AVERAGE LOW BID UNIT PRICE - MAINTENANCE - STATEWIDE

Last Update: Thursday, March 20, 2014
ITEMS 687 2001 TO 690 2234
Items Items Bid Code Range
0100 - 0169
0204 - 0292
0305 - 0361
0400 - 0496
0500 - 0560
0610 - 0690
0700 - 0788
1004 - 1138
2092 - 2199
3035 - 3281
4003 - 4644
5049 - 5953
6005 - 6986
7008 - 7649
8020 - 8987
9054 - 9606
610 2016 - 636 2001
636 2002 - 662 2027
662 2030 - 666 2100
666 2101 - 666 2274
666 2289 - 677 2049
678 2001 - 686 2291
687 2001 - 690 2234
Item No Description Units February 28, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
687 2001 PED POLE ASSEMBLY EA 8.000 1,188.23250 63.000 1,149.72905 12
687 2002 PEDESTRIAN PUSH BUTTON POLE EA     4.000 512.00000 1
688 2001 PED DETECT (2 INCH PUSH BTN) EA     32.000 89.26375 4
688 2002 VEH LP DETECT (SAWCUT) LF     20,634.000 7.10965 8
688 2003 VEH LP DETECT (SAWCUT) (14 AWG) (BLK) LF     11,808.000 7.84485 3
690 2001 REMOVAL OF CONDUIT LF     50.000 4.00000 1
690 2002 INSTALL OF CONDUIT BY TRENCHING LF     14,130.000 5.64756 6
690 2004 INSTALL OF CONDUIT BY BORING LF     8,630.000 16.60197 5
690 2005 INSTALL OF VEHICLE DETECTORS LF     1,000.000 6.42000 2
690 2006 REMOVAL OF GROUND BOXES EA     127.000 107.55118 6
690 2007 REPLACE OF GROUND BOXES EA     122.000 602.37705 7
690 2008 INSTALL OF GROUND BOXES EA     68.000 497.36324 4
690 2009 REMOVAL OF CABLES LF     18,250.000 0.40384 5
690 2010 REPLACE OF CABLES LF     52,500.000 1.46600 6
690 2011 INSTALL OF CABLES LF     19,300.000 1.77435 4
690 2013 REMOVAL OF CABLES BY MESSENGER CABLE LF     500.000 1.00000 1
690 2014 REPLACE OF CABLES BY MESSENGER CABLE LF     4,600.000 1.47391 2
690 2016 REMOVAL OF SPAN CABLE ASSM LF     3,300.000 0.53182 4
690 2017 REPLACE OF SPAN CABLE ASSM LF     5,400.000 2.52963 5
690 2018 INSTALL OF SPAN CABLE ASSM LF     5,600.000 3.19554 4
690 2019 REPLACE OF ELECTRICAL SERVICE EA     44.000 1,485.52273 7
690 2020 INSTALL OF ELECTRICAL SERVICE EA     12.000 1,381.05667 4
690 2021 REMOVAL OF TIMBER POLES EA     18.000 157.63889 4
690 2022 REPLACE OF TIMBER POLES EA     12.000 441.00000 3
690 2023 INSTALL OF TIMBER POLES EA     28.000 530.16429 4
690 2024 REMOVAL OF SIGNAL HEAD ASSM EA     91.000 80.64835 4
690 2025 REPLACE OF SIGNAL HEAD ASSM EA     485.000 264.03093 7
690 2026 INSTALL OF SIGNAL HEAD ASSM EA     248.000 198.22984 5
690 2027 REMOVAL OF SIGNAL RELATED SIGNS EA     57.000 40.05263 3
690 2028 REPLACE OF SIGNAL RELATED SIGNS EA     195.000 78.15385 6
690 2029 INSTALL OF SIGNAL RELATED SIGNS EA     35.000 66.57143 3
690 2030 REMOVAL OF PEDESTRIAN PUSH BUTTONS EA     22.000 22.77273 3
