AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AUSTIN DISTRICT

Last Update: Tuesday, November 29, 2016
ITEMS 730 6003 TO 785 6011
Items Items Bid Code Range
0100 - 0193
0204 - 0275
0310 - 0354
0400 - 0496
0500 - 0560
0610 - 0690
0730 - 0785
1002 - 1005
3002 - 3002
4000 - 4000
5000 - 5019
6000 - 6222
7056 - 7101
9050 - 9065
730 6003 - 785 6011
Item No Description Units November 30, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
730 6003 SPOT MOWING AC     38.000 234.21053 2
730 6107 FULL - WIDTH MOWING CYC     7.000 1,905.66857 2
734 6002 LITTER REMOVAL CYC     12.000 965.60000 2
738 6003 CLEANING / SWEEPING (OUTSIDE MAIN LANE CYC     1.000 114.69000 1
738 6005 CLEANING / SWEEPING (FRONTAGE ROAD) CYC     12.000 1,960.78500 4
752 6007 TREE REMOVAL (18" - 24" DIA) EA     3.000 400.00000 1
752 6011 TREE REMOVAL (42" - 48" DIA) EA     1.000 1,000.00000 1
764 6001 DRAIN INLET CLEANING EA     4.000 250.00000 1
764 6011 STORM SEWER CLEANING (PIPE) (37" - 42"DIA LF     295.000 30.00000 1
764 6012 STORM SEWER CLEANING (PIPE) (43" - 54"DIA LF     211.000 35.00000 1
772 6001 POST AND CABLE FENCE (REMOVAL) LF     1,118.000 10.00000 1
772 6002 POST AND CABLE FENCE (REMV CONC ANCHOR EA     1.000 250.00000 1
772 6003 POST AND CABLE FENCE (NEW INSTALLATION LF     1,766.000 20.83000 1
772 6004 POST AND CABLE FENCE (NEW CONC ANCHOR) EA     5.000 2,015.00000 1
785 6011 BRIDGE JOINT REPLACEMENT (SEJ) LF     267.000 108.61000 1