT LF     375.600 70.78938 3
454 2005 ARMOR JOINT (WITH SEAL) LF     444.000 92.43243 2
454 2006 HEADER TYPE EXPANSION JOINT LF     632.800 61.25664 2
454 2007 HEADER TYPE EXPANSION JOINT CF     431.340 528.24129 4
454 2008 JOINT SEALANT LF     2,948.000 10.18114 4
454 2010 SEALED EXPANSION JOINT (4") (SEJ - S (O) ) LF     24.000 400.00000 1
459 2002 GABIONS (GALV) CY     79.000 165.00000 1
459 2009 GABION MATTRESSES (GALV) (6 IN) SY 7.400 150.00000 1,268.400 58.66131 5
459 2011 GABION MATTRESSES (GALV) (12 IN) SY     445.100 70.49459 2
459 2012 GABION MATTRESSES (GALV) (18 IN) SY     51.000 91.45000 1
459 2014 GABIONS (3' X 3') (GALV) CY     125.000 175.00000 1
459 2015 GABIONS (PVC) ( 3FT X 3 FT) CY     101.000 220.00000 1
460 2003 CMP (GAL STL 18 IN) LF     1,870.000 48.23173 8
460 2004 CMP (GAL STL 24 IN) LF     1,359.500 90.65628 10
460 2005 CMP (GAL STL 30 IN) LF     806.000 105.08146 3
460 2007 CMP (GAL STL 36 IN) LF     101.500 172.31360 4
460 2008 CMP (GAL STL 42 IN) LF     35.000 103.22143 2
460 2009 CMP (GAL STL 48 IN) LF     8.000 158.77000 1
460 2014 CMP AR (GAL STL DES 2) LF 19.000 55.00000 1,365.000 44.99150 6
460 2015 CMP AR (GAL STL DES 3) LF     128.500 91.75051 6
460 2016 CMP AR (GAL STL DES 4) LF     30.000 180.00000 1
460 2017 CMP AR (GAL STL DES 5) LF     61.000 166.21672 3
460 2018 CMP AR (GAL STL DES 6) LF     100.000 190.00000 1
460 2021 CMP AR (GAL STL DES 9) LF     18.000 236.26000 1
460 2109 CMP AR (GAL STL DES 1) LF     235.000 50.00000 1
462 2001 CONC BOX CULV (3 FT X 2 FT) LF     591.700 142.27375 6
462 2002 CONC BOX CULV (3 FT X 3 FT) LF     601.800 167.97762 5
462 2003 CONC BOX CULV (4 FT X 2 FT) LF     762.000 201.90664 6
462 2004 CONC BOX CULV (4 FT X 3 FT) LF     1,522.800 179.65396 7
462 2005 CONC BOX CULV (4 FT X 4 FT) LF     76.000 240.00000 1
462 2006 CONC BOX CULV (5 FT X 2 FT) LF     2,044.000 201.88063 5
462 2007 CONC BOX CULV (5 FT X 3 FT) LF     928.140 222.45789 6
462 2008 CONC BOX CULV (5 FT X 4 FT) LF     342.220 309.54459 3
462 2009 CONC BOX CULV (5 FT X 5 FT) LF 6.000 1,365.08000 781.770 288.88257 5
462 2010 CONC BOX CULV (6 FT X 3 FT) LF     426.000 348.00587 6
462 2011 CONC BOX CULV (6 FT X 4 FT) LF     269.650 279.22544 3
462 2012 CONC BOX CULV (6 FT X 5 FT) LF     304.630 402.28080 2
462 2013 CONC BOX CULV (6 FT X 6 FT) LF     355.000 308.98538 2
462 2014 CONC BOX CULV (7 FT X 3 FT) LF 8.000 1,181.32000 1,278.000 329.46053 3
462 2015 CONC BOX CULV (7 FT X 4 FT) LF     51.400 428.97996 1
462 2016 CONC BOX CULV (7 FT X 5 FT) LF     199.390 477.34746 2
462 2017 CONC BOX CULV (7 FT X 6 FT) LF 2.000 2,205.14000 147.000 470.18048 2
462 2019 CONC BOX CULV (8 FT X 4 FT) LF 16.000 1,155.07000 16.000 1,155.07000 1
462 2020 CONC BOX CULV (8 FT X 5 FT) LF     174.000 390.00000 1
462 2021 CONC BOX CULV (8 FT X 6 FT) LF     33.000 600.00000 1
462 2022 CONC BOX CULV (8 FT X 7 FT) LF     476.700 468.51762 3
462 2023 CONC BOX CULV (8 FT X 8 FT) LF     804.550 458.71170 2
462 2025 CONC BOX CULV (9 FT X 6 FT) LF     192.000 512.05000 1
462 2031 CONC BOX CULV (10 FT X 7 FT) LF     180.000 701.56000 1
462 2032 CONC BOX CULV (10 FT X 8 FT) LF     152.000 935.47237 2
462 2034 CONC BOX CULV (10 FT X 10 FT) LF     366.000 790.82273 2
462 2035 CONC BOX CULV ( 8 FT X 3 FT) LF     42.000 550.00000 1
462 2038 CONC BOX CULV (6 FT X 2 FT) LF     1,167.000 280.08466 2
462 2040 CONC BOX CULV (5 FT X 6.5 FT) LF     28.850 425.00000 1
462 2045 CONC BOX CULV (2 FT X 2 FT) LF     48.000 531.59000 1