Roadwork
Typical closure times are 9:00 a.m. to 3:00 p.m. for weekday closures and 7:00 p.m. to 6:00 a.m. for weeknight closures. Lane closures are allowed all day Saturday, and Sunday (as needed).
Please note closures are subject to changes due to weather and schedule.
*** new closures are highlighted in bold text ***
Closures
I-20 Mainlanes
- Ongoing: right and left shoulder closures from Markum Ranch Road to the I-20/I-30 split.
- Ongoing: eastbound and westbound I-20 reduced to two travel lanes between the I-20/I-30 split and FM 1187/FM 3325.
- Nightly, Apr 6-10, 7p-6a: I-20 eastbound and westbound single lane closures between FM 1187/FM 3325 and I-20/I-30 interchange for pavement striping.
- 7p, Apr 9 to 7p, Apr 10: The I-20 westbound entrance ramp from FM 1187/FM 3325 will be closed for drainage work. Traffic will be directed to the next entrance from Ranch House Rd. (map)
- Effective, Mar 18: The I-20 westbound exit to FM1187/FM3325 (Exit 420 nearest FM1187/FM3325) was permanently closed for construction of a new westbound entrance ramp in this area. I-20 westbound traffic is directed to use the new permanent exit (Exit 420) located in I-30 interchange area (map).
- Effective, Mar 19: The I-20 eastbound entrance from FM1187/FM3325 switched to the new permanent entrance ramp further east from the frontage road (map).
I-30 Mainlanes
- Daily, Apr 6- 11, 9a-3p: I-30 eastbound and westbound mainlanes reduced to one lane between FM 2871 and Linkcrest Dr for truck access.
- Daily, Apr 6-11, 9a-3p: i-30 eastbound and westbound manlanes reduced to one lane between Alemeda St and Lincrest Dr for pothole repair and sweeping.
- Nightly, Apr 7-10, 9p-6a: I-30 eastbound closed at SP 580 to I-820 for FM 2871 bridge beam placement. Traffic will be advised to use I-20 eastbound, to northbound I-820. Secondary detour is eastbound SP 580 to I-820 northbound (map).
- Nightly, Apr 13-17, 9p-6a: I-30 eastbound closed at SP 580 to I-820 for FM 2871 bridge construction. Traffic will be advised to use I-20 eastbound, to northbound I-820. Secondary detour is eastbound SP 580 to I-820 northbound (map).
- Nightly, Apr 13-17, 9p-6a: I-30 westbound closed at I-820 to Chapel Creek Blvd for FM 2871 bridge beam placement. Traffic will be detoured south on I-820, and west on I-20 (map).
- Nightly, Apr 20-23, 9p-6a: I-30 westbound closed at I-820 to Chapel Creek Blvd for FM 2871 bridge construction. Traffic will be detoured south on I-820, and west on I-20 (map).
- Nightly, Apr 7-10, and Apr 13-17, 9p-6a: I-30 eastbound entrance ramp from SP 580 will be closed in coordination with the I-30 eastbound mainlane closure for FM 2871 bridge work.
- Nightly, Apr 7-10, and Apr 13-17, 9p-6a: I-30 eastbound entrance ramp from Chapel Creek Blvd will be closed in coordination with the I-30 eastbound mainlane closure for FM 2871 bridge work.
- Nightly, Apr 13-17, and Apr 20-23, 9p-6a: I-30 westbound entrance from Las Vegas Trl will be closed in coordination with the i-30 westbound mainlane closure for FM 2871 bridge work. Traffic will be detoured to the Cherry Ln entrance ramp.
- Ongoing: I-30 eastbound right lane closure from Linkcrest Drive to Spur 580 exit for ramp construction. EXPECT DELAYS.
- Permanent, Effective Aug 2025: The I-30 westbound exit to Linkcrest Drive was closed. Motorists now use the Spur 580/Linkcrest Drive exit to the I-20 westbound frontage road to access Linkcrest Drive. EXPECT DELAYS.
- Permanent, Effective Sep 2025: The I-30 eastbound entrance from Linkcrest Drive was closed. Motorists should follow detour signs and enter eastbound I-30 from Spur 580/W. Camp Bowie Boulevard. EXPECT DELAYS.
