0200-01-082 | Angelina/ Lufkin |
US 69 | Actual | $861,311 | 6 | SAFETY TREAT FIXED OBJECTS |
0156-05-056 | Archer/ Wichita Falls |
US 82 | Actual | $4,811,526 | 1 | 2" OVERLAY - REMAINING PAVEMENT STRUCT |
0527-07-007 | Austin/ Yoakum |
PR 38 | Actual | $1,368,077 | 6 | REPLACE BRIDGE AND APPROACHES |
0738-05-013 | Bee/ Corpus Christi |
FM 2441 | Actual | $4,303,828 | 8 | WIDEN ROADWAY |
0915-12-534 | Bexar/ San Antonio |
VA | Actual | $880,803 | 3 | LOW IMPACT LANDSCAPING AROUND DOWNTOWN SAN ANTONIO FREEWAY |
0915-12-560 | Bexar/ San Antonio |
VA | Actual | $20,520,000 | 9 | BUS PURCHASE, PARK & RIDE FACILITIES, AND BUS STOP AMENITIES |
0113-05-047 | Blanco/ Austin |
US 281 | Actual | $1,397,340 | 1 | LEVEL UP, SEAL, THIN OVERLAY |
0610-06-087 | Bowie/ Atlanta |
IH 30 | Actual | $88,000 | 6 | REPAIR STEEL BEAM |
0111-08-120 | Brazoria/ Houston |
SH 288 | Actual | $651,061 | 8 | IMPROVE TRAFFIC SIGNALS AT INTERSECTION |
0178-08-016 | Brazoria/ Houston |
BS 35-C | Actual | $504,498 | 8 | FY 2016 RR SIGNAL & WARNING DEVICES (BNSF DOT# 022 645V) |
0506-04-022 | Burleson/ Bryan |
FM 2155 | Actual | $1,647,283 | 6 | REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES, |
0648-03-066 | Burleson/ Bryan |
FM 60 | Actual | $2,005,363 | 1 | OVERLAY CONSISTING OF PLANING, HMA OVERLAY AND PAVEMENT |
0006-07-076 | Callahan/ Abilene |
IH 20 | Actual | $249,107 | 6 | REPAIR CULVERT SAFETY END TREATMENTS |
0220-04-035 | Cameron/ Pharr |
US 281 | Actual | $12,496,310 | 1 | CONSTRUCT RURAL 4 LANE |
0044-02-079 | Clay/ Wichita Falls |
US 82 | Actual | $5,938,098 | 1 | REPLACE BRIDGE AND APPROACH RAILING |
0549-03-025 | Collin/ Dallas |
SH 121 | Actual | $14,843,627 | 8 | CONSTRUCTION OF SH 160 GRADE SEPARATION |
0266-03-029 | Colorado/ Yoakum |
SH 71 | Actual | $9,120,997 | 1 | CONSTRUCT SUPER 2 LANES |
0003-02-039 | Culberson/ El Paso |
IH 10 | Actual | $12,874,699 | 1 | MILL AND INLAY |
0918-00-237 | Dallas/ Dallas |
VA | Actual | $625,000 | 5 | NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM |
0135-10-055 | Denton/ Dallas |
US 377 | Actual | $5,166,238 | 1 | FULL DEPTH CONCRETE REPAIR AND PAVEMENT MARKING |
0300-03-066 | Dimmit/ Laredo |
US 277 | Actual | $9,546,333 | 1 | RESURFACE OF EXISTING HIGHWAY |
0925-10-036 | Donley/ Childress |
CR | Actual | $247,503 | 8 | 2015 FEDERAL RAILROAD SIGNAL PROGRAM |
0086-10-049 | Duval/ Laredo |
SH 359 | Actual | $14,344,015 | 1 | RESURFACE OF EXISTING HIGHWAY |
2296-01-051 | Ector/ Odessa |
SH 191 | Actual | $4,387,312 | 11 | HTMIX, FLBS, SEALCOAT, ILL, CLV & SGNS & PM |
0924-06-154 | El Paso/ El Paso |
CS | Actual | $7,848,531 | ROW | OFF - SYSTEM BRIDGE REPLACEMENT |
0924-06-466 | El Paso/ El Paso |
VA | Actual | $540,000 | 5 | FORTY FT. BUS PURCHASE |
0924-06-524 | El Paso/ El Paso |
