Letting Schedule for July, 2016 (FY 2016)
July, 2016 (FY 2016) | (see Links) |
SEP 2015 | OCT 2015 | NOV 2015 | DEC 2015 | JAN 2016 | FEB 2016 | MAR 2016 | APR 2016 | MAY 2016 | JUN 2016 | JUL 2016 | AUG 2016 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0205-12-001 | Anderson/ Tyler |
FM 1990 | Actual | $30,080 | 10 | REPLANK RR CROSSING |
0520-09-043 | Anderson/ Tyler |
SL 256 | Actual | $187,200 | 10 | REPLANK RR CROSSING |
0548-05-048 | Andrews/ Odessa |
SH 176 | Actual | $10,506,608 | 1 | REHABILITATION OF EXISTING ROAD |
0911-38-070 | Angelina/ Lufkin |
CR | Actual | $460,228 | 6 | REPLACE BRIDGE AND APPROACHES |
0507-04-041 | Aransas/ Corpus Christi |
FM 1069 | Actual | $340,987 | 8 | TEXTURIZE SHOULDERS, (ROLL OR MILL IN) , CENTERLINE TEXTURING |
2176-01-008 | Bastrop/ Austin |
FM 1209 | Actual | $1,990,498 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0088-01-067 | Bee/ Corpus Christi |
US 59 | Actual | $3,243,062 | 1 | HOT RUBBER SEAL |
1198-03-009 | Bell/ Waco |
FM 2670 | Actual | $521,758 | 8 | SAFETY TREAT FIXED OBJECTS |
1835-02-057 | Bell/ Waco |
FM 1741 | Actual | $648,213 | 3 | INTERSECTION IMPROVEMENTS TO INCLUDE INSTALL TRAFFIC SIGNAL |
2304-02-036 | Bell/ Waco |
FM 2410 | Actual | $6,800,753 | 1 | WIDEN FROM TWO TO FOUR LANES WITH CONTINUOUS LEFT TURN LANE |
0017-09-100 | Bexar/ San Antonio |
IH 35 | Actual | $30,080 | 10 | REPLANK CROSSING ON NB FRONTAGE ROAD EAST OF ZARZAMORA |
0017-09-101 | Bexar/ San Antonio |
IH 35 | Actual | $30,080 | 10 | REPLANK CROSSING ON SB FRONTAGE ROAD EAST OF ZARZAMORA |
0017-10-281 | Bexar/ San Antonio |
IH 35 | Actual | $60,160 | 10 | REPLANKING CROSSING ON SB FROTNAGE ROAD WEST OF AT & T CENTER |
0017-10-282 | Bexar/ San Antonio |
IH 35 | Actual | $54,144 | 10 | REPLANK CROSSING ON NB FRONTAGE ROAD WEST OF AT & T CENTER |
0024-08-133 | Bexar/ San Antonio |
US 90 | Actual | $1,069,800 | 10 | LANDSCAPE DEVELOPMENT |
0073-08-188 | Bexar/ San Antonio |
US 281 | Actual | $2,131,726 | 1 | MILL, SC, OVERLAY & PAVEMENT MARKINGS |
2925-02-016 | Bowie/ Atlanta |
FM 2148 | Actual | $30,080 | 10 | RAILROAD CROSSING REPLANKING |
0192-02-050 | Brazoria/ Houston |
SH 6 | Actual | $4,942,809 | 1 | CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS (MEDIAN, |
0912-31-301 | Brazoria/ Houston |
VA | Actual | $920,524 | 10 | LANDSCAPE DEVELOPMENT |
0475-01-055 | Brazos/ Bryan |
OSR | Actual | $30,080 | 10 | RAILROAD GRADE CROSSING REPLANKING, 2016 REPLANKING PROGRAM |
0917-29-130 | Brazos/ Bryan |
VA | Actual | $8,200 | 3 | MISCELLANEOUS WORK CONSISTING OF INSTALLING SIGNS ALONG |
0713-01-032 | Burleson/ Bryan |
