AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - AUSTIN DISTRICT

Last Update: Thursday, November 20, 2014
ITEMS 400 2001 TO 432 2033
Items Items Bid Code Range
0100 - 0193
0216 - 0275
0305 - 0360
0400 - 0496
0500 - 0560
0610 - 0690
0740 - 0760
1003 - 1122
2090 - 2308
3233 - 3283
4022 - 4668
5217 - 5926
6006 - 6834
7655 - 7655
8020 - 8973
9035 - 9035
400 2001 - 432 2033
432 2035 - 464 2003
464 2004 - 466 2047
466 2048 - 467 2337
467 2339 - 496 2074
Item No Description Units November 30, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
400 2001 STRUCT EXCAV CY     104.670 23.30610 3
400 2002 STRUCT EXCAV (BOX) CY     167.000 18.88623 3
400 2003 STRUCT EXCAV (PIPE) CY     47.000 9.00000 1
400 2004 STRUCT EXCAV (BRIDGE) CY     430.600 25.52531 2
400 2005 CEM STABIL BKFL CY 98.000 123.00000 2,220.200 105.32217 14
400 2006 CUT & RESTORING PAV SY     641.000 82.81828 4
400 2008 CUT & RESTORING PAV (ASPH) SY     1,443.000 99.05198 7
400 2017 CEM STABIL BKFL F CY     163.600 160.00000 1
400 2023 CEM STAB BKFL (BEHIND ABUTMENT) CY 25.500 200.00000 25.500 200.00000 1
401 2001 FLOWABLE BACKFILL CY     3,021.910 120.49538 19
402 2001 TRENCH EXCAVATION PROTECTION LF     54,920.000 2.51247 22
402 2003 TRENCH EXCAVATION PROTECTION F LF 14.000 50.00000 14.000 50.00000 1
403 2001 TEMPORARY SPL SHORING SF 121.000 12.00000 68,457.000 14.00805 21
407 2005 SHEET PILING (PZ - 22) SF     1,888.000 2.00000 1
416 2001 DRILL SHAFT (18 IN) LF     1,209.000 119.10725 8
416 2002 DRILL SHAFT (24 IN) LF 84.000 330.00000 1,329.000 169.34481 4
416 2003 DRILL SHAFT (30 IN) LF     440.000 219.36091 4
416 2004 DRILL SHAFT (36 IN) LF     12,283.000 140.90894 15
416 2006 DRILL SHAFT (48 IN) LF     2,051.000 295.02868 3
416 2007 DRILL SHAFT (54 IN) LF     476.000 275.00000 1
416 2008 DRILL SHAFT (60 IN) LF     508.000 325.00000 1
416 2016 DRILL SHAFT (SIGN MTS) (12 IN) LF     14.000 156.00000 1
416 2018 DRILL SHAFT (SIGN MTS) (24 IN) LF     208.000 160.14519 5
416 2019 DRILL SHAFT (SIGN MTS) (30 IN) LF     52.000 216.95000 1
416 2020 DRILL SHAFT (SIGN MTS) (36 IN) LF     100.000 256.84000 2
416 2021 DRILL SHAFT (SIGN MTS) (42 IN) LF     75.000 306.48000 2
416 2022 DRILL SHAFT (SIGN MTS) (48 IN) LF     18.000 360.00000 1
416 2023 DRILL SHAFT (SIGN MTS) (54 IN) LF     17.000 415.00000 1
416 2029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF     1,328.000 184.08036 10
416 2030 DRILL SHAFT (TRF SIG POLE) (24 IN) LF     303.000 150.99960 5
416 2031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF     339.600 185.04049 7
416 2032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF     1,441.800 212.46122 12
416 2033 DRILL SHAFT (TRF SIG POLE) (42 IN) LF     18.000 250.00000 1
416 2034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF     747.800 332.51769 8
416 2055 DRILL SHAFT (TRF SIG POLE) (30 IN) (ROCK LF     44.300 292.14605 2
416 2056 DRILL SHAFT (TRF SIG POLE) (36 IN) (ROCK LF     122.200 324.80000 2
420 2002 CL B CONC (FLUME) CY     21.350 450.00000 1
420 2003 CL C CONC (ABUT) CY 20.600 1,500.00000 1,443.400 699.74408 16
420 2004 CL C CONC (BENT) CY     1,845.500 721.85088 12
420 2005 CL C CONC (FOOTING) CY     11.000 625.00000 1
420 2006 CL C CONC (RAIL FOUNDATION) CY     281.400 470.95330 6
420 2013 CL C CONC (MISC) CY     118.400 584.08801 5
420 2016 CL C CONC (COLLAR) EA 18.000 1,000.00000 19.000 1,057.89474 2
420 2018 CL C CONC (FOOTING) (MASS PLACEMENT) CY     375.800 475.00000 1
420 2019 CL C CONC (CAP) CY     680.600 595.73468 3
420 2029 CL S CONC (SLAB) CY     341.700 745.19564 5
420 2031 CL S CONC (SHEAR KEY) CY     7.300 500.00000 1