690 2031 REPLACE OF PEDESTRIAN PUSH BUTTONS EA     77.000 74.69675 7
690 2032 INSTALL OF PEDESTRIAN PUSH BUTTONS EA     22.000 72.93091 4
690 2033 REMOVAL OF TRAFFIC SIGNAL POLE FND LF     25.000 120.35080 3
690 2036 INSTALL OF FND FOR GROUND MNT CABINETS EA     28.000 1,904.03571 8
690 2037 INSTALL OF FND FOR POLE MNT CABINETS EA     5.000 732.00000 1
690 2038 REMOVAL OF CONTROL CABINET (GRND MNT) EA     31.000 205.77419 4
690 2039 REPLACE OF CONTROL CABINET (GRND MNT) EA     27.000 1,036.37037 6
690 2040 INSTALL OF CONTROL CABINET (GRND MNT) EA     29.000 1,232.06897 4
690 2041 REMOVAL OF CONTROL CABINET (POLE MNT) EA     9.000 134.44444 2
690 2042 REPLACE OF CONTROL CABINET (POLE MNT) EA     13.000 932.15385 4
690 2043 INSTALL OF CONTROL CABINET (POLE MNT) EA     9.000 859.33333 2
690 2044 REMOVAL OF FLASHER CABINET EA     6.000 78.83333 3
690 2045 REPLACE OF FLASHER CABINET EA     19.000 525.78947 7
690 2046 INSTALL OF FLASHER CABINET EA     11.000 306.00000 3
690 2047 INSTALL OF FND FOR RDSD FLSH BEA ASSM EA     15.000 725.00000 1
690 2048 REMOVAL OF RDSD FLSH BEACON ASSM EA     10.000 220.90000 4
690 2049 REPLACE OF RDSD FLSH BEACON ASSM EA     22.000 748.18182 4
690 2050 INSTALL OF RDSD FLSH BEACON ASSM EA     28.000 1,046.36607 4
690 2051 REMOVAL OF SIGNAL POLE ASSM EA     19.000 415.78947 5
690 2052 REPLACE OF SIGNAL POLE ASSM EA     57.000 961.38158 8
690 2053 INSTALL OF SIGNAL POLE ASSM EA     30.000 1,028.26667 5
690 2054 REMOVAL OF CURBS LF     10.000 25.37500 2
690 2055 REPLACE OF CURBS LF     400.000 16.37500 2
690 2056 INSTALL OF CURBS LF     200.000 16.37500 2
690 2057 REMOVAL OF PEDESTRIAN RAMPS EA     1.000 667.00000 1
690 2058 REPLACE OF PEDESTRIAN RAMPS EA     4.000 1,500.50000 2
690 2059 INSTALL OF PEDESTRIAN RAMPS EA     23.000 1,625.13043 4
690 2060 REMOVAL OF SIDEWALKS SF     50.000 5.75000 1
690 2061 REPLACE OF SIDEWALKS SF     200.000 9.40500 2
690 2062 INSTALL OF SIDEWALKS SF     8.000 52.90500 2
690 2063 REMOVAL OF CONCRETE FOUNDATIONS EA     22.000 442.45455 6
690 2064 REMOVAL OF LUMINAIRE HEAD EA     1.000 66.00000 1
690 2065 REPLACE OF LUMINAIRE HEAD EA     109.000 122.33945 7
690 2066 INSTALL OF LUMINAIRE HEAD EA     18.000 93.33333 3
690 2067 REMOVAL OF LUMINAIRE MAST ARMS EA     1.000 88.00000 1
690 2068 REPLACE OF LUMINAIRE MAST ARMS EA     31.000 71.96774 4
690 2069 INSTALL OF LUMINAIRE MAST ARMS EA     13.000 108.46154 3
690 2070 INS OF TRF SIG PL FND (24" DRIL SHFT) LF     174.000 99.90667 4
690 2071 INS OF TRF SIG PL FND (30" DRIL SHFT) LF     283.000 148.32011 4
690 2072 INS OF TRF SIG PL FND (36" DRIL SHFT) LF     300.000 167.63990 5