FM 60 | Actual | $2,429,598 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES |
0151-01-050 | Burnet/ Austin |
SH 29 | Actual | $97,200 | 10 | REPLACE RAILROAD GRADE CROSSING |
0914-22-068 | Caldwell/ Austin |
CR | Actual | $4,879,112 | 3 | GRADING, ASPHALTIC CEMENT PAVEMENT & MARKINGS FOR CR 222 |
0331-01-046 | Cameron/ Pharr |
SH 100 | Actual | $60,160 | 10 | UPGRADE RAILROAD CROSSING PLANKING |
0919-00-073 | Cass/ Atlanta |
VA | Actual | $680,959 | 1 | 2016 DISTRICT SEAL COAT PAVEMENT MARKINGS |
2629-01-011 | Childress/ Childress |
FM 2638 | Actual | $22,144 | 10 | RR REPLANKING |
0869-01-024 | Coleman/ Brownwood |
FM 503 | Actual | $86,400 | 10 | RAILROAD REPLANKING |
1104-01-022 | Coleman/ Brownwood |
FM 1026 | Actual | $57,600 | 10 | RAILROAD REPLANKING |
0816-05-023 | Collin/ Dallas |
FM 2862 | Actual | $22,144 | 10 | INSTALL RAILROAD CROSSING SURFACE |
1728-02-059 | Comal/ San Antonio |
FM 306 | Actual | $5,996,508 | 1 | EXPAND 2 TO 4 LANES WITH CONTINUOUS LEFT TURN LANE, BIKE |
0567-01-027 | Coryell/ Waco |
FM 1996 | Actual | $2,775,914 | 1 | REHABILITATE ROADWAY |
0724-01-054 | Coryell/ Waco |
FM 116 | Actual | $33,216 | 10 | RAILROAD REPLANKING |
0140-11-043 | Crockett/ San Angelo |
IH 10 | Actual | $14,033,551 | 1 | PLANE, EMULSION TREAT, SURFACE TREATMENT, AND ACP OVERLAY |
0009-11-233 | Dallas/ Dallas |
IH 30 | Actual | $2,254,488 | 8 | CONSTRUCT PREFAB PEDESTRIAN BRIDGE |
0095-02-102 | Dallas/ Dallas |
US 80 | Actual | $10,441,948 | 7 | RAMP MODIFICATIONS & ADDITION OF AUXILIARY LANE ON FRONTAGE |
0918-47-169 | Dallas/ Dallas |
CS | Actual | $107,199 | 10 | REPAIR ROADWAY |
0918-47-170 | Dallas/ Dallas |
CS | Actual | $12,552 | 10 | REPAIR ROADWAY |
0918-47-171 | Dallas/ Dallas |
CS | Actual | $496,369 | 10 | REPAIR ROADWAY |
0918-47-173 | Dallas/ Dallas |
CS | Actual | $221,477 | 10 | REPAIR ROADWAY |
0918-47-174 | Dallas/ Dallas |
CS | Actual | $32,497 | 10 | REPAIR ROADWAY |
1047-03-070 | Dallas/ Dallas |
FM 1382 | Actual | $6,048,901 | 5 | INSTALL TRAFFIC SIGNAL |
0353-02-074 | Denton/ Fort Worth |
SH 114 | Actual | $24,897,375 | 1 | WIDEN FREEWAY FROM 4 LANES TO 6 LANES |
0816-02-076 | Denton/ Dallas |
FM 455 | Actual | $4,986,229 | 1 | CONSTRUCT PAVED SHOULDERS (1 - 4FT) |
0918-46-272 | Denton/ Dallas |
CS | Actual | $6,719,415 | 3 | BICYCLE AND PEDESTRIAN FACILITY - 10 WIDE CONCRETE PATH AND |
0918-46-294 | Denton/ Dallas |
CS | Actual | $186,337 | 10 | REPAIR ROADWAY |
0918-46-295 | Denton/ Dallas |
CS | Actual | $172,508 | 10 | REPAIR ROADWAY |
0918-46-296 | Denton/ Dallas |
CS | Actual | $116,990 | 10 | REPAIR ROADWAY |
