TxDOT Expressway
Search:
   Home   |    Contact Us   |    Tools & Plug-Ins  
Alphabetic Business Listing:


 
 
Last Update: Wednesday, January 18, 2012
ITEMS 684 2012 TO 690 2069
Items Items Bid Code Range
0100 - 0193
0216 - 0292
0305 - 0361
0400 - 0499
0500 - 0560
0610 - 0690
0700 - 0788
1004 - 1014
3043 - 3242
4003 - 4581
5049 - 5953
6006 - 6986
7008 - 7610
8020 - 8809
9066 - 9066
610 2024 - 636 2007
636 2008 - 658 2371
658 2372 - 666 2100
666 2101 - 668 2102
668 2103 - 684 2010
684 2012 - 690 2069
690 2070 - 690 2224
Item No Description Units December 31, 2011 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
684 2012 TRF SIG CBL (TY A) (12 AWG) ( 7 CONDR) LF     10,933.000 1.91380 8
684 2014 TRF SIG CBL (TY A) (12 AWG) ( 9 CONDR) LF     4,774.000 2.53973 6
684 2017 TRF SIG CBL (TY A) (12 AWG) (12 CONDR) LF     685.000 3.10657 2
684 2021 TRF SIG CBL (TY A) (12 AWG) (16 CONDR) LF     1,016.000 4.22785 3
684 2024 TRF SIG CBL (TY A) (12 AWG) (19 CONDR) LF     176.000 3.80000 1
684 2079 TRF SIG CBL (TY C) (12 AWG) ( 2 CONDR) LF     12,000.000 1.50000 1
684 2080 TRF SIG CBL (TY C) (14 AWG) ( 2 CONDR) LF     7,500.000 0.90933 3
685 2001 INSTALL RDSD FLASH BEACON ASSEMBLY EA     28.000 1,686.17857 5
685 2002 RELOCATE RDSD FLASH BEACON ASSEMBLY EA     4.000 805.50000 2
685 2004 INSTL RDSD FLSH BEACON ASSM (SOLAR PWRD EA     14.000 3,908.57143 3
685 2005 RLCT RDSD FLASH BEACON ASSM (SOLAR PWRD EA     4.000 597.00000 2
686 2006 INS TRF SIG PL AM (S) STR (TY B) LUM EA     4.000 3,816.39000 1
686 2018 INS TRF SIG PL AM (S) STR (TY D) LUM EA     2.000 4,800.00000 1
686 2019 INS TRF SIG PL AM (S) 1 ARM (20') EA     3.000 3,312.59000 1
686 2025 INS TRF SIG PL AM (S) 1 ARM (24') LUM EA     1.000 2,730.00000 1
686 2027 INS TRF SIG PL AM (S) 1 ARM (28') EA     1.000 2,760.85000 1
686 2031 INS TRF SIG PL AM (S) 1 ARM (32') EA     2.000 3,500.00000 1
686 2035 INS TRF SIG PL AM (S) 1 ARM (36') EA     3.000 3,954.10333 2
686 2037 INS TRF SIG PL AM (S) 1 ARM (36') LUM EA     2.000 5,400.00000 1
686 2041 INS TRF SIG PL AM (S) 1 ARM (40') LUM EA     1.000 5,800.00000 1
686 2043 INS TRF SIG PL AM (S) 1 ARM (44') EA     4.000 5,225.00000 2
686 2045 INS TRF SIG PL AM (S) 1 ARM (44') LUM EA     1.000 5,700.00000 1
686 2048 INS TRF SIG PL AM (S) 1 ARM (48') ILSN EA     1.000 7,500.00000 1
686 2049 INS TRF SIG PL AM (S) 1 ARM (48') LUM EA     1.000 6,500.00000 1
686 2115 INS TRF SIG PL AM (S) 2 ARM (36 - 28') EA     1.000 5,517.67000 1
686 2125 INS TRF SIG PL AM (S) 2 ARM (36 - 36') LUM EA     2.000 7,167.50000 2
686 2145 INS TRF SIG PL AM (S) 2 ARM (40 - 36') LUM EA     1.000 7,245.00000 1
686 2193 INS TRF SIG PL AM (S) 2 ARM (50 - 44') LUM EA     1.000 17,585.00000 1
686 2269 INS TRF SIG PL AM (S) 2 ARM (65 - 36') LUM EA     2.000 17,900.00000 1
686 2279 RELOC TRF SG PL AM (S) DUAL MST ARM POLE EA     1.000 1,600.00000 1
686 2290 TRF SIG PL AM (MAST) (INSTALL ONLY) EA     13.000 1,011.53846 3
686 2291 TRF SIG PL AM (STRAIN) (INSTALL ONLY) EA     4.000 600.00000 1
687 2001 PED POLE ASSEMBLY EA     25.000 1,146.72800 7
687 2002 PEDESTRIAN PUSH BUTTON POLE EA     6.000 638.00000 2
688 2001 PED DETECT (2 INCH PUSH BTN) EA     26.000 129.15385 4
688 2002 VEH LP DETECT (SAWCUT) LF     3,900.000 8.18590 3
690 2001 REMOVAL OF CONDUIT LF     100.000 3.25000 1
690 2002 INSTALL OF CONDUIT BY TRENCHING LF     9,130.000 5.41621 4
690 2003 INSTALL OF CONDUIT BY JACKING LF     125.000 10.00000 1
690 2004 INSTALL OF CONDUIT BY BORING LF     3,925.000 23.64968 3
690 2005 INSTALL OF VEHICLE DETECTORS LF     5,500.000 6.81818 2
690 2006 REMOVAL OF GROUND BOXES EA     25.000 199.31440 6
690 2007 REPLACE OF GROUND BOXES EA     38.000 526.84211 4
690 2008 INSTALL OF GROUND BOXES EA     30.000 447.33333 2
