AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - TYLER DISTRICT

Last Update: Friday, June 26, 2015
ITEMS 730 2001 TO 752 6012
Items Items Bid Code Range
0100 - 0193
0247 - 0275
0305 - 0361
0400 - 0496
0500 - 0560
0618 - 0690
0730 - 0752
1014 - 1122
3002 - 3269
5369 - 5369
6001 - 6834
8020 - 8020
9033 - 9033
730 2001 - 752 6012
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
730 2001 STRIP MOWING AC     66.000 67.50000 2
730 2002 FULL - WIDTH MOWING AC     630.000 50.00000 2
730 6107 FULL - WIDTH MOWING CYC 8.000 7,312.50000 9.000 6,722.22222 5
740 2005 ANTI - GRAFFITI COATING (PERMANENT) SF     1,586.000 2.25000 1
752 6005 TREE REMOVAL (4" - 12" DIA) EA 1.000 650.00000 1.000 650.00000 1
752 6006 TREE REMOVAL (12" - 18" DIA) EA 6.000 850.00000 6.000 850.00000 1
752 6007 TREE REMOVAL (18" - 24" DIA) EA 3.000 1,200.00000 3.000 1,200.00000 1
752 6008 TREE REMOVAL (24" - 30" DIA) EA 1.000 1,500.00000 1.000 1,500.00000 1
752 6009 TREE REMOVAL (30" - 36" DIA) EA 6.000 1,800.00000 6.000 1,800.00000 1
752 6012 TREE REMOVAL (48" - 60" DIA) EA 1.000 7,500.00000 1.000 7,500.00000 1