0918-46-297 | Denton/ Dallas |
CS | Actual | $383,175 | 10 | REPAIR ROADWAY |
0913-17-041 | Dewitt/ Yoakum |
CR | Actual | $323,694 | 6 | REPLACE BRIDGE AND APPROACHES |
1113-01-026 | Dewitt/ Yoakum |
FM 766 | Actual | $4,871,849 | 11 | RESTORE ROADWAY |
0007-04-113 | Eastland/ Brownwood |
IH 20 | Actual | $278,880 | 3 | CRASH WALLS |
0924-06-511 | El Paso/ El Paso |
CS | Actual | $674,447 | 3 | CONSTRUCTION OF SIDEWALKS, DUAL USE PATHS, AND ACCESSIBLE CU |
2121-04-098 | El Paso/ El Paso |
IH 10 | Actual | $12,915,902 | 2M | WIDEN ROADWAY TO 8 LANES |
0568-01-051 | Ellis/ Dallas |
SH 34 | Actual | $77,504 | 10 | INSTALL RAILROAD CROSSING SURFACE |
1332-01-030 | Erath/ Fort Worth |
FM 1188 | Actual | $64,800 | 10 | 2016 RAILROAD XING REPLANKING PROGRAM |
1990-01-019 | Erath/ Fort Worth |
FM 205 | Actual | $64,765 | 10 | HMAC, MILL, REMOVE & INSTALL GUARDRAIL, CSS1P, STRIPING, |
0027-12-151 | Fort Bend/ Houston |
IH 69 | Actual | $1,458,610 | 10 | LANDSCAPE DEVELOPMENT |
0089-09-067 | Fort Bend/ Houston |
US 59 | Actual | $37,743,799 | 4 | WIDEN TO 6 MAIN LANES WITH 2 - LANE FRONTAGE ROADS, GRADE |
0413-05-031 | Freestone/ Bryan |
SH 164 | Actual | $27,680 | 10 | RAILROAD GRADE CROSSING REPLANKING, 2016 REPLANKING PROGRAM |
0192-04-105 | Galveston/ Houston |
SH 6 | Actual | $144,000 | 10 | FY 2016 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0628-01-023 | Galveston/ Houston |
FM 519 | Actual | $54,144 | 10 | FY 2016 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
2523-03-012 | Galveston/ Houston |
FM 646 | Actual | $33,216 | 10 | FY 2016 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0081-07-023 | Grayson/ Paris |
US 377 | Actual | $1,372,923 | 8 | TEXTURIZE SHOULDERS, ROLLED OR MILLED IN, CENTERLINE AND |
1701-02-013 | Hardeman/ Childress |
FM 2363 | Actual | $44,288 | 10 | RR REPLANKING |
0389-05-128 | Harris/ Houston |
SH 146 | Actual | $48,128 | 10 | FY 2016 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0500-03-603 | Harris/ Houston |
IH 45 | Actual | $2,369,011 | 10 | LANDSCAPE DEVELOPMENT |
0502-01-218 | Harris/ Houston |
SH 225 | Actual | $30,080 | 10 | FY 2016 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0502-01-219 | Harris/ Houston |
SH 225 | Actual | $30,080 | 10 | FY 2016 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0912-00-506 | Harris/ Houston |
VA | Actual | $6,000,000 | 5 | DEVELOPING TRANSIT MARKET FLEET EXPANSION PROGRAM YEAR 2 |
0016-03-120 | Hays/ Austin |
IH 35 | Actual | $36,100 | 10 | REPLACE RAILROAD GRADE CROSSING |
0016-03-121 | Hays/ Austin |
IH 35 | Actual | $36,100 | 10 | REPLACE RAILROAD GRADE CROSSING |