690 2009 REMOVAL OF CABLES LF     1,600.000 0.27375 2
690 2010 REPLACE OF CABLES LF     13,400.000 1.51127 3
690 2011 INSTALL OF CABLES LF     5,200.000 1.58462 2
690 2014 REPLACE OF CABLES BY MESSENGER CABLE LF     2,500.000 1.45000 1
690 2016 REMOVAL OF SPAN CABLE ASSM LF     1,420.000 0.36634 3
690 2017 REPLACE OF SPAN CABLE ASSM LF     2,850.000 1.30140 4
690 2018 INSTALL OF SPAN CABLE ASSM LF     2,450.000 1.36286 2
690 2019 REPLACE OF ELECTRICAL SERVICE EA     16.000 1,596.87500 3
690 2020 INSTALL OF ELECTRICAL SERVICE EA     4.000 1,081.25000 3
690 2021 REMOVAL OF TIMBER POLES EA     7.000 217.85714 2
690 2022 REPLACE OF TIMBER POLES EA     10.000 216.00000 1
690 2023 INSTALL OF TIMBER POLES EA     7.000 325.71429 2
690 2024 REMOVAL OF SIGNAL HEAD ASSM EA     125.000 66.20000 5
690 2025 REPLACE OF SIGNAL HEAD ASSM EA     494.000 248.76518 5
690 2026 INSTALL OF SIGNAL HEAD ASSM EA     35.000 129.28571 2
690 2027 REMOVAL OF SIGNAL RELATED SIGNS EA     2,050.000 7.20244 4
690 2028 REPLACE OF SIGNAL RELATED SIGNS EA     84.000 59.04762 4
690 2029 INSTALL OF SIGNAL RELATED SIGNS EA     187.000 133.93048 4
690 2030 REMOVAL OF PEDESTRIAN PUSH BUTTONS EA     31.000 30.90323 3
690 2031 REPLACE OF PEDESTRIAN PUSH BUTTONS EA     68.000 91.70588 5
690 2032 INSTALL OF PEDESTRIAN PUSH BUTTONS EA     9.000 79.77778 2
690 2033 REMOVAL OF TRAFFIC SIGNAL POLE FND LF     4.000 783.00000 1
690 2035 INSTALL OF TRAFFIC SIGNAL POLE FND LF     25.000 145.00000 1
690 2036 INSTALL OF FND FOR GROUND MNT CABINETS EA     32.000 1,645.34375 6
690 2038 REMOVAL OF CONTROL CABINET (GRND MNT) EA     11.000 266.90909 2
690 2039 REPLACE OF CONTROL CABINET (GRND MNT) EA     12.000 803.58333 4
690 2040 INSTALL OF CONTROL CABINET (GRND MNT) EA     13.000 437.92308 3
690 2041 REMOVAL OF CONTROL CABINET (POLE MNT) EA     3.000 373.33333 2
690 2042 REPLACE OF CONTROL CABINET (POLE MNT) EA     17.000 1,058.82353 3
690 2043 INSTALL OF CONTROL CABINET (POLE MNT) EA     4.000 332.50000 2
690 2044 REMOVAL OF FLASHER CABINET EA     3.000 72.66667 2
690 2045 REPLACE OF FLASHER CABINET EA     13.000 473.07692 3
690 2046 INSTALL OF FLASHER CABINET EA     3.000 183.33333 2
690 2047 INSTALL OF FND FOR RDSD FLSH BEA ASSM EA     15.000 583.33333 2
690 2048 REMOVAL OF RDSD FLSH BEACON ASSM EA     5.000 263.60000 4
690 2049 REPLACE OF RDSD FLSH BEACON ASSM EA     14.000 649.14286 3
690 2050 INSTALL OF RDSD FLSH BEACON ASSM EA     6.000 431.33333 2
690 2051 REMOVAL OF SIGNAL POLE ASSM EA     10.000 477.00000 4
690 2052 REPLACE OF SIGNAL POLE ASSM EA     25.000 666.48000 3
690 2053 INSTALL OF SIGNAL POLE ASSM EA     11.000 429.81818 2
690 2054 REMOVAL OF CURBS LF     35.000 28.28571 2
690 2055 REPLACE OF CURBS LF     5.000 27.00000 1
690 2056 INSTALL OF CURBS LF     1.000 27.00000 1
690 2057 REMOVAL OF PEDESTRIAN RAMPS EA     3.000 786.66667 2
690 2058 REPLACE OF PEDESTRIAN RAMPS EA     2.000 3,023.00000 1
690 2059 INSTALL OF PEDESTRIAN RAMPS EA     2.000 2,011.50000 2
690 2060 REMOVAL OF SIDEWALKS SF     29.000 90.89655 2
690 2061 REPLACE OF SIDEWALKS SF     4.000 38.00000 1
690 2062 INSTALL OF SIDEWALKS SF     29.000 134.55172 2
690 2063 REMOVAL OF CONCRETE FOUNDATIONS EA     15.000 548.80000 5
690 2064 REMOVAL OF LUMINAIRE HEAD EA     1.000 68.00000 1
690 2065 REPLACE OF LUMINAIRE HEAD EA     81.000 208.50617 6
690 2066 INSTALL OF LUMINAIRE HEAD EA     5.000 145.80000 2
690 2067 REMOVAL OF LUMINAIRE MAST ARMS EA     1.000 83.00000 1
690 2068 REPLACE OF LUMINAIRE MAST ARMS EA     13.000 67.15385 3
690 2069 INSTALL OF LUMINAIRE MAST ARMS EA     5.000 144.60000 2
 
spacer spacer
Disclaimer | Accessibility Policy | Privacy and Security Policy | Open Records | TxDOT Contacts