Letting Schedule for March, 2016 (FY 2016)
March, 2016 (FY 2016) | (see Links) |
SEP 2015 | OCT 2015 | NOV 2015 | DEC 2015 | JAN 2016 | FEB 2016 | MAR 2016 | APR 2016 | MAY 2016 | JUN 2016 | JUL 2016 | AUG 2016 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0910-08-063 | Anderson/ Tyler |
PW | Actual | $446,430 | 10 | REPAIR BRIDGES & REPLACE VARIOUS DRAINAGE CULVERTS |
0176-13-006 | Angelina/ Lufkin |
FM 3439 | Actual | $687,635 | 1 | RECONSTRUCT AND WIDEN PAVEMENT |
0265-03-040 | Bastrop/ Austin |
SH 71 | Actual | $579,475 | 6 | UPGRADE BRIDGE AND APPROACH RAILING |
1117-01-015 | Bee/ Corpus Christi |
FM 798 | Actual | $4,270,570 | 1 | WIDEN ROADWAY |
0017-10-270 | Bexar/ San Antonio |
IH 35 | Actual | $5,439,587 | 1 | MILL, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS |
0085-04-045 | Bowie/ Atlanta |
US 259 | Actual | $111,968 | 10 | FOR TRAFFIC CONTROL |
0976-02-091 | Brazoria/ Houston |
FM 518 | Actual | $5,218,685 | 1 | PAVEMENT REPAIR AND 1.5" ACP OVERLAY |
0054-07-082 | Brown/ Brownwood |
US 67 | Actual | $1,070,153 | 1 | SEAL COAT |
0471-04-029 | Caldwell/ Austin |
SH 21 | Actual | $2,356,388 | 1 | WIDEN AND REHABILITATE ROADWAY |
0331-01-044 | Cameron/ Pharr |
SH 100 | Actual | $6,339,988 | 1 | INSTALL WILDLIFE CROSSINGS |
0925-00-064 | Childress/ Childress |
VA | Actual | $774,832 | 1 | DISTRICT WIDE STRIPING |
0044-02-096 | Clay/ Wichita Falls |
US 82 | Actual | $419,000 | 1 | ILLUMINATION UPGRADE |
0681-08-021 | Clay/ Wichita Falls |
FM 1288 | Actual | $42,841 | 10 | REPAIR DAMAGE DUE TO FLOODING |
0047-04-024 | Collin/ Dallas |
SH 5 | Actual | $3,442,214 | 1 | MILL, BASE REPAIR, OVERLAY |
0845-03-060 | Cooke/ Wichita Falls |
FM 922 | Actual | $332,008 | 1 | REALIGN INTERSECTION |
0231-02-058 | Coryell/ Waco |
US 190 | Actual | $3,387,359 | 3 | MILL / INLAY |
0141-01-053 | Crockett/ San Angelo |
IH 10 | Actual | $5,457,414 | 1 | OVERLAY |
0095-02-119 | Dallas/ Dallas |
US 80 | Actual | $3,008,042 | 1 | DEPRESS ROADWAY |
0918-00-239 | Dallas/ Dallas |
VA | Actual | $1,547,000 | 3 | TRAVEL SURVEY AND DATA COLLECTION EFFORT FOR PROJECTS IN MPO |
0237-04-013 | Duval/ Laredo |
SH 44 | Actual | $4,178,905 | 1 | REHABILITATION OF EXISTING HIGHWAY |
0906-00-153 | Ector/ Odessa |
VA | Actual | $1,024,337 | 1 | PAVEMENT MARKINGS |
0906-00-171 | Ector/ Odessa |
VA | Actual | $519,081 | 1 | PAVEMENT MARKINGS |
3510-03-006 | Fort Bend/ Houston |
SH 99 | Actual | $5,199,905 | 3 | CONSTRUCT 2 - LN SOUTHBOUND FRONTAGE ROAD ON ULTIMATE LOCATION |
0057-05-028 | Freestone/ Bryan |
US 84 | Actual | $3,425,362 | 1 | OVERLAY CONSISTING OF PLANING, HMA OVERLAY AND PAVEMENT |
0901-19-171 | Grayson/ Paris |
CR | Actual | $3,068,027 | 6 | BRIDGE REPLACEMENT |
0917-17-062 | Grimes/ Bryan |
CR | Actual | $553,517 | 6 | REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, |
0915-46-044 | Guadalupe/ San Antonio |
VA | Actual | $46,040 | 10 | ENHANCE EXISTING RURAL HIGHWAY ADVISORY RADIO SYSTEM WITH |
0500-03-580 | Harris/ Houston |
IH 45 | Actual | $5,562,892 | 1 | FAST TRACK CONCRETE PAVEMENT, CONCRETE CURB AND SIDEWALK |
0528-01-100 | Hidalgo/ Pharr |