420 2033 CL S CONC (APPR SLAB) CY 51.900 500.00000 2,672.100 379.97622 14
420 2034 CL S CONC (BRIDGE SDWLK) CY     277.500 495.39960 3
420 2035 CL S CONC (CIP SLAB SPAN) CY     132.600 758.55000 1
420 2049 CL S CONC (BRIDGE MEDIAN) CY     25.200 500.00000 1
420 2051 CL C CONC (COLUMN) CY     88.200 960.14172 3
420 2055 CL C CONC (COLUMN) (MASS PLACEMENT) CY     602.000 660.00000 1
420 2072 CL H CONC (BENT) (MASS PLACEMENT) CY     608.600 650.00000 1
420 2120 CL C CONC (BUS STOP) CY     277.000 450.00000 1
420 2124 CL S CONC (SLAB) SF     5,600.000 35.00000 1
420 2221 CL S CONC (JUNCTION BOX) CY     30.000 1,400.00000 1
420 2242 CL A CONC (CHANNEL LINING) CY     20.000 450.00000 1
422 2001 REINF CONC SLAB SF 1,040.000 22.00000 388,866.000 13.72221 13
423 2001 RETAINING WALL (MSE) SF     128,184.160 31.92644 6
423 2003 RETAINING WALL (MSE) (ASHLAR STONE FIN) SF     46,536.000 28.00000 1
423 2005 RETAINING WALL (TEMP WALL) SF     26,238.000 9.62340 2
423 2006 RETAINING WALL (CONC BLOCK) SF     20,684.000 27.08528 2
423 2007 RETAINING WALL (SPREAD FOOTING) SF     1,470.000 65.00000 1
423 2009 RETAINING WALL (SOIL NAILED) (FACIA) SF     8,693.000 50.19732 2
423 2011 RETAINING WALL (DRILL SHAFT) (FACIA) SF     805.000 65.00000 1
423 2012 RETAINING WALL (CAST - IN - PLACE) SF     641.000 93.00000 1
423 2050 RET. WALL (SOIL NAILED) (GUNNITE FACIA) SF     946.000 65.00000 1
425 2006 PRESTR CONC BOX BEAM (4B20) LF     218.000 228.13000 1
425 2007 PRESTR CONC BOX BEAM (5B20) LF     109.000 303.25000 1
425 2015 PRESTR CONC SLAB BEAM (5SB12) LF 197.110 200.00000 373.630 176.37770 2
425 2016 PRESTR CONC SLAB BEAM (4SB15) LF     594.000 140.00000 1
425 2017 PRESTR CONC SLAB BEAM (5SB15) LF     495.000 145.46000 2
425 2064 PRESTR CONC GIRDER (TX28) LF     4,666.400 124.77163 4
425 2065 PRESTR CONC GIRDER (TX34) LF     2,681.270 140.67519 3
425 2066 PRESTR CONC GIRDER (TX40) LF     2,445.000 110.00000 1
425 2067 PRESTR CONC GIRDER (TX46) LF     657.000 164.00000 1
425 2068 PRESTR CONC GIRDER (TX54) LF     33,228.990 126.48939 6
426 2001 POST - TENSIONING (GROUTED) MKF     1,036.000 100.00000 1
427 2003 OPAQUE SEALER FINISH SF     108,385.000 .35215 2
429 2008 CNC STR REP (VERTICAL OR OVERHEAD) SF     20.000 100.00000 1
429 2009 CNC STR REP (BRDG DECK) (PARTIAL DEPTH) SF     15.000 130.00000 1
430 2002 CL C CONC FOR EXT STR (ABUT) CY     87.500 850.68183 2
430 2009 CL C CONC FOR EXT STRU (CULV) (6'X 3') LF     15.000 650.00000 1
430 2024 CL C CONC FOR EXT STR (CULV) (5'X 4') LF     7.000 580.00000 1
430 2036 CL C CONC FOR EXT STRU (CULV) (8'X8') LF     20.000 1,000.00000 1
432 2001 RIPRAP (CONC) (4 IN) CY 137.000 300.00000 3,528.870 374.53723 18
432 2002 RIPRAP (CONC) (5 IN) CY 70.000 315.00000 4,823.580 333.42758 27
432 2012 RIPRAP (STONE TY F) (GROUT) (8 IN) CY     7.000 106.00000 1
432 2014 RIPRAP (STONE TY F) (MORTAR) (8 IN) CY     1,470.000 325.82000 1
432 2015 RIPRAP (STONE COMMON) (DRY) (6 IN) CY     248.000 50.77823 2
432 2018 RIPRAP (STONE COMMON) (GROUT) (8 IN) CY     20.000 120.00000 1
432 2019 RIPRAP (STONE PROTECTION) (12 IN) CY 26.000 125.00000 273.800 130.44558 3
432 2021 RIPRAP (STONE PROTECTION) (18 IN) CY     3,425.800 86.38689 7
432 2023 RIPRAP (STONE PROTECTION) (24 IN) CY     2,229.000 137.56292 5
432 2026 RIPRAP (CEMENT STABILIZED) (5 IN) CY     49.000 130.00000 1
432 2027 RIPRAP (SPECIAL) CY     74.150 350.00000 1
432 2030 RIPRAP (CONC) (CL C) CY     58.000 520.68966 2
432 2031 RIPRAP (CEM STAB) (6 IN) CY     362.000 105.00000 1
432 2033 RIPRAP (STONE COMMON) (DRY) (12 IN) CY     575.000 64.60000 2