690 2073 INS OF TRF SIG PL FND (42" DRIL SHFT) LF     4.000 347.00000 2
690 2074 INS OF TRF SIG PL FND (48" DRIL SHFT) LF     4.000 437.50000 2
690 2088 REPLACE SIGNAL HEAD SECTION EA     100.000 160.18000 1
690 2091 INSTL DOWN GUY W / GUARD EA     6.000 210.00000 1
690 2092 REPLACE DOWN GUY W / GUARD EA     6.000 210.00000 1
690 2093 INSTL DOWN GUY AND ANCHOR W / GUARD EA     10.000 325.35000 2
690 2094 REPLACE DOWN GUY AND ANCHOR W / GUARD EA     8.000 342.00000 1
690 2097 SALVAGE OPERATIONS EA     4.000 735.00000 1
690 2103 INSTL PED POLE ASSM EA     23.000 1,029.60870 5
690 2104 REPLACE PED POLE ASSM EA     15.000 353.26667 4
690 2109 REMOVE DOWN GUY AND ANCHOR W / GUARD EA     1.000 117.00000 1
690 2110 INSTL DOWN GUY AND ANCHOR W / GUARD EA     2.000 273.00000 2
690 2111 REPLACE DOWN GUY AND ANCHOR W / GUARD EA     12.000 319.00000 2
690 2112 REPLACE 12" LED TRAF SIG LAMP UNIT EA     122.000 74.86885 2
690 2116 INSTALL LUMINAIRE POLE EA     5.000 614.40000 3
690 2117 REPLACE LUMINAIRE POLE EA     6.000 547.33333 3
690 2118 REMOVE LUMINAIRE POLE FOUNDATION EA     4.000 386.00000 2
690 2122 REPLACE SPREAD SPECTRUM ANTENNA EA     3.000 63.00000 1
690 2123 INSTALL SPREAD SPECTRUM ANTENNA EA     2.000 165.00000 1
690 2124 REPLACE VIVDS CAMERA ASSEMBLY EA     6.000 195.00000 1
690 2125 INSTALL VIVDS CAMERA ASSEMBLY EA     14.000 109.42857 2
690 2127 EMERGENCY CALLOUT EA     12.000 537.00000 1
690 2128 REMOVE PED POLE ASSM EA     4.000 117.50000 2
690 2154 INSTAL OF FND FOR STRAIN SGL POLE EA     2.000 2,403.00000 1
690 2164 INSTL STEEL STRAIN POLE EA     2.000 554.00000 1
690 2165 INSTL LUMINAIRE HEAD AND MAST ARMS EA     5.000 88.00000 1
690 2191 INSTALL LED LAMP UNIT EA     200.000 48.73500 2
690 2195 INSTALL SCREW - IN FOUNDATION EA     15.000 596.93333 2
690 2196 REMOVE SCREW - IN FOUNDATION EA     4.000 147.00000 1
690 2202 VIVDS CABLE (INSTALL) LF     4,000.000 2.58000 1
690 2204 VIVDS CAMERA (INSTALL) EA     16.000 98.00000 1
690 2207 REMOVE LUMINAIRE POLE EA     3.000 147.00000 1
690 2218 REPAIR OF CABLE EA     10.000 121.00000 1
690 2219 REMOVE VIVDS CAMERA ASSEMBLY EA     6.000 49.00000 1
690 2220 REPL LED TRAF SIG LAMP UNIT EA     400.000 52.00000 2
690 2222 REPL VEH SIG TUNNEL VISOR (12") EA     48.000 28.00000 1
690 2223 WRAP SIGNAL CABLE LF     240.000 2.58000 1
690 2230 REPLACE CONTROLLER BREAKAWAY BASE EA     5.000 1,461.00000 1
690 2231 REPLACE BBU SYSTEM EA     3.000 978.00000 1
690 2232 INSTALL BBU SYSTEM EA     35.000 827.42857 2
690 2233 REPLACE RADD SENSOR EA     4.000 452.00000 1
690 2234 INSTALL RADD SENSOR EA     4.000 452.00000 1