SH 107 | Actual | $2,081,791 | 1 | REHABILITATE EXISTING ROADWAY |
0080-03-054 | Hood/ Fort Worth |
US 377 | Actual | $4,079,052 | 1 | BASE REPAIR, SEAL COAT AND HMAC OVERLAY |
0009-09-101 | Hopkins/ Paris |
IH 30 | Actual | $2,403,661 | 1 | OVERLAY |
0495-01-070 | Kaufman/ Dallas |
IH 20 | Actual | $2,582,662 | 6 | INSTALL CABLE BARRIER SYSTEM IN MEDIAN |
2003-01-008 | Lamar/ Paris |
FM 2122 | Actual | $763,854 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0211-03-036 | Lee/ Austin |
US 77 | Actual | $876,077 | 1 | LEVEL - UP SEAL COAT & OVERLAY |
0783-01-100 | Lubbock/ Lubbock |
SL 289 | Actual | $199,534 | 1 | REHABILITATION OF EXISTING ROAD |
0258-09-139 | McLennan/ Waco |
SH 6 | Actual | $14,481,308 | 6 | MILL, SEAL AND INLAY |
1259-01-041 | Montgomery/ Houston |
FM 1097 | Actual | $238,827 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) |
0617-01-190 | Nueces/ Corpus Christi |
SH 358 | Actual | $4,086,050 | 1 | NOVACHIP |
0916-00-082 | Nueces/ Corpus Christi |
VA | Actual | $839,680 | 1 | DISTRICT WIDE SMALL SIGN REPLACEMENT - PLANNING CSJ |
2263-03-041 | Nueces/ Corpus Christi |
SH 361 | Actual | $5,552,812 | 11 | CONSTRUCT 4 LANE ROADWAY WITH RAISED MEDIAN, HIKE / BIKE PATH |
0009-04-061 | Rockwall/ Dallas |
SH 66 | Actual | $15,872,365 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0372-01-096 | San Patricio/ Corpus Christi |
US 77 | Actual | $2,636,292 | 1 | MILL, SEAL AND OVERLAY NB & SB LANES |
0810-02-019 | Shelby/ Lufkin |
FM 417 | Actual | $5,757,569 | 1 | RECONSTRUCT AND WIDEN PAVEMENT |
0165-01-101 | Smith/ Tyler |
US 271 | Actual | $4,372,572 | 1 | PLANE, REPAIR, RESURF RDWY & BRIDGE, REPAIR & SEAL BRG JOINTS |
0495-05-049 | Smith/ Tyler |
IH 20 | Actual | $2,060,090 | 1 | RESURFACE ROADWAY - OMIT CONCRETE PVMT |
0910-16-131 | Smith/ Tyler |
CR | Actual | $947,500 | 6 | REPLACE BRIDGE AND APPROACHES |
0038-07-058 | Starr/ Pharr |
US 83 | Actual | $1,229,939 | 11 | CONSTRUCT DRAINAGE OUTFALL FOR US 83 PHASE I TRUNK SYSTEM |
0008-06-050 | Tarrant/ Fort Worth |
SH 180 | Actual | $4,321,303 | 1 | MILL, BASE REPAIR, HMAC OVERLAY |
0902-48-577 | Tarrant/ Fort Worth |
CS | Actual | $12,134,407 | 3 | WIDEN FROM 4 TO 6 LANES W / CONT CENTER LEFT TURN LANE & ADDT |
0152-01-078 | Travis/ Austin |
US 183 | Actual | $432,341 | 3 | WIDEN BRIDGE AND INSTALL LEFT TURN LANE |
0914-00-369 | Travis/ Austin |
VA | Actual | $1,104,881 | 1 | FY 2016 NON - SITE SPECIFIC SIGNALS |
1186-01-089 | Travis/ Austin |
FM 969 | Actual | $2,067,552 | 1 | MILL, SEAL & TY D OVERLAY |
3277-01-022 | Travis/ Austin |
FM 3177 | Actual | $2,045,353 | 3 | CONSTRUCT SIDEWALKS |
0036-07-032 | Uvalde/ San Antonio |
US 83 | Actual | $620,125 | 8 | PLACE INVERTED PROFILE PAVEMENT MARKINGS ALONG EDGELINES |
0910-12-034 | Van Zandt/ Tyler |
CR | Actual | $1,432,781 | 6 | REPLACE BRIDGE AND APPROACHES |
0913-27-065 | Victoria/ Yoakum |
CR | Actual | $296,071 | 6 | REPLACE BRIDGE AND APPROACHES |
0044-01-103 | Wichita/ Wichita Falls |
US 82 | Actual | $1,194,000 | 1 | UPGRADE ROADWAY ILLUMINATION |
0312-03-030 | Wise/ Fort Worth |
FM 51 | Actual | $5,354,818 | 1 | 2" HMAC OVERLAY - LANES AND SHOULDERS_W / RUMBLE STRIPS |
|