0113-07-067 | Hays/ Austin |
US 290 | Actual | $816,443 | 1 | OVERLAY |
2612-01-011 | Hemphill/ Amarillo |
RM 2654 | Actual | $5,653,752 | 8 | SAFETY WIDENING OF ROADWAY |
0745-02-014 | Henderson/ Tyler |
FM 314 | Actual | $24,064 | 10 | REPLANK RR CROSSING |
0921-02-252 | Hidalgo/ Pharr |
CR | Actual | $967,447 | 6 | REPLACE BRIDGE & RECONST APPROACHES |
1939-01-057 | Hidalgo/ Pharr |
FM 2061 | Actual | $145,800 | 10 | UPGRADED RAILROAD CROSSING PLANKING |
0014-23-032 | Hill/ Waco |
IH 35W | Actual | $1,948,180 | 8 | SAFETY TREAT FIXED OBJECTS |
0901-28-088 | Hopkins/ Paris |
CR | Actual | $565,396 | 6 | REPLACE BRIDGE AND APPROACHES |
0911-28-040 | Houston/ Lufkin |
CR | Actual | $1,080,977 | 6 | REPLACE BRIDGE AND APPROACHES |
0135-07-044 | Hunt/ Paris |
SS 302 | Actual | $115,200 | 10 | UPGRADE RXR CROSSING SURFACE |
0764-02-011 | Hunt/ Paris |
FM 272 | Actual | $3,455,817 | 1 | REHABILITATION OF EXISTING ROAD |
0239-07-018 | Jack/ Fort Worth |
SH 59 | Actual | $29,306 | 10 | RAP BACKFILL AT CULVERT ENDS, HMAC, REPLACE EXISTING CMP, |
0515-01-069 | Jackson/ Yoakum |
FM 234 | Actual | $86,400 | 10 | 2016 RAILROAD REPLANKING PROGRAM |
0307-01-148 | Jefferson/ Beaumont |
SH 87 | Actual | $78,208 | 10 | REPLANK RR CROSSING |
0368-04-028 | Jefferson/ Beaumont |
SH 124 | Actual | $162,353 | 6 | REPAIR BRIDGE SUBSTRUCTURE |
0019-02-033 | Johnson/ Fort Worth |
SH 171 | Actual | $40,068 | 10 | REPLACE STRUCTURE AND ROADWAY |
1599-01-018 | Johnson/ Fort Worth |
FM 916 | Actual | $43,457 | 10 | REMOVE AND REPLACE HMAC AND GUARDRAIL |
2118-02-019 | Johnson/ Fort Worth |
FM 1902 | Actual | $6,740,440 | 1 | WIDEN PAVEMENT AND ADD SHOULDERS |
3207-01-012 | Johnson/ Fort Worth |
FM 3136 | Actual | $6,158 | 10 | REPLACE BASE, HMAC, AND GUARDRAIL |
0901-29-079 | Lamar/ Paris |
VA | Actual | $638,645 | 3 | BICYCLE & PEDESTRIAN FACILITIES |
0335-01-031 | Leon/ Bryan |
SH 7 | Actual | $25,152,378 | 8 | REHABILITATE EXISTING ROAD CONSISTING OF PAVEMENT REPAIRS, |
1067-01-026 | Liberty/ Beaumont |
FM 686 | Actual | $1,690,130 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0643-03-031 | Limestone/ Waco |
FM 39 | Actual | $36,096 | 10 | RAILROAD REPLANKING |
0380-01-085 | Lubbock/ Lubbock |
US 62 | Actual | $17,312,700 | 1 | WIDEN FREEWAY FROM 4 LANES TO 6 LANES |
2933-02-008 | Lubbock/ Lubbock |
FM 2378 | Actual | $86,400 | 10 | INSTALL RAILROAD PLANKS |
0569-03-021 | Marion/ Atlanta |
SH 43 | Actual | $1,204,182 | 1 | REPLACE STEEL GRATE SPAN |
0005-16-015 | Martin/ Odessa |
BI 20-F | Actual | $36,096 | 10 | INSTALL RR CROSSING REPLANKING FOR CROSSING DOT# 796 352E |
