Roadwork
Typical closure times are 9:00 a.m. to 3:00 p.m. for weekday closures and 7:00 p.m. to 6:00 a.m. for weeknight closures. Lane closures are allowed all day Saturday, and Sunday (as needed).
Please note closures are subject to changes due to weather and schedule.
Project 1: I-20 Closures
I-20 Mainlanes
- Daily: right and left shoulder closures throughout the project area from Markum Ranch Road to the I-20/I-30 split.
Project 2: I-20/I-30 Closures
I-20 Mainlanes
- Ongoing: westbound right lane of I-20 closed approaching the Walsh Ranch Parkway entrance ramp (one lane remains open for traffic to continue on I-20 or exit to FM 1187/FM 3325). This closure is expected to last until October 2025. EXPECT DELAYS.
- Daily: the left lane of I-20/I-30 eastbound closed between FM 1187 and the Walsh Ranch Parkway from 9 a.m. to 3 p.m. for drainage installation. EXPECT DELAYS.
I-30 Mainlanes
- Daily: the left lane of I-20/I-30 eastbound closed between FM 1187 and the Walsh Ranch Parkway from 9 a.m. to 3 p.m. for drainage installation. EXPECT DELAYS..
I-20 Frontage Roads
- Ongoing: eastbound frontage road between FM 1187/FM 3325 entrance ramp to just west of Walsh Ranch Parkway exit ramp reduced to one travel lane (July 2025 through Fall 2025). EXPECT DELAYS.
- Ongoing: westbound frontage road between Walsh Ranch Parkway entrance ramp to I-20 and I-20 exit ramp to FM 1187/FM 3325 closed (March 2025 through Fall 2025). Motorists will be forced to enter westbound I-20 using the entrance ramp from Walsh Ranch Parkway and then can continue to westbound I-20 or exit to FM 1187/FM 3325 to rejoin the westbound frontage road. EXPECT DELAYS.
I-30 Frontage Roads
- No scheduled closures.
Project 3: I-30 Closures
I-30 Mainlanes
- Daily: eastbound and westbound various lane and various ramp closures from 9 a.m. to 3 p.m. between Linkcrest Drive and I-820 for construction activities from Saturday, July 26th to Saturday, August 2nd. During ramp closures, motorists should follow detour signs and EXPECT DELAYS.
- Daily: the eastbound exit ramp to Spur 580/W. Camp Bowie Blvd. is scheduled to be closed from 9 a.m. to 3 p.m. on Friday, July 25th for light pole removals. Motorists will be directed to use the Linkcrest Drive exit and continue on the eastbound frontage road to access Spur 580/W. Camp Bowie Blvd. EXPECT DELAYS.
- Nightly: the I-30 eastbound main lanes will be closed between Spur 580/W. Camp Bowie Blvd. and I-820 for overhead sign bridge removals for two nights: 7 p.m. on Monday, July 28th to 6 a.m. on Tuesday, July 29th and 7 p.m. on Tuesday, July 29th to 6 a.m. on Wednesday, July 30th (see detour maps: night 1 and night 2). Spur 580/W. Camp Bowie Blvd. will serve as the detour route for thru traffic on I-30 eastbound during these overnight closures and the frontage roads will also remain open. EXPECT DELAYS.
I-30 Frontage Roads
- Ongoing: westbound frontage road between Alemeda Street and Old Weatherford Road reduced to one travel lane (January 2025 through Summer 2025). Access to Old Weatherford Road from the frontage road is closed and motorists should follow detour signs to Academy Boulevard. EXPECT DELAYS.
Spur 580/W. Camp Bowie Boulevard
- Daily: the eastbound exit ramp to Spur 580/W. Camp Bowie Blvd. is scheduled to be closed from 9 a.m. to 3 p.m. on Friday, July 25th for light pole removals. Motorists will be directed to use the Linkcrest Drive exit and continue on the eastbound frontage road to access Spur 580/W. Camp Bowie Blvd. EXPECT DELAYS.
I-820 West Loop Mainlanes
- Ongoing: southbound right lane between Westpoint Boulevard and the eastbound and westbound exits to I-30 closed for roadway construction (January 2025 through Summer 2025). EXPECT DELAYS.
I-820 West Loop Frontage Roads
- Ongoing: southbound frontage road right lane closed between Westpoint Drive and Alemeda Street for roadway construction (January 2025 through Summer 2025).
This webpage and any information submitted via this form are maintained by the Texas A&M Transportation Institute on behalf of the Texas Department of Transportation