VA | Actual | $1,250,000 | 5 | PURCHASE TWO 35' BUSES AND ONE LOW FLOOR 28' BUS (TO ASSIST |
0924-06-525 | El Paso/ El Paso |
VA | Actual | $2,100,000 | 5 | WEST EL PASO TRAFFIC MITIGATION CIRCULATOR SERVICE |
0918-22-154 | Ellis/ Dallas |
CS | Actual | $238,887 | 8 | INSTALL GRADE CROSSING WARNING DEVICES |
0343-04-042 | Erath/ Fort Worth |
SH 108 | Actual | $75,144 | 8 | TEXTURIZE SHOULDERS |
0026-03-043 | Fayette/ Yoakum |
US 90 | Actual | $958,370 | 8 | SAFETY TREAT FIXED OBJECTS |
0912-34-182 | Fort Bend/ Houston |
CS | Actual | $6,588,849 | 3 | CONSTRUCT 2 LANE CONCRETE ROADWAYS TO EXISTING INTERCHANGE |
0190-01-021 | Franklin/ Paris |
SH 37 | Actual | $20,387,244 | 1 | RECONST & ADD 10' SHLDRS |
0917-20-038 | Freestone/ Bryan |
CR | Actual | $490,735 | 6 | REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES, |
1002-02-019 | Galveston/ Houston |
FM 517 | Actual | $3,082,201 | 1 | BASE REPAIR, SEAL COAT, 1.5" ACP O / L AND PAVEMENT MARKINGS |
0081-16-003 | Grayson/ Paris |
BU 377C | Actual | $178,510 | 10 | LANDSCAPE DEVELOPMENT |
0901-19-186 | Grayson/ Paris |
CS | Actual | $700,297 | 8 | GRADE CROSSING PROTECTION |
0271-07-305 | Harris/ Houston |
IH 10 | Actual | $1,166,378 | 1 | RESTRIPE IN SECTIONS TO ADD LANES TO PROVIDE 10 MAIN LANES |
1685-03-096 | Harris/ Houston |
FM 1960 | Actual | $191,208 | 1 | PAVEMENT MARKINGS |
0041-02-014 | Hartley/ Amarillo |
US 385 | Actual | $6,104,316 | 8 | OVERLAY |
0016-03-096 | Hays/ Austin |
IH 35 | Actual | $1,166,529 | 1 | MILL & INLAY NB & SB FRONTAGE ROADS |
0039-04-122 | Hidalgo/ Pharr |
BU 83-S | Actual | $525,151 | 8 | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT |
0083-02-048 | Hopkins/ Paris |
SH 11 | Actual | $5,504,239 | 1 | WIDEN ROADWAY |
0109-04-029 | Houston/ Lufkin |
US 287 | Actual | $1,611,863 | 8 | SAFETY TREAT FIXED OBJECTS |
1725-01-012 | Hunt/ Paris |
FM 118 | Actual | $1,185,832 | 6 | BRIDGE REPLACEMENT |
0089-03-088 | Jackson/ Yoakum |
US 59 | Actual | $6,620,873 | 1 | ACP OVERLAY |
0422-03-073 | Johnson/ Fort Worth |
BU 67-M | Actual | $1,839,574 | 1 | WEDGE MILL, SEAL, 2 INCHES HMAC OVERLAY SIGNAL WORK |
1181-03-030 | Johnson/ Fort Worth |
FM 917 | Actual | $919,634 | 1 | 2" OVERLAY, PAVEMENT MARKINGS & FULL DEPTH PAVEMENT REPAIR |
3348-01-019 | Johnson/ Fort Worth |
FM 3136 | Actual | $6,829,235 | 8 | WIDEN PAVEMENT & ADD SHOULDERS |
1397-01-031 | Kaufman/ Dallas |
FM 1836 | Actual | $5,943,147 | 1 | RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS |
0035-07-044 | Kimble/ San Angelo |
US 83 | Actual | $1,487,817 | 1 | CONSTRUCT TRAFFIC SIGNALS AND IMPROVE INTERSECTION |
0769-02-028 | Lamar/ Paris |
FM 906 | Actual | $5,917,664 | 1 | REHAB |
0117-04-041 | Madison/ Bryan |
US 190 | Actual | $2,150,935 | 1 | OVERLAY CONSISTING OF PLANING, HMA OVERLAY AND PAVEMENT |
0917-31-022 | Madison/ Bryan |