0494-04-016 | Martin/ Odessa |
SH 137 | Actual | $36,096 | 10 | INSTALL RR CROSSING REPLANKING FOR CROSSING DOT# 796 356G |
0258-09-124 | McLennan/ Waco |
SH 6 | Actual | $14,733,503 | 1 | WIDEN TO FOUR LANE FREEWAY - PHASE 1 OF 3 |
2625-01-015 | McLennan/ Waco |
FM 2063 | Actual | $48,128 | 10 | RAILROAD REPLANKING |
0523-08-015 | Montgomery/ Houston |
FM 1488 | Actual | $48,128 | 10 | FY 2016 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0720-02-089 | Montgomery/ Houston |
FM 149 | Actual | $33,216 | 10 | FY 2016 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
1062-01-215 | Montgomery/ Houston |
FM 1485 | Actual | $30,080 | 10 | FY 2016 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0074-06-226 | Nueces/ Corpus Christi |
IH 37 | Actual | $6,667,564 | 1 | MILL, SEAL AND OVERLAY |
0882-02-056 | Orange/ Beaumont |
FM 1006 | Actual | $54,144 | 10 | REPLANK RR CROSSING |
0882-02-057 | Orange/ Beaumont |
FM 1006 | Actual | $54,144 | 10 | REPLANK RR CROSSING |
0428-02-023 | Panola/ Atlanta |
FM 2260 | Actual | $27,680 | 10 | RAILROAD CROSSING REPLANKING |
1222-02-026 | Panola/ Atlanta |
FM 999 | Actual | $22,144 | 10 | RAILROAD CROSSING REPLANKING |
0475-11-031 | Polk/ Lufkin |
FM 356 | Actual | $7,653,712 | 11 | RECONSTRUCT AND WIDEN PAVEMENT WITH TWO WAY CONTINUOUSLEFT |
0911-04-083 | Polk/ Lufkin |
CR | Actual | $812,182 | 6 | REPLACE BRIDGE AND APPROACHES |
0773-01-018 | Red River/ Paris |
FM 412 | Actual | $2,884,882 | 10 | REHABILITATION OF EXISTING ROAD |
3371-01-009 | Red River/ Paris |
FM 3390 | Actual | $298,222 | 6 | REPLACE BRIDGE AND APPROACHES |
0350-01-016 | Refugio/ Corpus Christi |
SH 239 | Actual | $179,858 | 8 | TEXTURIZE SHOULDERS (ROLL OR MILL IN) CENTERLINE TEXTURING |
0344-02-045 | Runnels/ San Angelo |
SH 158 | Actual | $129,600 | 10 | REPLANK RAILROAD CROSSING |
0119-02-018 | Sabine/ Lufkin |
SH 21 | Actual | $3,928 | 3 | PLACE DIRECTIONAL SIGNS AND FOUNDATION FOR HISTORICAL SITES |
0180-06-099 | San Patricio/ Corpus Christi |
SH 35 | Actual | $60,160 | 10 | REPLANK RAILROAD CROSSING |
0180-06-100 | San Patricio/ Corpus Christi |
SH 35 | Actual | $36,096 | 10 | REPLANK RAILROAD CROSSING |
0911-39-054 | Shelby/ Lufkin |
CR | Actual | $552,048 | 6 | REPLACE BRIDGE AND APPROACHES |
0164-04-158 | Smith/ Tyler |
SH 31 | Actual | $198,528 | 10 | REPLANK RR CROSSING |
0424-01-053 | Smith/ Tyler |
SH 31 | Actual | $1,795,044 | 1 | PLANE AND RESURFACE ROADWAY |
0721-03-010 | Terry/ Lubbock |
FM 211 | Actual | $86,400 | 10 | INSTALL RAILROAD PLANKS |
0077-06-098 | Tom Green/ San Angelo |
