Item No Description Units February 28, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
204 2003 SPRINKLING (DUST CONTROL) MG 26.000 10.00000 26.000 10.00000 1
216 2001 PROOF ROLLING HR 4.000 70.00000 21.000 94.28571 3
247 2044 FL BS (CMP IN PLC) (TY A GR 4) (FNAL POS CY     7,870.000 25.00000 1
247 2056 FL BS (CMP IN PLC) (TY D GR 4) (FNAL POS CY     51.000 140.00000 1
247 2366 FL BS (CMP IN PLC) (TY A GR 5) (FNAL POS CY 5,415.000 45.84955 146,053.700 33.08434 16
247 2392 FL BS (CMP IN PLC) (TY D GR 5) (FNAL POS) CY     85,649.350 38.95226 14
247 2422 FL BS (RDWY DEL) (TY D GR 5) (FNAL POS) TON     106,303.000 13.74000 1
251 2026 REWORK BS MTL (TY B) (8") (ORD COMP) SY     104,100.000 2.81000 1
260 2001 LIME (HYDRATED LIME (DRY) ) TON     4,419.000 136.07000 1
260 2002 LIME (HYDRATED LIME (SLURRY) ) TON     652.800 162.52696 2
260 2011 LIME TRT (EXST MATL) (12") SY     14,921.000 3.50000 1
260 2012 LIME (HYD, COM OR QK) (SLRY) OR QK (DRY) TON     662.000 140.00000 1
260 2027 LIME TRT (EXST MATL) (8") SY     259,305.000 3.04490 2
260 2028 LIME TRT (EXST MATL) (8") SY     9,032.300 2.50000 1
275 2001 CEMENT TON     6,520.000 150.36821 2
275 2009 CEMENT TREAT (NEW BASE) (8") SY     185,835.000 1.65000 1
275 2011 CEMENT TREAT (EXIST MATL) (8") SY     185,835.000 1.65000 1
275 2019 CEMENT TREAT (SUBGRADE) (6") SY     38,969.400 1.37000 1