CR | Actual | $1,204,840 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF |
0915-51-011 | McMullen/ San Antonio |
VA | Actual | $454,942 | 10 | CONSTRUCT 12 NEW GRAVEL PARKING LOTS AND DRIVEWAYS |
0912-37-226 | Montgomery/ Houston |
VA | Actual | $766,066 | 1 | BASE REPAIR AND PAVEMENT LEVELING |
1402-03-011 | Montgomery/ Houston |
FM 1375 | Actual | $1,297,510 | 1 | OCST AND PAVEMENT MARKINGS |
2560-01-076 | Nacogdoches/ Lufkin |
SL 224 | Actual | $789,787 | 1 | RESURFACE WITH THIN OVERLAY MIXTURE |
0883-02-068 | Orange/ Beaumont |
FM 105 | Actual | $2,668,331 | 1 | ADD SHOULDERS |
0441-07-062 | Pecos/ Odessa |
IH 10 | Actual | $23,135,092 | 9 | CONSTRUCTION OF SAFETY REST AREA |
0911-04-054 | Polk/ Lufkin |
VA | Actual | $2,009,215 | 10 | REHABILITATE ROADS, PARKING LOTS, AND CAMPSITE PULLOUTS IN |
0904-11-059 | Randall/ Amarillo |
CS | Actual | $43,673 | 8 | 2016 FED RAILROAD SIGNAL PR2016 FED |
0901-27-029 | Red River/ Paris |
CS | Actual | $1,506,399 | 6 | REPLACE BRIDGE AND APPROACHES |
0169-08-022 | Roberts/ Amarillo |
US 60 | Actual | $996,579 | 8 | CENTERLINE TEXTURING |
0118-10-058 | San Augustine/ Lufkin |
SH 21 | Actual | $5,229,088 | 6 | REPLACE BRIDGE AND APPROACHES |
0008-04-046 | Tarrant/ Fort Worth |
SS 580 | Actual | $3,743,232 | 1 | HMAC OVERLAY |
0902-00-142 | Tarrant/ Fort Worth |
VA | Actual | $1,179,390 | 1 | NON - SITE SPECIFIC INSTALLATION OF TRAFFIC SIGNALS ON - SYSTEM |
0902-48-453 | Tarrant/ Fort Worth |
CS | Actual | $24,298,000 | 3 | RECONSTRUCT FROM 4 LANES TO 4 LANE DIVIDED WITH RAISED |
2079-01-043 | Tarrant/ Fort Worth |
FM 1220 | Actual | $8,350,775 | 1 | CONSTRUCT LEFT TURN BAYS, 10'SHLDERS, EXTEND CULVERT, REPAIR |
2266-02-138 | Tarrant/ Fort Worth |
SH 360 | Actual | $2,126,640 | 1 | PAVEMENT REPAIR, MILL AND OVERLAY BRIDGES, DIAMOND GRINDING |
0016-01-110 | Travis/ Austin |
IH 35 | Actual | $2,011,906 | 1 | MILL, SEAL, & OVERLAY FRTG RDS |
0523-02-046 | Waller/ Houston |
FM 362 | Actual | $1,069,740 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) |
0004-03-048 | Ward/ Odessa |
SS 57 | Actual | $1,972,471 | 8 | TEXTURIZE SHOULDERS |
0114-09-073 | Washington/ Bryan |
US 290 | Actual | $990,746 | 8 | 2016 FEDERAL RAILROAD SIGNAL PROGRAM |
0043-09-124 | Wichita/ Wichita Falls |
US 287 | Actual | $2,435,988 | 1 | MILL AND INLAY |
0249-01-045 | Wichita/ Wichita Falls |
US 281 | Actual | $2,947,969 | 1 | OVERLAY |
0337-01-038 | Williamson/ Austin |
SH 29 | Actual | $2,014,970 | 1 | UNDERSEAL & THIN OVERLAY |
0337-02-041 | Williamson/ Austin |
SH 29 | Actual | $1,499,000 | 1 | UNDERSEAL & THIN OVERLAY |
0463-06-027 | Winkler/ Odessa |
SH 302 | Actual | $7,977,008 | 1 | REHABILITATION OF EXISTING ROAD |
0313-01-053 | Wise/ Fort Worth |
FM 51 | Actual | $2,188,439 | 8 | HMAC OVERLAY - 1.8 MILE SOUTH US 81 TO SH 114 |
|