US 67 | Actual | $3,805,304 | 1 | GRADING, BASE, STRUCTURES, TRAFFIC SIGNALS |
0907-24-044 | Tom Green/ San Angelo |
VA | Actual | $469,578 | 6 | UPGRADE BRIDGE AND APPROACH RAILING / ADD SAFETY END TREATMENT |
0015-13-378 | Travis/ Austin |
IH 35 | Actual | $42,617,265 | ROW | ADD SHOULDERS, AUXILIARY LNS, RAMP IMPROVEMENTS, PAVEMENT |
0914-00-368 | Travis/ Austin |
VA | Actual | $1,041,313 | 1 | FY 2016 SITE - SPECIFIC SIGNALS |
0914-00-392 | Travis/ Austin |
VA | Actual | $339,000 | 3 | 2045 REGIONAL ACTIVE TRANSPORTATION PLAN |
0914-04-298 | Travis/ Austin |
VA | Actual | $1,177,598 | 10 | LANDSCAPING AND IRRIGATION |
0023-01-087 | Val Verde/ Laredo |
US 90 | Actual | $5,319,276 | 1 | OVERLAY |
0495-03-061 | Van Zandt/ Tyler |
IH 20 | Actual | $4,570,487 | 1 | REALIGN WB EXIT RAMP |
0143-10-050 | Victoria/ Yoakum |
US 87 | Actual | $10,878,661 | 2U | CONSTRUCT 4 - LANE OVERPASS AT INTERSECTION OF FM 447 |
0432-02-088 | Victoria/ Yoakum |
SH 185 | Actual | $193,412 | 8 | INSTALL TRAFFIC SIGNAL |
2447-01-029 | Washington/ Bryan |
FM 577 | Actual | $60,896 | 10 | RAILROAD GRADE CROSSING REPLANKING, 2016 REPLANKING PROGRAM |
0086-01-084 | Webb/ Laredo |
US 83 | Actual | $4,395,788 | 1 | OVERLAY |
0089-06-085 | Wharton/ Yoakum |
US 59 | Actual | $1,880,242 | 6 | REHABILITATE BRIDGE |
0709-02-054 | Wharton/ Yoakum |
FM 102 | Actual | $32,400 | 10 | 2016 RAILRAOD REPLANKING PROGRAM |
0913-09-067 | Wharton/ Yoakum |
CR | Actual | $289,824 | 6 | REPLACE BRIDGE AND APPROACHES |
0802-02-066 | Wichita/ Wichita Falls |
FM 369 | Actual | $2,496,814 | 1 | IMPROVE INTERSECTIONS |
0015-08-146 | Williamson/ Austin |
IH 35 | Actual | $730,891 | 10 | LANDSCAPING AND IRRIGATION |
0151-08-008 | Williamson/ Austin |
SL 332 | Actual | $72,000 | 10 | REPLACE RAILROAD GRADE CROSSING |
0204-01-067 | Williamson/ Austin |
US 79 | Actual | $265,696 | 1 | MEDIAN MODIFICATIONS |
0320-03-093 | Williamson/ Austin |
SH 95 | Actual | $1,507,709 | 3 | CONSTRUCT PEDESTRIAN AND BIKE PATH |
0914-05-188 | Williamson/ Austin |
CS | Actual | $263,500 | 3 | WILLIAMS DRIVE CORRIDOR & CENTERS PLAN FOR MULTIMODAL AND |
0134-06-054 | Wise/ Fort Worth |
FM 1810 | Actual | $90,240 | 10 | 2016 RAILROAD XING REPLANKING PROGRAM |
1604-02-016 | Wise/ Fort Worth |
FM 1655 | Actual | $299,998 | 8 | INSTALL CHEVRON SIGNS WITH MOTION ACTIVATED LED LIGHTS |
2292-01-031 | Wise/ Fort Worth |
FM 730 | Actual | $232,897 | 10 | RAP BACKFILL AT CULVERT ENDS, HMAC, FLEX PAVE REPAIR, |
0190-03-082 | Wood/ Tyler |
US 69 | Actual | $132,352 | 10 | REPLANK RR CROSSING |
2274-01-010 | Wood/ Tyler |
FM 1804 | Actual | $30,080 | 10 | REPLANK RR CROSSING |
|