- Ongoing, Effective Mar. 6, 2026: The I-30 eastbound exit to Walsh Ranch Parkway is closed until early 2027. During this closure, I-30 eastbound motorists will be directed to exit to FM 1187/FM 3325 (Exit 420) and continue on the eastbound frontage road to access Walsh Ranch Parkway. EXPECT DELAYS.
- Effective, Mar 18: I-20 westbound exit to FM1187/FM3325 (Exit 420 nearest FM1187/FM3325) was permanently closed for construction of a new westbound entrance ramp in this area. I-30 westbound traffic is directed to use Walsh Ranch Pkwy exit until the new permanent exit ramp being constructed immediately west of Walsh Ranch Pkwy is completed (map).
- Effective, Mar 19: The I-30 eastbound entrance from FM1187/FM3325 was removed service to construct a new permanent exit ramp in its current location. I-30 traffic will be detoured on the eastbound frontage road to enter I-30 from the Walsh Ranch Pkwy entrance. The permanent I-30 entrance ramp is under construction immediately west of Walsh Ranch Pkwy (map).
I-820 West Loop Mainlanes
- Ongoing, I-820 southbound right lane between Westpoint Boulevard and the eastbound and westbound exits to I-30 closed for new ramp construction. EXPECT DELAYS.
- Daily, Apr 6-11, 9a-3p: I-820 south connector to I-30 east will be closed for general construction. Traffic will be detoured to SP 580, use U-turn, and return on I-820 north to I-30 east connector.
- Nightly, Apr 13-17, 9p-6a: I-820 connectors to I-20 west will be closed for FM 2871 bridge beam placement. Traffic will be detoured south on I-820, and west on I-20. EXPECT SIGNIFICANT DELAYS. SEEK ALTERNATE ROUTES.
- Nightly, Apr 20-23, 9p-6a: I-820 connectors to I-20 west will be closed for FM 2871 bridge beam placement. Traffic will be detoured south on I-820, and west on I-20. EXPECT SIGNIFICANT DELAYS. SEEK ALTERNATE ROUTES.
I-20 Frontage Roads
- 7p, Apr 10 to 11p, Apr 11: The I-20 westbound frontage road will be closed between FM 1187/FM 3325 and Trichia Trl for drainage work. Traffic will be detoured onto the I-20 westbound mainlanes to exit Ranch House Rd (map).
- Effective, Mar 24: The I-20 westbound frontage road approach to FM 1187/FM 3325 is reduced to two lanes (shared left turn and through, and right turn only) for first phase of construction of new westbound frontage road pavement approaching FM 1187/FM 3325.
- Effective, Mar 19: The I-20 eastbound frontage road traffic switched onto new pavement east of FM1187/FM3325. Sections of the eastbound are reduced to one lane for construction between FM 1187 and Walsh Ranch Pkwy.
I-30 Frontage Roads
- Ongoing: The I-30 westbound frontage road between Alemeda Street and Old Weatherford Road is reduced to one travel lane for roadway construction. EXPECT DELAYS.
- Ongoing: The I-30 eastbound frontage road between RM 2871/Longvue Avenue and Alemeda Street exit ramp is reduced to one lane for drainage, structures, and roadway construction. EXPECT DELAYS.
- Daily, Apr 6-11, 9a-3p: The I-30 westbound frontage road will be reduced to one lane approaching FM 2871 to Chapel Creek Blvd for drainage work.
- Daily, Apr 6-11, 9a-3p: I-820 westbound frontage road closed between Alemeda St and Academy Blvd/Longvue Ave/FM 2871 for bridge construction. Traffic will be detoured west on north on Alemeda St, west on Amber Ridge Dr, and south on Academy Blvd.
I-820 Frontage Roads
- No scheduled closures.
Spur 580/W. Camp Bowie Boulevard
- No scheduled closures.
Chapel Creek Blvd
- No scheduled closures.
Alemeda Street
- No scheduled closures.
Old Weatherford Road
- Effective, Mar 24: Old Weatherford Rd from I-30 frontage road west of Alemeda St was returned to service.
RM 2871/Longvue Avenue
- Ongoing, Effective Feb 5, 2026: The RM 2871/Longvue Avenue bridge over I-30 is closed for reconstruction until Aug. 2026. Motorists will be detoured to either Chapel Creek Boulevard or Alemeda Street to get across I-30 during this closure.
This webpage and any information submitted via this form are maintained by the Texas A&M Transportation Institute on behalf of TxDOT.